W911YN18B0002_QA_9-4-2018.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Construction Projects NVZR062031 and NVZR132003 MacDill AFB Federal contract opportunity
Solicitation number
W911YN18B0002
Issued by
Department of the Army National Guard National Capital Region Integrated Air Defense System

About this file

Solicitation questions and answers 1 through 21 as of September 04, 2018, incorporated by amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to Construction Projects NVZR062031 and NVZR132003 MacDill AFB, newest first.
File Type Posted
OF1419_W91YN18B0002_signed.pdf PDF
Bid_Opening_Attendance_Sheet_23Oct18.pdf PDF
W911YN18B00020008.pdf PDF
SSK-01.pdf PDF
ASK-01.pdf PDF
W911YN18B00020007.pdf PDF
W911YN18B0002_QA_10-5-2018.xlsx XLSX spreadsheet
W911YN18B00020006.pdf PDF
W911YN18B00020005.pdf PDF
W911YN18B0002_QA_9-28-2018.xlsx XLSX spreadsheet
W911YN18B00020004.pdf PDF
W911YN18B00020003.pdf PDF
Site_visit_23Aug18_attendance.pdf PDF
W911YN18B0002_QA_8-31-2018.xlsx XLSX spreadsheet
W911YN18B0002_QA_8-20-18.xlsx XLSX spreadsheet
W911YN18B00020002.pdf PDF
Site_visit_1Aug18_attendance.pdf PDF
W911YN18B00020001.pdf PDF
Pre-Bid_Site_Visit_Minutes_W911YN18B0002.pdf PDF
W911YN18B0002.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question-Comment and Response W911YN18B0002 - Bidding Questions/Response

Comment NumberDateDisciplineSpec/ ReportSheetQuestion/CommentResponseResponse ByOn Date
17/30/18Roof framing05 16 50Retrofit Framings Section 05 16 50 – 1.03 – A – 2. “Approval shall have been granted to any manufacturing facility producing the retrofit roof framing system components by the MBMA and IAS (International Accreditation Services), for quality assurance in manufacturing operations. A letter from the manufacturer certifying compliance will accompany the product approval submittals.” We ask to waive this approval in lieu of our Factory Mutual accreditation, which is similar in requirements. Or as an alternate accreditation. We recently did a retrofit project for at Avon Park Air Force Range, FL with similar requirements.
Atkins will not recommend waiving these industry accepted standards/accreditation. These associations set a minimum standard in an objective manner which is generally accepted in the Metal building manufacturing industry.Atkins8/16/18
28/9/18T-102; E-001BUILDING 1885, Re: Drawings T-102 and Legend on E-001 and Spec Div 27. Is there any equipment to be provided or is the work strictly the wiring, conduits and boxes? If so, please clarify/specify the equipment to be provided.Contractor shall comply with the requirements indicated on the drawings and in specification section 271000 Building TelecommunicationCabling System.Work includes, cabling, conduits, supports, back boxes, data outlets and testing. No other telecommunication equipment is included.Atkins8/16/18
38/24/18Fire AlarmAre we required to meet the requirements of the UFC regarding mass notification systems? The plans and specification do not make any reference to mass notification.The project inculudes a new Fire Alarm System as indicated on the drawings and specifications section 283163.00. There is no Mass Notification System.Atkins8/31/18
48/24/18Fire AlarmAre we to include the required dual-lens strobes? (Clear for fire and amber for MNS).Please see response above.Atkins8/31/18
58/24/18Fire AlarmAre we to include the required local operator’s console or LOC?Please see response above.Atkins8/31/18
68/24/18Fire AlarmAre we to include the required Monaco radio transmitter capable of mass notification?Please see response above.Atkins8/31/18
78/28/18CivilC-103The drawings show a transition from 8” pvc to 8” HDPE, then back. That typically implies a directional drill for that area of pipe. This work may require a site contractor to obtain a separate sub to mobilize. It is a relatively short run and could be very expensive. Please confirm if that area must be directional drilled or if it can be open-cut like the remainder of the water line?That section is to be directional drill. See callout 33.07. This area is shown to be directionally drilled to limit the impacts of Southshore Avenue. If that area is to be open cut, the roadway will have to be closed until the roadway is stabilized for traffic.Atkins8/31/18
88/28/18CivilC-502; C-106Limits of work for Milling and Resurfacing of Asphalt -- Reference Drawing Sheet C-502, Typical Paving Detail and Drawing Sheet C-106, SITE PLAN. We recognize the Milling and Resurfacing needed at open cuts per Sheet C-502, but please clarify that the Parking Lot on Sheet C-106 only gets new striping (no Milling and resurfacing)?Milling and resurfacing are NOT included in the scope.Atkins8/31/18
98/28/1833 11 00The specs for the Fire Hydrants call for “Wet Barrel”. According to one of our suppliers, the only place they know on the east coast of the USA that has Wet Barrel Hydrants is at Disney World. All other hydrants are “Dry Barrel”, including all the existing Hydrants at MacDill. Wet Barrel Hydrants are commonly used out west where frost is not an issue. Please confirm that Hydrant status since a Wet Barrel Hydrant is much more expensive than a Dry Barrel.It is acceptable to provide dry barrel fire hydrants.Atkins8/31/18
108/29/1801 00 00Reference is made to Section 01 00 00 General Requirements, Paragraph 36, Key Personnel Descriptions states “An individual Key Team Member may not hold more than one key role. The following are minimum qualifications for the key personnel” The Key Personnel include Project Manager, Site Superintendent, Quality Control Manager, and Safety Manager. Reference is also made to Section 01 45 00.00 10 Quality Control, 3.4 Quality Control Organization, 3.4.1 Personnel Requirements states “The Safety and Health Manager will also serve as a member of the CQC Stall Personnel”. It also states “The Contractor’s CQC staff must maintain a presence at the site at all times during progress of the work”. It is our interpretation the project staff shall include full time Superintendent, QC Manager, and Safety Manager and they shall be On-Site at all time during construction. The staff also shall include a Project Manager but he does not have to be On-Site at all times during construction. Please confirm this is correct?Required on-site staff includes Superintendent and SSOH. QC Manager and Project Manager are not required to be on-site at all times.FLNG8/29/18
118/29/1802 82 14Both projects (Buildings 1885 and 1886) call for a preconstruction building survey for asbestos-containing materials. This is confirmed in Section 01 11 00 Summary of Work and 02 82 14.00 10 Asbestos Hazard Control Activities. In Section 02 82 14.00 10 Asbestos Hazard Control Activities, Part 1 General it states “Should the Contractor’s survey indicate presence of ACM, the abatement and remediation work will be performed as additional project scope under the provisions of the specification.” It is our interpretation is that the General Contractor shall include the cost of an asbestos survey in our bid and if after the survey asbestos remediation is required the work will be performed as a change order to the contract. Please confirm this is correct?CorrectFLNG8/29/18
128/29/1802 85 00.00 20; 02 41 00Both projects (Buildings 1885 and 1886) include Section 02 85 00.00 20 Mold Remediation. The specification makes reference to a mold survey being performed (see 02 41 00 page 3, "the contractor shall provide a Microbial Assessment Visual Field Report for each work area and material within the work area") and for actual mold remediation work as well (see 02 41 00 page 3, "If contaminents are identified, the remediation shall be performed as base scope in accordance with the provisions of Section 02 85 00.00 20 MOLD REMEDIATION"). This is confusing in what we are actually to include in our bid. It is impossible to properly price mold remediation work if the bidder does not know the extent of the mold. The extent of the mold is unknown until a survey is performed. It is our interpretation that for the bid we are only to include the cost of a mold survey and that any actual mold remediation work will be performed by a change order to the contract? Please confirm this is correct?Your interpretation is correct. Mold Remediation, 02 85 00.00 20 SHALL NOT be included in bids. The contractor SHALL provide a Microbial Assessment Visual Field Report in accordance with 02 41 00. If contaminants are identified, the Government will then discuss a remediation plan/solution with the contractor including negotiations regarding the additional work effort and services associated with the approved remediation plan.Atkins8/31/18
138/29/18G-001Just want to confirm the only area that may be occupied on-site during construction is the area designated on sheet G-001 Construction Access?Yes, confirmed. Including haul route/construction access to the building site.Atkins8/31/18
148/29/18A-514Reference is made to sheet A-514 Details, Detail 11/A-514 Monument Sign Elevation Detail states “Monument sign to have Brazil Nut colored stucco finish to match base design standards.” This is the only exterior color I found that is indicated. It has been our experience on other construction projects located at MacDill AFB that all of the exterior colors will match the base design standards. Please confirm this is correct?Correct.Atkins8/31/18
158/30/18Div 8A-101Bldg 1886--Note 8.09 indicates “NEW 3’4”h x 7’4”w PAINTED METAL FRAME OPENING ON EXISTING WALL PARTITION” between 014 REPAIR and 018 ALLIED WORKSHOP (no mark#). Is this to be a Hollow Metal Borrowed light? Cased Opening? If so, is it to be knock down or welded?Cased opening, welded frame per specification 08 11 13Atkins8/31/18
168/30/18Div 8A-602Bldg 1886-- This Door Schedule appears to be more accurate than Door/Hardware Index at the end of Spec section 08 71 00. Which should be used for estimating purposes?Use Door Schedule.Atkins8/31/18
178/30/18Div 10A-401Bldg 1886--There are no Shower Curtain Rods on the plans (T-16, T-17) but 4 curtains. Confirm the contractor is to supply.ConfirmedAtkins8/31/18
188/30/18Div 8A-603Bldg 1885--This Door Schedule appears to be more accurate than Door/Hardware Index at the end of Spec section 08 71 00. Which should be used for estimating purposes?Use Door ScheduleAtkins8/31/18
198/30/18Div 8A-103Bldg 1885--Doors 006, 032A, and 034 are drawn as new doors. Door 006 is noted as Existing in Door Schedule (A-601); 032A and 034 have no info in Door Schedule (other than size and 45 min label). Are these new doors? If so, to what hardware set do they belong?See separate tab for responseAtkins8/31/18
208/30/18Div 8A-103Bldg 1885--Note 8.09 indicates “NEW 3’4”h x 7’4”w PAINTED METAL FRAME OPENING ON EXISTING WALL PARTITION” between OFFICE 015 and MATERIAL/CONTROL 018 (mark#015B). Is this to be a Hollow Metal Borrowed light? Cased Opening? If so, is it to be knock down or welded?Cased opening, welded frame per specification 08 11 13Atkins8/31/18
218/30/18Div 10A-402Bldg 1885--Sheet A-402 --- There are a number of Toilet Accessories that appear to be missing: There are no Shower Curtain Rods on the plans (T-16) but 4 curtains; there are no hand dryers in the men’s room (3 would be indicated); only 2 Toilet Tissue Dispenser (T-1) but 7 toilets; only 2 Sanitary Napkin Disposal (T-9) but 3 women’s toilets; Men’s ADA stall appears to be missing T-4, T-5, T-7, and T-8. Please confirm the contractor is to supply.Confirmed to provide shower curtain rods,

Confirmed to provide total 6 hand dryers 2 hand dryers for men’s roof by sinks(shown in drawings, but not tagged), 1 hand dryer in men’s ADA stall, place on center of North East wall (Drawing 6/A403), (not shown in drawings) 2 hand dryers for women’s by sinks,(shown and tagged in drawings) 1 hand dryer in women’s ADA Restroom(shown and tagged in drawings) Confirmed total of 7 Toilet Tissue Dispensers.

Confirmed total of 3 Sanitary Napkin Dispensers(two shown on drawing and tagged, one shown on drawing, but not tagged) Confirmed to supply T-4, T-5, T-7 and T-8 in men’s ADA stall.

Atkins8/31/18
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

19 Response

#19 Response detail
HDW SETDOOR PANEL TYPEDOOR PANEL MAT’LDOOR PANEL FINISHFRAME TYPEFRAME MAT’LFRAME FINISHFIRE RATING
DR 0065D1HMPTDF1HMPTD45 MINADJACENT WALL TYPE SHOULD BE S3A* FOR A FIRE RATED ASSEMBLY. CURRENTLY SHOWN AS S3A- NON RATED.
DR 032a12D1HMPTDF1HMPTDNONE
DR 03412D1HMPTDF1HMPTD45 MIN
*Wall Partition types adjacent to DRs 006, 044, 055B, 055D, 046B should be Type S3C (fire rated), not S3A as noted on the drawings.
*Wall partition types adjacent to DR’s 026 and 027 should be Type S3C (fire rated and sound attentuation), not S3A as noted on the drawings.