W911YN18B0002_QA_8-20-18.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Construction Projects NVZR062031 and NVZR132003 MacDill AFB Federal contract opportunity
Solicitation number
W911YN18B0002
Issued by
Department of the Army National Guard National Capital Region Integrated Air Defense System

About this file

Solicitation questions and answers as of 8/20/18

View the file

Other files for this federal contract opportunity

Other files attached to Construction Projects NVZR062031 and NVZR132003 MacDill AFB, newest first.
File Type Posted
OF1419_W91YN18B0002_signed.pdf PDF
Bid_Opening_Attendance_Sheet_23Oct18.pdf PDF
W911YN18B00020008.pdf PDF
ASK-01.pdf PDF
SSK-01.pdf PDF
W911YN18B00020007.pdf PDF
W911YN18B0002_QA_10-5-2018.xlsx XLSX spreadsheet
W911YN18B00020006.pdf PDF
W911YN18B00020005.pdf PDF
W911YN18B0002_QA_9-28-2018.xlsx XLSX spreadsheet
W911YN18B00020004.pdf PDF
W911YN18B00020003.pdf PDF
W911YN18B0002_QA_9-4-2018.xlsx XLSX spreadsheet
Site_visit_23Aug18_attendance.pdf PDF
W911YN18B0002_QA_8-31-2018.xlsx XLSX spreadsheet
W911YN18B00020002.pdf PDF
Site_visit_1Aug18_attendance.pdf PDF
W911YN18B00020001.pdf PDF
Pre-Bid_Site_Visit_Minutes_W911YN18B0002.pdf PDF
W911YN18B0002.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question-Comment and Response W911YN18B0002 - Bidding Questions/Response

Comment NumberDateDisciplineSpec/ ReportSheetQuestion/CommentResponseResponse ByOn Date
17/30/18Roof framing05 16 50Retrofit Framings Section 05 16 50 – 1.03 – A – 2. “Approval shall have been granted to any manufacturing facility producing the retrofit roof framing system components by the MBMA and IAS (International Accreditation Services), for quality assurance in manufacturing operations. A letter from the manufacturer certifying compliance will accompany the product approval submittals.” We ask to waive this approval in lieu of our Factory Mutual accreditation, which is similar in requirements. Or as an alternate accreditation. We recently did a retrofit project for at Avon Park Air Force Range, FL with similar requirements.
Atkins will not recommend waiving these industry accepted standards/accreditation. These associations set a minimum standard in an objective manner which is generally accepted in the Metal building manufacturing industry.Atkins8/16/18
28/9/18T-102; E-001BUILDING 1885, Re: Drawings T-102 and Legend on E-001 and Spec Div 27. Is there any equipment to be provided or is the work strictly the wiring, conduits and boxes? If so, please clarify/specify the equipment to be provided.Contractor shall comply with the requirements indicated on the drawings and in specification section 271000 Building TelecommunicationCabling System.Work includes, cabling, conduits, supports, back boxes, data outlets and testing. No other telecommunication equipment is included.Atkins8/16/18
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Williams, Brian J MSG MIL USA: Williams, Brian J MSG MIL USA:

Need A/E input for "LEED AP Wast Manager, Commissioning Authority" requirements.

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46

File details come from the government source that posted it.