W911YN18B0002_QA_8-20-18.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- Construction Projects NVZR062031 and NVZR132003 MacDill AFB Federal contract opportunity
- Solicitation number
- W911YN18B0002
About this file
Solicitation questions and answers as of 8/20/18
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| OF1419_W91YN18B0002_signed.pdf | ||
| Bid_Opening_Attendance_Sheet_23Oct18.pdf | ||
| W911YN18B00020008.pdf | ||
| ASK-01.pdf | ||
| SSK-01.pdf | ||
| W911YN18B00020007.pdf | ||
| W911YN18B0002_QA_10-5-2018.xlsx | XLSX spreadsheet | |
| W911YN18B00020006.pdf | ||
| W911YN18B00020005.pdf | ||
| W911YN18B0002_QA_9-28-2018.xlsx | XLSX spreadsheet | |
| W911YN18B00020004.pdf | ||
| W911YN18B00020003.pdf | ||
| W911YN18B0002_QA_9-4-2018.xlsx | XLSX spreadsheet | |
| Site_visit_23Aug18_attendance.pdf | ||
| W911YN18B0002_QA_8-31-2018.xlsx | XLSX spreadsheet | |
| W911YN18B00020002.pdf | ||
| Site_visit_1Aug18_attendance.pdf | ||
| W911YN18B00020001.pdf | ||
| Pre-Bid_Site_Visit_Minutes_W911YN18B0002.pdf | ||
| W911YN18B0002.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question-Comment and Response W911YN18B0002 - Bidding Questions/Response
| Comment Number | Date | Discipline | Spec/ Report | Sheet | Question/Comment | Response | Response By | On Date |
| 1 | 7/30/18 | Roof framing | 05 16 50 | Retrofit Framings Section 05 16 50 – 1.03 – A – 2. “Approval shall have been granted to any manufacturing facility producing the retrofit roof framing system components by the MBMA and IAS (International Accreditation Services), for quality assurance in manufacturing operations. A letter from the manufacturer certifying compliance will accompany the product approval submittals.” We ask to waive this approval in lieu of our Factory Mutual accreditation, which is similar in requirements. Or as an alternate accreditation. We recently did a retrofit project for at Avon Park Air Force Range, FL with similar requirements. | ||||
| Atkins will not recommend waiving these industry accepted standards/accreditation. These associations set a minimum standard in an objective manner which is generally accepted in the Metal building manufacturing industry. | Atkins | 8/16/18 | ||||||
| 2 | 8/9/18 | T-102; E-001 | BUILDING 1885, Re: Drawings T-102 and Legend on E-001 and Spec Div 27. Is there any equipment to be provided or is the work strictly the wiring, conduits and boxes? If so, please clarify/specify the equipment to be provided. | Contractor shall comply with the requirements indicated on the drawings and in specification section 271000 Building TelecommunicationCabling System.Work includes, cabling, conduits, supports, back boxes, data outlets and testing. No other telecommunication equipment is included. | Atkins | 8/16/18 | ||
| 3 | ||||||||
| 4 | ||||||||
| 5 | ||||||||
| 6 | ||||||||
| 7 | ||||||||
| 8 | ||||||||
| 9 | ||||||||
| 10 | ||||||||
| 11 | ||||||||
| 12 | ||||||||
| 13 | ||||||||
| 14 | ||||||||
| 15 | ||||||||
| 16 | ||||||||
| 17 | ||||||||
| 18 | ||||||||
| 19 | ||||||||
| 20 | ||||||||
| 21 | ||||||||
| 22 |
Williams, Brian J MSG MIL USA: Williams, Brian J MSG MIL USA:
Need A/E input for "LEED AP Wast Manager, Commissioning Authority" requirements.
| 23 |
| 24 |
| 25 |
| 26 |
| 27 |
| 28 |
| 29 |
| 30 |
| 31 |
| 32 |
| 33 |
| 34 |
| 35 |
| 36 |
| 37 |
| 38 |
| 39 |
| 40 |
| 41 |
| 42 |
| 43 |
| 44 |
| 45 |
| 46 |
File details come from the government source that posted it.