ASK-01.pdf
PDF 618 KB Posted
- Attached to
- Construction Projects NVZR062031 and NVZR132003 MacDill AFB Federal contract opportunity
- Solicitation number
- W911YN18B0002
About this file
Sketch ASK-01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Attendance_Sheet_23Oct18.pdf | ||
| OF1419_W91YN18B0002_signed.pdf | ||
| W911YN18B00020008.pdf | ||
| W911YN18B00020007.pdf | ||
| W911YN18B0002_QA_10-5-2018.xlsx | XLSX spreadsheet | |
| SSK-01.pdf | ||
| W911YN18B00020006.pdf | ||
| W911YN18B0002_QA_9-28-2018.xlsx | XLSX spreadsheet | |
| W911YN18B00020005.pdf | ||
| W911YN18B00020004.pdf | ||
| W911YN18B00020003.pdf | ||
| W911YN18B0002_QA_9-4-2018.xlsx | XLSX spreadsheet | |
| W911YN18B0002_QA_8-31-2018.xlsx | XLSX spreadsheet | |
| Site_visit_23Aug18_attendance.pdf | ||
| W911YN18B0002_QA_8-20-18.xlsx | XLSX spreadsheet | |
| W911YN18B00020002.pdf | ||
| Site_visit_1Aug18_attendance.pdf | ||
| W911YN18B00020001.pdf | ||
| Pre-Bid_Site_Visit_Minutes_W911YN18B0002.pdf | ||
| W911YN18B0002.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEVEL 1
0' - 0"
PLATFORM @ EL 12'-4"
12' - 4"
SSK-01
L3X3X3/8
L3X3X3/8
L6X3-1/2X3/8 L6X3-1/2X3/8
L3X3X3/8
WT12X31WT12X31
L2X2X3/16
L2X2X3/16
L3X3X3/8L3X3X3/8
/2
/2
2' - 0 3/8"
NOTE: PROVIDE SIDE
BRACING AND
CONNECTIONS EA. FACE
PER PLAN DETAIL 9/408
LEVEL 1
0' - 0"
PLATFORM @ EL 12'-4"
12' - 4"
SSK-01
L3X3X3/8
L3X3X3/8
L3X3X3/8WT12X31
W14X26
5' - 2"
/8
/2
/8
A
SSK-01
TYP
SSK-01
TYP
Scale
Project number
Date
Drawn by
Checked by As indicated
/3
/2
:0 :2
P
M
SSK-01
BRACE ELEVATIONS
100042200
MacDILL AIR FORCE BASE, FLORIDA - AIR NATIONAL GUARD
Repair JCSS Reserve Forces Building 1885
JAI
Checker
3/8" = 1'-0"SSK-01
2 BRACE ELEV. 2
1/8" = 1'-0"SSK-01
4 PARTIAL PLAN VIEW
No. Description Date
ILTE3541
STRUCTURAL
10/3/2018
CUDD2969
Text Box A
CUDD2969
Text Box
MWC
CUDD2969
Image
CUDD2969
Snapshot
CUDD2969
Text Box For Clarification:
Height of Fence on North and West Side to be 16’ high.
Fence on South Side to be 8’ High with 6’ wide double gate to align with stairs.
File details come from the government source that posted it.