Specifications_-_W911XK18B0005.pdf
PDF 7 MB Posted
- Attached to
- FY18 West Center Pier Bollard Replacement
- Solicitation number
- W911XK18B0005
About this file
Specifications - W911XK18B0005
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY18 WCP BOLLARD REPLACEMENT
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 22 00. 00 10 PRI CE AND PAYMENT PROCEDURES
01 32 16. 00 20 SMALL PROJECT CONSTRUCTI ON PROGRESS SCHEDULES
01 33 00 SUBMI TTAL PROCEDURES
01 35 13 SPECI AL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 45 00. 00 10 QUALI TY CONTROL
01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 78 00 CLOSEOUT SUBMI TTALS
01 99 90 LI STI NG OF ENCLOSED DOCUMENTS, EXHI BI TS AND OTHER
ATTACHMENTS
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 13 90 SI TE PREPARATI ON
DI VI SI ON 03 - CONCRETE
03 15 10 EXPANSI ON AND CONSTRUCTI ON JOI NTS I N CONCRETE
03 20 00. 00 10 CONCRETE REI NFORCI NG
03 30 70 REI NFORCED CONCRETE
DI VI SI ON 05 - METALS
05 50 15 MOORI NG BOLLARDS
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 63 29 DRI LLED CONCRETE PI ERS AND SHAFTS
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1
CERTI FI ED FI NAL READY TO ADVERTI SE
SECTI ON 01 22 00. 00 10
PRI CE AND PAYMENT PROCEDURES
08/15
PART 1 GENERAL
1. 1 SI NGLE JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 2 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.
1. 3 BI DDI NG SCHEDULE
1. 3. 1 0001 Bol l ar d I D Nos. 1260E t o 1860E & associ at ed wor k f r om Coor di nat e Li ne 1212E t o Coor di nat e Li ne 1890E
1. 3. 1. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h oper at i ons necessar y f or t he demol i t i on, di sposal and const r uct i on of al l r equi r ed wor k f r om Coor di nat e Li ne 1212E t o Coor di nat e Li ne 1890E, i ncl udi ng Bol l ar d I D Nos. 1260E t o 1860E, as i ndi cat ed i n t he dr awi ngs and speci f i cat i ons.
1. 3. 1. 2 Uni t of Measur e
Uni t of measur e: JOB.
1. 3. 2 0002 Opt i on 1 - Bol l ar d I D Nos. 1920E t o 2100E & associ at ed wor k f r om coor di nat e l i ne 1890E t o Coor di nat e Li ne 2142E
1. 3. 2. 1 Payment
Payment wi l l be made f or cost s associ at ed wi t h oper at i ons necessar y f or t he demol i t i on, di sposal and const r uct i on of al l r equi r ed wor k f r om coor di nat e l i ne 1890E t o Coor di nat e Li ne 2142E, i ncl udi ng Bol l ar d I D Nos. 1920E t o 2100E, as i ndi cat ed i n t he dr awi ngs and speci f i cat i ons.
SECTI ON 01 22 00. 00 10 Page 1
1. 3. 2. 2 Uni t of Measur e
Uni t of measur e: JOB.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
3. 1 BASI S FOR SETTLEMENT OF PROPOSALS
Act ual cost s wi l l be used t o det er mi ne equi pment cost s f or a set t l ement pr oposal submi t t ed on t he t ot al cost basi s under Feder al Acqui s i t i on Regul at i on ( FAR) 49. 206- 2( b) . I n eval uat i ng a t er mi nat i on set t l ement pr oposal usi ng t he t ot al cost basi s, t he f ol l owi ng pr i nci pl es wi l l be appl i ed t o det er mi ne al l owabl e equi pment cost s:
( a) Act ual cost s f or each pi ece of equi pment , or gr oups of s i mi l ar ser i al or ser i es equi pment , need not be avai l abl e i n t he cont r act or ' s account i ng r ecor ds t o det er mi ne t ot al act ual equi pment cost s.
( b) I f equi pment cost s have been al l ocat ed t o a cont r act usi ng pr edet er mi ned r at es, t hose char ges wi l l be adj ust ed t o act ual cost s.
( c) Recor ded j ob cost s adj ust ed f or unal l owabl e expenses wi l l be used t o det er mi ne equi pment oper at i ng expenses.
( d) Owner shi p cost s ( depr eci at i on) wi l l be det er mi ned usi ng t he cont r act or ' s depr eci at i on schedul e ( subj ect t o t he pr ovi s i ons of Feder al Acqui s i t i on Regul at i on ( FAR) 31. 205- 11) .
( e) Li cense, t axes, st or age and i nsur ance cost s ar e nor mal l y r ecover ed as an i ndi r ect expense and unl ess t he cont r act or char ges t hese cost s di r ect l y t o cont r act s, t hey wi l l be r ecover ed t hr ough t he i ndi r ect expense r at e.
- - End of Sect i on - -
SECTI ON 01 22 00. 00 10 Page 2
SECTI ON 01 32 16. 00 20
SMALL PROJECT CONSTRUCTI ON PROGRESS SCHEDULES
02/15
PART 1 GENERAL
1. 1 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00
SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Const r uct i on Schedul e; G, AOF
SD- 07 Cer t i f i cat es
Mont hl y Updat es
1. 2 ACCEPTANCE
Pr i or t o t he st ar t of wor k, pr epar e and submi t t o t he Cont r act i ng Of f i cer f or accept ance a const r uct i on schedul e i n t he f or m of a Net wor k Anal ysi s Schedul e ( NAS) i n accor dance wi t h t he t er ms i n Cont r act Cl ause " FAR
52. 236- 15, Schedul es f or Const r uct i on Cont r act s, " except as modi f i ed i n t hi s cont r act .
The accept ance of a Basel i ne Const r uct i on Schedul e i s a condi t i on pr ecedent t o:
a. The Cont r act or st ar t i ng wor k on t he demol i t i on or const r uct i on st age( s) of t he cont r act .
b. Pr ocessi ng Cont r act or ' s i nvoi ce( s) f or const r uct i on act i v i t i es/ i t ems of work.
c. Revi ew of any schedul e updat es.
Submi t t al of t he Basel i ne Schedul e, and subsequent schedul e updat es, i s under st ood t o be t he Cont r act or ' s cer t i f i cat i on t hat t he submi t t ed schedul e meet s al l of t he r equi r ement s of t he Cont r act Document s, r epr esent s t he Cont r act or ' s pl an on how t he wor k wi l l be accompl i shed, and accur at el y r ef l ect s t he wor k t hat has been accompl i shed and how i t was sequenced ( as- bui l t l ogi c) .
1. 3 SCHEDULE FORMAT
1. 3. 1 Net wor k Anal ysi s Schedul e ( NAS)
Use t he cr i t i cal pat h met hod ( CPM) t o schedul e and cont r ol pr oj ect act i v i t i es. Pr epar e and mai nt ai n pr oj ect schedul es usi ng Pr i maver a P6 or Mi cr osof t Pr oj ect 2010. I mpor t i ng dat a i nt o t he schedul i ng pr ogr am usi ng dat a conver si on t echni ques or t hi r d par t y sof t war e i s cause f or r ej ect i on of t he submi t t ed schedul e. Bui l d t he schedul e as f ol l ows:
SECTI ON 01 32 16. 00 20 Page 1
a. The Pr oj ect Schedul e must show l ong mat er i al del i ver y l ead t i me such as t he l ong l ead t i me associ at ed wi t h t he cast i ng of domest i cal l y pr oduced moor i ng bol l ar ds.
b. The Pr oj ect Schedul e must show submi t t al s, Gover nment r evi ew per i ods, mat er i al / equi pment del i ver y, ut i l i t y out ages, al l on- si t e const r uct i on, i nspect i on, t est i ng, and cl oseout act i v i t i es. Gover nment and Cont r act or on- si t e wor k act i v i t i es must be dr i ven by cal endar s t hat r ef l ect Sat ur days, Sundays and al l Feder al Hol i days as non- wor k days.
c. Wi t h t he except i on of t he Cont r act Awar d and End Cont r act mi l est one act i v i t i es, no act i v i t i es shal l be open- ended; each act i v i t y must have pr edecessor and successor t i es. No act i v i t y must have open st ar t or open f i ni sh ( dangl i ng) l ogi c. Mi ni mi ze r edundant l ogi c t i es. Once an act i v i t y exi st s on t he schedul e i t must not be del et ed or r enamed t o change t he scope of t he act i v i t y and must not be r emoved f r om t he schedul e l ogi c wi t hout appr oval f r om t he Cont r act i ng Of f i cer . Whi l e an act i v i t y cannot be del et ed, wher e sai d act i v i t y i s no l onger appl i cabl e t o t he schedul e but must r emai n wi t hi n t he l ogi c st r eam f or hi st or i cal r ecor d, i t can be changed t o a mi l est one. Document any such change i n t he mi l est one' s " Not ebook" , i ncl udi ng a dat e and expl anat i on f or t he change. The I D number f or a del et ed act i v i t y must not be r e- used f or anot her act i v i t y.
c. Each act i v i t y must be assi gned i t s appr opr i at e Responsi bi l i t y Code i ndi cat i ng r esponsi bi l i t y t o accompl i sh t he wor k i ndi cat ed by t he act i v i t y, Phase Code and Wor k Locat i on Code.
d. Dat e/ t i me const r ai nt ( s) and/ or l ags, ot her t han t hose r equi r ed by t he cont r act , ar e not al l owed unl ess accept ed by t he Cont r act i ng Of f i cer .
I ncl ude as t he l ast act i v i t y i n t he cont r act schedul e, a mi l est one act i v i t y named " Cont r act Compl et i on Dat e" .
1. 3. 1. 1 Pr i maver a P6 Set t i ngs and Par amet er s
Use t he f ol l owi ng Pr i maver a P6 set t i ngs and par amet er s i n pr epar i ng t he Basel i ne Schedul e. Devi at i on f r om t hese set t i ngs and par amet er s, wi t hout pr i or consent of t he Cont r act i ng Of f i cer , i s cause f or r ej ect i on of schedul e submi ssi on.
a. Gener al : Def i ne or est abl i sh Cal endar s and Act i v i t y Codes at t he " Pr oj ect " l evel , not t he " Gl obal " l evel .
b. Admi n Dr op- Down Menu, Admi n Pr ef er ences, Ti me Per i ods Tab:
( 1) Set t i me per i ods f or P6 t o 8. 0 Hour s/ Day, 40. 0 Hour s/ Week, 172. 0 Hour s/ Mont h and 2000. 0 Hour s/ Year .
( 2) Use assi gned cal endar t o speci f y t he number of wor k hour s f or each t i me per i od: Must be checked.
c. Pr oj ect Level , Dat es Tab:
( 1) Set " Must Fi ni sh By" dat e t o " Cont r act Compl et i on Dat e" .
d. Pr oj ect Level , Def aul t s Tab:
( 1) Dur at i on Type: Set t o " Fi xed Dur at i on & Uni t s" .
SECTI ON 01 32 16. 00 20 Page 2
( 2) Per cent Compl et e Type: Set t o " Physi cal " .
( 3) Act i v i t y Type: Set t o " Task Dependent " .
( 4) Cal endar : Set t o " St andar d 5 Day Wor kweek" . Cal endar must r ef l ect Sat ur day, Sunday and al l Feder al hol i days as non- wor k days.
Al t er nat i ve cal endar s may be used wi t h Cont r act i ng Of f i cer approval.
e. Pr oj ect Level , Cal cul at i ons Tab:
( 1) Act i v i t y per cent compl et e based on act i v i t y st eps: Must be Checked.
( 2) Reset Remai ni ng Dur at i on and Uni t s t o Or i gi nal : Must be Checked.
( 3) Subt r act Act ual f r om At Compl et i on: Must be Checked.
( 4) Recal cul at e Act ual uni t s and Cost when dur at i on per cent ( %) compl et e changes: Must be Checked.
( 5) Li nk Act ual t o Dat e and Act ual Thi s Per i od Uni t s and Cost : Must be Checked.
f . Pr oj ect Level , Set t i ngs Tab:
( 1) Def i ne Cr i t i cal Act i v i t i es: Check " Tot al Fl oat i s l ess t han or equal t o" and add " 0d" .
g. No on- si t e const r uct i on act i v i t y may have dur at i ons i n excess of 20 wor ki ng days.
1. 3. 1. 2 Mi cr osof t Pr oj ect 2010 Set t i ngs and Par amet er s
The Net wor k must have a mi ni mum of 30 const r uct i on act i v i t i es. No on- si t e const r uct i on act i v i t y may have dur at i ons i n excess of 20 wor ki ng days.
1. 3. 1. 3 Cost Loadi ng Mi cr osof t Pr oj ect 2010 Schedul es
Assi gn mat er i al , l abor and equi pment cost s t o t hei r r espect i ve Const r uct i on Act i v i t i es. Mat er i al and equi pment cost s f or whi ch payment wi l l be r equest ed i n advance of i nst al l at i on must be assi gned t o t hei r r espect i ve pr ocur ement act i v i t y ( i . e. t he mat er i al / equi pment on- si t e act i v i t y) . Evenl y di sper se over head and pr of i t t o each act i v i t y over t he dur at i on of t he pr oj ect . Cost l oadi ng must t ot al t o 100 per cent of t he val ue of t he cont r act .
a. Submi t an Ear ned Val ue Repor t wi t h each schedul e updat e showi ng act i v i t y budget , cost per cent compl et e, ear ned amount and cost t o compl et e as di r ect ed by t he Cont r act i ng Of f i cer .
b. Wi t h each schedul e submi ssi on, pr ovi de a Schedul e Var i ance cont r ol ( SVC) di agr am showi ng:
( 1) Cash Fl ow S- Cur ves i ndi cat i ng pl anned pr oj ect cost based on pr oj ect ed ear l y and l at e act i v i t y f i ni sh dat es.
( 2) Ear ned Val ue t o- dat e. Revi se Cash Fl ow S- Cur ves when t he cont r act i s modi f i ed, or as di r ect ed by t he Cont r act i ng Of f i cer .
SECTI ON 01 32 16. 00 20 Page 3
1. 3. 1. 3. 1 As- Bui l t Dr awi ngs
I f t her e i s no separ at e cont r act l i ne i t em ( CLI N) f or as- bui l t dr awi ngs, cost l oad t he " Submi ssi on and appr oval of as- bui l t dr awi ngs" act i v i t y not l ess t han $35, 000 or 1 per cent of t he pr esent cont r act val ue, whi ch ever i s gr eat er , up t o $200, 000. Act i v i t y wi l l be decl ar ed 100 per cent compl et e upon t he Gover nment ' s appr oval .
1. 3. 2 Schedul e Submi t t al s and Pr ocedur es
Submi t Net wor k Anal ysi s Schedul es ( NAS) and updat es i n har d copy and on el ect r oni c medi a t hat i s accept abl e t o t he Cont r act i ng Of f i cer . Submi t an el ect r oni c back- up of t he pr oj ect schedul e i n an i mpor t f or mat compat i bl e wi t h t he Gover nment ' s schedul i ng pr ogr am.
1. 4 SCHEDULE MONTHLY UPDATES
Updat e t he Const r uct i on Schedul e at mont hl y i nt er val s or when t he schedul e has been r evi sed. The updat ed schedul e must be kept cur r ent , r ef l ect i ng act ual act i v i t y pr ogr ess and pl an f or compl et i ng t he r emai ni ng wor k.
Submi t copi es of pur chase or der s and conf i r mat i on of del i ver y dat es as di r ect ed by t he Cont r act i ng Of f i cer .
a. Nar r at i ve Repor t : Pr ovi de wi t h schedul e updat es. I dent i f y and j ust i f y;
( 1) Pr ogr ess made i n each ar ea of t he pr oj ect
( 2) Cr i t i cal Pat h
( 3) Dat e/ t i me const r ai nt ( s) , ot her t han t hose r equi r ed by t he cont r act
( 4) Changes i n t he f ol l owi ng; added or del et ed act i v i t i es, or i gi nal and r emai ni ng dur at i ons f or act i v i t i es t hat have not st ar t ed, l ogi c, mi l est ones, pl anned sequence of oper at i ons, and cr i t i cal path
( 5) St at us of Cont r act Compl et i on Dat e and i nt er i m mi l est ones;
( 6) Cur r ent and ant i c i pat ed del ays ( descr i be cause of del ay and cor r ect i ve act i ons( s) and mi t i gat i on measur es t o mi ni mi ze) ;
( 7) Descr i pt i on of cur r ent and f ut ur e schedul e pr obl em ar eas.
Each ent r y i n t he nar r at i ve r epor t must c i t e t he r espect i ve Act i v i t y I D and Act i v i t y Descr i pt i on, t he dat e and r eason f or t he change, and descr i pt i on of t he change.
1. 5 CONTRACT MODI FI CATI ON
Submi t a Ti me I mpact Anal ysi s ( TI A) wi t h each cost and t i me pr oposal f or a pr oposed change. TI A must i l l ust r at e t he i nf l uence of each change or del ay on t he Cont r act Compl et i on Dat e or mi l est ones. No t i me ext ensi ons wi l l be gr ant ed nor del ay damages pai d unl ess a del ay occur s whi ch consumes al l avai l abl e Pr oj ect Fl oat , and ext ends t he Pr oj ect ed Fi ni sh beyond t he Cont r act Compl et i on Dat e.
a. Each TI A must be i n bot h nar r at i ve and schedul e f or m. The nar r at i ve must def i ne t he scope and condi t i ons of t he change; pr ovi de st ar t and
SECTI ON 01 32 16. 00 20 Page 4 f i ni sh dat es of i mpact , successor and pr edecessor act i v i t y t o i mpact per i od, r esponsi bl e par t y, descr i be how i t or i gi nat ed, and how i t i mpact s t he schedul e. The schedul e submi ssi on must consi st of t hr ee nat i ve f i l es:
( 1) Fr agnet used t o def i ne t he scope of t he changed condi t i on
( 2) Most r ecent accept ed schedul e updat e as of t he t i me of t he pr oposal or c l ai m submi ssi on t hat has been updat ed t o show al l act i v i t y pr ogr ess as of t he t i me of t he i mpact st ar t dat e.
( 3) The i mpact ed schedul e t hat has t he f r agnet i nser t ed i n t he updat ed schedul e and t he schedul e " r un" so t hat t he new compl et i on dat e i s determined.
b. For c l ai med as- bui l t pr oj ect del ay, t he i nser t ed f r agnet TI A met hod must be modi f i ed t o account f or as- bui l t event s known t o occur af t er t he dat a dat e of schedul e updat e used.
c. Al l TI As must i ncl ude any mi t i gat i on, and must det er mi ne t he appor t i onment of t he over al l del ay assi gnabl e t o each i ndi v i dual del ay. The associ at ed nar r at i ve must c l ear l y descr i be t he f i ndi ngs i n a chr onol ogi cal l i s t i ng begi nni ng wi t h t he ear l i est del ay event .
( 1) I dent i f y t ypes of del ays as f ol l ows:
( a) Excusabl e Del ay: For ce- Maj eur e ( e. g. weat her ) - Cont r act or may r ecei ve t i me ext ensi on, but t i me wi l l not be compensabl e.
( b) I nexcusabl e Del ay: Cont r act or Responsi bi l i t y - Cont r act or wi l l not r ecei ve t i me ext ensi on.
( c) Compensabl e Del ay: Gover nment Responsi bi l i t y - Cont r act or may r ecei ve compensabl e t i me ext ensi on.
( 2) I f a combi nat i on of any of t he del ay t ypes out l i ned above occur s, i t i s consi der ed a Concur r ent Del ay, whi ch wi l l r equi r e an anal ysi s of t he f act s t o det er mi ne compensabi l i t y and ent i t l ement t o any t i me ext ensi on under t he appl i cabl e cont r act c l auses.
d. Submi t Dat a di sks cont ai ni ng t he nar r at i ve and nat i ve schedul e f i l es.
e. Unl ess t he Cont r act i ng Of f i cer r equest s ot her wi se, onl y add conf or med cont r act modi f i cat i ons i nt o t he Pr oj ect NAS.
1. 6 4- WEEK LOOK AHEAD SCHEDULE
Pr epar e and i ssue a 4- Week Look Ahead schedul e t o pr ovi de a mor e det ai l ed day- t o- day pl an of upcomi ng wor k i dent i f i ed on t he Const r uct i on Schedul e.
Key t he wor k pl ans t o act i v i t y number s when a NAS i s r equi r ed and updat e each week t o show t he pl anned wor k f or t he cur r ent and f ol l owi ng t wo- week per i od. Addi t i onal l y, i ncl ude upcomi ng out ages, c l osur es, pr epar at or y meet i ngs, and i ni t i al meet i ngs. I dent i f y cr i t i cal pat h act i v i t i es on t he Thr ee- Week Look Ahead Schedul e. The det ai l wor k pl ans ar e t o be Net wor k Anal ysi s Schedul e ( NAS) t ype schedul es, mai nt ai ned separ at el y f r om t he Const r uct i on Schedul e on an el ect r oni c spr eadsheet pr ogr am and pr i nt ed on 8- 1/ 2 by 11 i nch sheet s as di r ect ed by t he Cont r act i ng Of f i cer .
Act i v i t i es must not exceed 5 wor ki ng days i n dur at i on and have suf f i c i ent l evel of det ai l t o assi gn cr ews, t ool s and equi pment r equi r ed t o compl et e
SECTI ON 01 32 16. 00 20 Page 5 t he wor k. Del i ver t hr ee har d copi es and one el ect r oni c f i l e of t he 4- Week Look Ahead Schedul e t o t he Cont r act i ng Of f i cer f or r evi ew dur i ng t he weekl y CQC Coor di nat i on or Pr oduct i on Meet i ng.
1. 7 CORRESPONDENCE AND TEST REPORTS:
Al l cor r espondence ( e. g. , l et t er s, Request s f or I nf or mat i on ( RFI s) , e- mai l s, meet i ng mi nut e i t ems, Pr oduct i on and QC Dai l y Repor t s, mat er i al del i ver y t i cket s, phot ogr aphs) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed. Al l t est r epor t s ( e. g. , concr et e, soi l compact i on, wel d, pr essur e) must r ef er ence Schedul e Act i v i t i es t hat ar e bei ng addr essed.
1. 8 ADDI TI ONAL SCHEDULI NG REQUI REMENTS
Any r ef er ences t o addi t i onal schedul i ng r equi r ement s, i ncl udi ng syst ems t o be i nspect ed, t est ed and commi ssi oned, t hat ar e l ocat ed t hr oughout t he r emai nder of t he Cont r act Document s, ar e subj ect t o al l r equi r ement s of t hi s sect i on.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 32 16. 00 20 Page 6
SECTI ON 01 33 00
SUBMI TTAL PROCEDURES
05/11
PART 1 GENERAL
1. 1 SUMMARY
The Cont r act i ng Of f i cer may r equest submi t t al s i n addi t i on t o t hose speci f i ed when deemed necessar y t o adequat el y descr i be t he wor k cover ed i n t he r espect i ve sect i ons.
Uni t s of wei ght s and measur es used on al l submi t t al s ar e t o be t he same as t hose used i n t he cont r act dr awi ngs.
Each submi t t al i s t o be compl et e and i n suf f i c i ent det ai l t o al l ow r eady det er mi nat i on of compl i ance wi t h cont r act r equi r ement s.
Cont r act or ' s t o check and appr ove al l i t ems pr i or t o submi t t al and st amp, s i gn, and dat e i ndi cat i ng act i on t aken. Pr oposed devi at i ons f r om t he cont r act r equi r ement s ar e t o be cl ear l y i dent i f i ed. I ncl ude wi t hi n submi t t al s i t ems such as: Cont r act or ' s, manuf act ur er ' s, or f abr i cat or ' s dr awi ngs; descr i pt i ve l i t er at ur e i ncl udi ng ( but not l i mi t ed t o) cat al og cut s, di agr ams, oper at i ng char t s or cur ves; t est r epor t s; t est cyl i nder s;
sampl es; O&M manual s ( i ncl udi ng par t s l i s t ) ; cer t i f i cat i ons; war r ant i es;
and ot her such r equi r ed submi t t al s.
Submi t t al s r equi r i ng Gover nment appr oval ar e t o be schedul ed and made pr i or t o t he acqui s i t i on of t he mat er i al or equi pment cover ed t her eby.
Pi ck up and di spose of sampl es not i ncor por at ed i nt o t he wor k i n accor dance wi t h manuf act ur er ' s Mat er i al Saf et y Dat a Sheet s ( MSDS) and i n compl i ance wi t h exi st i ng l aws and r egul at i ons.
1. 2 DEFINITIONS
1. 2. 1 Submi t t al Descr i pt i ons ( SD)
Submi t t al s r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons.
Submi t t al s ar e i dent i f i ed by Submi t t al Descr i pt i on ( SD) number s and t i t l es as f ol l ows:
SD- 01 Pr econst r uct i on Submi t t al s
Submi t t al s whi ch ar e r equi r ed pr i or t o or t he st ar t of t he next maj or phase of t he const r uct i on on a mul t i - phase cont r act , i ncl udes schedul es, t abul ar l i s t of dat a, or t abul ar l i s t i ncl udi ng l ocat i on, f eat ur es, or ot her per t i nent i nf or mat i on r egar di ng pr oduct s, mat er i al s, equi pment , or component s t o be used i n t he wor k.
Cer t i f i cat es of i nsur ance
Sur et y bonds
Li st of pr oposed Subcont r act or s
Li st of pr oposed pr oduct s
SECTI ON 01 33 00 Page 1
Const r uct i on pr ogr ess schedul e
Net wor k Anal ysi s Schedul e ( NAS)
Submi t t al r egi st er
Schedul e of pr i ces
Heal t h and saf et y pl an
Wor k pl an
Qual i t y Cont r ol ( QC) pl an
Envi r onment al pr ot ect i on pl an
SD- 02 Shop Dr awi ngs
Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e some por t i on of t he wor k.
Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .
Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.
SD- 03 Pr oduct Dat a
Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.
Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.
SD- 05 Desi gn Dat a
Desi gn cal cul at i ons, mi x desi gns, anal yses or ot her dat a per t ai ni ng t o a par t of wor k.
SD- 06 Test Repor t s
Repor t s i gned by aut hor i zed of f i c i al of t est i ng l abor at or y t hat a mat er i al , pr oduct or syst em i dent i cal t o t he mat er i al , pr oduct or syst em t o be pr ovi ded has been t est ed i n accor d wi t h speci f i ed r equi r ement s. ( Test i ng must have been wi t hi n t hr ee year s of dat e of cont r act awar d f or t he pr oj ect . )
Repor t whi ch i ncl udes f i ndi ngs of a t est r equi r ed t o be per f or med by t he Cont r act or on an act ual por t i on of t he wor k or pr ot ot ype pr epar ed f or t he pr oj ect bef or e shi pment t o j ob s i t e.
Repor t whi ch i ncl udes f i ndi ng of a t est made at t he j ob s i t e or on sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er installation.
SECTI ON 01 33 00 Page 2
I nvest i gat i on r epor t s.
Dai l y l ogs and checkl i st s.
Fi nal accept ance t est and oper at i onal t est pr ocedur e.
SD- 07 Cer t i f i cat es
St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat pr oduct , syst em or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .
Document r equi r ed of Cont r act or , or of a manuf act ur er , suppl i er , i nst al l er or Subcont r act or t hr ough Cont r act or , t he pur pose of whi ch i s t o f ur t her qual i t y of or der l y pr ogr essi on of a por t i on of t he wor k by document i ng pr ocedur es, accept abi l i t y of met hods or per sonnel qualifications.
Conf i ned space ent r y per mi t s.
Text of post ed oper at i ng i nst r uct i ons.
SD- 11 Cl oseout Submi t t al s
Document at i on t o r ecor d compl i ance wi t h t echni cal or admi ni st r at i ve r equi r ement s or t o est abl i sh an admi ni st r at i ve mechani sm.
Speci al r equi r ement s necessar y t o pr oper l y c l ose out a const r uct i on cont r act . For exampl e, Recor d Dr awi ngs and as- bui l t dr awi ngs. Al so, submi t t al r equi r ement s necessar y t o pr oper l y c l ose out a maj or phase of const r uct i on on a mul t i - phase cont r act .
I nt er i m " DD For m 1354" wi t h cost br eakout f or al l asset s 30 cal endar days pr i or t o f aci l i t y t ur nover .
1. 2. 2 Appr ovi ng Aut hor i t y
Of f i ce or desi gnat ed per son aut hor i zed t o appr ove submi t t al .
1. 2. 3 Work
As used i n t hi s sect i on, on- and of f - s i t e const r uct i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s, except t hose SD- 01 Pr e- Const r uct i on Submi t t al s not ed above, const r uct i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such const r uct i on.
1. 3 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h t hi s sect i on.
SD- 01 Pr econst r uct i on Submi t t al s
SECTI ON 01 33 00 Page 3
Submi t t al Regi st er ; G, AOF
1. 4 SUBMI TTAL CLASSI FI CATI ON
Submi t t al s ar e c l assi f i ed as f ol l ows:
1. 4. 1 Gover nment Appr oved
Wi t hi n t he t er ms of t he Cont r act Cl ause 52. 236- 21, " Speci f i cat i ons and Dr awi ngs f or Const r uct i on, " t hey ar e consi der ed t o be " shop dr awi ngs. "
1. 4. 2 I nf or mat i on Onl y
They ar e not consi der ed t o be " shop dr awi ngs" wi t hi n t he t er ms of t he Cont r act Cl ause r ef er r ed t o above.
1. 5 PREPARATION
1. 5. 1 Tr ansmi t t al For m
Use t he at t ached sampl e t r ansmi t t al f or m ( ENG For m 4025) f or submi t t i ng bot h Gover nment appr oved and i nf or mat i on onl y submi t t al s i n accor dance wi t h t he i nst r uct i ons on t he r ever se si de of t he f or m. These f or ms ar e i ncl uded i n t he RMS sof t war e t hat t he Cont r act or i s r equi r ed t o use f or t hi s cont r act . Pr oper l y compl et e t hi s f or m by f i l l i ng out al l t he headi ng bl ank spaces and i dent i f y i ng each i t em submi t t ed. Exer ci se speci al car e t o ensur e pr oper l i s t i ng of t he speci f i cat i on par agr aph and sheet number of t he cont r act dr awi ngs per t i nent t o t he dat a submi t t ed f or each i t em.
1. 6 QUANTI TY OF SUBMI TTALS
1. 6. 1 Number of Copi es of SD- 02 Shop Dr awi ngs
Onl y upon r equest by t he COR, submi t el ect r oni c f i l es and har d copi es of submi t t al s of shop dr awi ngs r equi r i ng r evi ew and appr oval onl y by QC or gani zat i on. Onl y upon r equest by t he COR, submi t copi es of shop dr awi ngs r equi r i ng r evi ew and appr oval by Cont r act i ng Of f i cer .
1. 6. 2 Number of Copi es of SD- 03 Pr oduct Dat a and SD- 08 Manuf act ur er ' s Instructions
Submi t i n compl i ance wi t h quant i t y r equi r ement s speci f i ed f or shop drawings.
1. 6. 3 Number of Sampl es SD- 04 Sampl es
a. Submi t 2 sampl es, or 2 set s of sampl es showi ng r ange of var i at i on, of each r equi r ed i t em. One appr oved sampl e or set of sampl es wi l l be r et ai ned by appr ovi ng aut hor i t y and one wi l l be r et ur ned t o Cont r act or .
b. Submi t one sampl e panel or pr ovi de one sampl e i nst al l at i on wher e di r ect ed. I ncl ude component s l i s t ed i n t echni cal sect i on or as directed.
c. Submi t one sampl e i nst al l at i on, wher e di r ect ed.
d. Submi t one sampl e of non- sol i d mat er i al s.
SECTI ON 01 33 00 Page 4
1. 6. 4 Number of Copi es SD- 05 Desi gn Dat a and SD- 07 Cer t i f i cat es
Submi t i n compl i ance wi t h quant i t y r equi r ement s speci f i ed f or shop drawings.
1. 6. 5 Number of Copi es SD- 06 Test Repor t s and SD- 09 Manuf act ur er ' s Fi el d Reports
Submi t i n compl i ance wi t h quant i t y and qual i t y r equi r ement s speci f i ed f or shop dr awi ngs ot her t han f i el d t est r esul t s t hat wi l l be submi t t ed wi t h QC reports.
1. 6. 6 Number of Copi es of SD- 10 Oper at i on and Mai nt enance Dat a
Submi t an el ect r oni c copy of O&M Dat a t o t he Cont r act i ng Of f i cer f or r evi ew and appr oval .
1. 6. 7 Number of Copi es of SD- 01 Pr econst r uct i on Submi t t al s and SD- 11 Cl oseout Submi t t al s
Unl ess ot her wi se speci f i ed, submi t 2 set s of admi ni st r at i ve submi t t al s.
1. 7 I NFORMATI ON ONLY SUBMI TTALS
Nor mal l y submi t t al s f or i nf or mat i on onl y wi l l not be r et ur ned. Appr oval of t he Cont r act i ng Of f i cer i s not r equi r ed on i nf or mat i on onl y submi t t al s. The Gover nment r eser ves t he r i ght t o r equi r e t he Cont r act or t o r esubmi t any i t em f ound not t o compl y wi t h t he cont r act . Thi s does not r el i eve t he Cont r act or f r om t he obl i gat i on t o f ur ni sh mat er i al conf or mi ng t o t he pl ans and speci f i cat i ons; wi l l not pr event t he Cont r act i ng Of f i cer f r om r equi r i ng r emoval and r epl acement of nonconf or mi ng mat er i al i ncor por at ed i n t he wor k; and does not r el i eve t he Cont r act or of t he r equi r ement t o f ur ni sh sampl es f or t est i ng by t he Gover nment l abor at or y or f or check t est i ng by t he Gover nment i n t hose i nst ances wher e t he t echni cal speci f i cat i ons so pr escr i be.
1. 8 VARIATIONS
Var i at i ons f r om cont r act r equi r ement s r equi r e Gover nment appr oval pur suant t o cont r act Cl ause FAR 52. 236- 21 " Speci f i cat i ons and Dr awi ngs f or Const r uct i on" and wi l l be consi der ed wher e advant ageous t o Gover nment .
1. 8. 1 Consi der i ng Var i at i ons
Di scussi on wi t h Cont r act i ng Of f i cer pr i or t o submi ssi on wi l l hel p ensur e f unct i onal and qual i t y r equi r ement s ar e met and mi ni mi ze r ej ect i ons and r e- submi t t al s. When cont empl at i ng a var i at i on whi ch r esul t s i n l ower cost , consi der submi ssi on of t he var i at i on as a Val ue Engi neer i ng Change Pr oposal ( VECP) .
Speci f i cal l y poi nt out var i at i ons f r om cont r act r equi r ement s i n t r ansmi t t al l et t er s. Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at no addi t i onal cost t o t he Gover nment .
1. 8. 2 Pr oposi ng Var i at i ons
When pr oposi ng var i at i on, del i ver wr i t t en r equest t o t he Cont r act i ng Of f i cer , wi t h document at i on of t he nat ur e and f eat ur es of t he var i at i on
SECTI ON 01 33 00 Page 5 and why t he var i at i on i s desi r abl e and benef i c i al t o Gover nment . I f l ower cost i s a benef i t , al so i ncl ude an est i mat e of t he cost savi ngs. I n addi t i on t o document at i on r equi r ed f or var i at i on, i ncl ude t he submi t t al s r equi r ed f or t he i t em. Cl ear l y mar k t he pr oposed var i at i on i n al l documentation.
Check t he col umn " var i at i on" of ENG For m 4025 f or submi t t al s whi ch i ncl ude pr oposed devi at i ons r equest ed by t he Cont r act or . Set f or t h i n wr i t i ng t he r eason f or any devi at i ons and annot at e such devi at i ons on t he submi t t al .
The Gover nment r eser ves t he r i ght t o r esci nd i nadver t ent appr oval of submi t t al s cont ai ni ng unnot ed devi at i ons.
1. 8. 3 War r ant i ng That Var i at i ons Ar e Compat i bl e
When del i ver i ng a var i at i on f or appr oval , Cont r act or war r ant s t hat t hi s cont r act has been r evi ewed t o est abl i sh t hat t he var i at i on, i f i ncor por at ed, wi l l be compat i bl e wi t h ot her el ement s of wor k.
1. 8. 4 Revi ew Schedul e I s Modi f i ed
I n addi t i on t o nor mal submi t t al r evi ew per i od, a per i od of 10 wor ki ng days wi l l be al l owed f or consi der at i on by t he Gover nment of submi t t al s wi t h variations.
1. 9 SUBMI TTAL REGI STER
Pr epar e and mai nt ai n submi t t al r egi st er , as t he wor k pr ogr esses. Do not change dat a whi ch i s out put i n col umns ( c) , ( d) , ( e) , and ( f ) as del i ver ed by Gover nment ; r et ai n dat a whi ch i s out put i n col umns ( a) , ( g) , ( h) , and ( i ) as appr oved. A submi t t al r egi st er showi ng i t ems of equi pment and mat er i al s f or whi ch submi t t al s ar e r equi r ed by t he speci f i cat i ons i s pr ovi ded as an at t achment . Thi s l i s t may not be al l i ncl usi ve and addi t i onal submi t t al s may be r equi r ed. Mai nt ai n a submi t t al r egi st er f or t he pr oj ect i n accor dance wi t h Sect i on 01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM) . The Gover nment wi l l pr ovi de t he i ni t i al submi t t al r egi st er i n el ect r oni c f or mat wi t h t he f ol l owi ng f i el ds compl et ed, t o t he ext ent t hat wi l l be r equi r ed by t he Gover nment dur i ng subsequent usage.
Col umn ( c) : Li st s speci f i cat i on sect i on i n whi ch submi t t al i s required.
Col umn ( d) : Li st s each submi t t al descr i pt i on ( SD No. and t ype,
e. g. SD- 02 Shop Dr awi ngs) r equi r ed i n each speci f i cat i on sect i on.
Col umn ( e) : Li st s one pr i nci pal par agr aph i n speci f i cat i on sect i on wher e a mat er i al or pr oduct i s speci f i ed. Thi s l i s t i ng i s onl y t o f aci l i t at e l ocat i ng submi t t ed r equi r ement s. Do not consi der ent r i es i n col umn ( e) as l i mi t i ng pr oj ect r equi r ement s.
Ther eaf t er , t he Cont r act or i s t o t r ack al l submi t t al s by mai nt ai ni ng a compl et e l i s t , i ncl udi ng compl et i on of al l dat a col umns, i ncl udi ng dat es on whi ch submi t t al s ar e r ecei ved and r et ur ned by t he Gover nment .
1. 9. 1 Use of Submi t t al Regi st er
Submi t submi t t al r egi st er . Submi t wi t h QC pl an and pr oj ect schedul e.
Ver i f y t hat al l submi t t al s r equi r ed f or pr oj ect ar e l i s t ed and add mi ssi ng submi t t al s. Coor di nat e and compl et e t he f ol l owi ng f i el ds on t he r egi st er
SECTI ON 01 33 00 Page 6 submi t t ed wi t h t he QC pl an and t he pr oj ect schedul e:
Col umn ( a) Act i v i t y Number : Act i v i t y number f r om t he pr oj ect schedule.
Col umn ( g) Cont r act or Submi t Dat e: Schedul ed dat e f or appr ovi ng aut hor i t y t o r ecei ve submi t t al s.
Col umn ( h) Cont r act or Appr oval Dat e: Dat e Cont r act or needs appr oval of submi t t al .
Col umn ( i ) Cont r act or Mat er i al : Dat e t hat Cont r act or needs mat er i al del i ver ed t o Cont r act or cont r ol .
1. 9. 2 Cont r act or Use of Submi t t al Regi st er
Updat e t he f ol l owi ng f i el ds wi t h each submi t t al t hr oughout cont r act .
Col umn ( b) Tr ansmi t t al Number : Cont r act or assi gned l i s t of consecut i ve number s.
Col umn ( j ) Act i on Code ( k) : Dat e of act i on used t o r ecor d Cont r act or ' s r evi ew when f or war di ng submi t t al s t o QC.
Col umn ( l ) Li st dat e of submi t t al t r ansmi ssi on.
Col umn ( q) Li st dat e appr oval r ecei ved.
1. 9. 3 Appr ovi ng Aut hor i t y Use of Submi t t al Regi st er
Updat e t he f ol l owi ng f i el ds.
Col umn ( b) Tr ansmi t t al Number : Cont r act or assi gned l i s t of consecut i ve number s.
Col umn ( l ) Li st dat e of submi t t al r ecei pt .
Col umn ( m) t hr ough ( p) Li st Dat e r el at ed t o r evi ew act i ons.
Col umn ( q) Li st dat e r et ur ned t o Cont r act or .
1. 9. 4 Copi es Del i ver ed t o t he Gover nment
Del i ver one copy of submi t t al r egi st er updat ed by Cont r act or t o Gover nment wi t h each i nvoi ce r equest .
1. 10 SCHEDULING
Schedul e and submi t concur r ent l y submi t t al s cover i ng component i t ems f or mi ng a syst em or i t ems t hat ar e i nt er r el at ed. I ncl ude cer t i f i cat i ons t o be submi t t ed wi t h t he per t i nent dr awi ngs at t he same t i me. No del ay damages or t i me ext ensi ons wi l l be al l owed f or t i me l ost i n l at e submi t t al s.
a. Coor di nat e schedul i ng, sequenci ng, pr epar i ng and pr ocessi ng of submi t t al s wi t h per f or mance of wor k so t hat wor k wi l l not be del ayed by submi t t al pr ocessi ng. Al l ow f or pot ent i al r esubmi t t al of requirements.
SECTI ON 01 33 00 Page 7
b. Submi t t al s cal l ed f or by t he cont r act document s wi l l be l i s t ed on t he r egi st er . I f a submi t t al i s cal l ed f or but does not per t ai n t o t he cont r act wor k, t he Cont r act or i s t o i ncl ude t he submi t t al i n t he r egi st er and annot at e i t " N/ A" wi t h a br i ef expl anat i on. Appr oval by t he Cont r act i ng Of f i cer does not r el i eve t he Cont r act or of suppl y i ng submi t t al s r equi r ed by t he cont r act document s but whi ch have been omi t t ed f r om t he r egi st er or mar ked " N/ A. "
c. Re- submi t r egi st er and annot at e mont hl y by t he Cont r act or wi t h act ual submi ssi on and appr oval dat es. When al l i t ems on t he r egi st er have been f ul l y appr oved, no f ur t her r e- submi t t al i s r equi r ed.
d. Car ef ul l y cont r ol pr ocur ement oper at i ons t o ensur e t hat each i ndi v i dual submi t t al i s made on or bef or e t he Cont r act or schedul ed submi t t al dat e shown on t he appr oved " Submi t t al Regi st er . "
1. 11 GOVERNMENT APPROVI NG AUTHORI TY
When appr ovi ng aut hor i t y i s Cont r act i ng Of f i cer , t he Gover nment wi l l :
a. Not e dat e on whi ch submi t t al was r ecei ved.
b. Revi ew submi t t al s f or appr oval wi t hi n schedul i ng per i od speci f i ed and onl y f or conf or mance wi t h pr oj ect desi gn concept s and compl i ance wi t h cont r act document s.
c. I dent i f y r et ur ned submi t t al s wi t h one of t he act i ons def i ned i n par agr aph ent i t l ed, " Revi ew Not at i ons, " of t hi s sect i on and wi t h mar ki ngs appr opr i at e f or act i on i ndi cat ed.
Upon compl et i on of r evi ew of submi t t al s r equi r i ng Gover nment appr oval , st amp and dat e appr oved submi t t al s. 1 copy of t he appr oved submi t t al wi l l be r et ai ned by t he Cont r act i ng Of f i cer and 1 copy of t he submi t t al wi l l be r et ur ned t o t he Cont r act or .
1. 11. 1 Revi ew Not at i ons
Cont r act i ng Of f i cer r evi ew wi l l be compl et ed wi t hi n 5 cal endar days af t er dat e of submi ssi on. Submi t t al s wi l l be r et ur ned t o t he Cont r act or wi t h t he f ol l owi ng not at i ons:
a. Submi t t al s mar ked " appr oved" or " accept ed" aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed.
b. Submi t t al s mar ked " appr oved as not ed" " or appr oved except as not ed, r esubmi t t al not r equi r ed, " aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed pr ovi ded he t akes no except i on t o t he cor r ect i ons.
c. Submi t t al s mar ked " not appr oved" or " di sappr oved, " or " r evi se and r esubmi t , " i ndi cat e noncompl i ance wi t h t he cont r act r equi r ement s or desi gn concept , or t hat submi t t al i s i ncompl et e. Resubmi t wi t h appr opr i at e changes. No wor k shal l pr oceed f or t hi s i t em unt i l r esubmi t t al i s appr oved.
d. Submi t t al s mar ked " not r evi ewed" wi l l i ndi cat e submi t t al has been pr evi ousl y r evi ewed and appr oved, i s not r equi r ed, does not have evi dence of bei ng r evi ewed and appr oved by Cont r act or , or i s not compl et e. A submi t t al mar ked " not r evi ewed" wi l l be r et ur ned wi t h an expl anat i on of t he r eason i t i s not r evi ewed. Resubmi t submi t t al s
SECTI ON 01 33 00 Page 8 r et ur ned f or l ack of r evi ew by Cont r act or or f or bei ng i ncompl et e, wi t h appr opr i at e act i on, coor di nat i on, or change.
1. 12 DI SAPPROVED OR REJECTED SUBMI TTALS
Cont r act or shal l make cor r ect i ons r equi r ed by t he Cont r act i ng Of f i cer . I f t he Cont r act or consi der s any cor r ect i on or not at i on on t he r et ur ned submi t t al s t o const i t ut e a change t o t he cont r act dr awi ngs or speci f i cat i ons; not i ce as r equi r ed under t he c l ause 52. 243- 4, " Changes, " i s t o be gi ven t o t he Cont r act i ng Of f i cer . Cont r act or i s r esponsi bl e f or t he di mensi ons and desi gn of connect i on det ai l s and const r uct i on of wor k.
Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at t he Cont r act or ' s expense.
I f changes ar e necessar y t o submi t t al s, t he Cont r act or shal l make such r evi s i ons and submi ssi on of t he submi t t al s i n accor dance wi t h t he pr ocedur es above. No i t em of wor k r equi r i ng a submi t t al change i s t o be accompl i shed unt i l t he changed submi t t al s ar e appr oved.
1. 13 APPROVED/ ACCEPTED SUBMI TTALS
The Cont r act i ng Of f i cer ' s appr oval or accept ance of submi t t al s i s not t o be const r ued as a compl et e check, and i ndi cat es onl y t hat
Appr oval or accept ance wi l l not r el i eve t he Cont r act or of t he r esponsi bi l i t y f or any er r or whi ch may exi st , as t he Cont r act or under t he Cont r act or Qual i t y Cont r ol ( CQC) r equi r ement s of t hi s cont r act i s r esponsi bl e f or .
Af t er submi t t al s have been appr oved or accept ed by t he Cont r act i ng Of f i cer , no r esubmi t t al f or t he pur pose of subst i t ut i ng mat er i al s or equi pment wi l l be consi der ed unl ess accompani ed by an expl anat i on of why a subst i t ut i on i s necessar y.
1. 14 APPROVED SAMPLES
Appr oval of a sampl e i s onl y f or t he char act er i st i cs or use named i n such appr oval and i s not be const r ued t o change or modi f y any cont r act r equi r ement s. Bef or e submi t t i ng sampl es, t he Cont r act or t o assur e t hat t he mat er i al s or equi pment wi l l be avai l abl e i n quant i t i es r equi r ed i n t he pr oj ect . No change or subst i t ut i on wi l l be per mi t t ed af t er a sampl e has been appr oved.
Mat ch t he appr oved sampl es f or mat er i al s and equi pment i ncor por at ed i n t he wor k. I f r equest ed, appr oved sampl es, i ncl udi ng t hose whi ch may be damaged i n t est i ng, wi l l be r et ur ned t o t he Cont r act or , at hi s expense, upon compl et i on of t he cont r act . Sampl es not appr oved wi l l al so be r et ur ned t o t he Cont r act or at i t s expense, i f so r equest ed.
Fai l ur e of any mat er i al s t o pass t he speci f i ed t est s wi l l be suf f i c i ent cause f or r ef usal t o consi der , under t hi s cont r act , any f ur t her sampl es of t he same br and or make of t hat mat er i al . Gover nment r eser ves t he r i ght t o di sappr ove any mat er i al or equi pment whi ch pr evi ousl y has pr oved unsat i sf act or y i n ser vi ce.
Sampl es of var i ous mat er i al s or equi pment del i ver ed on t he si t e or i n pl ace may be t aken by t he Cont r act i ng Of f i cer f or t est i ng. Sampl es f ai l i ng t o meet cont r act r equi r ement s wi l l aut omat i cal l y voi d pr evi ous appr oval s. Cont r act or t o r epl ace such mat er i al s or equi pment t o meet
SECTI ON 01 33 00 Page 9 cont r act r equi r ement s.
Appr oval of t he Cont r act or ' s sampl es by t he Cont r act i ng Of f i cer does not r el i eve t he Cont r act or of hi s r esponsi bi l i t i es under t he cont r act .
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
Not Used
- - End of Sect i on - -
SECTI ON 01 33 00 Page 10
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES
FY18 West Center Pier Bollard Replacement, Sault Ste. Marie, MI
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 G AOFConstruction Schedule
SD-07 Certificates
1.4Monthly Updates
01 33 00 SD-01 Preconstruction Submittals
1.9 GSubmittal Register
01 35 13 SD-01 Preconstruction Submittals
G AOFPhoto Work Plan;
G AOFPrework Photographs
G AOFTraffic control plan;
G AOFConstruction site plan;
G AOFMobilization Plan
G AOFLoading Plan
SD-11 Closeout Submittals
G AOFConstruction Photographs;
G AOFCompletion Photographs;
G AOFPHOTO DATABASE;
01 35 26 SD-01 Preconstruction Submittals
1.7 G AOFAccident Prevention Plan (APP)
SD-06 Test Reports
1.4Monthly Exposure Reports
1.12Notifications and Reports
1.12.2 G AOFAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates
1.6.1.4Crane Operators/Riggers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES
01 35 26 1.7.2.2 G AOFStandard Lift Plan
1.7.2.3 G AOFCritical Lift Plan
1.7.2.4 G AOFNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA)
1.9.1Confined Space Entry Permit
1.9.1Hot Work Permit
Certificate of Compliance
1.14License Certificates
1.14.1 G AOFRadiography Operation Planning
Work Sheet
1.14.1 G AOFPortable Gauge Operations
Planning Worksheet
01 45 00.00 10 SD-01 Preconstruction Submittals
3.2 G AOFContractor Quality Control (CQC)
Plan
01 50 00 SD-01 Preconstruction Submittals
1.2 G AOFConstruction site plan
01 57 19 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.7 G AOFEnvironmental Protection Plan
3.2.1.2 G AOFStormwater Notice of Intent
1.7.8.1 G AOFDirt and Dust Control Plan
SD-06 Test Reports
3.2.1.3Inspection Reports
1.9 G AOFSolid Waste Management Report
3.7.2.1 G AOFSolid Waste Management Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES
01 57 19 SD-07 Certificates
Certificate of Competency
SD-11 Closeout Submittals
3.2.1.4 G AOFStormwater Pollution Prevention
Plan Compliance Notebook
3.2.1.5 G AOFStormwater Notice of Termination
3.7.1 G AOFWaste Determination
Documentation
G AOFDisposal Documentation for
Hazardous and Regulated Waste
G AOFAssembled Employee Training
Records
G AOFSolid Waste Management Permit
1.9 G AOFSolid Waste Management Report
3.7.2.1 G AOFSolid Waste Management Report
G AOFHazardous Waste/Debris
Management
Contractor Certification
As-Built Topographic Survey
01 78 00 SD-11 Closeout Submittals
G ECAs-Built Drawings
3.4 G AOFRecord Drawings
3.5Final Approved Shop Drawings
02 13 90 SD-03 Product Data
G AOFConstruction Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.