Drawing_G-001_Amd_1.pdf

PDF 1 MB Posted

Attached to
FY18 West Center Pier Bollard Replacement
Solicitation number
W911XK18B0005
Issued by

About this file

Drawing G-001_Amd 1.pdf

View the file

Other files

File Type Posted
Bid_Abstract_W911XK18B0005.pdf PDF
Drawing_CU401_Amd_1.pdf PDF
W911XK18B0005-Amendment_0001.pdf PDF
Drawing_CD301_Amd_1.pdf PDF
Drawing_V-102_Amd_1.pdf PDF
Drawing_V-103_Amd_1.pdf PDF
Drawing_S-301_Amd_1.pdf PDF
Drawing_CD103_Amd_1.pdf PDF
Drawing_CD102_Amd_1.pdf PDF
Site_Visit_Sign_In_Sheet_21June2018.pdf PDF
Specification_01_99_90_Attachments.pdf PDF
Solicitation_W911XK18B0005.pdf PDF
Specifications_-_W911XK18B0005.pdf PDF
Drawings_-_W911XK18B0005.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLC+018

SLC+033/RJ1269

SLC+051/RJ1346

The code SLC+018 does not exist in the feature table

The code SLC+033/RJ1269 does not exist in the feature table

The code SLC+051/RJ1346 does not exist in the feature table

ONTARIO CANADA

CHIPPEWA CO., MI

ANCHOR

ANCHOR

BEAM

BEAM

BEAM

ANCHOR

MONUMENT

CATWALK

T R

A C

K S

HANDRAIL

BEAM

DIRT PILE

DIRT PILE

CANADIAN FLAG

INTERNATIONAL LINE

c a t w a l k

AMERICAN FLAG

ONTARIO CANADA

CHIPPEWA CO., MI

ANCHOR

ANCHOR

BEAM

BEAM

BEAM

ANCHOR

MONUMENT

CATWALK

T R

A C

K S

HANDRAIL

BEAM

DIRT PILE

DIRT PILE

CANADIAN FLAG

INTERNATIONAL LINE

c a t w a l k

AMERICAN FLAG

ONTARIO CANADA

CHIPPEWA CO., MI

ANCHOR

ANCHOR

BEAM

BEAM

BEAM

ANCHOR

MONUMENT

CATWALK

T R

A C

K S

HANDRAIL

BEAM

DIRT PILE

DIRT PILE

CANADIAN FLAG

INTERNATIONAL LINE

c a t w a l k

AMERICAN FLAG

AE8006

AE8005 The code AE8005 does not exist in the feature table

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+

11+00

12+00

13+00

14+00

15+00

16+00

17+00

18+00

19+00

20+00

21+00

22+00

23+00

24+00

25+00

26+00

27+00

28+00

29+00

30+00

31+00

32+00

33+00

34+00

35+00

36+00

37+00

38+00

39+00

40+00

41+00

42+00

43+00 44+00

45+00 46+00

47+00 48+00

49+00 50+00

51+00 52+00

53+00 54+00

55+00 56+00

57+00 58+00

59+00

60+00

61+00

62+00 62+89.68

0+00 1+00

2+00 3+00

4+00 5+00

6+00 7+00

8+00 9+00

10+00 11+00

12+00 13+00

14+00 15+00

16+00

17+00

18+00

19+00

20+00

21+00

22+00

23+00

24+00 25+00

26+00 27+00

28+00 29+00

30+00

31+00

32+00

33+0033+21.67

0+001+002+003+004+005+006+007+008+009+0010+0011+00 12+00

13+00

14+00

15+00

16+00

17+00

18+00

19+00

20+00

21+00

22+00

23+00

23+85

0+00

1+00

2+00

3+00

4+00

5+00

6+00

7+00

8+00

9+00

10+00

11+00

12+00

13+00

14+00

15+00

16+0017+00 18+00

19+00

20+00

20+96.95

606.57

CP

606.01

CP54

606.97

CP

606.97

CP

605.58

CP

613.15

CP

609.21

CP48

607.74

CP

607.05

CP

618.02

CP

614.25

CP

619.78

CP

621.33

CP

618.08

CP

611.61

CP

612.22

CP

708.69

CP

618.79

CP

618.51

CP

694.76

CP

619.61

CP

617.69

CP

605.77

CP

590.29

CP

589.69

CP

590.10

CP

594.20

CP

596.12

CP

585.28

CP

585.51

CP

609.22

CP

605.71

CP

606.86

CP

606.74

CP

606.56

CP28

606.56

CP

606.65

CP

606.48

CP

599.79

CP

585.77

CP 33

586.94

CP

586.86

CP

586.67

CP

606.66

CP

606.66

CP

606.05

CP

606.28

CP

606.27

CP

606.25

CP

608.69

CP

606.79

CP

595.44

CP

603.89

CP

598.60

CP

595.94

CP

585.24

CP

586.62

CP

586.56

CP

587.06

CP

of Engineers

US Army Corps

THIER EMPLOYMENT AS REQUIRED BY ER 1110-1-8152

APPEAR ON THESE PROJECT DOCUMENTS WITHIN THE SCOPE OF

SIGNATURES AND REGISTRATION DESIGNATIONS OF INDIVIDUALS

THE U.S. ARMY CORPS OF ENGINEERS. THE INITIALS OR

THIS PROJECT WAS DESIGNED BY THE DETROIT DISTRICT OF

PHILLIP C. ROSS P.E., CHIEF ENGINEERING & CONSTRUCTION OFFICE

WILLIAM D. MERTE P.E., CHIEF COST & GENERAL ENGINEERING BRANCH

NICHOLAS J. ZAGER P.E., CHIEF GEOTECH & STRUCTURES BRANCH

G-001

CONTRACT NO. :

ISSUE DATE:

W911XK-XX-X-XXXX

Detroit District

GENERAL NOTES

VICINITY MAP

C O

V E

R S

H E

E T

SOO LOCKS COMPLEX

G -0

A m d .d g n

MARIE STRUM P.E., CHIEF ENGINEERING & TECHNICAL SERVICES

FY18 WEST CENTER PIER BOLLARD REPLACEMENT

W911XK-18-B-0005SOLICITATION NO.:

07 MAY 2018

NICHOLAS J. ZAGER /S/

WILLIAM D. MERTE /S/

PHILLIP C. ROSS /S/

MARIE STRUM /S/

A

A

A M

E N

D M

E N

T N

O

/2

/1

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

S

IZ

E

S U

B M

IT

T E

D B

Y

C O

N T

R A

C T N

O

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

S

A AF

E

Y

Y

T

P S

C O

R P

S

O F

E N

G

IN

E E

R S

D E

T R

IT

D

IS

T R

IC

T

In c r e a s e

P r o f it .S u b m it

V

E C

P 'S

V a lu e

E n g in e e r in g

W

X K -X

X -X -X

X X

X

A N

S I

D

P

H

IL

L

IP

R

O

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

®of Engineers

US Army Corps

D E

T R

O

IT

D

IS

T R

IC

T

A

B

C

D

E

F

G

1 2 3 4 5 6 7 8 9 10

D E

S C

R

IP

T

IO

N M

A R

K D

A T

E

S A

U L T S

T E

M A

R

IE

S

O O L

O C

K S

M I

C H

IP

P E

W A C

O U

N T

Y

N Z

A G

E R

M

A Y

M

IC

H

IG

A N A

V E

D E

T R

O

IT

M I

F Y W

E S

T C

E N

T E

R P

IE

R

B O

L L

A R

D R

E P

L A

C E

M E

N T

C T

R O

M M

E R

W

X K -1

-B -0

B

D A

W S

N

CERTIFIED FINAL - READY TO ADVERTISE

Minnesota

Wisconsin

Illinois

Indiana Ohio

Michigan

Detroit Area Office

Duluth Area Office Sault Ste. Marie

Soo Locks Complex

Sault Ste. Marie, MI Soo Locks Facility Project Location.

N

Location Map

L ake H uron

La ke E rie

Lake Superior

L a k e M ic h ig a n

Kewaunee Area Office

WEST CENTER PIER

SOUTH WALL

PROJECT REPAIR AREA,

SCALE: 1' = 1000'

THE CONTRACTOR'S WORK PLAN.

PROPOSED METHOD FOR ANY ANTICIPATED DISTRIBUTION OF LOADS SHALL BE INCLUDED IN

CLAY CONDUIT LOCATED AT NORTH MONOLITH,SEE SHEET CU401. CONTRACTOR'S

THE WEST CENTER PIER CONCRETE MONOLITHS WILL NOT EXCEED 150 PSF, EXCEPT ON

DISTRIBUTED OVER THE SURFACE AREA SUCH THAT THE NET LOADING WITHIN 10 FEET OF

ALL SURCHARGE (DEAD LOAD AND LIVE LOAD) GREATER THAN 6,000 POUNDS SHALL BE 7.

WITH THE CURRENT DISPOSAL REGULATIONS AND THE PROJECT SPECIFICATIONS.

THE CONTRACTOR MUST DISPOSE OF EXCAVATED MATERIAL OFF-SITE IN ACCORDANCE 6.

MOORING BOLLARD SYSTEMS AND CONCRETE WALKWAY, WITHIN THE LIMITS SHOWN.

BOLLARD SYSTEMS, REMOVAL OF ABANDONED DUCT BANKS, INSTALLATION OF PROPOSED

WORK CONSISTS OF, BUT IS NOT LIMITED TO DEMOLITION OF EXISTING PAVED SURFACE AND 5.

LOADED AT ANY TIME DURING CONSTRUCTION.

CONTRACTOR MUST ENSURE THAT THE EXISTING CONCRETE CAP / MONOLITH IS NOT

ALL CONSTRUCTION MATERIALS TO BE STOCKPILED ALONG THE PIER SURFACE. THE 4.

ALL ITEMS SHOWN ARE EXISTING UNLESS OTHERWISE INDICATED.3.

ELEVATIONS SHOWN ARE IN FEET AND ARE REFERENCED TO CANAL DATUM.

ALL ELEVATIONS AND DIMENSIONS MUST BE VERIFIED IN THE FIELD BEFORE WORK BEGINS. 2.

SIGNIFICANCE OF THE COMPLEX DURING THE EXTENT OF WORK UNDER THIS CONTRACT.

PLACES. THE CONTRACTOR IS THEREFORE RESPONSIBLE FOR PROTECTING THE HISTORIC

THE SOO AREA OFFICE PROPERTY IS LISTED ON THE NATIONAL REGISTER OF HISTORIC 1.

File details come from the government source that posted it.