W911XK10-B-0012-0003.pdf
PDF 19 KB Posted
- Solicitation number
- W911XK-10-B-0012
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56MES01758287
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Fence/Observation Deck at Sault Ste Marie
This amendment is issued to make changes to the specifications and plans as described on the follow ing pages.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-B-0012
X 9B. DATED (SEE ITEM 11)
07-Aug-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-Aug-2010
CODE
CONTRACTING DIVISION
DETROIT DISTRICT
477 MICHIGAN AVE
RM 700
DETROIT MI 48226-2550
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-10-B-0012
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 3
CHANGES TO SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS
SECTION 01 58 01 PROJECT SIGN AND SAFETY SIGN
Delete: 2.1.3 Project Identification Label
FOR LINE 3, ARRA Signage
Add: To End of Section 01 58 01 PROJECT SIGN AND SAFETY SIGN
Plate 01 58 00.00 03-1 Plate 01 58 00.00 03-2
(SEE ATTACHED)
DIVISION 05 – METALS
SECTION 05 12 00 STRUCTURAL STEEL
Delete: 1.4 AISC QUALITY CERTIFICATION
Work shall be fabricated in an AISC certified Category STD fabrication plant.
CHANGES TO PLANS
SHEET: OBSERVATION DECK SITE DEMOLITION
Add: SHEET : CD104, REV DATE: 08-30-10
(SEE ATTACHED)
SHEET: S-100 STRUCTURAL GENERAL NOTES
Delete: FOUNDATION
W911XK-10-B-0012
5. MINIMUM ALLOWABLE SOIL BREARING PRESSURE = 2000 PSF
Add: FOUNDATION
5. MINIMUM ALLOWABLE SOIL BEARING PRESSURE = 3000 PSF
(SEE ATTACHED)
SHEET: S-200 FOUNDATION PLAN & DETAILS
Delete: FOUNDATON PLAN NOTES
1. ASSUMED SOIL BEARING CAPACITY OF 2000 PSF
Add: FOUNDATION PLAN NOTES
1. ASSUSMED SOIL BARING CAPACITY OF 3000 PSF
(SEE ATTACHED)
END OF AMENDMENT
(End of Summary of Changes)
File details come from the government source that posted it. Updated .