Text version

W56MES01758287

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY10 Soo Replacement Center Observation Deck and Security Fence

This amendment is issued to:

1. Change bidding schedule

2. Update the specifications

3. Update Wage Determination

4. Revise clause number 252.204-7007 w ith correct NAICS code

1. CONTRACT ID CODE PAGE OF PAGES

J 1 38

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Aug-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-B-0012

X 9B. DATED (SEE ITEM 11)

07-Aug-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Aug-2010

CODE

CONTRACTING DIVISION

DETROIT DISTRICT

477 MICHIGAN AVE

RM 700

DETROIT MI 48226-2550

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-10-B-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 1

Amendment 0001 – FY10 Soo Replacement Center Observation Deck and Security Fence

Bidding Schedule:

ITEM # SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

0001 Mobilization & Demobilization 1 Lump Sum $_______________ 0002 Remove and Replace

Security Fence

1 Lump Sum

0003 Remove and Replace Ctr

Observation Deck

1 Lump Sum

Sub Total – Items 0001 through 0003 – Base Items for New Fence/Observation Deck 0004 Option 1 – Furnish and

Deliver Fencing Materials 335 Foot

0005 Option 2 – Install Fencing

Materials 335 Foot

0006 Option 3 – Furnish and

Deliver Fencing Materials 400 Foot

0007 Option 4 – Install Fencing

Materials 400 Foot

0008 Option 5 – Furnish and

Deliver Fencing Materials 490 Foot

0009 Option 6 – Install Fencing

Materials 490 Foot

0010 Option 7 – Furnish and

Deliver Fencing Materials 242 Foot

0011 Option 8 – Install Fencing

Materials 242 Foot

0012 Option 9 – Furnish and

Deliver Fencing Materials 472 Foot

0013 Option 10 – Install Fencing

Materials 472 Foot

Option 11 – Furnish and Deliver Fencing Materials

550 Foot

Option 12 – Install Fencing Materials

550 Foot

Sub Total – Items 0004 through 0015 – Options for Soo Fence/Observation Deck Total Amount of ALL items (0001 through 0015) for New Fence/Observation Deck and Options – Soo Sault Marie Michigan (US Army Corps Area Office Complex)

SECTION 01 11 00 SUMMARY OF WORK

Delete: 1.1.1 Project Description

The work includes removal of existing center observation deck and chain link security fence, construction of a new center observation deck and security fence and incidental related work.

Add: 1.1.1 Project Description

The work includes removal of existing chain link security fence in proximity of the Center Observation Deck and construction of a new security fence. The Center Observation Deck shall also be removed and a new Center Observation Deck constructed. Additional sections of existing chain link security fence may also be furnished and delivered to the Soo Locks Complex or removed and replaced with new security fence at the option of the Government. Incidental related work shall be included.

SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT

Delete: SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT

Add: SECTION 01 22 00.00 10 MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Schedule of Prices; G

1.2 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. Contractor shall submit Schedule of Prices for lump sum payment items within 14 calendar days of issuance of the

Notice to Proceed. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum or unit price payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2.1 Mobilization / Demobilization [Item No. 0001]

1.2.1.1 Payment

Payment will be made for the entire work complete in accordance with the drawings and specifications associated with Mobilization / Demobilization work.

1.2.1.2 Unit of Measure

Unit of measure: lump sum.

1.2.2 Remove and Replace Security Fence [Item No. 0002]

1.2.2.1 Payment

specifications associated with Remove and Replace Security Fence work.

1.2.2.2 Unit of Measure

1.2.3 Remove and Replace Observation Platform [Item No. 0003]

1.2.3.1 Payment

specifications associated with Remove and Replace Observation Platform work.

1.2.3.2 Unit of Measure

1.3 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.3.1 Option-01 Furnish and Deliver Security Fence Materials [Item No. 0004]

1.3.1.1 Payment

Payment will be made for Option-01 Furnish and Deliver Security Fence in accordance with drawings and specifications (Division 00, Sections 09 96 00, 32 31 19) associated with the work. Work includes; site visits as required to obtain information necessary for the production of design shop drawings and layout plans; fabrication and painting of fence components; and delivery of fence components, including detailed assembly and installation drawings, to the Soo Locks Facility. This section of fence includes one swing gate with two (2) 8' leaves.

1.3.1.2 Unit of Measure

Unit of measure: per lineal foot (FT) as measured along the fence, with no deduction made for gates.

1.3.2 Option-02 Install Security Fence Materials [Item No. 0005]

1.3.2.1 Payment

Payment will be made for Option-02 Install Security Fence in accordance with drawings and specifications (Division 00, Sections 02 41 00, 09 96 00, 32 31 19, 32 92 19) associated with the work. Work includes: removal of existing chain link security fence, installation of the new security fence materials provided under Bid Item 0004.

1.3.2.2 Unit of Measure

1.3.3 Option-03 Furnish and Deliver Security Fence Materials [Item No. 0006]

1.3.3.1 Payment

Payment will be made for Option-03 Furnish and Deliver Security Fence in accordance with drawings and specifications (Division 00, Section 32 31 19) associated with the work. Work includes; site visits as required to obtain information necessary for the production of design shop drawings and layout plans; fabrication and painting of fence components; and delivery of materials, including detailed assembly and installation drawings, to the Soo Locks Facility.

This section of fence includes one swing gate with two (2) 9' leaves.

1.3.3.2 Unit of Measure

1.3.4 Option-04 Install Security Fence Materials [Item No. 0007]

1.3.4.1 Payment

Payment will be made for Option-04 Install Security Fence in accordance with drawings and specifications (Division 00, 02 41 00, 09 96 00, 32 31 19, 32 92 19) associated with the work.

Work includes: removal of existing chain link security fence and installation of the new security fence materials provided under Bid Item 0006.

1.3.4.2 Unit of Measure

1.3.5 Option-05 Furnish and Deliver Security Fence Materials [Item No. 0008]

1.3.5.1 Payment

Payment will be made for Option-05 Furnish and Deliver Security Fence in accordance with work. Work includes; site visits as required to obtain information necessary for the production of design shop drawings and layout plans; fabrication and painting of fence components; and delivery of materials, including detailed assembly and installation drawings, to the Soo Locks Facility. This section of fence includes one swing gate with two (2) 10' leaves, and one gate with two 18' leaves.

1.3.5.2 Unit of Measure

1.3.6 Option-06 Install Security Fence Materials [Item No. 0009]

1.3.6.1 Payment

Payment will be made for Option-06 Install Security Fence in accordance with drawings and specifications (Division 00, 02 41 00, Sections 09 96 00, 32 31 19, 32 92 19) associated with the work. Work includes: removal of existing chain link security fence and installation of the new security fence materials provided under Bid Item 0008.

1.3.6.2 Unit of Measure

1.3.7 Option-07 Furnish and Deliver Security Fence Materials [Items No. 0010]

1.3.7.1 Payment

Payment will be made for Option-07 Furnish and Deliver Security Fence in accordance with work. Work includes; site visits as required to obtain information necessary for the production of design shop drawings and layout plans; fabrication and painting of fence components; and delivery of materials, including detailed assembly and installation drawings, to the Soo Locks Facility.

1.3.7.2 Unit of Measure

1.3.8 Option-08 Install Security Fence Materials [Items No. 0011]

1.3.8.1 Payment

Payment will be made for Option-08 Install Security Fence in accordance with drawings and specifications Division 00,Sections 02 41 00, 09 96 00, 32 31 19, 32 92 19) associated with the work. Work includes: removal of existing chain link security fence and installation of the new security fence materials provided under Bid Item 0010.

1.3.8.2 Unit of Measure

1.3.9 Option-09 Furnish and Deliver Security Fence Materials [Item No. 0012]

1.3.9.1 Payment

Payment will be made for Option-09 Furnish and Deliver Security Fence in accordance with work. Work includes; site visits as required to obtain information necessary for the production of design shop drawings and layout plans; fabrication and painting of fence components; and delivery of materials, including detailed assembly and installation drawings, to the Soo Locks Facility. This section of fence includes one swing gate with two (2) 12' leaves.

1.3.9.2 Unit of Measure

1.3.10 Option-10 Install Security Fence Materials [Item No. 0013]

1.3.10.1 Payment

Payment will be made for Option-10 Install Security Fence in accordance with drawings and specifications (Division 00, Sections 02 41 00, 09 96 00, 32 31 19, 32 92 19) associated with the work. Work includes: removal of existing chain link security fence and installation of the new security fence materials provided under Bid Item 0013.

1.3.10.2 Unit of Measure

1.3.11 Option-11 Furnish and Deliver Security Fence Materials [Item No. 0014]

1.3.11.1 Payment

Payment will be made for Option-11 Furnish and Deliver Security Fence in accordance with work. Work includes; site visits as required to obtain information necessary for the production of design shop drawings and layout plans; fabrication and painting of fence components; and delivery of materials, including detailed assembly and installation drawings, to the Soo Locks Facility. This section of fence includes two swing gates: one with one (1) 7' leaf, and one with two (2) 9' leaves.

1.3.11.2 Unit of Measure

1.3.12 Option-12 Install Security Fence Materials [Item No. 0015]

1.3.12.1 Payment

Payment will be made for Bid Option 0015 Install Security Fence in accordance with drawings and specifications (Division 00, Sections 02 41 00, 09 96 00, 32 31 19, 32 92 19) associated with the work. Work includes: removal of existing chain link security fence and installation of the new security fence materials provided under Bid Item 0015.

1.3.12.2 Unit of Measure

PART 2 PRODUCTS

NOT USED

PART 3 EXECUTION

NOT USED

-- End of Section --

DIVISION 09 – FINISHES

SECTION 09 96 00 HIGH-PERFORMANCE COATINGS

Delete: SECTION 09 96 00 HIGH PERFORMANCE COATINGS

Add: SECTION 09 96 00 HIGH PERFORMANCE COATINGS

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

MASTER PAINTERS INSTITUTE (MPI)

MPI ASM (2004) Architectural Painting Specification Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Submit Material, Equipment and Fixture List in accordance with paragraph entitled, "Delivery, Handling and Storage," of this section.

SD-03 Product Data

Submit manufacturer's catalog data for the following items including manufacturer's name and identification. Data shall include detailed analysis of each special coating material required for the project, with all the coating constituents measured as percentages of the total weight of the coating. Manufacturer's data concerning application, thinning, and average coverage per gallon shall be included.

Epoxy Coatings

SD-04 Samples

Submit sample Color Chips in accordance with paragraph entitled, "Delivery, Handling and Storage," of this section.

SD-07 Certificates

Submit certificates for following items showing conformance with the referenced standards contained in this section.

Epoxy Coatings

1.3 DELIVERY, HANDLING AND STORAGE

Special coating materials must be delivered to the project in their original containers bearing manufacturer's name, descriptive label, and coating formulations. Provide new and unopened containers.

Special coating materials must be stored in tightly closed containers in a covered, well-ventilated area where they will not be exposed to excessive heat, fumes, sparks, flame, or direct sunlight. Protect water-based coatings against freezing.

Solvents, thinners, and equipment cleaners must be stored with the same care as the coating materials with ambient temperatures continuously maintained at a minimum 45 degrees F.

Submit Material, Equipment and Fixture List consisting of a list of proposed equipment to be used in performance of construction work.

Submit three color chips 3 inch by 4 inch or manufacture pull-down of each finish color and gloss as scheduled.

1.4 FIELD TESTS

Government may take dry-film tests from time to time on finished surfaces. Apply additional coatings to surfaces where there is less than the minimum specified dry-film thickness.

1.5 PROTECTIONS AND SAFETY PRECAUTIONS

Protect adjacent materials and equipment against damage from spillage, dripping, and spatter of coating materials. Building materials and equipment must be left clean and with all damaged surfaces corrected. Provide "WET PAINT" signs to indicate newly painted surfaces.

Provide forced ventilation for interior spaces during application and drying of coatings to prevent the buildup of toxic or explosive concentrations of solvent vapors.

Provide fire extinguishers of the required quantity and correct type to combat flammable liquid fires.

Dispose of rags that are used to wipe up coating materials, solvents, and thinners by drenching them with water and placing in a covered metal container.

1.6 QUALITY ASSURANCE

Comply with Master Painters Institute (MPI) Standards indicated and listed in "MPI Approved Products List." Comply with the requirements in "MPI Architectural Painting Specification Manual" before any project is started.

PART 2 PRODUCTS

2.1 EPOXY COATINGS

2.1.1 General

Conform to MPI ASM, No. 116 for epoxy coatings, as modified.

Vehicle resins for finish coats must be based on a polyamide-cured, epoxy-resin material.

Apply finish coats with a dry-film thickness of not less than 4 mils per coat. Finish color and gloss must be as indicated.

2.1.2 Concrete Surface Coatings

Apply an epoxy slip-resistant deck coating system in conformance with MPI ASM, No. 82.

Prime coat must fill concrete surface pores with a total dry-film thickness of not less than 2 mils.

2.1.3 Ferrous and Galvanized Metal Surface Coatings

Coatings on ferrous and galvanized metal surfaces must be a prime coat and not less than two finish coats. Comply with MPI ASM, No. 101 for an epoxy zinc primer with a metallic-zinc pigment for the substrate to be coated and the end use of the coated surface. Resin solids and zinc pigment must not be less than 80 percent of the total weight of the coating material.

Apply prime coat with a total dry-film thickness of not less than 4 mils. Provide an epoxy-based finished coat as specified.

2.1.4 Aluminum Surface Coatings

Apply an Epoxy Coating System in conformance with MPI ASM, No. 80 and MPI ASM, No.

77. Apply prime coat with a total dry-film thickness of not less than 4 mils.

2.1.5 Security Fence Coatings

2.1.5.1 Powder Coatings

Powder Coating: EAS-6-00023 Zinc Primer and POWDURA RAL Series Super Durable TGIC FREE POLYESTER Powder Coating manufactured by The Sherwin-Williams Company, or approved equal.

2.1.5.2 Liquid Coatings

ZINC CLAD 5 ORGANIC ZINC-RICH PRIMER and Polane S Plus UVR Polyurethane Enamel manufactured by The Shirwin-Williams Company, or approved equal.

PART 3 EXECUTION

3.1 SURFACE PREPARATION

3.1.1 Concrete Surfaces

Conform to MPI ASM for substrates indicated. Remove plates, machined surfaces, and similar items already in place that are not to be coated. Provide surface-applied protection before surface preparation and coating where removal is impractical or impossible. After completing coating operations, reinstall items that were removed.

Clean dirt, oil, grease, and incompatible paints from substrates to ensure bonding.

Coordination of shop-applied prime coats with high-performance coatings is critical. Remove incompatible primers. Reprime substrate with compatible primers as required to produce coating systems indicated.

3.1.1.1 Galvanized-Metal Substrates

Remove grease and oil residue from galvanized sheet metal fabricated from coil stock by mechanical methods to produce clean, lightly etched surfaces that promote adhesion of subsequently applied coatings.

3.1.1.2 Aluminum Substrates

Remove surface oxidation.

3.1.1.3 Wood Substrates

Prep substrates by scraping and cleaning small, dry, seasoned knot. Sand surfaces smooth.

Apply a thin coat of knot sealer before applying an interior latex-based wood primer. Prime edges, ends, faces, undersides, and back sides of wood. After priming, fill holes and crevices to the finished surface with putty or plastic wood filler. After finished surface is dry, smooth surface by sanding. For a finished product.

3.1.1.4 Security Fence

General substrate preparation shall include but is not limited to: ensuring substrate is free of grease, oil, dirt, fingerprints, drawing compounds, any contamination, and surface preparation treatments to ensure optimum adhesion and coating performance properties.

Substrate shall be prepared using methods recommended in writing by coating manufacturer.

3.2 COATING MATERIAL PREPARATION

3.2.1 General

Mix and prepare coating materials in accordance with the coating manufacturer's printed instructions for the particular material and coat to be applied. Keep materials which are not in actual use in closed containers.

Coating materials that have been mixed with an automatic shaker must be allowed to stand to let air bubbles escape, and then given a final hand mixing before application. Stir materials so as to produce a mixture of uniform density. Stir at frequent intervals during application to prevent skinning. Do not stir film which may form on the surface of the material. Remove film and strain, if necessary.

3.2.2 Thinning

Thinning must be done in accordance with coating manufacturer's printed directions for the particular material and coat.

3.2.3 Tinting

Prime and intermediate coats of paint must be a slightly different tint from the finish coat to facilitate identification of each coat. Tinting must be done by the coating manufacturer and clearly identified as to color and coat.

3.3 APPLICATION OF COATING MATERIALS

3.3.1 General

Do not perform exterior painting in damp or rainy weather. Interior painting must not be allowed until the building is enclosed and has thoroughly dried out. Do not allow painting below 50 degrees Fand above 95 degrees F. Painting application must be in accordance with the coating manufacturer's recommendations, and as specified.

Application of coatings must be done by skilled applicators. Apply coatings to clean and properly prepared surfaces. Apply coatings carefully with clean, high-quality application equipment. Allow sufficient time between coats to ensure complete drying and curing.

Surfaces must be sanded and dusted between coatings, as required, to produce a surface free of visible defects. High gloss coatings and clear finishes must be lightly sanded between coats to ensure bond of following coats.

Apply coats to the surfaces in an even film. Do not accept cloudiness, spotting, holidays, laps, application marks, runs, sags, and other similar surface imperfections. Remove defective coating applications and recoat as directed.

Coating lines such as wainscots must be sharp, true, and well-defined. Tape may be used to establish coating lines, providing tape is removed before ragging or sawtooth edges form.

Surfaces, including edges, corners, crevices, welds, and other similar changes in surface plane, must receive a dry-film thickness not less than specified.

3.3.2 Brush Application

Brushes must be clean and the proper size and type for high-quality application of the specified coating materials. Slow-dry coatings must be brushed out. Quick-dry coatings must be brushed only enough to spread out evenly.

3.3.3 Roller Application

Roller covers must be clean and of the proper nap length, nap texture, and material for high-quality application of the specified coating materials.

Roller application must be done carefully and must be equivalent in all respects to the same coats applied by high-quality brush application.

3.3.4 Spray Application

Spray application equipment must be limited to airless-spray equipment and electrostatic-spray equipment. Equipment must be clean and operated by workmen skilled in high quality application of coating materials.

Spray application of coatings must be limited to finish coats on metal frame works, siding, decking, wire mesh, and other surfaces where hand work would be inferior. Sprayed coatings must be carefully applied and equivalent in all respects to the same coats applied by high quality brush application. Each spray coat must be permitted to cure before the succeeding coat is applied. Do not permit doubling back with application equipment, for the purpose of building up film thickness of two coats in one operation.

Surfaces adjacent to areas to be spray coated shall be covered to prevent damage from overspray, coating rebound, and spray drift.

3.3.5 Security Fence

Painting of the Security Fence shall be performed as part of the manufacturing process in accordance with the paint manufacturer’s written specifications.

Onsite field painting shall only be performed to repair minor defects/scratching occurring during the assembly process. All onsite field painting shall be approved by the Contracting Officer's Representative prior to application. Onsite field painting shall be in accordance with the paint manufacturer's written specifications.

3.4 ACCEPTANCE PROVISIONS

3.4.1 Repairing

Remove damaged and unacceptable portions of completed work and replace with new work to match adjacent surfaces at no additional cost to the Government.

3.4.2 Cleaning

At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.

After completing coating application, clean spattered surfaces. Remove spattered coatings by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

Application equipment must be cleaned promptly and thoroughly with a suitable solvent after each use and stored in a clean, covered, well-ventilated container.

Protect work of other trades against damage from coating operation. Correct damage by cleaning, repairing, replacing, and recoating, as approved by Architect, and leave in an undamaged condition. At completion of construction activities of other trades, touch up and restore damaged or defaced coated surfaces.

-- End of Section –

DIVISION 32 – EXTERIOR IMPROVEMENTS

SECTION 32 31 19 HIGH-SECURITY STEEL FENCES AND GATES

Delete: 1.4 DELIVERY, STORAGE, AND HANDLING

ADD: 1.4 DELIVERY, STORAGE, AND HANDLING

Deliver materials to site in an undamaged condition. Store materials off the ground to provide protection against oxidation caused by ground contact.

Materials for bid items 0004, 0006, 0008, 0010, 0012, and 0014 shall be delivered to the Soo Locks Complex. The delivery date, time, and location within the complex shall be coordinated with the COR.

Delete: 2.6.1 Gate Assembly

Add: 2.6.1 Gate Assembly

Provide gate assembly of the type and swing shown. Provide gate frames adequate to support gate assembly.

Gates to be furnished under bid items 0004, 0006, 0008, 0010, 0012, and 0014 shall be fabricated with swinging leaves, lockable steel gate latch, and drop rod assembly.

CHANGE TO PLANS

SHEET 21 OF 33 A-301 BUILDING SECTIONS

Add: Revised detail, SHEET NO.S-1, 1/A-301 LEVEL 2 AND LEVEL 3 HANDRAIL (See Attached Details)

SHEET 22 OF 33 A-302 BUILDING AND WALL SECTIONS

Add: Revised detail, SHEET NO. S-2, 1/A-302 LEVEL 2 AND LEVEL3 HANDRAIL (See Attached Details)

SHEET 23 OF 33 A-501 ARHITECURAL DETAILS

Add: Revised detail, SHEET NO. S-3, 7/A-501 LEVEL 3 HANDRAIL SECTION DETAIL (See Attached Details)

SHEET 17 OF 33 S-401 FRAMING DETAILS & MOMENT CONNECTIONS

Delete: Detail D2 BEAM CONN. DETAIL

Add: Revised detail, SHEET NO. S-4, REVISED BEAM CONN. DETAIL D2/S401 (See Attached Details)

SHEET 24 OF 33 A-502 ARCHITECTURAL DETAILS

Delete: 8 SECTION DETAIL

Add: Revised detail, SHEET S-5, 8/A-502 SECTION DETAIL REVISION (See Attached Details)

Delete: 11 SECTION DETAIL

Add: Revised detail, SHEET S-6, 11/A-502 SECTION DETAIL REVISION (See Attached Details)

SHEET 10 OF 33 C-501 FENCE DETAILS

Delete: SHEET 10 OF 33 C-501 FENCE DETAILS

Add: SHEET 10 OF 33 C-501 FENCE DETAILS (05 FENCE PICKET DETAIL) (See Attached SHEET 10 OF 33, C-501)

ADD: SHEET 04 OF 33 XX101 BID OPTION ITEMS

END OF AMENDMENT

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0001

The CLIN description has changed from Mobilization & Demobilization to See Bid Schedule.

The CLIN extended description For Government Use Only has been added.

CLIN 0002

The CLIN description has changed from Remove and Replace Security Fence to For government use only.

CLIN 0003

The CLIN description has changed from Remove and Replace Ctr Observation Deck to For government use only.

The CLIN extended description has changed from TOTAL AMOUNT OF BID $____________________________ to .

The following have been modified:

DESCRIPTION OF WORK

This project involves the replacement of the center observation deck and the security fencing at the Soo Locks Facility, located in Sault Ste. Marie Michigan.

The observation deck removal includes the demolition of the existing steel structure and concrete footings, as well as removal of several existing electrical devices that will be reinstalled on the new platform. Construction of the new observation deck includes installing new concrete footings and constructing a new steel structure in the same location as the existing structure. The new structure will have two elevated viewing platforms and will be constructed of galvanized steel with glass walls, a metal roof and an insulated wall panel system. The project also includes reinstallation of various electrical devices and installation of new light fixtures inside the platform and mounted to the exterior of the structure.

The security fence replacement portion of the project will consist of removal of the existing chain link fence that currently separates the publically accessible park from the MacArthur Lock with a black steel fence that matches the existing fence at the street side of the park. The new fence will be installed in the same general location of the existing fence. The new fence will be constructed of shop finished steel with new concrete footings and outward curved security devices installed on the top of the fencing.

Both portions of the project will require temporary security fencing to ensure adequate facility security is maintained during construction.

The contractor shall coordinate with the Government the delivery and unloading of the optional items selected to be a part of the original bid based on the available budget. The quantities listed above are estimated from design drawings and are not based on actual field measurements. Contract shall refer to section 01 22 00 “Measurement and Payment” for explanation of all included in the proposed bid price. The Contracting Officer may exercise optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a “non-responsive bid.”

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by reference:

52.217-5 Evaluation Of Options JUL 1990

SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS

252.204-7007 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (52.204-8) ALTERNATE A (MAY 2010)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990 .

(2) The small business size standard is $33.5 M.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes tofurnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

(__) Paragraph (d) applies.

(__) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $100,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business).This provision applies to solicitations that--

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vi) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(vii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(viii) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(ix) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(x) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xi) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xiv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xv) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225- 1.

(xvi) 52.225-4, Buy American Act--Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternate I, and Alternate II) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $67,826, the provision with its Alternate II applies.

(xvii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xviii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification.

(xix) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to--

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following certifications are applicable as indicated by the Contracting Officer:

(Contracting Officer check as appropriate.)

----(i) 52.219-19, Small Business Concern Representation for the Small Business Competitiveness Demonstration

Program.

------(ii) 52.219-21, Small Business Size Representation for Targeted Industry Categories Under the Small

Business Competitiveness Demonstration Program.

------(iii) 52.219-22, Small Disadvantaged Business Status.

------(A) Basic.

------(B) Alternate I.

------(iv) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

------(v) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.

------(vi) 52.222-52 Exemption from Application of the Service Contract Act to Contracts for Certain Services--

Certification.

------(vii) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-

Designated Products (Alternate I only).

------(viii) 52.223-13, Certification of Toxic Chemical Release Reporting.

------(ix) 52.227-6, Royalty Information.

------ (A) Basic.

------ (B) Alternate I.

------(x) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) Web site at https://orca.bpn.gov/.

After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR/DFARS clause No. Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.

(End of Provision)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

WAGE DET MI 4

General Decision Number: MI100004 08/13/2010 MI4

Superseded General Decision Number: MI20080004

State: Michigan

Construction Type: Building

Counties: Alger, Chippewa, Delta, Dickinson, Luce, Mackinac, Marquette, Menominee and Schoolcraft Counties in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Modification Number Publication Date 0 03/12/2010 1 07/02/2010 2 08/06/2010 3 08/13/2010

ASBE0047-001 07/01/2009

CHIPPEWA, LUCE AND MACKINAC COUNTIES:

Rates Fringes

ASBESTOS WORKER/INSULATOR

Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems..........$ 28.42 15.41

ASBE0127-003 05/31/2009

ALGER, DELTA, DICKINSON, MARQUETTE, MENOMINEE AND SCHOOLCRAFT

COUNTIES:

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR

Includes the application of all insulating materials; protective coverings, coatings, and finishings to all types of mechanical systems..........$ 27.54 19.38

BOIL0169-001 07/01/2008

Rates Fringes

BOILERMAKER......................$ 31.953 20.869

BRMI0006-001 05/01/2009

Rates Fringes

Bricklayer; plasterer;

marble, terrazzo and tile setter...........................$ 24.88 14.43

CEMENT MASON/CONCRETE FINISHER...$ 24.88 14.43

Pointer, caulker and cleaner.....$ 24.88 14.43

FOOTNOTES: Stacks: Work on industrial and powerhouse stacks shall receive $2.00 per hour above the journeyman bricklayer rate.Industrial: Refinishing work on digesters, tanks, lime kilns, chests, boilers, and boiler tubes shall receive $2.00 per hour above the journeyman bricklayer rate.

CARP1510-001 05/01/2009

ALGER, CHIPPEWA, DELTA, DICKINSON, LUCE, MACKINAC AND MARQUETTE

COUNTIES; MENOMINEE COUNTY (except for that part south of County Road K at Amberg, Wisconsin, starting on the west at the Menominee River and ending on the east at the Bay of Green Bay); AND SCHOOLCRAFT COUNTIES:

CARPENTER (Includes concrete forms; Does not include drywall finisher)

DRYWALL HANGER; SOFT FLOOR

LAYER.......................$ 26.27 12.18

MILLWRIGHT.......................$ 30.78 12.40

Piledriver.......................$ 26.47 12.18

FOOTNOTES:

Waterfront work on the Great Lakes or connecting water navigable to Lake carriers: $0.20 per hour additional.

Work on industrial construction, defined as industrial manufacturing and processing plants such as ore plants, paper mills, power houses, foundries, saw mills, wood processing plants, or other industrial complexes: $.25 per hour additional.

ELEC0158-001 06/02/2008

MENOMINEE COUNTY (Townships of Ingallston, Melon and Menominee)

Rates Fringes

ELECTRICIAN......................$ 27.27 7.62+26.25%

FOOTNOTE: Work 40 or more ft. above the floor or ground, if not working on approved equipment, for the time when work is performed; also, work in tunnels under construction and where gas accumulaton rquires the use of protective equipmnet: 20% of the regular straight time rate of pay, additional.

ELEC0219-001 05/31/2010

DICKINSON COUNTY:

Rates Fringes

ELECTRICIAN (Does not include low-voltage work) Electrical contracts of $90,000 or less.............$ 26.24 16.59 Electrical Contracts over $90,000.....................$ 28.44 16.65

FOOTNOTES: All industrial work over 30 ft. above the ground, unless on solid flooring or grating permanently attached in place: 10% per hour additional.Over 60 ft.: 20% per hour additional.Over 90 ft.: 30% per hour additional.Work performed within 3 ft. of an unguarded opening at the above-mentioned heights to receive the above-mentioned premiums.Work in underground mines, except mine shaft work:

10% per hour additional.

ELEC0979-001 06/01/2009

DELTA COUNTY; MENOMINEE COUNTY (does not include the townships of Ingallston, Melon and Menominee); AND SCHOOLCRAFT COUNTY:

ELECTRICIAN......................$ 29.69 13.45+4%

FOOTNOTES: Work on chimneys, stacks, or towers where the worker is required to work at a distance of twenty-five

(25) feet but less than fifty (50) feet from the ground or floor to the working area (catwalks are not to be considered as a permanent floor): 10% additional.Work as defined above over fifty (50) feet but less than seventy-five (75) feet from the ground or floor: 20% additional.Work as defined above over seventy-five (75) feet but less than one hundred (100) feet from the ground or floor: 30% additional.Work as defined above over one hundred (100 feet from the ground or floor: to be paid at the double time rate.

ELEC1070-002 06/01/2009

Rates Fringes

ELECTRICIAN

Contracts $130,000 and under.......................$ 27.33 15.99+1% Contracts over $130,000.....$ 29.33 16.05+1%

ELEV0085-005 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 42.73 20.035

FOOTNOTE: Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service. Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day,Thanksgiving Day and Friday after, and Christmas Day.

ENGI0324-009 05/01/2010

Rates Fringes

OPERATOR: Power Equipment (Including underground work) Crane operator, main boom & jib 120' or longer........$ 26.78 18.65 Crane operator, main boom & jib 140' or longer........$ 27.03 18.65 Crane operator, main boom & jib 220' or longer........$ 27.28 18.65

GROUP 1.....................$ 26.28 18.65

GROUP 2.....................$ 23.03 18.65

GROUP 3.....................$ 22.45 18.65

GROUP 4.....................$ 21.51 18.65

Mechanic with truck and tools.......................$ 27.78 18.65

FOOTNOTES: Swing boom truck operator over 15 tons:$.50 per hour additional. Hydraulic crane operator 75 tons and under:$.75 per hour additional. Hydraulic crane operator over 75 tons:$1.00 per hour additional. Lattice boom crane operator:$1.50 per hour additional. Crusher pits, shafts and tunnel workers:$2.00 per hour additional. Premium rate:

main boom and jib 300 feet or longer is $1.50 per hour above the 220 ft. boom and jib rate. Premium rate: main boom and jib 400 feet or longer is $3.00 per hour above the 220 ft. boom and jib rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Regular equipment operator , backhoe, crane, dozer, front end loader, job mechanic, pumpcrete and squeezecrete, welder, concrete pump, excavator, milling and pulverizing machines,scraper (self-propelled and tractor drawn), welder

GROUP 2: Air track drill, boom truck (non-swing), concrete mixer, material hoist and tugger, pump 6" and over, beltcrete, sweeping machine, trencher, winches, well points and freeze systems

GROUP 3: Air compressor, conveyor, concrete saw, farm tractor (without attachments), fork truck, generator, guard post driver, mulching machine, pumps under 6-in., welding machine and grease person

GROUP 4: Oiler, fire tender, heater operator, brock concrete breaker, elevators (other than passenger), end dumps and skid steer.

Crane Operator with main boom and jib 300' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 220' of boom and jib wage rate.

Crane Operator with main boom and jib 400' or longer shall be paid an additional one dollar and fifty cents ($1.50) per hour above the 300 foot of boom wage rate ($3.00)

ENGI0325-006 10/01/2009

ALGER, BARAGA, CHIPPEWA, DELTA, DICKINSON, GOGEBIC, HOUGHTON,

IRON, KEWEENAW, LUCE, MACKINAC, MARQUETTE, MENOMINEE,

ONTONAGON, SCHOOLCRAFT

Power equipment operators -hazardous waste removal:

LEVEL A:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator...................$ 31.09 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.77 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 33.07 17.80

GROUP 1....................$ 30.12 17.80

GROUP 2....................$ 25.72 17.80

LEVEL B AND C:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators..................$ 30.14 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.71 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.03 17.80

GROUP 1....................$ 29.17 17.80

GROUP 2....................$ 24.78 17.80

LEVEL D WHEN CAPPING

LANDFILL:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators..................$ 28.59 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.27 17.80

Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.57 17.80

GROUP 1....................$ 27.62 17.80

GROUP 2....................$ 23.23 17.80

LEVEL D:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operators..................$ 28.84 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.52 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.82 17.80

GROUP 1....................$ 27.87 17.80

GROUP 2....................$ 23.48 17.80

HAZARDOUS WASTE REMOVAL CLASSIFICATIONS

GROUP 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader, heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self- propelled or tractor drawn), side boom tractor, slip form paver, slop paver, trencher, ultra high pressure…