W911WN19B8003-0001.pdf

PDF 205 KB Posted

Attached to
Lower Mon Area Office Rehabilitation Federal contract opportunity
Solicitation number
W911WN19B8003
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Amendment 0001

View the file

Other files for this federal contract opportunity

Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET483555753 113106

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RE: LOWER MON AREA OFFICE REHABILITATION AT CHARLEROI LOCK AND DAM, MONONGAHELA RIVER, WESTMORELAND COUNTY, PENNSYLVANIA

The purpose of this amendment is to: 1) Provide responses to questions received; 2) Revise three (3) Sections of the Technical Specifications; 3) Revise and Replace Sketches and Reference Draw ings; 4) Revise the Bid Schedule; 5) Extend the Bid Due Date; and 6) Incorporate the current Wage Determination, General Decision Number PA190105, dated 03/01/2019. ADDENDUM TO SECTION 00 73 00, Section 00 73 00 - 01 WAGE RATES have been updated, as indicated in the Summary of Changes to this Amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Mar-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN19B8003

X 9B. DATED (SEE ITEM 11)

19-Feb-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Mar-2019

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-RC-P

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN19B8003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0001

The following specification sections have been revised and is attached to this amendment:

Technical Specifications: Lower Mon Area Office Rehabilitation, Charleroi Lock and Dam, Monongahela River, Westmoreland County, Pennsylvania, Certified Final, February 2019 (Attachment 1 to Solicitation)

SECTION 01 11 00 – PERFORMANCE WORK STATEMENT

Paragraph 1.4.2 New Office Building – Delete option of conventional construction for new office building.

Paragraph 2.1.1.1 Design Requirements – Delete requirement of design professional if pre-engineered structure.

Paragraph 2.1.3.2 Communication System – Replace fiber optic cable with CAT 6 cable.

Paragraph 2.1.5.2 Exterior Walls – Remove reference to fiber cement siding.

Paragraph 2.2.3 Electrical – Replace fiber optic cable with CAT 6 cable.

Paragraph 2.5.2 Electrical Site Improvements – Delete New Slide Gate work.

SECTION 01 22 00.00 10 – PRICE AND PAYMENT PROCEDURES

Deleted CLIN 0015 – Replace Existing Sliding Entrance Gate with New Electrically Operated Cantilever Sliding Entrance Gate and related references.

SECTION 01 35 00.00 08 – SPECIAL PROCEDURES

Paragraph 3.1.i SEQUENCE OF WORK, Deleted references to New Slide Gate work.

The following contract drawings have been revised and are attached to this amendment:

Sketches and Reference Drawings: Lower Mon Area Office Rehabilitation, Charleroi Lock and Dam, Monongahela River, Westmoreland County, Pennsylvania, February 2019 (Attachment 2 to the Solicitation)

SKETCHES SK-01 thru SK-04 Revised and renumbered all notes.

Removed reference to New Slide Gate from SK-01.

REFERENCE DRAWINGS

Rescaled all reference drawings to 22x34 inches.

REPLACED ENTIRE SKETCHES AND REFERENCE DRAWINGS with larger scaled size.

Bid Schedule has been revised and is attached to this amendment:

Deleted BID ITEM 0015-Replace Existing Sliding Entrance Gate with New Electrically Operated Cantilever Sliding Entrance Gate from the BID SCHEDULE.

Davis Bacon Wage Determination, PA190105 02-01-2019 PA105 (Attachment 3 to the Solicitation)

Replaced with current Wage Determination, Davis Bacon Wage Determination, PA190105 03-01-2019 PA105 (Attachment 3)

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 21-Mar-2019 11:00 AM to 26-Mar-2019 11:00 AM.

The following have been modified:

BID SCHEDULE

ITEM

DESCRIPTION

QUANTITY

UNIT

UNIT PRICE

TOTAL

0001 Reimbursement for Actual Performance and Payment Bonds Premiums

1 Job $ $

0002 Site Utility Investigation 1 Job $ $ 0003 New Office Building 1 Job $ $ 0004 New Breezeway Structure 1 Job $ $ 0005 Existing Office Building: Entrance

Vestibule Demolition 1 Job $ $

0006 Existing Office Building: New Roofing System and Gutters

1 Job $ $

0007 Existing Office Building: Replace Exterior Skirting

590 Square Feet

0008 Existing Office Building: Replace Existing 4-inch Trim Boards

485 Linear Feet

0009 Existing Office Building: Replace Existing 6-inch Trim Boards

235 Linear Feet

0010 Existing Office Building:

Miscellaneous Exterior Improvements

1 Job $ $

0011 Existing Office Building:

Miscellaneous Interior Improvements

1 Job $ $

0012 Improve Underground Utility Service Piping

1 Job $10,000.00 $10,000.00

0013 Site Preparation, Grading and Restoration

1 Job $ $

0014 Engineering and Design Services 1 Job $ $

0015 NOT USED 1 Job $ $

0016 Existing Office Building, Replace Existing Exterior Siding

100 Square Feet

0017 Existing Office Building, Paint Building Exterior

2,600 Square Feet

Total, Items 0001 through 0017

SECTION 00 21 00 - INSTRUCTIONS

The following have been added by full text:

QUESTIONS AND ANSWERS

RESPONSES TO QUESTIONS RECEIVED (1-28)

Q1: We are interested in pursuing the project to rehab the existing triple-wide modular building and install a new double-wide modular office building. Does the existing triple-wide building on site that will be renovated contain asbestos?

A1: As far as it can be determined, there is no asbestos in the existing building.

Q2: Is there any mold in the existing triple-wide building that will need to be remediated?

A2: As far as it can be determined, there is no mold in the existing building.

Q3: Section 1.4 DESCRIPTION OF WORK states, “Obtain and pay for all required permits and inspections of the building construction as required by State and local authorities having jurisdiction. Licenses, impact fees, utility fees, state and local taxes, and any and all permit cost that may be imposed are to be included in the proposal.” Please identify permits, permit fees, licenses, impact fees, state and local taxes, utility fees are being referenced.

A3: The Contractor has the responsibility of investigating, obtaining and paying for all necessary permits, licenses, etc.

Q4: What is the voltage of the overhead power lines?

A4: Per the reference drawing showing the existing Lower Mon Area Office (LMAO) building electric service, the existing transformer pole has a 100kVA, 120/240 V, 1 phase, 3 wire transformer attached to it.

Q5: On the breezeway side of the building, there are wires coming out of the exterior lights that run on the roof. What do they supply, and do we need to rework them?

A5: The subject light fixtures were added after the building was constructed. The wires are the power cables to the lights and come from an existing fixture on the front of the building. These cable will have to be adjusted as needed to accommodate the required construction.

Q6. Are the existing tanks filled with flowable fill?

A6: The 11,000 gallon UST was filled with a controlled low-strength material (CLSM) in 2002.

Q7: Please show approximate location of sewer and water.

A7: Reference Drawing Sheet ID SK-01 shows the approximate location of the sanitary sewer line and the water line tie in. Contractor is required to perform utility investigation and determine locations for tie in / connection; etc.

Q8: Will the office be occupied while the work is being done?

A8: Yes. Reference Section 01 35 00.00 08, para OPERATION OF GOVERNMENT FACILITY.

Q9: Will the USACE be responsible for moving existing furniture?

A9: Yes. Contractor shall coordinate the furniture moving very closely with the office staff.

Q10: Will we be replacing all the floor tile in the existing office building?

A10: No

Q11: Are there soil reports? Is a Geotechnical Report available?

A11: No reports of these types are available.

Q12: Fire protection?

A12: There is no fire suppression system in the existing office building. The existing “Tattletale Security System” consists of two smoke detectors that will generate an automatic call to the monitoring system if triggered.

Q13: Are there any asbestos or lead paint reports?

A13: There are no asbestos or lead paint reports available.

Q14: Can you provide full size scaled drawings. The drawings we received are 11 x 17 at full size.

A14: Yes, full sized scaled drawings can be provided. The current Attachment 2, Sketches and Ref Drawings, Feb 2019, Lower Mon Area Office Rehab has been replaced with a copy of the full size scaled drawings.

Q15: Are we required to fill out both pages 3 and 4 (Item No. 0001 and Bid Schedule) along with the Bid Schedule (Excel document) provided with the bid package? They seem to be duplicates.

A15: Since the completion areas on the Bid Schedule in the Solicitation (pages 3 and 4) does not contain much space, the Bid Schedule has been provided as an Excel File for completion and submission with the Bid Package.

However, the total on the Bid Schedule should be transferred to the total for Item No. 0001 located on page 3 of the Solicitation.

Q16: The specifications indicate that the new slide gate’s power is to be supplied from the main service near the utility pole. At the site visit we did not notice the pole. Is it back by the existing electrical panels indicated on drawing SK-01?

A16: CLIN 0015 is deleted from the BID SCHEDULE. References to New Slide Gate have been deleted from respective Sections of the Technical Specifications.

Q17: Does the conduit feeding the new sliding gate have to be encased in concrete?

A17: CLIN 0015 is deleted from the BID SCHEDULE. References to New Slide Gate have been deleted from respective pages of the Technical Specifications.

Q18: There does not appear to be any specs related to the new electrical slide gate.

A18: CLIN 0015 is deleted from the BID SCHEDULE. References to New Slide Gate have been deleted from respective pages of the Technical Specifications.

Q19: Drawing SK-03 has a note for the stairs to be moved, “FURNISH AND INSTALL NEW ALUMINUM

STAIRS W/PLATFORM AND HAND RAILS. NEW STAIRS SHALL BE SIMILAR TO EXISTING

STAIRS LOCATED ON OPPOSITE SIDE OF THE BUILDING.”

Are all new stairs for this project to be similar to those located on the opposite side of the existing building?

A19: Yes.

Q20: Mentioned at the Site Visit were Modular or Stick-Built. Which one is it that is being asked for this project?

A20: Building provided to be a metal or modular style pre-engineered construction. Specifications have been revised.

Q21: The proposed drawing shows an exterior door on a mateline from the breezeway. Which module would you want the door to be located on?

A21: For the Existing Building, Reference Drawing A2 indicates that the dimensions of the existing building will allow the exterior doorway to be placed in Module #1 directly across from where the interior door is shown as removed in order to create the new breezeway foyer.

For the New Building, Note No. 3 on SK-02 states that “The layout is provided for illustration purposes only.

Contractor is responsible for coordination and layout of all improvements with final approval by the Contracting Officer”. Additionally, Section 01 11 00, Paragraph 2.1.1.3 a. allows the building dimensions to vary by plus or minus five feet in either dimension (total length or width).

It cannot be determined whether there is a “mateline” conflict with the new building layout as illustrated. Conflicts will be dependent on what type of building is proposed and submitted for review.

Q22: With regards to Question 21 (Q21), since the hallway is no longer centered on the mateline, this affects the dimensioning of the offices. Three offices would be 10x14’ and one office would be 10x11’ with the current dimensions. There are two options, extend the overall length of the building another 4’ and 10x15’ or keep the 60’ and have a smaller office. Please advise.

A22: See response to Question Q21 regarding mate line conflict and building dimension variance.

Additionally, the size of the utility room ONLY can be decreased as needed to accommodate the door shifting away from the illustrated location if it is unavoidable.

Q23: What material do you want for the exterior of the new building? The existing building has T-111 which does not hold up for the long term. I would recommend smart panel.

A23: Replacement is to be in kind. T-111 is required.

Q24: The specifications do not point out the type of frame on the new building. The existing has a perimeter frame. In addition, I would recommend a clear span building for the ability to reconfigure and have no interior columns in the building.

A24: Contractor is responsible for providing all information related to and submitting information for building type, method of construction, as well as design. A clear span building (of some type) may be one of the options considered by the Contractor that will allow for the new building to be configured as shown in the sketches. See response to Question Q21 related to building dimension variance.

Q25: Specify the required fiber optic cabling from existing office building to new building utility room.

A25: Reference to fiber optic cable has been deleted and replaced with CAT 6 ethernet cable.

Q26: Can fiber optic cabling installed within existing office building be installed in open air?

A26: The CAT 6 cabling (see response to Q25) needs to be kept indoors and can be run through the drop ceiling without conduit. There should not be a need to run it outside, but if it does it must be in conduit.

Q27: Please specify minimum lumen output rating for exterior lighting fixtures.

A27: Reference Section 01 11 00, Paragraphs 2.1.3.1.k and 2.3.2.2 for the output rating for the exterior light fixtures.

Q28: Please clarify if data outlets shall be comprised of a minimum of one data port or a minimum of three data ports.

A28: Reference Section 01 11 00, Paragraph 2.1.3.1 which states that for each office ... “at least one data port”… and for conference room… “a minimum of four data ports”.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

ADDENDUM TO SECTION 00 73 00

ADDENDUM TO SECTION 00 73 00 – SUPPLEMENTARY CONDITIONS

00 73 00 - 01 WAGE RATES

The attached schedule, Attachment 3, of wage rates contains rates applicable to all work under the contract:

General Decision Number: PA190105 03/01/2019 PA105 Superseded General Decision Number: PA20180129 State: Pennsylvania Construction Type: Building County: Westmoreland County in Pennsylvania.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

https://www.wdol.gov/wdol/scafiles/davisbacon/PA105.dvb?v=3

00 73 00 - 2 PAYMENT FOR PERFORMANCE AND PAYMENT BONDS

a. In order to ensure that sufficient funds have been set-aside for payment of performance and payment bond premiums, bidders shall insert in Bid Item No. 0001, an appropriate not-to-exceed dollar amount. Failure of bidders to insert a not-to-exceed dollar amount in Bid Item No. 0001 will cause the bid to be rejected as non-responsive.

b. The Contractor shall be reimbursed the actual bond costs only, as established by evidence of full payment to the surety, up to the dollar amount set forth in Bid Item No. 0001. In no case will the Contractor be reimbursed an amount which exceeds the dollar amount set forth in Bid Item No. 0001.

c. The Government will reimburse only the Prime Contractor for actual paid bond premiums. The Government will not reimburse any subcontractor's paid bond premiums.

00 73 00 - 3 REQUIRED INSURANCE

a. The Contractor shall procure and maintain during the entire performance period of this contract, the following minimum insurance. (See also Section 00 70 00 CONDITIONS OF THE CONTRACT, FAR 52.228-5 Insurance – Work On A Government Installation (JAN 1997).)

Type Bodily Injury Amount Property Damage

Comprehensive General Liability $500,000 Per Occurrence $100,000

Automobile Liability $200,000 Each Person --

$500,000 Per Occurrence $ 20,000 Workmen’s Compensation $100,000 (PA) and Employers Liability

b. The Contracting Officer will notify the Contractor of any noncompliance with the foregoing provisions. The Contractor shall, after receipt of such notice, immediately comply. Such notice, when delivered to the Contractor or his representative at the site or mailed to the Contractor's address, will be deemed sufficient for the purpose. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until the Contractor complies. No part of the time lost due to any such stop orders shall be made the subject of a claim for extension of time or for excess costs or damages by the Contractor. Compliance with the provisions of this article by subcontractors will be the responsibility of the Contractor.

00 73 00 - 4 SAFETY AND HEALTH REQUIREMENTS MANUAL

A copy of the current US Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 and its changes are available at http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx .

The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.

00 73 00 - 5 WORK UNDER OTHER CONTRACTS

Attention is directed to the fact that other Contractors may be employed by the Government or by local interests at or in the vicinity of the work covered by these specifications. All Contractors shall have equal rights to the use of all roads and grounds so far as practicable and this Contractor shall cooperate with other Contractors so that the work may be performed with the maximum efficiency. Should a disagreement occur between Contractors as to the use of facilities or in other matters, the decision of the Contracting Officer shall govern. (See also the Section 00 73 00 CONDITIONS OF THE CONTRACT, FAR 52.236-8 Other Contracts (APR 1984).)

00 73 00 - 6 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

a. This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with FAR clause 52.249-10 entitled "Default (Fixed-Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.

(1) The weather experienced at the project site during the contract period must be found to be unusually severe; that is, more severe than the adverse weather anticipated for the project location during any given month.

(2) The unusually severe weather must actually cause a delay to the completion of the project. This delay must be beyond the control and without the fault or negligence of the Contractor.

b. The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all-weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

12 9 7 6 5 6 5 5 4 4 5 11

c. Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more on the

Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated in paragraph b. above, the Contracting Officer will convert any qualifying delays to work days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with FAR clause 52.249-10 entitled, "Default (Fixed-Price Construction)".

d. The anticipated adverse weather work days listed above are based on days with precipitation greater than 0.1 inch and/or maximum temperature below 32 degrees F. The numbers shown represent the number of work days (not calendar days) normally expected to have these particular weather conditions based on historical data obtained from the "Climatography of the United States No. 20". The actual number of days will vary. This information is furnished for computation of possible time extensions due to weather delays and is not intended to imply that no work can be done on these days. The Contractor shall make his own determination of the effect of these conditions on his operations under this contract, and schedule his work accordingly.

00 73 00 - 7 WORK PERFORMED BY CONTRACTOR

Within ten (10) calendar days after award of the contract, the successful bidder will be required to furnish a description of the work which he intends to perform with his own organization, the percentage of the total work this represents, and the estimated cost thereof.

00 73 00 - 8 CONTRACTOR QUALITY CONTROL

Section 01 45 01, USACE QUALITY CONTROL, of this specification requires that the Contractor's Quality Control System Manager or person responsible for Contractor Quality Control complete the Corps of Engineers' "Construction Quality Management for Contractors" course not later than 90 calendar days after receipt of the Notice to Proceed. The course consists of approximately 12 hours of classroom instruction and is offered periodically by the Pittsburgh District. For additional information on scheduling and location of the training, contact U.S. Army Engineer District, Pittsburgh, Theresa Bonanno, U.S. Army Engineer District, Pittsburgh, Upper Ohio Area Office, 3510 Grand Avenue, Pittsburgh, Pennsylvania 15225, telephone (412) 395-7677. Certification of course completion is valid for 5 years. Completion of training offered by other Corps of Engineers Districts will be acceptable provided a valid certification is presented.

00 73 00 - 9 COPYING, DISSEMINATION OR DISTRIBUTION OF INFORMATION.

Those who disseminate information contained on this CD-ROM or in the solicitations and/or drawings must ensure that the recipients have a legitimate need for the information and maintain a record of each recipient. Legitimate need means recognized business entities seeking to do business, or having business, with the Government as prime contractors, subcontractors or suppliers. You shall maintain a record of the following information on each recipient:

Business name and address, the Unique Entity Identifier (formerly DUNS) Number, and name and telephone number of person receiving the information.

00 73 00 - 10 ELECTRONIC EMAIL (E-MAIL) ADDRESS

Establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments as text files, pdf files, and other similar formats. Within 10 calendar days after contract award, provide the Contracting Officer a single (only one) e-mail address for electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use e-mail to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes or terrorist threats. Multiple e-mail addresses are not allowed.

It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). Promptly notify the Contracting Officer, in writing, of any changes to this e-mail address.

00 73 00 - 11 SUBMISSION OF CONTRACT DOCUMENTATION

Provide contract documentation in an electronic format to the greatest extent practicable. Contract documentation to be submitted electronically includes, but is not limited to, the following:

Submittals, including ENG 4025 transmittal form Meeting Minutes Construction Photographs Correspondence Requests for Information Payroll Documents Statement and Acknowledgement Forms (SF 1413) Request for Additional Classification (SF 1444) Progress Payment Requests and Supporting Documentation Contract Modification Documentation, including SF 30, Contractor’s Offer, Cost/Pricing Audit Report, and

Certificate of Current Cost or Pricing Data Contractor Quality Control Reports (with attachments) Accident Reports Schedules and Schedule Updates Closeout Documentation, including Release of Claims

Electronic files must be of sufficient quality that all information is legible. Electronic format shall be in Adobe.PDF format, unless otherwise specified or directed by the Contracting Officer. Whenever possible, PDF files shall be generated from original documents so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Files exceeding 30 pages shall be indexed and bookmarked to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.

Email electronic documents fewer than 10MB to an email address as directed by the Contracting Officer. Electronic documents over 10MB shall be provided on a CD/DVD or through an electronic secure file sharing system that will require coordination with the Contracting Officer for access guidance.

The Contractor shall be prepared to provide up to five (5) additional paper hard copies of any contract document at the discretion of the Contracting Officer, at no additional cost to the Government. In addition to the electronic file format described above, the following list of documents shall be provided in their original format because law or other regulations require signed originals be kept in accordance with FAR 4.805 -- Storage, Handling, and Disposal of Contract Files:

Advance Payment Bond Bid Bond including Annual Bid Bond Performance Bond including Annual Performance Bond Payment Bond Patent Infringement Bond Any performance security instruments Certificate of Insurance Novation/Change of Name Agreement Assignment of Claims Any document containing a raised seal. Examples include o Notarized documents o Architecture Drawings

Paper Payroll Documents Physical signatures on contracts and modifications o SF 1442 o SF 30