Pre-Bid Contracting Discussion Pre-Bid Site Visit held on 05 March 2019
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Site Visit Lower Mon Area Office Rehabilitation
Charleroi Lock and Dam 05 March 2019, 10:00 am
Contracting Discussion
Introduction
Good morning, my name is Jane Roney, I’m the Contract Specialist for this solicitation. I want to welcome everyone to the pre-bid site visit for the Lower Mon Area Office Rehabilitation project.
The Contracting Officer is Carole Householder.
The Administrative Contracting Officer will be Kirk McWilliams.
The Project Engineer will be Steve Dine.
To begin, I’ll let the Government attendees introduce themselves.
Reason for this Pre-Bid Conference
The reason for this pre-bid conference is that we hope to improve your understanding of the Government’s requirement for this project.
Everyone was given (or will be given) a couple of note cards. These cards are to be used by you with questions that you may have. I will collect these at the end of the Site Visit. The questions and concerns brought up today will be addressed by an Amendment which will be posted to the Federal Business Opportunities (FBO) website.
We will consider any constructive comments or recommendations that you make.
The Sign-In Sheet and my discussion here will be posted to the Federal Business Opportunities (FBO) website.
You are cautioned that any remarks made at this site visit conference shall not qualify the terms of the solicitation unless the solicitation is amended in writing.
The one thing we will not do at this conference is to make any comment or opinion regarding your particular bid or approach that you may take for this requirement – this is up to you.
1. The Solicitation Number is W911WN19B8003 which was issued on 19 February 2019 on Standard Form (SF) 1442.
2. BID OPENING, THURSDAY, 21 March 2019, at 11:00 A.M. ET in the Federal Building in Pittsburgh, PA (see block 7); signs will be posted in the lobby with identification of the room. Revisions to bids received by EMAIL or FAX will NOT be considered. All Bids including Acknowledgement of Amendments (if applicable) must be in the Government possession by 11:00 AM ET.
3. NAICS Code 236220 (Commercial and Industrial Building Construction) - SB Size Standard $36,500,000.
4. Estimated Magnitude of Construction is between $250,000 and $500,000.
5. Restricted Procurement: Service-Disabled Veteran Owned Small Business (SDVOSB).
6. System for Award Management (SAM) – must have an ACTIVE registration, AND IT MUST BE ACTIVE PRIOR to Bid submission. If awarded this contract, you SAM Status including your Representations and Certifications (Reps & Certs) must remain CURRENT throughout the contract period. If you are not already registered in SAM or your registration requires renewal, be sure to do it right after the site visit because it can take a few days to process. Registration is FREE. Internet Site: http://www.sam.gov .
SAM now requires a Notarized Letter for new activations and for renewals. This process can take 2 weeks to 30 days to be “fully” activated by GSA in SAM.
7. This is a Firm Fixed Price Contract.
8. Term of the contract will be 270 calendar days after Notice to Proceed (NTP). The time stated for completion shall include final cleanup at the project site.
9. Documents to submit with your Sealed Bid Package (Original and Copy) include,
a. Submission of a Bid Bond. Bid guarantee is REQUIRED (see page 10, para 00 21 00 - 6, Bid Bond Requirements.) The current version of the Standard Form 24 must be used. The internet site to assure that you have the current version is https://www.gsa.gov/reference/forms#SF.
b. Solicitation Pages. Completed Page 2, blocks 14, 15, 17, 19, 20A. 20B, and 20C.
Completed Page 3 with the total amount of bid for Item No. 0001.
http://www.sam.gov/ https://www.gsa.gov/reference/forms#SF
c. Bid Schedule (on FBO Posting). Identification of a Unit Price and Total Price for each item on Bid Schedule. The Total of Items 1 - 17 from the Bid Schedule would reflect the total amount for the Job, Item No. 0001 on the Solicitation.
10. Page 11, Para. 00 21 00 - 8 Award. Award will be made as a whole to one bidder; that bidder must be determined by the Contracting Officer (KO) to be RESPONSIBLE per FAR
9.104. Very shortly after bid opening the apparent low bidder will be sent an email asking for specific information to help the KO make the responsibility determination. See Pgs 11 & 12, Para. 00 21 00 - 13 Pre-Award Survey.
11. Provisions and Clauses – Provisions are conditions used in solicitations and apply before contract award. Clauses are conditions in both solicitations and contracts and apply before and after contract award. The VAST majority of provisions and clauses in this solicitation are included by reference only; that means, we’ve only given you the Number, the Title and the Date. It is up to you to go online to the website provided – www.farsite.hill.af.mil – and look up each one whether FAR and DFARS.
12. Questions are due by Friday, 08 March 2019 11:00 AM ET. Email:
LRP.CONTRACTING@USACE.ARMY.MIL with Subject identified as “W911WN19B8003 Question”.
13. Liquidated Damage are applicable to this contract, see clause 52.211-12. Liquidated Damages on this project is $279.00 for each calendar day of delay until the work is completed or accepted.
14. WAGE Determination, PA105, Building Construction Projects, dated 02/01/2019 is to this project. If it is updated prior to receipt of bids, an amendment will be issued and posted to fbo.gov.
http://www.farsite.hill.af.mil/ mailto:LRP.CONTRACTING@USACE.ARMY.MIL
That is the Contracting portion of the meeting.
At this time, I’ll turn it over to Ms. Karen Welton from the US Department of Labor, Wage and Hour, who will provide an overview of the Davis Bacon Wage Determination.
Next, John Rusnak, Civil Engineer and Technical Point of Contact on this Project, will now provide an overview of the project’s technical requirements. After that, the tour will take place.