01_22_00.00_10,_Amendment_0001.pdf
PDF 39 KB Posted
- Attached to
- Lower Mon Area Office Rehabilitation Federal contract opportunity
- Solicitation number
- W911WN19B8003
About this file
Revised Technical Specifications SECTION 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lower Mon Ar ea Of f i ce Rehabi l i t at i on
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 22 00. 00 10
PRI CE AND PAYMENT PROCEDURES
PART 1 GENERAL
1. 1 JOB PAYMENT I TEMS
1. 1. 1 Bonds
1. 1. 1. 1 Payment
1. 1. 1. 2 Uni t of Measur e
1. 1. 1. 3 Payment I t em
1. 1. 2 Si t e Ut i l i t y I nvest i gat i on
1. 1. 2. 1 Payment
1. 1. 2. 2 Uni t of Measur e
1. 1. 2. 3 Payment I t em
1. 1. 3 New Of f i ce Bui l di ng and Br eezeway St r uct ur e
1. 1. 3. 1 Payment
1. 1. 3. 2 Uni t of Measur e
1. 1. 3. 3 Payment I t em
1. 1. 4 Exi st i ng Of f i ce Bui l di ng: Ent r ance Vest i bul e Demol i t i on
1. 1. 4. 1 Payment
1. 1. 4. 2 Uni t of Measur e
1. 1. 4. 3 Payment I t ems
1. 1. 5 Exi st i ng Of f i ce Bui l di ng: New Roof i ng Syst em and Gut t er s
1. 1. 5. 1 Payment
1. 1. 5. 2 Uni t of Measur e
1. 1. 5. 3 Payment I t em
1. 1. 6 Exi st i ng Of f i ce Bui l di ng: Mi scel l aneous I mpr ovement s
1. 1. 6. 1 Payment
1. 1. 6. 2 Uni t of Measur e
1. 1. 6. 3 Payment I t ems
1. 1. 7 I mpr ove Under gr ound Ut i l i t y Ser vi ce Pi pi ng
1. 1. 7. 1 Payment
1. 1. 7. 2 Uni t of Measur e
1. 1. 7. 3 Payment I t ems
1. 1. 8 Si t e Pr epar at i on, Gr adi ng and Rest or at i on
1. 1. 8. 1 Payment
1. 1. 8. 2 Uni t of Measur e
1. 1. 8. 3 Payment I t em
1. 1. 9 Engi neer i ng And Desi gn Ser vi ces
1. 1. 9. 1 Payment
1. 1. 9. 2 Uni t of Measur e
1. 1. 9. 3 Payment I t em
1. 2 UNI T PRI CE PAYMENT I TEMS
1. 2. 1 Exi st i ng Of f i ce Bui l di ng: Repl ace Ext er i or Ski r t i ng
1. 2. 1. 1 Payment
1. 2. 1. 2 Measur ement
1. 2. 1. 3 Uni t of Measur e
1. 2. 1. 4 Payment I t ems
1. 2. 2 Exi st i ng Of f i ce Bui l di ng: Repl ace Ext er i or Tr i m Boar ds
1. 2. 2. 1 Payment
1. 2. 2. 2 Measur ement
SECTI ON 01 22 00. 00 10 Page 1 CERTI FI ED FI NAL DOCUMENT RTA - W911WN19B8003 Amendment 0001
1. 2. 2. 3 Uni t of Measur e
1. 2. 2. 4 Payment I t ems
1. 2. 3 Exi st i ng Of f i ce Bui l di ng: Repl ace Ext er i or Si di ng
1. 2. 3. 1 Payment
1. 2. 3. 2 Measur ement
1. 2. 3. 3 Uni t of Measur e
1. 2. 3. 4 Payment I t ems
1. 2. 4 Exi st i ng Of f i ce Bui l di ng: Pai nt Bui l di ng Ext er i or
1. 2. 4. 1 Payment
1. 2. 4. 2 Measur ement
1. 2. 4. 3 Uni t of Measur e
1. 2. 4. 4 Payment I t ems
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 CONTRACT COST BREAKDOWN
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 22 00. 00 10 Page 2
SECTI ON 01 22 00. 00 10
PRI CE AND PAYMENT PROCEDURES
PART 1 GENERAL
1. 1 JOB PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he Sol i c i t at i on/ Cont r act and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, shal l be i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.
1. 1. 1 Bonds
1. 1. 1. 1 Payment
Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or t he act ual pr emi um cost f or obt ai ni ng Per f or mance and Payment Bonds i n accor dance wi t h Sect i on 01 73 00 SUPPLEMENTARY CONDI TI ONS, par agr aph PAYMENT FOR
PERFORMANCE AND PAYMENT BONDS.
1. 1. 1. 2 Uni t of Measur e
Uni t of Measur e: Job
1. 1. 1. 3 Payment I t em
0001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMI UMS
1. 1. 2 Si t e Ut i l i t y I nvest i gat i on
1. 1. 2. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h i nvest i gat i ng t he wor k ar ea t o det er mi ne l ocat i on of exi st i ng s i t e ut i l i t i es, pr oposi ng ut i l i t y ser vi ce modi f i cat i ons, and f ur ni shi ng a r epor t as speci f i ed. Pr i ce shal l i ncl ude al l mat er i al s, l abor , equi pment , and suppl i es associ at ed wi t h t hi s work.
1. 1. 2. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 2. 3 Payment I t em
0002 SI TE UTI LI TY I NVESTI GATI ON
SECTI ON 01 22 00. 00 10 Page 3
1. 1. 3 New Of f i ce Bui l di ng and Br eezeway St r uct ur e
1. 1. 3. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h t he desi gn and const r uct i on of t he new of f i ce bui l di ng and br eezeway st r uct ur e, i ncl udi ng, but not l i mi t ed t o: per mi t s; i nspect i ons; st r uct ur e, mechani cal , and el ect r i cal desi gn and bui l di ng l ayout f or t he new of f i ce bui l di ng desi gn; and f ur ni shi ng al l mat er i al , l abor , and equi pment f or const r uct i on t he bui l di ng. Payment shal l i ncl ude al l el ect r i cal and mechani cal desi gn i ncl udi ng; but not l i mi t ed t o; wat er and sani t ar y sewer ut i l i t i es, HVAC, el ect r i cal wi r i ng, panel s, br eaker s, swi t ches, r ecept acl es, l i ght i ng.
Foundat i on desi gn f or t he new of f i ce bui l di ng and br eezeway and st r uct ur al and el ect r i cal desi gn f or t he br eezeway wi l l be i ncl uded i n I t em 0014 ENGI NEERI NG AND DESI GN SERVI CES. Payment f or t he new of f i ce bui l di ng shal l i ncl ude ext er i or st ai r s and al l i nt er i or f ur ni shi ngs.
1. 1. 3. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 3. 3 Payment I t em
0003 NEW OFFI CE BUI LDI NG
0004 NEW BREEZEWAY STRUCTURE
1. 1. 4 Exi st i ng Of f i ce Bui l di ng: Ent r ance Vest i bul e Demol i t i on
1. 1. 4. 1 Payment
Thi s wor k i s speci f i ed i n Sect i ons 01 11 00 PERFORMANCE WORK STATEMENT and 02 41 00 DEMOLI TI ON. Payment wi l l be made f or cost s associ at ed wi t h t he demol i t i on and di sposal of t he exi st i ng ent r ance vest i bul e st r uct ur e.
1. 1. 4. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 4. 3 Payment I t ems
0005 EXI STI NG OFFI CE BUI LDI NG: ENTRANCE VESTI BULE DEMOLI TI ON
1. 1. 5 Exi st i ng Of f i ce Bui l di ng: New Roof i ng Syst em and Gut t er s
1. 1. 5. 1 Payment
Thi s wor k i s speci f i ed i n Sect i ons 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h t he sel ect i ve r emoval and di sposal of t he exi st i ng r oof i ng syst em and gut t er s and f ur ni shi ng and i nst al l i ng new r oof i ng syst em and gut t er s.
1. 1. 5. 2 Uni t of Measur e
Uni t of measur e: Job
SECTI ON 01 22 00. 00 10 Page 4
1. 1. 5. 3 Payment I t em
0006 EXI STI NG OFFI CE BUI LDI NG: NEW ROOFI NG SYSTEM AND GUTTERS
1. 1. 6 Exi st i ng Of f i ce Bui l di ng: Mi scel l aneous I mpr ovement s
1. 1. 6. 1 Payment
Thi s wor k i s speci f i ed i n Sect i ons 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h t he i nt er i or and ext er i or i mpr ovement s as speci f i ed. Ext er i or i mpr ovement s i ncl ude t he f ol l owi ng:
Rel ocat e Exi st i ng Ent r ance St ai r s New Ent r ance St ai r s El ect r i cal Requi r ement s f or Exi st i ng Ext er i or Li ght i ng Abandonment at Vestibule Ext end Exi st i ng HVAC Condensat e Dr ai n Li nes Ext er i or Door at new br eezeway Tr i m at Exi st i ng Ext er i or Door
I nt er i or i mpr ovement s i ncl ude t he f ol l owi ng:
Repl ace exi st i ng l i ght f i x t ur es wi t h new LED l i ght s and f i xt ur es.
El ect r i cal Requi r ement s f or Par t i t i oni ng Exi st i ng Conf er ence Room Repl ace Exi st i ng Toi l et s Par t i t i on Wal l i n Exi st i ng Conf er ence Room Conver t Of f i ce i nt o Br eezeway Foyer I nt er i or Si gnage
1. 1. 6. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 6. 3 Payment I t ems
0010 EXI STI NG OFFI CE BUI LDI NG: MI SCELLANEOUS EXTERI OR I MPROVEMENTS
0011 EXI STI NG OFFI CE BUI LDI NG: MI SCELLANEOUS I NTERI OR I MPROVEMENTS
1. 1. 7 I mpr ove Under gr ound Ut i l i t y Ser vi ce Pi pi ng
1. 1. 7. 1 Payment
Thi s wor k i s speci f i ed i n Sect i ons 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h r el ocat i ng and modi f y i ng wat er and sewer ser vi ce pi pi ng as pr oposed by t he Cont r act or dur i ng s i t e ut i l i t y i nvest i gat i on wor k and as appr oved by t he Cont r act i ng Of f i cer .
Not e t hat t he $10, 000 pl acehol der i n t he bi d schedul e i s f or bi ddi ng pur poses onl y. Rei mbur sement shal l be made based on i nvoi ces submi t t ed by t he Cont r act or f or i t ems of wor k di r ect ed by t he Cont r act i ng Of f i cer .
I nvoi ces shal l i ncl ude a br eakdown of l abor , equi pment , mat er i al s and suppl i es ut i l i zed f or t he r epai r s, as wel l as an expl anat i on of any di f f er ences bet ween t he appr oved est i mat es and t he f i nal i nvoi ces.
1. 1. 7. 2 Uni t of Measur e
Uni t of measur e: Job
SECTI ON 01 22 00. 00 10 Page 5
1. 1. 7. 3 Payment I t ems
0012 I MPROVE UNDERGROUND UTI LI TY SERVI CE PI PI NG
1. 1. 8 Si t e Pr epar at i on, Gr adi ng and Rest or at i on
1. 1. 8. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h t he new of f i ce bui l di ng s i t e pr epar at i on, and gr adi ng t o dr ai n away f r om bui l di ngs. Payment shal l i ncl ude r est or at i on of al l di st ur bed ar eas wi t h ei t her bi t umi nous pavement or gr avel sur f aci ng as i ndi cat ed i n t he sket ches or as ot her wi se appr oved by t he Cont r act i ng Of f i cer . Payment shal l i ncl ude f ur ni shi ng al l mat er i al , l abor , and equi pment f or compl et i ng t hi s i t em of wor k.
1. 1. 8. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 8. 3 Payment I t em
0013 SI TE PREPARATI ON, GRADI NG AND RESTORATI ON
1. 1. 9 Engi neer i ng And Desi gn Ser vi ces
1. 1. 9. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or desi gn and engi neer i ng ser vi ces t o i ncl ude bui l di ng per mi t s, new of f i ce bui l di ng f oundat i on desi gn, new br eezeway st r uct ur e and f oundat i on desi gn, ut i l i t y ext ensi on desi gn, exi st i ng of f i ce bui l di ng r oof desi gn, exi st i ng of f i ce bui l di ng new ext er i or door desi gn, and al l ot her desi gn ser vi ces r equi r ed t o meet t hese speci f i cat i ons and appl i cabl e bui l di ng codes.
1. 1. 9. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 9. 3 Payment I t em
0014 ENGI NEERI NG AND DESI GN SERVI CES
1. 1. 10 Repl ace Sl i di ng Ent r ance Gat e
1. 1. 10. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h r emovi ng t he exi st i ng s l i di ng ent r ance gat e and i nst al l i ng a new el ect r i cal l y oper at ed cant i l ever s l i di ng ent r ance gat e. Payment shal l i ncl ude r emovi ng t he exi st i ng gat e and i nst al l i ng t he new gat e and el ect r i c cont r ol s and oper at or as i ndi cat ed i n t he sket ches or as ot her wi se appr oved by t he Cont r act i ng Of f i cer . Payment shal l i ncl ude f ur ni shi ng al l mat er i al , l abor , and equi pment f or compl et i ng t hi s i t em of wor k.
SECTI ON 01 22 00. 00 10 Page 6
1. 1. 10. 2 Uni t of Measur e
Uni t of measur e: Job
1. 1. 10. 3 Payment I t em
0015 REPLACE EXI STI NG SLI DI NG ENTRANCE GATE WI TH NEW ELECTRI CALLY
OPERATED CANTI LEVER SLI DI NG ENTRANCE GATE
1. 2 UNI T PRI CE PAYMENT I TEMS
Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he Sol i c i t at i on/ Cont r act and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed shal l const i t ut e f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce items.
1. 2. 1 Exi st i ng Of f i ce Bui l di ng: Repl ace Ext er i or Ski r t i ng
1. 2. 1. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h r emovi ng and di sposi ng of exi st i ng ski r t i ng and f ur ni shi ng and i nst al l i ng new f i ber - cement ski r t i ng. Pai nt i ng of t he new ski r t i ng i s i ncl uded i n I t em 0017 EXI STI NG
OFFI CE BUI LDI NG: PAI NT BUI LDI NG EXTERI OR.
1. 2. 1. 2 Measurement
Measur ement wi l l be based on t he number of squar e f eet of ski r t i ng replaced.
1. 2. 1. 3 Uni t of Measur e
Uni t of measur e: Squar e Foot
1. 2. 1. 4 Payment I t ems
0007 EXI STI NG OFFI CE BUI LDI NG: REPLACE EXTERI OR SKI RTI NG
1. 2. 2 Exi st i ng Of f i ce Bui l di ng: Repl ace Ext er i or Tr i m Boar ds
1. 2. 2. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h r emovi ng and di sposi ng of exi st i ng t r i m boar ds and f ur ni shi ng, i nst al l i ng, and pai nt i ng new t r i m boar ds as appr oved by t he Cont r act i ng Of f i cer . Payment shal l i ncl ude f ur ni shi ng al l mat er i al , l abor , and equi pment f or compl et i ng t hi s i t em of wor k.
1. 2. 2. 2 Measurement
Measur ement wi l l be based on t he number of l i near f eet of t r i m boar ds r epl aced as appr oved by t he Cont r act i ng Of f i cer .
SECTI ON 01 22 00. 00 10 Page 7
1. 2. 2. 3 Uni t of Measur e
Uni t of measur e: Li near Foot
1. 2. 2. 4 Payment I t ems
0008 EXI STI NG OFFI CE BUI LDI NG: REPLACE EXI STI NG 4" TRI M BOARDS
0009 EXI STI NG OFFI CE BUI LDI NG: REPLACE EXI STI NG 6" TRI M BOARDS
1. 2. 3 Exi st i ng Of f i ce Bui l di ng: Repl ace Ext er i or Si di ng
1. 2. 3. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h r emovi ng and di sposi ng of exi st i ng damaged si di ng and f ur ni shi ng and i nst al l i ng new si di ng as appr oved by t he Cont r act i ng Of f i cer . Payment shal l i ncl ude f ur ni shi ng al l mat er i al , l abor , and equi pment f or compl et i ng t hi s i t em of wor k. Pai nt i ng of t he new si di ng i s i ncl uded i n I t em 0017 EXI STI NG OFFI CE BUI LDI NG: PAI NT
BUI LDI NG EXTERI OR.
1. 2. 3. 2 Measurement
Measur ement wi l l be based on t he number of squar e f eet of s i di ng r epl aced as appr oved by t he Cont r act i ng Of f i cer .
1. 2. 3. 3 Uni t of Measur e
Uni t of measur e: Squar e Foot
1. 2. 3. 4 Payment I t ems
0016 EXI STI NG OFFI CE BUI LDI NG: REPLACE EXI STI NG EXTERI OR SI DI NG
1. 2. 4 Exi st i ng Of f i ce Bui l di ng: Pai nt Bui l di ng Ext er i or
1. 2. 4. 1 Payment
Thi s wor k i s speci f i ed i n Sect i on 01 11 00 PERFORMANCE WORK STATEMENT.
Payment wi l l be made f or cost s associ at ed wi t h sur f ace pr epar at i on and pai nt i ng t he ext er i or of t he exi st i ng of f i ce bui l di ng s i di ng. Payment shal l i ncl ude f ur ni shi ng al l mat er i al , l abor , and equi pment f or compl et i ng t hi s i t em of wor k.
1. 2. 4. 2 Measurement
Measur ement wi l l be based on t he act ual ar e of t he bui l di ng ext er i or pai nt ed as appr oved by t he Cont r act i ng Of f i cer .
1. 2. 4. 3 Uni t of Measur e
Uni t of measur e: Squar e Foot
1. 2. 4. 4 Payment I t ems
0017 EXI STI NG OFFI CE BUI LDI NG: PAI NT BUI LDI NG EXTERI OR
SECTI ON 01 22 00. 00 10 Page 8
PART 2 PRODUCTS
Not Used
PART 3 EXECUTI ON
3. 1 CONTRACT COST BREAKDOWN
The Cont r act or must f ur ni sh wi t hi n 30 cal endar days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of t he wor k i ncl uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .
- - End of Sect i on - -
SECTI ON 01 22 00. 00 10 Page 9
| 01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES |
| 01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES |
| PART 1 GENERAL |
| 1.1 JOB PAYMENT ITEMS |
| 1.1.1 Bonds |
| 1.1.1.1 Payment |
| 1.1.1.2 Unit of Measure |
| 1.1.1.3 Payment Item |
| 1.1.2 Site Utility Investigation |
| 1.1.2.1 Payment |
| 1.1.2.2 Unit of Measure |
| 1.1.2.3 Payment Item |
| 1.1.3 New Office Building and Breezeway Structure |
| 1.1.3.1 Payment |
| 1.1.3.2 Unit of Measure |
| 1.1.3.3 Payment Item |
| 1.1.4 Existing Office Building: Entrance Vestibule Demolition |
| 1.1.4.1 Payment |
| 1.1.4.2 Unit of Measure |
| 1.1.4.3 Payment Items |
| 1.1.5 Existing Office Building: New Roofing System and Gutters |
| 1.1.5.1 Payment |
| 1.1.5.2 Unit of Measure |
| 1.1.5.3 Payment Item |
| 1.1.6 Existing Office Building: Miscellaneous Improvements |
| 1.1.6.1 Payment |
| 1.1.6.2 Unit of Measure |
| 1.1.6.3 Payment Items |
| 1.1.7 Improve Underground Utility Service Piping |
| 1.1.7.1 Payment |
| 1.1.7.2 Unit of Measure |
| 1.1.7.3 Payment Items |
| 1.1.8 Site Preparation, Grading and Restoration |
| 1.1.8.1 Payment |
| 1.1.8.2 Unit of Measure |
| 1.1.8.3 Payment Item |
| 1.1.9 Engineering And Design Services |
| 1.1.9.1 Payment |
| 1.1.9.2 Unit of Measure |
| 1.1.9.3 Payment Item |
| 1.2 UNIT PRICE PAYMENT ITEMS |
| 1.2.1 Existing Office Building: Replace Exterior Skirting |
| 1.2.1.1 Payment |
| 1.2.1.2 Measurement |
| 1.2.1.3 Unit of Measure |
| 1.2.1.4 Payment Items |
| 1.2.2 Existing Office Building: Replace Exterior Trim Boards |
| 1.2.2.1 Payment |
| 1.2.2.2 Measurement |
| 1.2.2.3 Unit of Measure |
| 1.2.2.4 Payment Items |
| 1.2.3 Existing Office Building: Replace Exterior Siding |
| 1.2.3.1 Payment |
| 1.2.3.2 Measurement |
| 1.2.3.3 Unit of Measure |
| 1.2.3.4 Payment Items |
| 1.2.4 Existing Office Building: Paint Building Exterior |
| 1.2.4.1 Payment |
| 1.2.4.2 Measurement |
| 1.2.4.3 Unit of Measure |
| 1.2.4.4 Payment Items |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 CONTRACT COST BREAKDOWN |
File details come from the government source that posted it.