AR_OSUT__1_General_Requirements.pdf

PDF 97 KB Posted

Attached to
Armor OSUT 1 Federal contract opportunity
Solicitation number
W911SF-19-R-0018
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Benning

About this file

General Requirements

View the file

Other files for this federal contract opportunity

Other files attached to Armor OSUT 1, newest first.
File Type Posted
ARMOR_OSUT_1_-_5_General_Questions.pdf PDF
ARMOR_OSUT_Site_Visit_Attendees.pdf PDF
Blank_Bid_Breakdown_Form.xlsx XLSX spreadsheet
44026_Stevon_Booker_Oscar_14_Nad_83_Grading_Plan_.pdf PDF
OSUT_1_01_45_01_Quality_Control.pdf PDF
OSUT_1_01_74_19_Construction_and_Demolition_Waste_Management.pdf PDF
OSUT_1_01_11_0_Summary_of_Work.pdf PDF
OSUT_1_23_05_93_Testing,_Adjusting,_and_Balancing_for_HVAC.pdf PDF
OSUT_1_Ammo_Point_Single_Combined.pdf PDF
OSUT_1_06_10_00_Rough_Carpentry.pdf PDF
OSUT_1_08_14_00_Wood_Doors.pdf PDF
OSUT_1_07_84_00_Firestopping.pdf PDF
OSUT_1_11_42_01_Food_Serving_Tables.pdf PDF
OSUT_1_09_22_00_Metal_Support_Assemblies.pdf PDF
OSUT_1_07_92_00_Joint_Sealants.pdf PDF
OSUT_1_08_11_13_Steel_Doors_and_Frames.pdf PDF
OSUT_1_Control_Tower_CMU_Combined.pdf PDF
OSUT_1_32_05_33_Landscape_Establishment.pdf PDF
OSUT_1_01_50_00_Temporary_Construction_Faclities_and_Controls.pdf PDF
OSUT_1_28_31_76_Interior_Fire_Alarm_and_Mass_Notification_Sys.pdf PDF
OSUT_1_10_10_00_Visual_Comm_Speci.pdf PDF
W911SF-19-R-0018-0001,_ARMOR_OSUT_1,_Amend_0001.pdf PDF
OSUT_1_02_84_16_PCB_Trans_Hazard_Waste_Lamp_Removal.pdf PDF
OSUT_1_05_12_00_Structural_Steel.pdf PDF
OSUT_1_05_50_13_Miscellaneous_Metal_Fabrication.pdf PDF
OSUT_1_09_65_00_Resilient_Flooring.pdf PDF
OSUT_1_23_34_23_Power_Ventilators.pdf PDF
OSUT_1_01_32_01_Project_Schedule.pdf PDF
OSUT_1_32_11_23_Aggregate_Base_Course.pdf PDF
OSUT_1_26_28_01_Coordinated_Power_System_Protection.pdf PDF
OSUT_1_31_31_16_Soil_Treatment_for_Subt_Termites_Control.pdf PDF
W911SF-19-R-0018-0002,_ARMOR_OSUT_1,_Amend_0002.pdf PDF
OSUT_1_07_27_26_Fluid_Applied_Air_and_Moisture_Barrier.pdf PDF
OSUT_1_08_71_00_Door_Hardware.pdf PDF
OSUT_1_10_14_02_Interior_Signage.pdf PDF
OSUT_1_01_57_20_Environmental_Protection.pdf PDF
OSUT_1_31_11_00_Clearing_and_Grubbing.pdf PDF
OSUT_1_01_78_23_Operation_an_Maintenace_Data.pdf PDF
OSUT_1_23_07_00_Thermal_Insulation_for_Mechanical_Systems.pdf PDF
OSUT_1_32_31_13_High-Security_Chain_Link_Fences.pdf PDF
OSUT_1_04_21_13_13_Nonbearing_Masonry_Veneer_Steel_Stud_Walls.pdf PDF
OSUT_1_07_42_13_Metal_Wall_Panels.pdf PDF
OSUT_1_08_81_00_Glazing.pdf PDF
OSUT_1_23_37_13_Diffusers,_Registers,_and_Grills.pdf PDF
OSUT_1_04_20_00B_Masonry.pdf PDF
OSUT_1_C2_Facility_Combined.pdf PDF
Statement_of_Work_-_CTA_Covered_Bleachers.pdf PDF
Statement_of_Work_-_Covered_Mess.pdf PDF
Statement_of_Work_-_Latrine_(flushable)_and_leach_field.pdf PDF
Statement_of_Work_-_OSCAR_15.pdf PDF
Show all 50

Armor OSUT 1 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTORATE OF PUBLIC WORKS

ENGINEERING DIVISION

FORT BENNING, GEORGIA Project #: 44039

General Requirements – AR OSUT #1 25 April 2019

Armor OSUT: Oscar 14, 15 and Warner Range Fort Benning, Georgia

PROJECT INCLUDES:

Oscar 14 & 15

1. Build Protective Earth Berm Centered in Lane 3 (4M high x 2M wide cap at top)

2. Construct 4 ea. Observer Paths (GAB 100M x 3M)

Warner Range

3. Construct Control Tower (Small Arms)

4. Construct C2 facility

5. Construct Ammo Point (single)

6. Construct CTA covered bleacher

7. Construct Latrine (Flushable)

8. Construct Covered Mess

SCHEDULE:

The Contractor will only be allowed to work on one Fire and Movement Range (FM) at a time. This includes OSCARs 15 and 14. As the Contractor completes one there will be a ten day transition period that the Contractor will have to include in their schedule before receiving control of the next FM.

Warner Range is included in this contract however it is not a FM range. The total contract time for completing all work on the FMs shall not exceed 365 days.

1. REQUIRED BID DOCUMENTS

a. Proposed Schedule

b. Cost Proposal

LIQUIDATED DAMAGES:

In the event the contractor exceeds the completion date established per the Request for Task Order Proposal (RTOP), liquidated damages will be imposed on the contractor. The amount to be paid daily, will be $1,495.68 per day.