SPECIFICATIONS
DEMOLITION IDIQ
CONTRACT
FY 17 - FY 20
FORT MCCOY, WISCONSIN
DRAWING NO: 47-018-1390
July 2016 Demolition IDIQ FY16-FY19 00002
SECTION 00002
TABLE OF CONTENTS
DIVISION 1
Section 01000 General Requirements Section 01007 Industry Standard
Abbreviations and Codes Section 01019 Contract Considerations Section 01031 Hazardous Material Abatement Section 01300 Submittals Section 01400 Special Safety Requirements
DIVISION 2
Section 02010 Site Preparation Section 02015 Environmental Controls Section 02060 Selective Building Demo Section 02317 Filling Section 02821 Chainlink Fences and Gates Section 02923 Landscape Preparation Section 02930 Seeding, Maintained Areas Section 02931 Seeding, Not maintained
DIVISION 3 through 16 – NOT USED
END OF SECTION
01000 - 1
SECTION 01000
GENERAL REQUIREMENTS
PART 1 GENERAL
1.01 SUMMARY OF THE WORK
A. REMOVAL WORK: Remove all items indicated on the drawings and in the specifications and dispose of at the Contractor’s expense including but not limited to;
Demolish and dispose of various wood and metal buildings including all foundation structures, buried utilities, backfill, compaction, and site restoration. Any overhead power lines shall be removed by the utility provider. The Contractor shall notify the COR/Inspector to coordinate OH utility removal. Remove all water and sanitary utility laterals and cap at mains.
1. Contractor shall recycle 50% of material by weight.
2. Underground communication, power, and natural gas utility shut off shall be coordinated with the COR/Inspector and capped/terminated by the utility provider(s). The Contractor shall remove all underground conductors/conduits/pipes.
3. Contractor shall remove in its entirety all buried ACM covered pipe up to 10” diameter.
4. Contractor shall remove in its entirely two 12,000 gallon liquid petroleum tanks and LP dryers including all concrete slabs, bollards and foundations, utility connections and buried lines including backfill, compaction and site restoration..
B. NEW WORK: Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to;
1. Installation of chain-link fence and gates.
C. REPAIR WORK: Contractor shall repair any damages caused by this construction, including but not limited to;
1. Repair any existing construction which is damaged.
2. Repair any landscaping including trees, shrubs, flowers, and grass.
3. Repair vehicle ruts. Level the ruts, place topsoil, and seed the disturbed areas according to the specifications.
1.02 BUILDINGS (NOT USED)
1.03 ABBREVIATIONS
A. “KO” = Contracting Officer.
B. “COR” = Contracting Officer’s Representative.
C. Industry Standard Abbreviations - See Section 01007.
01000 - 2
1.04 TEMPORARY UTILITIES AND FACILITIES
A. General: This section is intended to include temporary utilities and temporary construction facilities to be provided by the Contractor unless otherwise stated below.
B. 120 VAC, 60 Hz electricity and lighting is currently in the building(s) and is available for use. The electricity used will be provided by the Government at no cost to the Contractor.
1. Temporary electricity, if required, shall be provided by the Contractor by portable generator or temporary power pole. The cost of the generator and fuel and/or temporary power pole shall be the responsibility of the Contractor. The cost of electricity used if the Contractor provides a temporary power pole will be provided by the Government at no cost to the Contractor. The Contractor shall contact Xcel Energy for temporary power.
C. Temporary heating, cooling, and ventilation
1. Furnish, install, and maintain all temporary systems and equipment required to maintain specified or required environmental conditions during the progress of the work. Remove upon completion of work at the expense of the Contractor.
2. Government provided utilities will not be used for heating.
D. Temporary Telephone Service
1. If the Contractor requires phone service for this project, the Contractor must contact the phone company business office:
Century Telephone 205 5th Avenue LaCrosse, Wisconsin 54601
(800) 872-4017
2. The Contractor shall pay for all telephone installation, maintenance, removal, and usage charges.
3. The Contractor is responsible for providing and paying for any and all subcontractor’s calls.
4. Existing telephones owned or rented by the Government will not be used by the Contractor under any circumstances.
E. Temporary Water
1. Process water in buildings may be used from the building(s) being demolished and shall be shut off for the Contractor when the COR/Inspector has been properly informed. Temporary water may be available from the nearest fire hydrant. Contractor shall secure permission through the COR/Inspector prior to connecting to any fire hydrant. Water is city water quality and contains sodium hypochlorite.
2. The Contractor shall furnish anti-siphon and backflow prevention devices on all temporary water connections. Proof of certification is required..
01000 - 3
3. Contractor shall not cause water to be wasted or left running when not in use. Leaks will be repaired immediately. Freeze protection shall be provided by the contractor.
4. The water used will be furnished by the Government. Failure to control water usage may result in Government provided process water being terminated.
F. Temporary Sanitary Facilities
1. Existing sanitary facilities in Government building(s) will not be used by the Contractor’s personnel.
2. The Contractor shall be responsible for providing and paying for temporary toilet and sanitary facilities. The Contractor shall pay rental fees and cleaning charges and shall remove the facilities when the project is completed.
3. The COR or Construction Inspector shall approve the site location for all temporary sanitary facilities.
4. Contractor shall maintain all such facilities used in a clean and sanitary condition.
G. Temporary Enclosures (NOT USED)
H. Barriers and Fences
1. Contractor shall provide, install, maintain, and remove suitable barriers to prevent public entry and to protect the work site.
2. Such barriers shall be erected to provide a safety barrier around such portions of the project that could cause injury or destruction of property and to provide general security for the affected project site.
3. Materials to be used are at the Contractor’s option and expense.
4. Barriers and fence shall be posted with appropriate warning signs. Place warning signs at the construction area perimeter designating the presence of construction hazards requiring unauthorized persons to keep out.
Signs must be placed on all sides of the project, with at least one sign every 300 feet. All points of entry shall have signs designating the construction site as a hard hat area.
5. Fencing shall be provided along the construction site at all open excavations and tunnels to control access by unauthorized people.
Fencing must be installed to restrain a lateral force of at least 200 pounds.
I. Security
1. The Contractor shall provide all materials, labor, and equipment to protect the project site from unauthorized entry, theft, and vandalism.
2. Existing Government buildings and facilities or portions of same not scheduled for demolition shall be protected by the Contractor during the contract when the work involves openings into existing Government buildings. The degree of protection shall not be less than what currently exists.
01000 - 4
3. The Contractor shall provide temporary doors, locks, and barricades to prevent unauthorized access to the construction site, structures, and existing buildings.
4. Storage of construction materials and tools are at the risk of the Contractor.
J. Access Roads and Parking Areas
1. Contractor’s private vehicles shall be parked at locations designated by the COR.
2. All construction vehicles and Contractor’s private vehicles will be parked in an orderly manner at all times and will not block normal traffic in the area. Private vehicles belonging to the contract personnel will be parked in designated parking areas and in no case on grass areas, adjacent to buildings, or along streets.
3. Contractor is responsible for any snow removal required for access or site work.
K. Access and General Protection/Security Policy and Procedures
1. This provision/contract text is for contractor employees with an area of performance as defined by Fort McCoy Pamphlet 190-13.8 (Installation Access Control), will add the following language in the PWS."The contractor and all associated subcontractors' employees shall provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. The contractor and all associated subcontractors' employees shall also comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The Government may require monthly participation in the Installation Random Antiterrorism Program".
L. Contractor’s Requiring Common Access Card (CAC)
1. This provision/contract text is for contractor employees with an area of performance as defined by Fort McCoy Pamphlet 190-13.8 (Installation Access Control) that requires a Common Access Card. When applicable, add the following language into the PWS. "Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher
01000 - 5 investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures;
or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI".
M. Traffic Work
1. All work around or involving roadways, to include roadway excavations and utility crossings, will be conducted in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) – FHWA, Latest Edition.
2. The Contractor shall provide and ensure appropriate road closure and detour signs are established as necessary for traffic management. All road closures shall be coordinated with the Contracting Officer in advance. Road closures shall require a road closure plan showing the location of signage.
N. Waste Reporting
1. The Army has established the requirement for a 50% minimum diversion rate by weight of C&D waste from landfill disposal. In order to achieve those results the Contractor shall submit a solid waste management plan as a required submittal for projects costing over $100,000. At a minimum, the solid waste plan shall include the anticipated waste streams and disposal/recycling facilities. No work shall begin until the Contractor has an approved plan.
2. The Contractor shall submit reports to the Contracting Officer quantifying the total pounds of hazardous, universal, recycled, and non-regulated waste disposed of during the duration of the contract.
Contractor shall also submit material(s) disposal location(s).
3. Reporting shall be specific to the month in which waste was disposed of and separated per waste type for Fort McCoy’s reporting requirements.
4. Reporting for recycled waste shall also be specific to how much revenue the Contractor received for each type of recycled material.
O. Refuse Disposal and Recycling
1. Provide all solid waste disposal associated with this contract, including but not limited to the container delivery, removal, and disposal fees.
Items included under this section are all solid wastes as defined by Wisconsin State Statute 289.01 (33). These items shall be disposed in a licensed sanitary landfill or recycling center in accordance with State of Wisconsin Administrative Code Chapter NR500 series.
2. The Contractor is allowed to use Fort McCoy recycling facilities for concrete, mixed paper, plastics (PETE#1 and HDPE#2), cardboard, 01000 - 6 trees/woody waste, metals, and aluminum cans. If materials are recycled at Fort McCoy, provide all labor and delivery to the designated recycling facilities. Materials shall be weighed and weigh slips provided to the COR to receive credit toward the 50% requirement in “Waste Reporting” above. Materials not weighed can be delivered to the designated recycling facilities, but the material will not count toward the 50% waste reporting requirement.
3. Provide for the recycling of all other construction/demolition debris including drywall, lumber, reinforcing steel, piping, wiring, brick, plaster, wall board, roofing material, insulation, plumbing fixtures, doors, and windows to the greatest extent possible . Only utilize licensed recycling facilities.
4. Provide a certificate of recycling for universal waste as defined in Wisconsin Administrative Code Chapter NR600.
P. Material Sales
1. Materials shall not be stockpiled for sale purposes on Post.
2. Public advertised sales of materials will not be permitted on Post.
3. Prior arranged sale of materials may be permitted on Post.
1.05 QUALITY CONTROL
A. The Contractor is responsible for quality control and shall establish and maintain an effective quality control system in compliance with the Contract Clause titled “Inspection of Construction.” The Contractor Quality Control (CQC) Plan shall include, as a minimum, the following to cover all design and construction operations, both onsite and offsite, including work by subcontractors, fabricators, suppliers, and shall be keyed to the proposed construction sequence. The plan shall identify personnel, procedures, control, instructions, tests, records, and forms to be used. The site project superintendent is responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract.
B. All plumbing work shall be performed by plumbers licensed by a state licensing board. The cost of the work shall include all State permit fees and approval for the installation of backflow prevention devices. Proof of certification is required.
C. All electrical work shall be supervised full time on site by a state certified journeyman electrician. All electrical work shall be overseen by a state certified Master electrician. Proof of certification is required.
D. All hazardous material abatement shall be supervised by a certified asbestos supervisor and a certified lead base paint supervisor.
E. All work associated with air-conditioning refrigerant shall be conducted by an Air-Conditioning Refrigerant Institute Certified Technician; Type-Universal. All work shall also be conducted in accordance with Federal Law “40 CFR Part 82 subpart F and Parts 273, 279, and 761” and U.S. Environmental Protection Agency “Clean Air Act (1990) Section 608” and all EPA final regulations associated with section 608.
01000 - 7
1.06 APPLICABLE STANDARDS, GUIDES AND SPECIFICATIONS
A. References are made in these specifications to published codes, standards, and specifications of manufacturers’ societies, associations, and other standards. All referenced documents are included in this specification as if written in their entirety.
B. Where referenced documents are not specified by date, the latest edition published as of the bid or proposal request date shall apply.
1.07 OPERATION AND MAINTENANCE MANUALS – NOT USED
1.08 DELIVERY AND STORAGE
A. Contractor shall insure that any items which are stored at the site prior to either removal or use by the Contractor shall be secured from unauthorized use or damage and are at the risk of the Contractor.
B. All labor and equipment required for processing, loading, unloading, transporting, and moving materials shall be provided by the Contractor.
C. Storage buildings will not be provided by the Government.
1.09 TRAILERS OR STORAGE BUILDINGS, INCLUDING OFFICE TRAILERS
A. Trailers or storage buildings will be permitted, where space is available, subject to the approval of the COR.
B. The trailers or buildings shall be in good condition, free from visible damage, rust, and deterioration, and meet all applicable safety requirements. Trailers shall be roadworthy and comply with all appropriate State and local vehicle requirements. Failure to maintain storage trailers or buildings to these standards shall result in the removal of non-complying units at the Contractor's expense.
C. A sign not smaller than 2-feet by 2-feet shall be conspicuously placed on the trailer depicting the company name, business phone number, and emergency phone number.
D. Trailers shall be anchored to resist high winds and must meet applicable state and local standards for anchoring mobile trailers.
E. Provide metal or fiberglass skirting completely around office trailers within 30 days after placement of the trailer on the lot and after being approved by the
COR.
F. Grass and weeds shall be cut weekly or as needed to a height not to exceed three inches. Trash shall be picked up and disposed of properly on a daily basis.
G. The Contractor shall be responsible for the installation and removal of all temporary utility connections at no cost to the Government.
1.10 STORAGE SITE
A. All stored materials shall be neatly stacked at all times.
B. Trash shall be picked up and properly disposed of on a daily basis.
C. Grass and weeds shall be cut on a regular basis to a height not to exceed three inches. In Cantonment, uncut height shall not exceed 6 inches. Outside Cantonment, uncut height shall not exceed 12 inches.
01000 - 8
D. Welding equipment shall be handled and stored in accordance with applicable regulations.
E. Fire extinguishers shall be provided where flammable liquids are stored.
1.11 SCHEDULING AND COORDINATING WORK
A. The Contractor shall be specifically responsible for the coordination of all phases of work under this contract within the approved construction schedule.
1. The Contractor shall at the Pre-construction Conference or if no Pre-con is held, within 20 calendar days of award, prepare and submit their schedule in the form of a Gantt Chart for approval. This schedule shall show at a minimum critical path, float, owner of float, milestones, baseline, elements of work, and duration of each significant element of work. The submitted schedule shall be approved prior to beginning work.
2. The Contractor shall maintain the original schedule/Gantt Chart throughout the life of the project and show actual schedule achievement in tandem with the original schedule and shall update the approved schedule bi-weekly to display time gained or lost against the original schedule. If in the opinion of the Contracting Officer the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve progress, including those steps that may be required by the Contracting Officer, without additional cost to the Government. The Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart from as the Contracting Officer deems necessary to demonstrate how the approved increased effort shall regain the original schedule of progress. FAR 52.236-15
B. The Contractor may be required to allow Government personnel or other Contractors to carry out work within the work site. Such work will be scheduled and coordinated through the COR.
C. The Contractor shall provide a phone number and address where a key, and/or approval, to enter may be obtained for the work sites during the work day for times when the Contractor may not be at the work site.
D. The Contractor shall provide 10 working days notice for any utility outage.
Outages shall be shown on the schedule provided. Emergency utility outages shall be reviewed by the Contracting Officer/Inspector prior to utility outage.
Expenses/damages caused by unscheduled or unapproved utility outages shall be chargeable to the Contractor.
1.12 WARRANTIES
A. All materials and workmanship shall be warranted by the Contractor for a period of not less than one year from the date of final acceptance by the Government, except when longer warranties are required from the Contractor as stated in each specification section.
B. For products and materials that are normally warranted by the manufacturer or supplier for more than one year, the Contractor shall provide the Government with a written warranty, or certification, indicating the manufacturer’s or supplier’s terms and conditions of the warranty.
01000 - 9
C. The Contractor shall populate and submit a Warranty Item Tracking spreadsheet;
that which is covered under par A. The spreadsheet shall be provided to the contractor upon request of the government COR. The spreadsheet shall outline each piece of extended warranty equipment provided. Extended warranty shall be anything beyond one calendar year from the Beneficial Occupancy Date. Item information will include the following: warranty item, equipment description, make, model, serial number, capacity, capacity unit of measure, warranty start date, warranty length, and Maintenance Information as indicated on the Provided Spreadsheet.
D. The Contractor shall develop, populate, and submit a Warranty Item Tracking spreadsheet for Equipment that has been demolished or replaced during a renovation. Demolished or removed equipment shall be reported on a Removed Item Tracking spreadsheet. The Contractor shall develop, populate, and submit the spreadsheet with equipment information to include: equipment description, make, model, serial number, capacity and capacity unit of measure.
E.
PART 2 PRODUCTS
2.01 EXISTING MATERIALS
A. Materials to be demolished:
1. All materials identified to be demolished and removed from the existing facilities shall be the responsibility of the Contractor to remove completely from Ft McCoy.
2. Under limited conditions and as specified on the plans, deliver scrap metal/materials to a location designated by the COR. Contractor will be responsible for hauling all demolished materials to the designated locations.
B. Existing materials may only be reused/relocated as specifically allowed per the contract drawings and specifications.
C. Any material not hauled to locations on Fort McCoy shall become the property of the Contractor and shall be properly recycled or disposed of.
2.02 NEW MATERIAL AND EQUIPMENT (NOT USED)
PART 3 EXECUTION
3.01 INSPECTION
A. The Contractor shall not begin successive phases of work until an inspection has been completed and the work is accepted by the COR. Notify the COR 48 hours prior to completing a phase requiring inspection.
1. Any work that will be covered by successive work must be inspected prior to performing successive work.
2. Work to be covered includes, but is not limited to, underground utilities, utilities located behind walls, and work located below finish floors.
B. When the contractor considers the work complete, submit written certification confirming:
01000 - 10
1. Contract documents have been reviewed.
2. Project submittals have been completed.
3. Work has been inspected by the Contractor for compliance with the contract.
4. Equipment and systems have been tested, balanced, and adjusted for proper operations.
5. Work is complete and ready for final inspection.
6. Contractor shall provide a requested date for punch list inspection to the Contracting Officer, in writing, not less than 7 working days prior to the proposed date of inspection. Punch list inspections shall be scheduled and conducted to ensure compliance with the contract completion date.
C. The COR will coordinate with the members of the inspection party and establish the punch list inspection date.
1. Should the COR consider the work incomplete or defective, a written punch list will be provided to the Contractor from the Contracting Officer.
2. The Contractor will be given 10 calendar days, unless otherwise determined by the Contracting Officer, to remedy the stated deficiencies.
3. The Contractor shall provide a second written certification and request re-inspection to be scheduled not later than the 10 calendar days, unless otherwise determined by the Contracting Officer. This re-inspection shall also be completed during the contract performance period to be in accordance with the contract.
4. If any further re-inspections are required the Contractor may be charged the additional cost of the inspections.
5. Final acceptance of the work occurs upon the Contracting Officer’s acceptance of the work subsequent to successful final inspection by the COR and receipt of all contract requirements.
6. If final acceptance does not occur prior to the contract completion date, liquidated damages may be applicable in accordance with the liquidated damaged clause.
D. If the Government requires beneficial occupancy of the facility prior to completion of the work by the Contractor, an inspection shall be conducted by the COR to determine the completed work, and either accept or document any work not complete. The Contractor will then complete the remaining work and correct any deficiencies.
3.02 ENVIRONMENTAL CONSIDERATIONS
A. [Migratory Bird Nesting Season]
1. [This project is subject to the Migratory Bird Treaty Act. Land clearing activities for construction, maintenance, and repair activities should generally be scheduled outside the migratory nesting season which is
01000 - 11 generally considered to be from 1 May thru 30 August. If the contractor intends to disturb or clear any project area of undeveloped land or demolish any trees, bushes or potential nesting sites they shall submit a Migratory Bird Treaty Act Deconfliction Notification. The notification shall be submitted not later than two weeks prior to scheduled clearing activities. Contractors are not allowed to proceed with construction until after the site has been cleared by the Fort McCoy Natural Resources Branch. The Submittal Notification shall state: “This project is subject to the Migratory Bird Treaty Act. Request that Fort McCoy, DPW, Natural Resources Branch if necessary, conduct a site investigation to ensure the project location(s) does not have naturally conflicting species.”]
B. Northern Long-Eared Bat
1. In May 2015, the Northern Long-Eared Bat (NLEB) was listed as a federally endangered species. As a result of this listing, tree removal is temporarily prohibited unless a survey is conducted to determine if bats are present. Fort McCoy biologists will conduct these surveys. The contractor shall submit an Endangered Species Act Deconfliction Notification a minimum of 14 days prior to the scheduling of any tree clearing activities. The notification shall state: “This project is subject to the Endangered Species Act. Request that Fort McCoy, DPW, Natural Resources Branch approve the removal of trees as required by the project specifications.” At that point an evening survey will be scheduled to determine if bats are present. If no bats are observed, the Contractor will be required to remove the trees the following morning. If bats are observed, further consultation will be required with the U.S. Fish and Wildlife Service and the tree clearing will be delayed.
C. Invasive Species
1. Contractor shall document the washing of equipment prior to arrival on Fort McCoy and upon departure from the work site to control the spread of invasive species. Spotted knapweed, crown vetch, and garlic mustard are documented to be in, adjacent, or near the work site. Any fill material transported to the work site shall be free of invasive weeds and/or seeds to the greatest extent practical.
D. Oak Wilt Season
1. Contractor shall not perform tree removal during the oak wilt season (April 1 thru 31 July) for tree removal. If tree removal is required during oak wilt season any oak trees not scheduled for removal shall be protected from damage. If non-scheduled live trees are damaged, tree wound dressing shall be immediately applied to the damaged area. All trees and/or stumps that require removal shall be transported to the stump disposal site on South Post or removed from the installation.
3.03 OBJECTS AFFECTING NAVIGABLE AIRSPACE
A. [FAA notification is required IAW CFR 14 part 77, Objects Affecting Navigable Airspace for the following:
1. Definition of Construction /Objects
01000 - 12
a. Any object of natural growth, terrain, of permanent or temporary construction or alteration, including equipment or materials used therein, and apparatus of a permanent or temporary character..
b. Any alteration of any permanent or temporary existing structure by a change in its height (including appurtenances, or lateral dimensions, including equipment or materials used therein.
2. Any construction/object or alteration of more than 200 feet in height above the ground level at its site.
3. Any construction/object or alteration of greater height than an imaginary surface extending outward and upward at the following slopes:
a. 100 to 1 for a horizontal distance of 50,000 feet from the nearest point of the nearest runway of each airport with at least one runway more than 3,200 feet in actual length, excluding heliports.
b. 50 to 1 for a horizontal distance of 10,000 feet from the nearest point of the nearest runway of each airport with at least one runway more than 3,200 feet in actual length, excluding heliports.
c. 25 to 1 for a horizontal distance of 5,000 feet from the nearest point of the nearest landing and takeoff area of each heliport (helipad).
4. Notification to the Airfield is required in addition to FAA notification of any object of permanent or temporary construction or alteration, including equipment or materials used therein:
a. Greater than 25 feet in open areas (open areas are defined as an area that does not contain other objects within 300 feet).
b. 50 feet in all other areas.
5. Objects shall be marked/lighted when greater that the above criteria as follows:
a. A red beacon for nighttime (or inclement weather conditions)
b. Either a beacon or checkered flag for daytime.
6. Objects lowered below the above criteria during nighttime shall only require marking.]
3.04 CLEANING
A. During Construction:
1. The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. The Contractor shall ensure all affected areas are “broom clean” at the end of each work day.
01000 - 13
Before completing the work, the Contractor shall remove from the work and premises, any rubbish, tools, scaffolding, equipment, and materials that are not the property of the government. Upon completing the work, the Contractor shall leave the work area in a fully cleaned, neat, and orderly condition, satisfactory to the Contracting Officer. FAR 52.236- 12.
B. Dust Control
1. Clean interior spaces prior to the start of finish coatings and continue cleaning on an as-needed basis until coatings are finished.
2. Schedule operations so that dust and other contaminants resulting from the cleaning process will not fall on wet or newly-coated surfaces.
3. The amount of dust resulting from demolition shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding areas. The use of water will not be permitted when it will create or result in hazardous or objectionable conditions such as ice, flooding, and pollution.
4. All buildings, materials, and equipment, including ductwork and diffusers, shall be cleaned of all dust and dirt resulting from the performance of the work under this contract.
C. Final Cleaning
1. Final cleaning shall be performed and completed prior to punch list inspection.
2. Clean interior and exterior surfaces exposed to view.
a. Remove temporary labels, stains, and foreign substances.
b. Polish transparent and glossy surfaces.
c. Vacuum carpeted and soft surfaces.
d. Clean equipment and fixtures to a sanitary condition.
e. Clean or replace filters of mechanical equipment.
f. Clean roofs, gutters, downspouts, and drainage systems.
3. Clean project site.
a. Sweep paved areas.
b. Rake clean other surfaces.
4. Remove waste and surplus materials, rubbish, and construction facilities from the project and from the site.
3.05 RECORD DRAWINGS
A. AsBuilt Drawings:
1. With red pencil or red ink, neatly inscribe all COR approved changes to show final locations and types of partitions, walls, doors, electrical, fire alarm system, communication system, plumbing, heating, ventilating, air conditioning services and equipment, and similar work.
01000 - 14
2. With red pencil or red ink, neatly inscribe the location of all existing and new exterior utilities. The locating may be accomplished by traditional survey methods or by global positioning system (GPS) satellite equipment supplemented by traditional methods where required. Include the size, material, and depth.
3. With red pencil or red ink, neatly inscribe the location of all new wire routing of electrical and fire alarm, layout and size of the plumbing, valves and duct access points.
4. Locations may be from existing buildings or from base monument system. Any existing structures used as a survey reference must be checked for conformity to NAD 83 surveying coordinates.
5. Contractor shall keep two sets of redlined Asbuilt drawings on the job site at all times during construction. One set shall be considered the contractor’s set and the other shall be the Government’s set. The Government set shall be submitted to the COR immediately upon completion of construction. The contractor’s set shall be used for CAD corrections and submittal of the Record Drawings.
B. Record Drawings:
1. Contractor will receive an original AutoCAD drawing package upon request from the COR. Contractor shall incorporate all redline As built changes made during the construction period that were authorized by the COR into the record AutoCAD files. All design documents shall be completed in accordance with the Fort McCoy CAD Standard. A copy of the Fort McCoy CAD Standard can be obtained from the COR.
2. The Record Drawings shall be submitted to the Government on compact disks (CD) in both DWG and PDF and full size hard copy formats. All design documents shall be completed in accordance with the Fort McCoy CAD Standard.
3. Prior to punch list inspection, present these corrected prints to the Government. Note all data and changes on these record drawings in sufficient detail and clarity and provide information necessary for the preparation of “Record Drawings” drawings. Submitted Record Drawings shall be marked “Record Drawing” and shall be submitted NLT 14 days prior to contract completion.
3.04 The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Contractor shall ensure all affected areas are “broom clean” and all tools shall be secured at the close of each work day. Before requesting a Final Inspection, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government.
Upon completing the work, the Contractor shall leave the work area in a fully cleaned, neat, and orderly condition satisfactory to the Contracting Officer. FAR 52.236-12
01007 - 1
SECTION 01007
INDUSTRY STANDARD ABBREVIATIONS AND CODES
PART 1 GENERAL
A. INDUSTRY STANDARD
1. Organizations and/or published documents representing Industry Standards are referred to throughout the Project Specifications by the following abbreviations.
2. Names are believed to be accurate and up-to-date as of the date of the Contract Documents but are subject to change.
B. APPLICABLE CODES
1. The Ft McCoy Army installation has adopted the UFC (Unified Facilities Criteria) as the primary building code. The following web link http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4 provides an index on each specific construction disciplines (and year) presently adopted and enforced by DPW.
a. UFC 1-200-01 General Building Requirements
b. UFC 1-900-01 Selection of Methods For the Reduction, Reuse and Recycling of Demolition Waste.
c. Other UFC Criteria as applicable
2. All state and local codes shall also apply.
3. Where ever there is a conflict between code models, the primary code (UFC) shall govern.
C. ABBREVIATIONS
1. Abbreviations used throughout the Specifications and the organization or document represented are:
AA Aluminum Association
AAMA Architectural Aluminum Manufacturer’s Association
AAN American Association of Nurserymen
AASHTO American Association of State Highway and Transportation Officials
ACI American Concrete Institute
AGA American Gas Association
AI Asphalt Institute
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
ANSI American National Standards Institute
ARI Air-conditioning Refrigerant Institute
ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
01007 - 2
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
AVATI Asphalt and Vinyl Asbestos Tile Institute
AWI Architectural Woodwork Institute
AWS American Welding Society
AWPA American Wood Preservers Association
AWPB American Wood Preservers Bureau
AWPI American Wood Preservers Institute
AWWA American Water Works Association
CRSI Concrete Reinforcing Steel Institute
CS Commercial Standards of U.S. Department of Standards
EIA Electronic Industries Alliance
EPA Environmental Protection Agency
EWA Engineered Wood Association (formerly APA)
FGJA Flat Glass Jobbers Association
FM Factory Mutual
FRP Fiber Reinforced Plastic
FS Federal Specifications
GA Gypsum Association
IEEE Institute of Electrical and Electronic Engineers
MSS Manufacturer’s Standardization Society
NAAMM National Association of Architectural Metal Manufacturers
NBS National Bureau of Standards
NBFU National Bureau of Fire Underwriters
NCMA National Concrete Masonry Association
NEC National Electric Code
NECA National Electrical Contractors Association
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
NFPA National Forest Products Association
NPC National Plumbing Code
NRCA National Roofing Contractors Association
NRMCA National Ready Mixed Concrete Association
NWMA National Woodwork Manufacturing Association
01007 - 3
NWAHHA National Warm Air Heating and Air Conditioning Association
OSHA Occupational Safety and Health Administration
PCA Portland Cement Association
PPI Plastic Pipe Institute
PS Product Standard of NBS
SMACNA Sheet Metal and Air Conditioning Contractors National Association
SPIB Southern Pine Inspection Bureau
SSPC Steel Structures Painting Council
TIA Telecommunications Industry Association
UL Underwriters Laboratories
USAS United States of American Standards (formerly ASA)
WCLIB West Coast Lumber Inspection Bureau
WDNR Wisconsin Department of Natural Resources
WWPA Western Wood Products Association (WPA and WCLA)
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
01019 - 1
SECTION 01019
CONTRACT CONSIDERATIONS
PART 1 GENERAL
1.01 The Delivery Order value and period of performance will be determined by completing a joint scope agreement, agreed upon by the Contractor and Government representative.
These quantities will be fixed for the duration of the work.
1.02 Delivery order completion time shall be determined as follows:
0001 The performance time for each line item (CLIN 0001) will be calculated using the following production quantities:
DESCRIPTION PRODUCTION QUANTITIES
Demolition and Removal of Walls 4000 SF/Day
Demolition and Removal of Ceilings 2500 SF/Day
Demolition and Removal of Floors 2500 SF/Day
Demolition and Removal of Chimney 60 VLF/Day
Removal of Water Laterals to Main, Seal and Cap 100 LF/Day
Removal of Sewer Laterals to Main, Seal and Cap 100 LF/Day
Cap and Seal Water/Sewer laterals at Mains 4 EA/Day
Removal of Concrete Pads < 7” 1000 SF/Day
Removal of Concrete Pads > 7” 1000 SF/Day
Removal of Frost Walls 200 LF/Day
Removal of Frost Piers 50 EA/Day
Removal of Footings 200 LF/Day
Removal of Asphalt Pavement 100 SY/Day
Installation of Compacted Base 400 CY/Day
Installation of Compacted Fill 400 CY/Day
Installation of Topsoil 200 CY/Day
Seeding 2000 SY/Day
Removal of Chain Link Fence 200 LF/Day
Installation of Chain Link Fence 100 LF/Day
Installation of 12’ Gate 2 EA/Day
Removal of asbestos siding 1500 SF/Day
Removal of asbestos flooring 1500 SF/Day
Removal of asbestos pipe insulation 50 LF/Day
Removal of buried ACM covered pipe 200 LF/Day
Removal of buried power conductors 200 LF/Day
Removal of buried communication conductors 200 LF/Day
Removal of buried gas lines 200 LF/Day
Removal of asbestos walls 1000 SF/Day
Removal of asbestos ceilings 600 SF/Day
01019 - 2
Whole building removal 1 EA/35 Days
Combined building removal 180 EA/Day
LP Tank Removal 30 EA//Day
0002 The project performance time for each project on the delivery order shall be determined as follows:
1. The quantities of each bid item on CLIN 0001 required to complete a project shall be negotiated and agreed upon by a Government representative and the Contractor.
2. The quantity of each bid item on CLIN 0001 shall be divided by the production quantity for that bid item to determine the time allowed. The time shall be rounded to the next whole day.
3. The total of the times for all bid items on CLIN 0001 used on the project shall be added to determine the project performance time.
0003 If two or more projects are included on one delivery order, then all project performance times shall be totaled prior to adding time for submittals.
1.03 Completion time on a delivery order starts on the day the order is issued unless stated otherwise. Individual delivery orders could require concurrent performance dependent upon the issue date of the delivery order.
1.04 Liquidated damages will apply for this contract. See the contract documents for more information.
1.05 It is the intent of the Government to issue a delivery order to demolish one building immediately following the award of this contract. After award, a joint scoping meeting will be held to negotiate quantities for CLIN 0001. The estimated quantities for this project have been attached for information only.
PART 2 PRODUCTS
2.01 CONTRACT LINE ITEMS: BID SCHEDULE
0001 Demolition and removal of walls. Payment shall be per the square foot of wall removed and shall be full compensation for demolition of framing, windows, insulation, interior and exterior finishes, electrical, plumbing, and HVAC.
0002 Demolition and removal of ceilings. Payment shall be per the square foot of ceiling removed and shall be full compensation for demolition of roof trusses, decking, shingles, interior finishes, insulation, electrical, plumbing, HVAC, and appliances.
0003 Demolition and removal of floors. Payment shall be per the square foot of floors removed and shall be full compensation for demolition of joist, insulation, decking, electrical, plumbing, HVAC, flooring materials, appliances, and plumbing fixtures.
Multi-level buildings will be paid by the square foot of floor removed on each level.
0004 Demolition and removal of brick chimney and foundation. Payment shall be for entire chimney and foundation and shall be full compensation for labor, equipment necessary to demolish the chimney, remove the foundation, excavation, disposal, backfill, compaction, and site restoration. Dispose of the chimney material at the Fort McCoy concrete recycling dump. The concrete dump is located approximately four miles north of State Highway 21 on North Post.
0005 Remove water lateral from the building to the main and cap at the main. Payment shall be per the linear foot of water line removed and shall be full compensation for
01019 - 3 excavation, removal of the lateral, disposal, capping of the main, backfill, compaction, and site restoration.
0006 Remove sanitary sewer lateral from the building to the main and cap at the main.
Payment shall be per the linear foot of sanitary sewer line removed and shall be full compensation for excavation, removal of the lateral, disposal, capping of the main, backfill, compaction, and site restoration.
0007 Remove water valve, valve box, and cap water lateral and/or sanitary sewer lateral at main when entire lateral is abandoned in place. Payment shall be per each cap installed to main and shall be full compensation for saw cutting of hard surface as necessary, removal and disposal of hard surface material, excavation, removal of buried utility lines, disposal of materials, capping of the main, backfill, compaction, and site restoration.
0008 Demolish and dispose of a concrete pad less than 7 inches thick. Payment shall be per square foot of concrete pad removed and shall be full compensation for labor and equipment necessary to demolish and dispose of the concrete pad at the Fort McCoy concrete recycling dump. The concrete dump is located approximately four miles north of State Highway 21 on North Post.
0009 Demolish and dispose of a concrete pad greater than 7 inches thick. Payment shall be per square foot of concrete pad removed and shall be full compensation for labor and equipment necessary to demolish and dispose of the concrete at the Fort McCoy concrete recycling dump. The concrete dump is located approximately four miles north of State Highway 21 on North Post.
0010 Demolish and dispose of frost wall (typically 8 inches thick). Payment shall be per the linear foot of frost wall removed and shall be full compensation for labor, equipment, excavation, disposal, backfill, compaction, and site restoration. Dispose of the clean concrete at the Fort McCoy concrete recycling dump. The concrete dump is located approximately four miles north of State Highway 21 on North Post.
0011 Demolish and dispose of a frost piers (typical 8 to 12 inches thick). Payment shall be per the linear foot of frost wall removed and shall be full compensation for labor, equipment, excavation, disposal, backfill, compaction, and site restoration. Dispose of the clean concrete at the Fort McCoy concrete recycling dump. The concrete dump is located approximately four miles north of State Highway 21 on North Post.
0012 Demolition and removal of footings. Payment shall be per the linear foot of footing removed, regardless of size, and shall be full compensation for labor, equipment, excavation, disposal, backfill, compaction, and site restoration. Dispose of the clean concrete at the Fort McCoy concrete recycling dump. The concrete dump is located approximately four miles north of State Highway 21 on North Post.
0013 Demolish and dispose of asphalt pavement up to 6" thick. Payment shall be per square yard of asphalt pavement removed and shall be full compensation for labor and equipment necessary to saw cut pavement, demolish and dispose of the asphalt pavement off post.
0014 Provide, install, and compact aggregate base course material when needed for a finished surface. Payment will be per the cubic yards of material compacted and shall be full compensation for the material, transportation of the material, compaction of subgrade material, placement to the required grades, compaction, and testing.
0015 Provide, install, and compact fill material for all other excavations. Payment will be per the cubic yard of compacted, in-place fill material and shall be full compensation for the material, transportation of the material, placement to the required grade, compaction, testing, and restoration. There is not a borrow pit available at Fort McCoy for Contractor use.
01019 - 4
0016 Provide and install topsoil fill material. Payment will be per the cubic yard of in-place topsoil and shall be full compensation for the material, transportation of the material, and placement to the required grade.
0017 Provide and install grass seed. Payment will be per the square yard of area seeded and shall be full compensation for preparation of soil, application of seed, fertilizer, mulch, and maintenance of seeded area. Seeded areas shall be maintained until grass has been established and after three mowing events.
0018 Removal and disposal of chain link fence. Payment will be per the linear foot of fence removed and shall be full compensation for disposal of fence, posts, gates, razor wire, barbed wire, etc., and associated concrete, backfill, compaction, and landscape restoration.
0019 Installation of chain link fence. Payment will be per the linear foot of fence installed and shall be full compensation for 6 foot high chain link, 3 strands of barb wire, and all associated posts, connectors, foundations, and landscape restoration.
0020 Installation of 12’ wide swing gate. Payment will be per each gate installed and shall be full compensation for the gate, post set in concrete, and all hardware needed for installation.
0021 Removal of ACM siding. Payment shall be per the square foot of asbestos siding or lead painted materials removed and shall be full compensation for permits, ACM and/or lead abatement, disposal, and testing.
0022 Removal of ACM flooring and/or subflooring up to 3 layers shall be paid by the square foot of…