W911SA-16-B-0001_Final_Solicitation.docx
DOCX document 126 KB Posted
- Attached to
- Fire Alarm IDIQ - Fort McCoy, WI
- Solicitation number
- W911SA-16-B-0001
About this file
W911SA-16-B-0001 Final Solicitation
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SA-16-B-0001
Section 00010 - Solicitation Contract Form
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Job |
FIRE ALARM BASE YEAR
FFP
PROVIDE ALL PARTS, LABOR, TOOLS, EQUIPMENT, AND SUPERVISION NECESSARY TO REPAIR, REPLACE, AND INSTALL FIRE ALARM SYSTEMS AT FORT MCCOY, WISCONSIN IN ACCORDANCE WITH THE SPECIFICATIONS, DRAWINGS, AND CONTRACT DOCUMENTS.
FOB: Destination
PURCHASE REQUEST NUMBER: 0010670139
MAX
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Job |
| OPTION |
| FIRE ALARM OPTION YEAR 1 |
FFP
PROVIDE ALL PARTS, LABOR, TOOLS, EQUIPMENT, AND SUPERVISION NECESSARY TO REPAIR, REPLACE, AND INSTALL FIRE ALARM SYSTEMS AT FORT MCCOY, WISCONSIN IN ACCORDANCE WITH THE SPECIFICATIONS, DRAWINGS, AND CONTRACT DOCUMENTS.
MAX
| ITEM NO |
| SUPPLIES/SERVICES |
| MAX QUANTITY |
| UNIT |
| UNIT PRICE |
| MAX AMOUNT |
| 1 |
| Job |
| OPTION |
| FIRE ALARM OPTION YEAR 2 |
FFP
PROVIDE ALL PARTS, LABOR, TOOLS, EQUIPMENT, AND SUPERVISION NECESSARY TO REPAIR, REPLACE, AND INSTALL FIRE ALARM SYSTEMS AT FORT MCCOY, WISCONSIN IN ACCORDANCE WITH THE SPECIFICATIONS, DRAWINGS, AND CONTRACT DOCUMENTS.
MAX
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
| CLIN |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| 0001 |
| Destination |
| Government |
| Destination |
| Government |
| 1001 |
| Destination |
| Government |
| Destination |
| Government |
| 2001 |
| Destination |
| Government |
| Destination |
| Government |
DELIVERY INFORMATION
| CLIN |
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC |
| 0001 |
| POP 01-MAR-2016 TO |
28-FEB-2017
| N/A |
| DIRECTOR OF PUBLIC WORKS |
W0XY DIRECTOR OF PUBLIC WORKS
ENG PLANS BR REPAIR CONSTRUCTION
2171 SOUTH 8TH AVENUE
FORT MCCOY WI 54656-5136
608-388-3423
W81TMH
| 1001 |
| POP 01-MAR-2017 TO |
28-FEB-2018
| N/A |
| (SAME AS PREVIOUS LOCATION) |
W81TMH
| 2001 |
| POP 01-MAR-2018 TO |
28-FEB-2019
| N/A |
| (SAME AS PREVIOUS LOCATION) |
W81TMH
Section 00100 - Bidding Schedule/Instructions to Bidders
SUPPLEMENTAL INFORMATION
1) GOVERNMENT POC INFORMATION:
Contract Specialist: Jamie Gregar Email: jamie.j.gregar.civ@mail.mil Phone: 608-388-1007
| Contracting Officer: Steven M. Bailey |
| Email: steven.m.bailey2.civ@mail.mil |
| Phone: 608-388-6077 |
2) CONTRACTOR POC INFORMATION:
Name: _____________________________________
E-mail _____________________________________
DUNS______________________________________
TAXPAYER ID #_____________________________
3) CONTRACT INFORMATION
a. CONTRACT TYPE: This will be a single award Firm Fixed Price Indefinite-Delivery Indefinite-Quantity type contract. This contract will be awarded for a base year and 2 one-year option periods and an option to extend services for up to 6 months. It is the unilateral right of the Government to exercise the option year(s) of this contract.
b. GUARANTEED MINIMUM AND MAXIMUM: The Government reserves the right to order the maximum quantities, set forth in the bid schedule (Attachment 1) and is only obligated to order the minimum guaranteed amount established from the minimum guarantee/seed project. All line items and quantities are tentative and will be subject to a quantity determination meeting between the awardees and a government employee. The minimum guarantee is one project, described below. There is no minimum guarantee in the option years.
The minimum guarantee is to provide all materials, labor, equipment, transportation, and supervision to upgrade the conventional fire alarm system in building 1658 to an addressable fire alarm system.
The maximum quantities available for the life of this contract will be the cumulative total of the base year plus the option years with the potential of a 30% increase of the overall contract total in the 6 month extention..
NOTE: The unit of measure for all CLINs is "JOB". JOB is not defined as the "number" of jobs. The unit of measure of “JOB" is used as the amount of dollars anticipated for the specific CLIN.
c. FUNDING: In accordance with FAR 52.232-18; Availability of Funds: FY16 funds are not presently available for this solicitation and resultant contract. However, funds are available for the award of the minimum guarantee.
d. SUBMISSION DEADLINE FOR QUESTIONS:
Any questions, concerns, verification or clarification of information on the documents included in the solicitation package shall be submitted in writing to the Government POC’s identified herein NLT 10:00 AM Central Time on December 18, 2015. Include in the subject line of the email the Government’s solicitation number; failure to do so will lessen the Government’s ability to ensure all questions are considered during the bidding process. Provide your company name, POC and contact information in the body of the email.
This deadline is created to ensure the Contracting Officer and Requiring Activity have sufficient time to respond to the questions. Questions will be consolidated from all contractors and responses to all questions will be posted as a separate attachment to the solicitation. NOTE: Contractors are highly encouraged to read the entire solicitation in full.
4) SITE VISIT
a. A site visit is scheduled for December 15, 2015 at 10:00 AM Local time. Interested attendees are asked to meet in the Contracting Office located in Bldg. 1108. South R Street, Fort McCoy, Wisconsin. The POC for the project is Jamie Gregar, 608-388-1007. This will be the only site visit conducted, requests for additional site visits will be denied.
For additional Site Visit information, see Site Visit clause 52.236-27, Alternate 1. Unless you already have a permanent vehicle pass, you will be required to obtain a one-day vehicle pass to gain access to Fort McCoy. You will be required to present the following information at the Gate to obtain a visitors pass: (1) vehicle registration, (2) valid driver’s license, (3) or car rental agreement (if applicable). It is highly recommended that bidders plan to arrive at the Visitor’s Center at least an hour prior to the scheduled time for the site visit. The conference will begin promptly without considerations for late or lost bidders; no subsequent site visits will be considered. Remarks, explanations and answers provided by Government representatives before, during and after the site visit shall not change or qualify any of the terms or conditions of the solicitation. The solicitation can only be changed by a formal written amendment issued by the Fort McCoy Contracting Office.
5) ORDERING/TASK ORDERS
a. The line item quantities listed in the Bid Schedule are for variable items which are to be purchased by the Government only after the specific need for the item has been identified. Once the basic contract is awarded, and for each task order, a pre-construction conference meeting and quantity determination will be scheduled. All of the items available for award will be reviewed by the government and contractor and the specific line items needed to complete the project will be inserted on a bid schedule. The government will prepare a separate bid schedule for each project and the total for all items ordered under that task order will be the price inserted in CLIN 0001 or the respective CLIN for the current option year, of the task order. The separate bid schedules will be included as part of the task order as back up documentation.
6) QUANTITY DETERMINATIONS
a. As needs arise for performance under the terms of this contract, the Government will notify the Contractor, verbally and/or in writing, of the requirement and establish a time for a joint site visit. At a time agreed upon, the Contractor and the designated Government representative shall visit the proposed work site to jointly determine quantities of the bid schedule items that will be required to complete the scope of work.
7) REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF BIDDERS
SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already registered, please register in the CCR database at https://www.sam.gov/
A DUNS number is required for SAM registration. If your company does not have DUNS #, obtain one by calling 800-333-0505.
Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 238210 under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.
If the prospective awardee for this request for quotes is not registered in the SAM database by close of solicitation, including NAICS 238210 under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful registered offeror.
SAM REQUIREMENT: Prospective contractors who have not completed electronic annual representations and certifications at www.sam.gov in conjunction with required registration in the SYSTEM for AWARD MANAGEMENT (SAM) database, shall complete and submit 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2014) and 252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2014) in SAM to be eligible to receive an award for this solicitation.
Contractors are referred to EPA’s list of EPA-designated products available at http://www.epa.gov providing products that contain recovered materials.
In accordance with DPAP changes to reporting requirements under FAR 52.223-2, Affirmative Procurement of Bio-based Products under Service and Construction Contracts, contractors are now required to submit annual bio-based reports to the new reporting module in the System for Award Management (SAM). SAM can be accessed at https://www.sam.gov.
The “Equal Employment Opportunity Is the Law” notice (poster) referenced in FAR clause 52.222-26(b) (3), Equal Opportunity, is located at http://www.dol.gov/ofccp/regs/compliance/posters/ofccpost.htm
In accordance with FAR 22.404-10, the contractor must post a copy of the wage determination and Department of Labor Form WH-1321 in a prominent place where employees working on federal construction contracts can easily see it. The applicable wage determination is incorporated into the contract at Section H. The WH-1321 poster is located at http://www.dol.gov/compliance/guide/index.htm
8) BONDING/BID GUARANTEE
a. A Bid Bond/Guarantee is required if the bid amount exceeds $150,000 and shall be provided in the amount of twenty percent (20%) of the bid price for the base year or $3,000,000, whichever amount is less. (Bidders must use the Standard Form (SF) 24 if providing a bid bond as the bid guarantee)
b. The successful offeror will be required to provide Performance and Payment bonds (Or Alternate Payment Protection) at the task order level. Contract Awardee will have ten days after issuance of a task order to provide the required Bonds/Protection to the contracting office. The contracting office has five days to complete the review and notify the contractor if the bonds are not sufficient. Actual work on site may not begin until bonding approval has been received by the contractor. If bonds are returned because of contractor error, performance dates will not be revised.
9) REQUIREMENTS/DELIVERABLES
· Completed SF1442 with acknowledgement of all amendments
· Completed Attachment 1, Bid Schedule
· Bid Guarantee
· Any additional verification/requested documents or information (i.e. Responses to #2 listed above and/or any additional fill-in provisions/clauses)
10) ORDERING OFFICIAL/OFFICER
a. There will be a designated Ordering Official under this contract, authorized to make purchases up to their designated authority of $25,000, per single known requirement, against this IDIQ contract.
Projects under this 25K threshold will not be issued on an individual task order FORM 1155, however, all requirements of the contract award, and all policies and procedures will be applicable to projects ordered by the designated official.
Contractor will still be required to negotiate quantities/specifications for the project with agreement/approval by the ordering official.
The ordering officials will administer and be the main POC for all orders placed under their authority.
The names and contact information for these individuals will be included in the resultant contract.
b. The following describes the procedures to be used for ordering items under this contract by using the Federal Government-wide purchase card. This option to order by use of the Government-wide purchase card is strictly an alternative method of ordering by the Government and may be used in place of ordering by other order forms that comply with FAR 12.204. The Government reserves the right to unilaterally terminate the use of the credit card at any time.
(1) All ordering officers may use the Government-wide purchase card, commonly referred to as the Government "credit card," as an alternative method of ordering and paying for purchases made under this contract. Purchase card orders are subject to all terms and conditions of this contract, unless otherwise stated in this provision or another provision in this contract.
(2) The purchase card is specifically designed for use by the Federal Government. The purchase card is like a typical commercial credit card. However, the authorization limitations of the purchase card are more specific, i.e., only for a particular contract, monthly limitations, certain categories of products or services, etc. The purchase card will be exclusively used for official Government purchases in accordance with the prices, terms, and conditions of this contract. The purchase card order limitation shall be $25,000. With respect to ordering authority, only designated Ordering Officers may use the purchase card as a means of purchasing items on this contract.
(3) Credit limits for the purchase card for ordering officers is $25,000. These credit limits for the purchase card are the responsibility of the credit card holder and the approving office.
(4) The contractor shall accept payment via credit card for projects authorized by the ordering officers and that have followed the required policies and procedures within this solicitation and resultant contract.
(5) Invoices for orders placed by the ordering officer will be submitted directly to the ordering officer, and progress payments will still be authorized if applicable, the same as would be authorized for Task Order issued on the Form 1155.
| (6) When using the purchase card as the payment method, the contractor is required to generate a receiving report in Wide Area Work Flow (WAWF), and the Government acceptor is required to accept the receiving report in WAWF. These reports are mandatory in order to ensure compliance with the Prompt Payment Act requirements for written acceptance. Use of WAWF to create and accept receiving reports is mandatory when the GPC is used as a method of payment against a contract. In order to ensure proper routing of contract transactions paid with the GPC, use the code "CRCARD" in the Pay Official/DoDAAC field. The contractor is required to generate a receiving report in WAWF, and the Government acceptor is required |
| to accept the receiving report in WAWF. The Cardholder is required to verify that acceptance has occurred in WAWF prior to submitting the invoice to the Certifying Official for certification. |
ATTACHMENTS
a. All referenced documents for this solicitation are available at the Government Point of Entry at http://www.fedbizopps.gov. Potential bidders are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
b. Attachments listed below will be incorporated into the resultant contract.
Attachment 1 - Bid Schedule Attachment 2 - AT/OPSEC Coversheet Attachment 3 - Specifications Attachment 4 - SF24
CONTRACT MAGNITUDE
The magnitude of this contract is between $1,000,000 and $5,000,000 including the base period and two one-year option periods.
EVALUATION OF BIDS
BASIS OF AWARD
This requirement for replacing or installing fire alarm components in buildings for Fort McCoy shall be awarded utilizing Sealed Bidding Procedures in accordance with Federal Acquisition Regulation (FAR) Part 14, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), and the Army Federal Acquisition Regulation Supplement (AFARS). Award will be made with reasonable promptness to the responsible bidder submitting the lowest responsive bid in accordance with requirements and provisions herein.
The Government will evaluate proposed prices for balanced and reasonable pricing, using price analysis techniques. Proposed prices evaluated as unreasonable or unbalanced may be grounds for eliminating the bid from award eligibility.
EVALUATION CRITERIA
The Government will evaluate bids received in response to this solicitation solely on the basis of price and price related factors.
a. RESPONSIVENESS OF BID. For a bid to be determined responsive and considered for award, the bid must comply in all material respects with the invitation for bids. Such compliance enables bidders to stand on an equal footing, and maintain integrity of the sealed bidding system (Subpart 14.301).
In order to be considered responsive the Bidder:
· Properly signed SF 1442, with Original Signature
· Acknowledgement (if any) of all Material Amendments,
· Fully completed Attachment 1 - Bid Schedule. (3 Worksheets/Tabs to complete)
· Shall not qualify the terms and conditions of the solicitation in the submitted bid
· Shall comply with the instructions of the solicitation.
· A Bid Bond/Guarantee is required and shall be provided in the amount of twenty percent (20%) of the bid base year price or $3 Million whichever is less. (Bidders must use the Standard Form (SF) 24 if providing a bid bond as the bid guarantee).
· Shall submit a complete sealed bid package prior to the cutoff for receipt of bids.
Non-Responsive bids will not be considered for contract award.
NOTE: It is the bidder's responsibility to ensure all information/deliverables are provide within the sealed bid package, and that all reporting and requirements are met and confirmation of these requirements provided. The list above is not necessarily all inclusive of required information.
b. PRICE EVALUATION. Unit Prices will be evaluated to determine if they are reasonable, complete and balanced. The price analysis techniques in 15.404-1 (b) may be used as guidelines as per guidance provided in Subpart 14.408-2 to determine reasonableness of price. If adequate price competition is not obtained or if price reasonableness cannot be determined using price analysis of Government obtained information, additional information may be required from the bidder to support the proposed price.
i. Total Evaluated Price: The total evaluated price will be a single numeric value, not to exceed 2 decimal places, calculated by the Government, that represents a single value which will be the value used to determine the lowest price and apparent winning bid. The steps and formulas utilized to calculate the Total Evaluated Price are as follows:
a. Contractor fully completes the Attachment 1 - Bid Schedule required information, all values are not to exceed 2 decimal places. (Required fields Highlighted within Attachment 1 document)
b. Attachment 1 Document will automatically calculate all other required figures utilizing the following formulas:
| Item Amount = (Est. Quantity) * (Unit Price) |
| Year Total = Sum of all Item Amounts |
NOTE: There will be three year totals one for the base year and each of the two options years.
| Offeror's Total Price= |
| (Base Year Total) + (Option Year 1 Total) + (Option Year 2 Total) |
Total Evaluated Price= (Offeror's Total Price)
ii. Balanced Pricing: Offerors are cautioned against submitting a bid that contains unbalanced pricing. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items (including Base and Option Years) is significantly overstated or understated as indicated by the application of price analysis techniques. Offers that are determined to be unbalanced may be rejected if the lack of balance poses an unacceptable risk to the Government.
iii. Definitions:
Reasonableness. A price is reasonable if, in its nature and amount, it does not exceed that which would be incurred by a prudent person in the conduct of competitive business.
Completeness/Accuracy. The offeror’s bid is in compliance with the Price instructions in the solicitation.
c. INCREASED QUANTITIES. There is a reasonable expectation that the option quantities will be exercised during the 3 year performance period. There will be a limit on quantities of 30% of the value of the full award. The Government would incur undue expenditures if required to solicit for this additional quantity. The contractor will not incur undue risks as it is anticipated that the market prices for the materials and labor will not fluctuate substantially during the three year period. A notice will be given prior to the expiration of the contract exercising this option. The total value exercised IAW FAR 52.217-6 shall not exceed 30% of the value of the total award.
In accordance with FAR 52.217-6, Should the need for additional quantities arise the Government may exercise it its right to increase quantities in accordance with 52.217-6 (see 700 section). The schedule being used at the time of exercising of the option will dictate the unit price to be used under the clause, in other words if the option for increased during option period three the unit prices in option period price schedule will be used.
The government will not evaluate its option to extend services (see FAR Clause 52.217-8) as part of price evaluation. This option is only intended to extend the ordering period for any quantities not used, not add additional quantity and only will be evaluated based on extending the period of performance. Offerors are required only to price the base and option periods. Offerors shall not submit a price for the potential six month extension of services period (see FAR Clause 52.217-8) The Government may choose to exercise the Extension of Services at the end of any performance period, utilizing the rates of that performance period.
d. RESPONSIBILITY DETERMINATION. According to FAR Part 9.1, Purchases shall be made from, and contracts shall be awarded to, responsible prospective contractors only.
To be determined responsible, a prospective contractor must --
· Have adequate financial resources to perform the contract, or the ability to obtain them (see 9.104-3(a));
· Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and governmental business commitments;
· Have a satisfactory performance record (see 9.104-3(b) and Subpart 42.15). A prospective contractor shall not be determined responsible or nonresponsible solely on the basis of a lack of relevant performance history, except as provided in 9.104-2;
· Have a satisfactory record of integrity and business ethics (for example, see Subpart 42.15);
· Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them (including, as appropriate, such elements as production control procedures, property control systems, quality assurance measures, and safety programs applicable to materials to be produced or services to be performed by the prospective contractor and subcontractors). (See 9.104-3 (a).)
· Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them (see 9.104-3(a)); and
· Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
No purchase or award shall be made unless the contracting officer makes an affirmative determination of responsibility. In the absence of information clearly indicating that the prospective contractor is responsible, the contracting officer shall make a determination of nonresponsibility.
INSTRUCTIONS TO BIDDERS
BID PREPARATION INSTRUCTIONS
The following instructions prescribe the format for the bid and describe the approach for the development and presentation of bid data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of bids. In the sealed bidding procedures the price alone will determine the “Apparent Low Bid”; however the submission of a low bid does not in and of itself determine responsibility of a bidder and therefore it is necessary to require additional information in order that the Contracting Officer may make an award based on the lowest overall priced responsible bidder.
1. BID SUBMISSION
a. Bid shall be submitted prior to offeror due date and time as identified on the Standard Form 1442 Block 13, to the following address:
Mission and Installation Contracting Command (MICC) – Ft. McCoy ATTN: Jamie Gregar 1108 South R Street Fort McCoy, WI 54656
b. Bid shall be submitted in a sealed envelope with the following information on the outside: Solicitation Number, Contract Specialist Name, Date and Time of Bid Opening, and bidders name and address. Please do not count the shipping/mailing envelope/box as your sealed envelope. Shipment packaging shall be able to be removed and still maintain the integrity of the sealed bid package.
c. Bids MUST be submitted via mail or hand carried to the MICC – Ft. McCoy Office to be received and time stamped prior to the due date and time listed on the Standard Form 1442 Block 13. Bids received after this date and time, or bids received via fax or email will be considered ineligible for award.
d. The bidder’s failure to include information required by this solicitation may result in the bid submission being found non-responsive and may therefore be ineligible for award.
2. BID PREPARATION INSTRUCTIONS
b. The bidder’s documentation specified below will constitute the Bidder's acceptance of the terms and conditions of the IFB, proposed contract type, and concurrence with the Specifications and other applicable documents.
c. All referenced documents for this solicitation are available at the Government Point of Entry at http://www.fedbizopps.gov. Potential bidders are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
d. The bidder shall provide one (1) hard copy and one (1) electronic copy of all submission requirements. Electronic copy shall be submitted on a CD-ROM. Attachment 1 - Bid Schedule shall be in Excel format and the remainder of the documents may be in Microsoft Word, PowerPoint, Excel and/or Adobe PDF format.
3. SUBMISSION OF OFFER CONTENT
The Bid Package shall be organized as follows:
TAB A - Standard Form 1442, Solicitation Offer and Award. The bidder is cautioned that the SF 1442 must contain an original signature on the form in Block 14. The Contractor shall acknowledge any amendments to the IFB in accordance with the instructions on the SF 1442. The bidder shall provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your submission and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.
TAB B – Bid Submission. The bidder shall ensure that Attachment 1 Bid Schedule is completely filled out and information is accurate. The spreadsheet contains sheet tabs one for the base and each option year, so ensure all years are completed.
Within Attachment 1 the bidder shall provide a Unit Price, not to exceed 2 decimal places, for each item on the Bid Schedule for the base and each option year. The Attachment 1 document will automatically perform all calculations needed to arrive at the Total Evaluated Price. No Bid for a quantity less than that specified in the Bid Schedule will be accepted. Failure to provide complete pricing information within Attachment 1 shall render the bid non-responsive, and may eliminate the bidder from competition
Bidders are required to consider inflationary factors and market trends in developing unit prices for items listed in the option years; no separate economic price adjustment clause will be used under this contract. All prices bid in response to this solicitation must include all costs associated with the conduct of this requirement, construction, and delivery work elements, applicable State sales taxes, permits, and licensure. Unit Prices also must include the overall project management, superintendence and quality control necessary for the planning and execution of multiple work requirements conducted simultaneously throughout each performance period.
The bid schedule, Attachment 1, will be incorporated into the resultant contract and utilized by the Government in determining the value of issued task orders throughout the life of the awarded contract.
TAB C – Bid Bond/ Guarantee. This tab shall include the bid bond.
A Bid Bond is required and shall be provided in the amount of twenty percent (20%) of the base year total or $3,000,000 whichever is less.
NOTE: Only the Awardee will be required to provide Performance and Payment (P&P) Bonds at the task order level, as is stated in this solicitation, P&P Bonds are not required to accompany the contractors bid.
TAB D – Additional/Supplemental Information. This tab shall contain all other required information requested throughout this solicitation and any additional supplemental information. This includes but is not limited to Fill-In Provisions/Clauses and any additional supporting documentation the bidder provides at their discretion.
CLAUSES INCORPORATED BY REFERENCE
| 52.204-7 |
| System for Award Management |
| JUL 2013 |
| 52.204-16 |
| Commercial and Government Entity Code Reporting |
| JUL 2015 |
| 52.214-3 |
| Amendments To Invitations For Bids |
| DEC 1989 |
| 52.214-4 |
| False Statements In Bids |
| APR 1984 |
| 52.214-5 |
| Submission Of Bids |
| MAR 1997 |
| 52.214-6 |
| Explanation To Prospective Bidders |
| APR 1984 |
| 52.214-7 |
| Late Submissions, Modifications, and Withdrawals of Bids |
| NOV 1999 |
| 52.214-18 |
| Preparation of Bids-Construction |
| APR 1984 |
| 52.214-19 |
| Contract Award-Sealed Bidding-Construction |
| AUG 1996 |
| 52.214-34 |
| Submission Of Offers In The English Language |
| APR 1991 |
| 52.214-35 |
| Submission Of Offers In U.S. Currency |
| APR 1991 |
| 52.217-5 |
| Evaluation Of Options |
| JUL 1990 |
| 252.236-7008 |
| Contract Prices-Bidding Schedules |
| DEC 1991 |
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price, Indefinite Delivery Indefinite Quantity contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY 2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| .6 |
| 6.9 |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Fort McCoy in Monroe County Wisconsin.
52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from , Construction Contracting Officer - Installation, 1108 South R Street, Fort McCoy, WI 54656-5153
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for--
December 15, 2015 at 10:00AM local time.
(c) Participants will meet at--
| 1108 South R Street |
| Fort McCoy, WI 54656 |
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/
Section 00600 - Representations & Certifications
| 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| NOV 2011 |
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238210.
(2) The small business size standard is $15,000,000.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in System for Award Management (SAM), and has completed the Representations and Certifications section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
( ) Paragraph (d) applies.
( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(iv) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(v) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.
(vi) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(vii) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xvi) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xvii) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternates I, II, and III.) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $79,507, the provision with its Alternate II applies.
(D) If the acquisition value is $79,507 or more but is less than $100,000, the provision with its Alternate III applies.
(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xx) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.
(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.] XXX (i) 52.204-17, Ownership or Control of Offeror.
(ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(iii) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.
(iv) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
XXX (v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).
(vi) 52.227-6, Royalty Information.
(A) Basic.
(B) Alternate I.
(vii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The offeror has completed the annual representations and certifications electronically via the SAM website accessed through https://www.acquisition.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)
(a) Definitions. As used in this provision--
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in--
(A) The payment of a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .