W911SA-16-B-0001_Attachment_3_-_Specifications.pdf
PDF 193 KB Posted
- Attached to
- Fire Alarm IDIQ - Fort McCoy, WI
- Solicitation number
- W911SA-16-B-0001
About this file
Attachment 3 - Specifications
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ANALOGUE
ADDRESSABLE FIRE
ALARM IDIQ
FY16-FY19
DRAWING NO: 47-018-8090
FORT MCCOY, WISCONSIN
June 2015 P8090 Fire Alarm IDIQ FY16-FY19 00002 - 1
SECTION 00002
TABLE OF CONTENTS
DIVISION 1
Section 01000 General Requirements Section 01007 Industry Standard
Abbreviations and Codes Section 01019 Contract Considerations Section 01031 Demolition And Removal
Procedures For Property Containing Hazardous Materials
Section 01300 Submittals Section 01400 Special Safety Requirements
DIVISION 2-15 NOT USED
DIVISION 16
Section 16010 Basic Electrical Requirements Section 16111 Conduit Section 16123 Building Wire and Cable Section 16130 Boxes Section 16721 Automatic Fire Detection and
Alarm System
END OF SECTION
01000 - 1
SECTION 01000
GENERAL REQUIREMENTS
PART 1 GENERAL
1.01 SUMMARY OF THE WORK
A. REMOVAL WORK: Remove all items indicated on the drawings and in the specifications and dispose of off post at the Contractor’s expense including but not limited to;
1. Remove existing fire alarm components which are to be replaced.
B. NEW WORK: Contractor shall provide all labor, equipment, materials, transportation, and supervision necessary to perform the work under this contract including but not limited to;
1. Replace fire alarm components in an existing fire alarm system.
2. Add new components to an existing fire alarm system.
3. Install a new fire alarm system.
C. REPAIR WORK: Contractor shall repair any damages caused by this construction, including but not limited to;
1. Repair any existing construction which is damaged.
1.02 BUILDINGS
A. Existing buildings may be occupied during the performance of the contract.
B. These buildings will be subject to annual heat deactivation by the Government and cold weather conditions. All products used must be able to withstand freezing conditions.
1.03 ABBREVIATIONS
A. “KO” = Contracting Officer.
B. “COR” = Contracting Officer’s Representative.
C. Industry Standard Abbreviations - See Section 01007.
1.04 TEMPORARY UTILITIES AND FACILITIES
A. General: This section is intended to include temporary utilities and temporary construction facilities to be provided by the Contractor unless otherwise stated below.
B. 120 VAC, 60 Hz electricity and lighting is currently in the building(s) and is available for use. The electricity used will be provided by the Government at no cost to the Contractor.
1. Temporary electricity, if required, shall be provided by the Contractor by portable generator or temporary power pole. The cost of the generator and fuel and/or temporary power pole shall be the responsibility of the Contractor. The cost of electricity used if the Contractor provides a temporary power pole will be provided by the Government at no cost to the Contractor. The Contractor shall contact Xcel Energy for temporary power.
01000 - 2
C. Temporary heating, cooling, and ventilation
1. Furnish, install, and maintain all temporary systems and equipment required to maintain specified or required environmental conditions during the progress of the work. Remove upon completion of work at the expense of the Contractor.
2. Government provided electricity will not be used for heating.
D. Temporary Telephone Service
1. If the Contractor requires phone service for this project, the Contractor must contact the phone company business office:
Century Telephone 205 5th Avenue LaCrosse, Wisconsin 54601
(800) 872-4017
2. The Contractor shall pay for all telephone installation, maintenance, removal, and usage charges.
3. The Contractor is responsible for providing and paying for any and all subcontractor’s calls.
4. Existing telephones owned or rented by the Government will not be used by the Contractor under any circumstances.
E. Temporary Water
1. Water for construction purposes is available from an existing water connection in building scheduled for work to be performed. Capacity is estimated to be not less than 10 GPM at 45 psi. Water is city water quality and contains sodium hypochlorite.
2. The Contractor shall furnish anti-siphon and backflow prevention devices on all temporary water connections.
3. Contractor shall not cause water to be wasted or left running when not in use. Leaks will be repaired immediately. Freeze protection shall be provided by the contractor.
4. The water used will be furnished by the Government.
F. Temporary Sanitary Facilities
1. Existing sanitary facilities in Government building(s) will not be used by the Contractor’s personnel.
2. The Contractor shall be responsible for providing and paying for temporary toilet and sanitary facilities. The Contractor shall pay rental fees and cleaning charges and shall remove the facilities when the project is completed.
3. The COR or Construction Inspector shall approve the site location for all temporary sanitary facilities.
4. Contractor shall maintain all such facilities used in a clean and sanitary condition.
G. Temporary Enclosures
01000 - 3
1. Contractor shall provide temporary enclosures as necessary for this project to provide weather protection for materials, allow for temporary heating, and to prevent entry of unauthorized persons.
2. Provide temporary, weather-tight enclosure of exterior walls for successive areas of buildings as work progresses.
3. Provide temporary doors with padlocks.
4. Enclosures shall be removable as necessary and for hauling of materials.
5. Temporary partition and ceiling enclosures shall consist of framing and sheet materials which comply with the structural and fire rating requirements of applicable codes and standards.
6. Close joints between sheet materials and seal edges and intersections to prevent penetration of dust and moisture.
7. During roof shingle removal, safeguarding of roof sheathing from rain and snow is required.
H. Barriers and Fences
1. Contractor shall provide, install, maintain, and remove suitable barriers to prevent public entry and to protect the work site.
2. Such barriers shall be erected to provide a safety barrier around such portions of the project that could cause injury or destruction of property and to provide general security for the affected project site.
3. Materials to be used are at the Contractor’s option and expense.
4. Barriers and fence shall be posted with appropriate warning signs. Place warning signs at the construction area perimeter designating the presence of construction hazards requiring unauthorized persons to keep out.
Signs must be placed on all sides of the project, with at least one sign every 300 feet. All points of entry shall have signs designating the construction site as a hard hat area.
5. Fencing shall be provided along the construction site at all open excavations and tunnels to control access by unauthorized people.
Fencing must be installed to restrain a lateral force of at least 200 pounds.
I. Security
1. The Contractor shall provide all materials, labor, and equipment to protect the project site from theft and vandalism.
2. Existing Government buildings and facilities shall be protected by the Contractor during the contract when the work involves openings into existing Government buildings. The degree of protection shall not be less than what currently exists.
3. The Contractor shall provide temporary doors, locks, and barricades to prevent unauthorized access to the construction site and existing buildings.
4. Storage of construction materials is at the risk of the Contractor.
01000 - 4
J. Access Roads and Parking Areas
1. Contractor’s private vehicles shall be parked at locations designated by the COR.
2. All construction vehicles and Contractor’s private vehicles will be parked in an orderly manner at all times and will not block normal traffic in the area. Private vehicles belonging to the contract personnel will be parked in designated parking areas and in no case on grass areas, adjacent to buildings, or along streets.
3. Contractor is responsible for any snow removal required for access or site work.
K. Traffic Work
1. All work around or involving roadways, to include roadway excavations and utility crossings, will be conducted in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) – FHWA, Latest Edition.
2. The Contractor shall provide and ensure appropriate road closure and detour signs are established as necessary for traffic management. All road closures shall be coordinated with the Contracting Officer in advance. Road closures shall require a road closure plan showing the location of signage.
L. Waste Reporting
1. The Army has established the requirement for a 50% minimum diversion rate by weight of C&D waste from landfill disposal. In order to achieve those results the Contractor shall submit a solid waste management plan as a required submittal for projects costing over $100,000. At a minimum, the solid waste plan shall include the anticipated waste streams and disposal/recycling facilities. No work shall begin until the Contractor has an approved plan.
2. The Contractor shall submit reports to the Contracting Officer quantifying the total pounds of hazardous, universal, recycled, and non-regulated waste disposed of during the duration of the contract.
Contractor shall also submit material(s) disposal location(s).
3. Reporting shall be specific to the month in which waste was disposed of and separated per waste type for Fort McCoy’s reporting requirements.
4. Reporting for recycled waste shall also be specific to how much revenue the Contractor received for each type of recycled material.
M. Refuse Disposal and Recycling
1. Provide all solid waste disposal associated with this contract, including but not limited to the container delivery, removal, and disposal fees.
Items included under this section are all solid wastes as defined by Wisconsin State Statute 289.01 (33). These items shall be disposed in a licensed sanitary landfill or recycling center in accordance with State of Wisconsin Administrative Code Chapter NR500 series.
2. The Contractor is allowed to use Fort McCoy recycling facilities for concrete, mixed paper, plastics (PETE#1 and HDPE#2), asphalt, 01000 - 5 cardboard, trees/woody waste, metals, and aluminum cans. If materials are recycled at Fort McCoy, provide all labor and delivery to the designated recycling facilities. Materials shall be weighed and weigh slips provided to the COR to receive credit toward the 50% requirement in “Waste Reporting” above. Materials not weighed can be delivered to the designated recycling facilities, but the material will not count toward the 50% waste reporting requirement.
3. Provide for the recycling of all other construction/demolition debris including drywall, lumber, reinforcing steel, piping, wiring, brick, plaster, wall board, roofing material, insulation, plumbing fixtures, doors, and windows to the greatest extent possible . Only utilize licensed recycling facilities.
4. Provide a certificate of recycling for universal waste as defined in Wisconsin Administrative Code Chapter NR600.
N. Material Sales
1. Materials shall not be stockpiled for sale purposes on Post.
2. Public advertised sales of materials will not be permitted on Post.
3. Prior arranged sale of materials may be permitted on Post.
1.05 QUALITY CONTROL
A. All plumbing work shall be performed by plumbers licensed by a state licensing board. The cost of the work shall include all State permit fees and approval for the installation of backflow prevention devices. Proof of certification is required.
B. All electrical work shall be supervised full time on site by a state certified journeyman electrician. All electrical work shall be overseen by a state certified Master electrician. Proof of certification is required.
C. All hazardous material abatement shall be supervised by a certified asbestos supervisor and a certified lead base paint supervisor.
D. All work associated with air-conditioning refrigerant shall be conducted by an Air-Conditioning Refrigerant Institute Certified Technician; Type-Universal. All work shall also be conducted in accordance with Federal Law “40 CFR Part 82 subpart F and Parts 273, 279, and 761” and U.S. Environmental Protection Agency “Clean Air Act (1990) Section 608” and all EPA final regulations associated with section 608.
1.06 APPLICABLE STANDARDS, GUIDES AND SPECIFICATIONS
A. References are made in these specifications to published codes, standards, and specifications of manufacturers’ societies, associations, and other standards. All referenced documents are included in this specification as if written in their entirety.
B. Where referenced documents are not specified by date, the latest edition published as of the bid or proposal request date shall apply.
1.07 OPERATION AND MAINTENANCE MANUALS
01000 - 6
A. Provide one (1) PDF copy of equipment maintenance and operation manuals for all major pieces of equipment and fixtures. Where the Contractor has installed entire systems or has assembled or interconnected several subsystems such as heating, ventilating, or special electrical systems, the Contractor shall include a written narrative of how each system or subsystem operates and how the overall system is intended to be operated, complete with diagrams showing flow routes or electrical interconnections.
B. Drawings:
1. Supplement product data with drawings as necessary to clearly illustrate:
a. Relations of component parts of equipment and systems.
b. Control and flow diagrams.
2. Coordinate drawings with the information in project record documents to assure correct illustration of completed installation.
C. Written text, as required to supplement product data for the particular installation:
1. Organize in consistent format under separate headings for different procedures.
2. Provide logical sequence of instructions for each procedure.
D. Content, for each unit of equipment and system, as appropriate:
1. Description of unit and component parts;
a. Function, normal operating characteristics, and limiting conditions.
b. Performance curves, engineering data, and test results.
c. Complete nomenclature and commercial number of replaceable parts.
2. Operating procedures;
a. Start-up, break-in, routine, and normal operating instructions.
b. Regulation, control, stopping, shut-down, and emergency instructions.
c. Summer and winter operating instructions.
d. Special operating instructions.
3. Maintenance procedures;
a. Routine operations.
b. Guide to “Trouble-Shooting.”
c. Disassemble, repair, and reassemble.
d. Alignment, adjusting, and checking.
4. Servicing and lubrication schedule including a list of required lubricants.
5. Manufacturer’s printed operating and maintenance instructions.
01000 - 7
6. Description of sequence of operations by control manufacturer.
7. Original manufacturer’s parts list, illustrations, assembly drawings, and diagrams required for maintenance:
a. Predicted life of parts subject to wear.
b. Items recommended to be stocked as spare parts.
8. As-installed control diagrams by controls manufacturer.
9. Each Contractor’s coordination drawings:
a. As-installed color coded piping diagrams.
b. As-installed color coded electrical and systems diagrams.
10. Charts of valve tag numbers, with location and function of each valve.
11. List of manufacturer’s spare parts, manufacturer’s current prices, and recommended quantities to be maintained in storage.
12. Other data as required under pertinent sections of specifications.
E. Prepare and include additional data when the need for such data becomes apparent for the training of government personnel.
1.08 DELIVERY AND STORAGE
A. Contractor shall insure that any items which are stored at the site prior to installation are stored in an environment that will not cause rusting, warping, staining, or any physical breakage or damage.
B. All labor and equipment required for loading, unloading, transporting, and moving materials shall be provided by the Contractor.
C. Storage buildings will not be provided by the Government.
1.09 TRAILERS OR STORAGE BUILDINGS, INCLUDING OFFICE TRAILERS
A. Trailers or storage buildings will be permitted, where space is available, subject to the approval of the COR.
B. The trailers or buildings shall be in good condition, free from visible damage, rust, and deterioration, and meet all applicable safety requirements. Trailers shall be roadworthy and comply with all appropriate State and local vehicle requirements. Failure to maintain storage trailers or buildings to these standards shall result in the removal of non-complying units at the Contractor's expense.
C. A sign not smaller than 2-feet by 2-feet shall be conspicuously placed on the trailer depicting the company name, business phone number, and emergency phone number.
D. Trailers shall be anchored to resist high winds and must meet applicable state and local standards for anchoring mobile trailers.
E. Provide metal or fiberglass skirting completely around office trailers within 30 days after placement of the trailer on the lot and after being approved by the
COR.
F. Grass and weeds shall be cut weekly or as needed to a height not to exceed three inches. Trash shall be picked up and disposed of properly on a daily basis.
01000 - 8
G. The Contractor shall be responsible for the installation and removal of all temporary utility connections at no cost to the Government.
1.10 STORAGE SITE
A. All stored materials shall be neatly stacked at all times.
B. Trash shall be picked up and properly disposed of on a daily basis.
C. Grass and weeds shall be cut on a regular basis to a height not to exceed three inches. In Cantonment, uncut height shall not exceed 6 inches. Outside Cantonment, uncut height shall not exceed 12 inches.
D. Welding equipment shall be handled and stored in accordance with applicable regulations.
E. Fire extinguishers shall be provided where flammable liquids are stored.
1.11 SCHEDULING AND COORDINATING WORK
A. Schedule
1 Contractor shall at the Pre-construction Conference or if no Pre-con is held, within 20 calendar days of award prepare and submit their schedule in the form of a Gantt chart for approval, in accordance with the FAR clause entitled “Schedule for Construction Contracts”. This schedule shall show at a minimum critical path, float, owner of float, milestones, baseline, elements of work, and duration of each significant element of work, identifying the first work day of each week. Distribute copies of the approved schedule to the project site file, subcontractors, suppliers, and other concerned parties. The submitted schedule shall be approved prior to beginning work.
2 The Contractor shall maintain the original schedule/Gantt Chart throughout the life of the project and show actual schedule achievement in tandem with the original schedule and shall update the approved schedule bi-weekly to display time gained or lost against the original schedule. If in the opinion of the Contracting Officer the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve progress, including those steps that may be required by the Contracting Officer, without additional cost to the Government. The Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedule or schedules in chart from as the Contracting Officer deems necessary to demonstrate how the approved increased effort shall regain the original schedule of progress. FAR 52.236-15
B. The Contractor shall be specifically responsible for the coordination of all phases of work under this contract within the approved construction schedule.
C. The Contractor may be required to allow Government personnel or other Contractors to carry out work within the work site. Such work will be scheduled and coordinated through the COR.
01000 - 9
D. The Contractor shall provide a phone number and address where a key, and/or approval, to enter may be obtained for the work sites during the work day for times when the Contractor may not be at the work site.
E. The Contractor shall provide 10 working days notice for any utility outage.
Outages shall be shown on the schedule provided. Emergency utility outages shall be reviewed by the Contracting Officer/Inspector prior to utility outage.
Expenses/damages caused by unscheduled or unapproved utility outages shall be chargeable to the Contractor.
1.12 WARRANTIES
A. All materials and workmanship shall be warranted by the Contractor for a period of not less than one year from the date of final acceptance by the Government, except when longer warranties are required from the Contractor as stated in each specification section.
B. For products and materials that are normally warranted by the manufacturer or supplier for more than one year, the Contractor shall provide the Government with a written warranty, or certification, indicating the manufacturer’s or supplier’s terms and conditions of the warranty.
PART 2 PRODUCTS
2.01 EXISTING MATERIALS
A. Materials to be demolished:
1. All materials identified to be demolished and removed from the existing facilities shall be the responsibility of the Contractor to remove completely from Ft McCoy.
2. Under limited conditions and as specified on the plans, deliver scrap metal/materials to a location designated by the COR. Contractor will be responsible for hauling all demolished materials to the designated locations.
B. Existing materials may only be reused/relocated as specifically allowed per the contract drawings and specifications.
2.02 NEW MATERIAL AND EQUIPMENT
A. Materials and equipment shall be essentially the standard products of a manufacturer regularly engaged in the manufacture of those products, shall meet the requirements of the specification, and shall essentially duplicate material and equipment that have been in satisfactory use.
B. All materials shall be of the latest type or model currently being produced by the manufacturer.
C. Seconds or otherwise substandard materials will not be allowed.
PART 3 EXECUTION
3.01 INSPECTION
01000 - 10
A. The Contractor shall not begin successive phases of work until an inspection has been completed and the work is accepted by the COR. Notify the COR 48 hours prior to completing a phase requiring inspection.
1. Any work that will be covered by successive work must be inspected prior to performing successive work.
2. Work to be covered includes, but is not limited to, underground utilities, utilities located behind walls, and work located below finish floors.
B. When the contractor considers the work complete, submit written certification confirming:
1. Contract documents have been reviewed.
2. Project submittals have been completed.
3. Work has been inspected by the Contractor for compliance with the contract.
4. Equipment and systems have been tested, balanced, and adjusted for proper operations.
5. Work is complete and ready for final inspection.
6. Contractor shall provide a requested date for punch list inspection to the Contracting Officer, in writing, not less than 7 working days prior to the proposed date of inspection. Punch list inspections shall be scheduled and conducted to ensure compliance with the contract completion date.
C. The COR will coordinate with the members of the inspection party and establish the punch list inspection date.
1. Should the COR consider the work incomplete or defective, a written punch list will be provided to the Contractor from the Contracting Officer.
2. The Contractor will be given 10 calendar days, unless otherwise determined by the Contracting Officer, to remedy the stated deficiencies.
3. The Contractor shall provide a second written certification and request re-inspection to be scheduled not later than the 10 calendar days, unless otherwise determined by the Contracting Officer. This re-inspection shall also be completed during the contract performance period to be in accordance with the contract.
4. If any further re-inspections are required the Contractor may be charged the additional cost of the inspections.
5. Final acceptance of the work occurs upon the Contracting Officer’s acceptance of the work subsequent to successful final inspection by the COR and receipt of all contract requirements.
6. If final acceptance does not occur prior to the contract completion date, liquidated damages may be applicable in accordance with the liquidated damaged clause.
D. If the Government requires beneficial occupancy of the facility prior to completion of the work by the Contractor, an inspection shall be conducted by the COR to determine the completed work, and either accept or document any
01000 - 11 work not complete. The Contractor will then complete the remaining work and correct any deficiencies.
3.02 TRANSITION FROM EXISTING TO NEW WORK
A. When new work abuts or finishes flush with existing work, make a smooth transition. Patched work shall match existing adjacent work in texture and appearance.
B. When finished surfaces are cut in such a way that a smooth transition with new work is not possible, terminate existing surface along a straight line at a natural line of division and provide trim appropriate to the finished surface.
3.03 OPERATING TESTS
A. After equipment installations are completed, the Contractor shall conduct an operating test for approval. The test shall demonstrate that the operating and installation requirements of the specifications have been met. The test shall be performed in the presence of the COR.
3.04 CLEANING
A. During Construction:
1. The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Contractor shall ensure all affected areas are “broom clean” and all tools shall be secured at the close of each work day. Before requesting a Final Inspection, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a fully cleaned, neat, and orderly condition satisfactory to the Contracting Officer. FAR 52.236-12.
B. Dust Control
1. Clean interior spaces prior to the start of finish coatings and continue cleaning on an as-needed basis until coatings are finished.
2. Schedule operations so that dust and other contaminants resulting from the cleaning process will not fall on wet or newly-coated surfaces.
3. The amount of dust resulting from demolition shall be controlled to prevent the spread of dust and to avoid creation of a nuisance in the surrounding areas. The use of water will not be permitted when it will create or result in hazardous or objectionable conditions such as ice, flooding, and pollution.
4. All buildings, materials, and equipment, including ductwork and diffusers, shall be cleaned of all dust and dirt resulting from the performance of the work under this contract.
C. Final Cleaning
1. Final cleaning shall be performed and completed prior to punch list inspection.
2. Clean interior and exterior surfaces exposed to view.
a. Remove temporary labels, stains, and foreign substances.
01000 - 12
b. Polish transparent and glossy surfaces.
c. Vacuum carpeted and soft surfaces.
d. Clean equipment and fixtures to a sanitary condition.
e. Clean or replace filters of mechanical equipment.
f. Clean roofs, gutters, downspouts, and drainage systems.
3. Clean project site.
a. Sweep paved areas.
b. Rake clean other surfaces.
4. Remove waste and surplus materials, rubbish, and construction facilities from the project and from the site.
3.05 RECORD DRAWINGS
A. Record Drawings:
1. With red pencil or red ink, neatly inscribe all COR approved changes to show final locations and types of partitions, walls, doors, electrical, fire alarm system, communication system, plumbing, heating, ventilating, air conditioning services and equipment, and similar work.
2. With red pencil or red ink, neatly inscribe the location of all existing and new exterior utilities. The locating may be accomplished by traditional survey methods or by global positioning system (GPS) satellite equipment supplemented by traditional methods where required. Include the size, material, and depth.
3. With red pencil or red ink, neatly inscribe the location of all new wire routing of electrical and fire alarm, layout and size of the plumbing, valves and duct access points.
4. Locations may be from existing buildings or from base monument system. Any existing structures used as a survey reference must be checked for conformity to NAD 83 surveying coordinates.
B. Recognize that the base maps which are often the basis for the contract site plans have been prepared from aerial photographs and as such show the roofline instead of the building structure line. Prior to punch list inspection, present these corrected prints to the Government. Note all data and changes on these record drawings in sufficient detail and clarity and provide information necessary for the preparation of “as-built” drawings.
01000 - 13
3.06 SECURITY REQUIREMENTS
A. Installation Access Control
1. The contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. The contractor and all associated subcontractors’ employees shall also comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190- 13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The Government may require monthly participation in the Installation Random Antiterrorism Program.
Common Access Card (CAC)
1. Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI.
01007 - 1
SECTION 01007
INDUSTRY STANDARD ABBREVIATIONS AND CODES
PART 1 GENERAL
A. INDUSTRY STANDARD
1. Organizations and/or published documents representing Industry Standards are referred to throughout the Project Specifications by the following abbreviations.
2. Names are believed to be accurate and up-to-date as of the date of the Contract Documents but are subject to change.
B. APPLICABLE CODES
1. The Ft McCoy Army installation has adopted the August 2010 UFC (Unified Facilities Criteria) as the primary building code.
a. For all General Building Requirements, see UFC 1-200-01. The following web link provides an index on each specific construction disciplines codes (and year) presently adopted and enforced by DPW.
http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
2. All state and local codes shall also apply.
3. Where ever there is a conflict between code models, the primary code (UFC) shall govern.
C. ABBREVIATIONS
1. Abbreviations used throughout the Specifications and the organization or document represented are:
AA Aluminum Association
AAMA Architectural Aluminum Manufacturer’s Association
AAN American Association of Nurserymen
AASHTO American Association of State Highway and Transportation Officials
ACI American Concrete Institute
AGA American Gas Association
AI Asphalt Institute
AISC American Institute of Steel Construction
AISI American Iron and Steel Institute
ANSI American National Standards Institute
ARI Air-conditioning Refrigerant Institute
ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers
ASME American Society of Mechanical Engineers
ASTM American Society for Testing and Materials
01007 - 2
AVATI Asphalt and Vinyl Asbestos Tile Institute
AWI Architectural Woodwork Institute
AWS American Welding Society
AWPA American Wood Preservers Association
AWPB American Wood Preservers Bureau
AWPI American Wood Preservers Institute
AWWA American Water Works Association
CRSI Concrete Reinforcing Steel Institute
CS Commercial Standards of U.S. Department of Standards
EIA Electronic Industries Alliance
EPA Environmental Protection Agency
EWA Engineered Wood Association (formerly APA)
FGJA Flat Glass Jobbers Association
FM Factory Mutual
FRP Fiber Reinforced Plastic
FS Federal Specifications
GA Gypsum Association
IEEE Institute of Electrical and Electronic Engineers
MSS Manufacturer’s Standardization Society
NAAMM National Association of Architectural Metal Manufacturers
NBS National Bureau of Standards
NBFU National Bureau of Fire Underwriters
NCMA National Concrete Masonry Association
NEC National Electric Code
NECA National Electrical Contractors Association
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
NFPA National Forest Products Association
NPC National Plumbing Code
NRCA National Roofing Contractors Association
NRMCA National Ready Mixed Concrete Association
NWMA National Woodwork Manufacturing Association
NWAHHA National Warm Air Heating and Air Conditioning Association
OSHA Occupational Safety and Health Administration
PCA Portland Cement Association
01007 - 3
PPI Plastic Pipe Institute
PS Product Standard of NBS
SMACNA Sheet Metal and Air Conditioning Contractors National Association
SPIB Southern Pine Inspection Bureau
SSPC Steel Structures Painting Council
TIA Telecommunications Industry Association
UL Underwriters Laboratories
USAS United States of American Standards (formerly ASA)
WCLIB West Coast Lumber Inspection Bureau
WDNR Wisconsin Department of Natural Resources
WWPA Western Wood Products Association (WPA and WCLA)
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
PART 1 June 2015 P8090 Fire Alarm IDIQ FY16-FY19
01019 - 1
SECTION 01019
CONTRACT CONSIDERATIONS
PART 1 SCOPE
1.01 This is an Indefinite Delivery Indefinite Quantity (IDIQ) contract to upgrade or repair existing conventional and addressable fire alarm systems and to install new conventional and addressable fire alarm systems.
1.02 Period of performance will be as follows:
A. Install new fire alarm system, first building 30 days.
B. Upgrade/repair existing fire alarm system, first building 30 days.
C. Install new fire alarm system, each additional building 3 days.
D. Upgrade /repair existing fire alarm system, each additional building 2 days
E. 10 days for Mobilization will be added once per delivery order.
1.03 Liquidated damages will apply for this project. See the contract documents for more information.
PART 2 PRODUCTS
2.01 Contracting Line Item (CLIN) 0001: Bid Schedule Line Items
A. 0001, Provide and install a new 10-Zone fire alarm control panel or replace an existing FACP with a new 10-Zone panel with Transient Voltage Protection at all AC inputs and at communication signal inputs and outputs.
This is to include demo of the old panel, installation of the new panel, all terminations made within the new panel, and testing the system. Payment will be for each FACP installed.
B. 0002, Provide and install a new addressable alarm control panel, with 400 events, minimum history log or replace an existing FACP with an addressable panel. FACP shall be a non-proprietary system programmable at the panel with no special software or additional equipment. Contractor shall provide all necessary technical documentation, tools and technical software tools required to modify the system by Fort McCoy personnel. FACP shall have Transient Voltage Protection at all AC inputs and at communication signal inputs and outputs. This is to include demo of the old panel, installation of the new panel, all terminations made within the new panel, and testing the system. Payment will be for each FACP installed.
C. 0003, Provide and install a new Voice Evacuation Panel to include all terminations made within the new panel needed to interface with the FACP and the transceiver. This equipment will only be installed as part of a new fire alarm system. Payment will be for each VEP installed.
D. 0004, Provide and install a new SigCom Transceiver and antenna system to include all terminations within the transceiver, mounting the antenna, installing the coax cable between the transceiver and the antenna, and any asbestos siding removal and repair work. Payment will be for each transceiver/ antenna system installed.
01019 - 2
E. 0005a, Provide and install a new conventional photoelectric smoke detector or replace an existing smoke detector with a new photoelectric detector. This is to include removal of the old device, installation of a new back plate, new device, remote test switches for duct smoke detectors, sounder base for all sleeping room detectors and all terminations within the device box. Payment will be for each smoke detector installed.
F. 0005b, Provide and install a new addressable photoelectric smoke detector or replace an existing smoke detector with a new photoelectric detector. This is to include removal of the old device, installation of a new back plate, new device, remote test switches for duct smoke detectors, sounder base for all sleeping room detectors and all terminations within the device box. Payment will be for each smoke detector installed.
G. 0005c, Provide and install a new combination addressable & conventional photoelectric smoke detector or replace an existing smoke detector with a new photoelectric detector. This is to include removal of the old device, installation of a new back plate, new device, remote test switches for duct smoke detectors, sounder base for all sleeping room detectors and all terminations within the device box. Payment will be for each smoke detector installed.
H. 0006a, Provide and install a new conventional heat detector or replace an existing heat detector. This is to include removal of the old device, installation of a new back plate, new device, and all terminations within the device box. Payment will be for each heat detector installed.
I. 0006b, Provide and install a new addressable heat detector or replace an existing heat detector. This is to include removal of the old device, installation of a new back plate, new device, and all terminations within the device box. Payment will be for each heat detector installed.
J. 0006c, Provide and install a new combination addressable & conventional heat detector or replace an existing heat detector. This is to include removal of the old device, installation of a new back plate, new device, and all terminations within the device box. Payment will be for each heat detector installed.
K. 0007a, Provide and install a new conventional manual pull station with mechanical reset features or replace an existing manual pull station. This is to include the removal of the old device, installation of the new device, and all terminations within the device box. Payment will be for each manual pull station installed.
L. 0007b, Provide and install a new addressable double action type manual pull station or replace an existing manual pull station. This is to include the removal of the old device, installation of the new device, and all terminations within the device box. Payment will be for each manual pull station installed.
(UFC 3-600-0, 5-3.3 Manual Pull Stations)
M. 0007c, Provide and install a new combination addressable & conventional double action type manual pull station or replace an existing manual pull station. This is to include the removal of the old device, installation of the new device, and all terminations within the device box. Payment will be for each manual pull station installed. (UFC 3-600-0, 5-3.3 Manual Pull Stations)
01019 - 3
N. 0008, Provide and install a new horn/strobe or replace an existing horn/strobe. This is to include the removal of the old device, installation of the new device, and all terminations within the device box. Payment will be for each horn/strobe installed.
O. 0009, Provide and install a new weather-proof horn/strobe or replace an existing horn/strobe. This is to include the removal of the old device, installation of the new device, all terminations within the device box, and any asbestos siding removal and replacement work. Payment will be for each weather-proof horn/strobe installed.
P. 0010, Install a new speaker/strobe to include the installation of the new device, device box and all terminations within the device box. Payment will be for each speaker/strobe installed.
Q. 0011, Provide and install a new weather-proof speaker/strobe to include the installation of the new device, device box and all terminations within the device box and any asbestos siding removal work. Payment will be for each weather-proof speaker/strobe installed.
R. 0012a, Provide and install a new conventional carbon monoxide detector to include the installation of the new device, device box and all terminations within the device box. Payment will be for each carbon monoxide detector installed.
S. 0012b, Provide and install a new addressable carbon monoxide detector to include the installation of the new device, device box and all terminations within the device box. Payment will be for each carbon monoxide detector installed.
T. 0012c, Provide and install a new combination addressable & conventional carbon monoxide detector to include the installation of the new device, device box and all terminations within the device box. Payment will be for each carbon monoxide detector installed.
U. 0013a, Provide and install a new conventional natural gas detector. to include the installation of the new device, device box and all terminations within the device box. Payment will be for each natural gas detector installed.
V. 0013b, Provide and install a new addressable natural gas detector. to include the installation of the new device, device box and all terminations within the device box. Payment will be for each natural gas detector installed.
W. 0013c, Provide and install a new combination addressable & conventional natural gas detector. to include the installation of the new device, device box and all terminations within the device box. Payment will be for each natural gas detector installed.
X. 0014, Provide and install new red ½” EMT conduit. This is to include surface mounting the fire alarm conduit, any field bends, offsets, couplers, and hardware. Payment will be per linear foot of ½” EMT conduit installed.
Y. 0015, Provide and install new red ¾” EMT conduit. This is to include surface mounting the fire alarm conduit, any field bends, offsets, couplers, and hardware. Payment will be per linear foot of ¾” EMT conduit installed.
01019 - 4
Z. 0016, Provide and install new ½” red flexible metal conduit. This is to include the installation of the flexible conduit, any couplers, and hardware.
Payment will be per linear foot of ½” flexible metal conduit installed.
AA. 0017, Provide and install a new 4” square, red junction box with cover. This is to include the installation of the box, cover, and any box connectors and mounting hardware. Payment will be for each junction box/cover installed.
BB. 0018, Provide and install a new 4” square, red device box. This is to include the installation of the device box, and any box connectors and mounting hardware. Payment will be for each device box installed.
CC. 0019, Provide and install new 16 to 18 gage solid copper wire in conduit.
This is to include the installation of fire alarm circuit wiring inside EMT conduit. Payment will be per linear foot of 16 to 18 gage copper wire installed.
DD. 0020, Provide and install new 12 to 14 gage solid copper wire in conduit.
This is a linear foot cost which is to include the installation of fire alarm circuit wiring inside EMT conduit. Payment will be per linear foot of 12 to 14 gage copper wire installed.
EE. 0021, Provide and install a new circuit breaker, 1 pole, plug-in, into an existing panel. This is to include opening the panel, installation of the new breaker, and attaching the wires in the panel. Payment will be for each circuit breaker installed.
FF. 0022, Provide and install a ¾” treated plywood backboard on the wall in the mechanical room. This is to include freeing up space on the wall and installation of up to 24 sq ft of backboard material, to be used for the installation of fire alarm system panels. Payment will be for each 24 sq ft backboard installed.
GG. 0023, Provide shop drawings and current calculation work sheets required prior to installing a new fire alarm system. This is to include product data submittals, system wiring diagram, work sheets for battery calculations and current draw calculations. This is also to include the Record of Completion Form for fire alarm systems. Payment will be one per new fire alarm system installed.
HH. 0024a, Provide and install a new conventional freeze protection detector to include the installation of the new device, device box and all terminations within the device box. Payment will be for each freeze detector installed.
II. 0024b, Provide and install a new addressable freeze protection detector to include the installation of the new device, device box and all terminations within the device box. Payment will be for each freeze detector installed.
JJ. 0024c, Provide and install a new combination addressable &conventional freeze protection detector to include the installation of the new device, device box and all terminations within the device box. Payment will be for each freeze detector installed.
KK. 0025, Provide and install monitor module to include the installation of the new device, device box and all terminations within the device box. Payment will be for each monitor module installed.
01019 - 5
LL. 0026 Provide and install control module to include the installation of the new device, device box and all terminations within the device box. Payment will be for each control module installed.
PART 3 EXECUTION
3.01 Payment will be based on actual quantities as measured in the field by the Contractor and the Construction Inspector. Not all items will be required for every building.
3.02 Perform Line Item work in accordance with the project specifications and the delivery order drawings.
01031 - 1
SECTION 01031
DEMOLTION AND REMOVAL PROCEDURES FOR PROPERTY CONTAINING
HAZARDOUS MATERIALS
PART 1 GENERAL
1.01 SCOPE
A. This contract action is not expected to encounter hazardous waste related to asbestos, lead based paint, PCB containing materials, petroleum, or other. This section describes the requirements for the handling, removal, and recycling/disposal of any and all friable and non-friable asbestos, lead based paint; PCB containing materials, universal wastes, and Contractor generated hazardous or other regulated waste.
B. The Contractor shall furnish all labor, materials, services, insurance, tools, transportation, personal protective equipment, supervision, and equipment necessary to remove and dispose of all items generated under this contract.
1.02 SUBMITTALS
A. Asbestos Project Notification: Asbestos removal projects greater than 260 linear feet of pipe insulation or 160 square feet of other ACM requires that an “Asbestos Project Notification”, Department Health Services (DHS) Form DHS 159, be filed with the state. A copy of the notification must be submitted. The notification must be postmarked at least 10 days prior to the project starting.
B. Asbestos Waste Tracking Record: Asbestos shipping records shall be signed by the asbestos contractor, the transporter, and the receiving facility and submitted.
The shipping record shall include the information specified in the Wisconsin Administrative Code NR 477.13 Paragraph (4).
C. Universal Waste Disposal: A copy of the “Certificate of Recycling” shall be submitted for all universal waste materials recycled under this contract.
D. Hazardous Material Inventory: A hazardous material inventory for all products requiring a Material Safety Data Sheet (MSDS) shall be provided to the Contracting Office and Environmental Division prior to the start of work. The MSDS must be on file at the work site.
E. Hazardous Waste: The Contractor is considered the “generator” for all hazardous waste generated under this contract. The Contractor shall obtain an EPA Hazardous Waste Generator Identification Number and is responsible for the labeling, disposal, transporting, manifesting and reporting of all hazardous waste they create under this contract. A signed copy by the generator, transporter and TSDF of EPA Form 8700-22, UNIFORM HAZARDOUS WASTE MANIFEST will be submitted.
F. Permits: Notification of Demolition and/or Renovation and Application for Permit Exemption (Form 4500-113 Rev 06-05).
G. Laboratory results: Submit a copy of all laboratory results including, but not limited to, asbestos and lead-based paint analysis.
H. Clearance sample results: Submit a copy of all clearance sample results for asbestos and lead-based paint.
01031 - 2
I. Personnel Roster: Provide a personnel roster of all employees conducting asbestos and/or Lead-based paint work and their associated Certification and Licenses that will be working on this project.
J. Receiving Facility/Landfill Certification: The Contractor shall provide a copy of the receiving facility’s “Operating Licenses” indicating that they are certified to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .