Active-Basic
| CUSTODIAL SERVICE JOB ORDER | 1 March 2019 | Page 1 of 2 | |||||
| Project & Contract Numbers & Title: F1-00007-7J 19-D-0000 Custodial Service for Fort Riley, Kansas | |||||||
| Building & Location: 580, 1st Division Rd., Main Post | Square Feet of Floor Area: 100,809 | ||||||
| Price Calculation | |||||||
| PWS | 1st Infantry Division Headquarters | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks - Basic Service | Freq | tities | Unit | Month | Price | Month |
| 3.2.2.1 | Collect and Remove Trash (Note 1) | 1/wk | 15 | ea | 4.33 | $0.00 | $0.00 |
| 3.2.2.1 | Collect and Remove Trash (Note 2) | 2/wk | 16 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.1 | Collect and Remove Trash (Note 3) | 637 | ea | $0.00 | $0.00 | ||
| 3.2.2.2 | Sweep and/or Dust Mop Floors (Note 4) | 5/wk | 2,802 | cf | 21.66 | $0.00 | $0.00 |
| 3.2.2.2 | Sweep and/or Dust Mop Floors (Note 5) | 2/wk | 821 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.2 | Sweep and/or Dust Mop Floors (Note 6) | 1/wk | 2,736 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.4 | Mop Floors (Note 4) | 5/wk | 2,802 | cf | 21.66 | $0.00 | $0.00 |
| 3.2.2.4 | Mop Floors (Note 5) | 2/wk | 821 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.4 | Mop Floors (Note 6) | 1/wk | 2,736 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.7 | Scrub and Rewax Resilient Floor Surfaces (Note 7) | 10/yr | 904 | cf | 0.83 | $0.00 | $0.00 |
| 3.2.2.8 | Strip and Rewax Resilient Floor Surfaces (Note 7) | 2/yr | 904 | cf | 0.17 | $0.00 | $0.00 |
| 3.2.2.9 | Vacuum Carpets (Note 8) | 2/wk | 5,133 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.9 | Vacuum Carpets (Note 9) | 2/wk | 13,613 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.9 | Vacuum Carpets, Rugs and Throwrugs (Note 10) | 1/wk | 73,962 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.11 | Clean Carpets, Rugs and Throwrugs (Note 11) | AO | 92,708 | cf | $0.00 | $0.00 | |
| 3.2.2.14 | Dust Furnishings/Structural Elements < 6-1/2' AFF (Note 12) | 97,563 | cf | $0.00 | $0.00 | ||
| 3.2.2.14 | Dust Furnishings/Structural Elements < 6-1/2' AFF (Note 13) | 16,685 | cf | $0.00 | $0.00 | ||
| 3.2.2.15 | Dust Furnishings/Structural Elements > 6-1/2' AFF (Note 12) | 97,563 | cf | $0.00 | $0.00 | ||
| 3.2.2.20 | Clean Walls, Doors, and Windows (Note 18) | 1/wk | 350 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.22 | Clean Interior Door and Window Glass (Note 14) | 1/wk | 782 | sf | 4.33 | $0.00 | $0.00 |
| 3.2.2.23 | Clean Exterior Door Glass (Note 15) | 1/wk | 510 | sf | 4.33 | $0.00 | $0.00 |
| 3.2.2.24 | Clean Exterior Window Glass (Note 16) | AO | 7,485 | sf | $0.00 | $0.00 | |
| 3.2.2.25 | Clean Drinking Fountains | 2/wk | 6 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.26 | Clean Kitchen/Kitchenette Sink (17) | 2/wk | 5 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.27 | Clean Countertop (17) | 2/wk | 24 | lf | 8.66 | $0.00 | $0.00 |
| 3.2.2.34 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 2/wk | 20 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.36 | Clean Toilets and Seats | 2/wk | 22 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.37 | Clean Urinals | 2/wk | 11 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.38 | Clean Shower Stalls and/or Bathtubs | 2/wk | 4 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.39 | Scrub and Disinfect Rest Room Floors; 9 for | 1/wk | 1,742 | cf | 4.33 | $0.00 | $0.00 |
| Total Calculated Price Per Month | $0.00 |
| CUSTODIAL SERVICE JOB ORDER | 1 March 2019 | Page 2 of 2 | |||||
| Price Calculation | |||||||
| PWS | Times | Calculated | |||||
| Para- | Custodial Tasks | Quan- | Per | Unit | Price Per | ||
| graph | Continued From Previous Page | Freq | tities | Unit | Month | Price | Month |
| Notes: |
| 1. Command Group Suite Only. |
| 2. Rest Rooms and Break Rooms Only. |
| 3. All Areas Except Command Group Suite and Rest Rooms. |
| 4. Resilient and Porcelain Tile in Entry Lobby, 1st Floor Elevator Lobby, Elevators, and Main Stairway Only. |
| 5. Resilient and Porcelain Tile in Command Group Suite, 1st Floor Service Corridor, and Break Rooms Only. |
| 6. All Concrete, Resilient and Porcelain Tile Floor Areas Except in Entry Lobby, 1st Floor Elevator Lobby, Main Stairway, Command Group Suite, and Break Rooms. |
| 7. All Resilient Floor Areas Except Raised Access Floor Systems. |
| 8. Carpeted Command Group Suite Only. |
| 9. Carpeted Corridors and 2nd and 3rd Floor Elevator Lobbies Only. |
| 10. All Carpeted Areas Except Command Group Suite, Corridors, and 2nd and 3rd Floor Elevator Lobbies. |
| 11. All Carpeted Areas. |
| 12. All Spaces Except Rest Rooms and Janitor Closets. |
| 13. Elevator Lobbies and Command Group Suite Door and Window Glass, Both Sides, Up To 7'-0" AFF. |
| 14. Main Entry and Vestibule Door and Window Glass, Both Sides, Up To 7'-0" AFF. |
| 15. All Exterior Prime Windows Including Main Entry and Vestibule Door and Window Glass, Both Sides, Over 7'-0" AFF. |
| 16. Kitchenette Sinks and Countertops in Break Rooms and Command Group Suite. |
| 17. Clean Walls, Doors, and Trim in Both Elevators. |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | RAF-C | RAF-T | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 33,989 | 704 | 1,822 | 1,534 | 3,200 | 142 | 800 | 41,391 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 30,196 | 100 | 0 | 0 | 599 | 530 | 448 | 31,425 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 21,568 | 100 | 0 | 0 | 599 | 530 | 448 | 22,797 |
| 1/yr = 1/12 = 0.0833 Times Per Month | Cmd Gp: | 5,133 | 0 | 0 | 0 | 63 | 0 | 46 | 5,196 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 90,886 | 904 | 1,822 | 1,534 | 4,461 | 1,202 | 1,742 | 100,809 |
&"Courier,Regular"&7 &"Courier New,Regular"
Active-Enhanced
| CUSTODIAL SERVICE JOB ORDER | 1 March 2019 | Page 1 of 2 | |||||
| Project & Contract Numbers & Title: F1-00007-7J 19-D-0000 Custodial Service for Fort Riley, Kansas | |||||||
| Building & Location: 580, 1st Division Rd., Main Post | Square Feet of Floor Area: 100,809 | ||||||
| Price Calculation | |||||||
| PWS | 1st Infantry Division Headquarters | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks - Enhanced Service | Freq | tities | Unit | Month | Price | Month |
| 3.2.2.1 | Collect and Remove Trash (Note 1) | 5/wk | 15 | ea | 21.66 | $0.00 | $0.00 |
| 3.2.2.1 | Collect and Remove Trash (Note 2) | 5/wk | 16 | ea | 21.66 | $0.00 | $0.00 |
| 3.2.2.1 | Collect and Remove Trash (Note 3) | 2/wk | 637 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.2 | Sweep and/or Dust Mop Floors (Note 4) | 5/wk | 2,802 | cf | 21.66 | $0.00 | $0.00 |
| 3.2.2.2 | Sweep and/or Dust Mop Floors (Note 5) | 2/wk | 821 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.2 | Sweep and/or Dust Mop Floors (Note 6) | 1/wk | 2,736 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.4 | Mop Floors (Note 4) | 5/wk | 2,802 | cf | 21.66 | $0.00 | $0.00 |
| 3.2.2.4 | Mop Floors (Note 5) | 2/wk | 821 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.4 | Mop Floors (Note 6) | 1/wk | 2,736 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.7 | Scrub and Rewax Resilient Floor Surfaces (Note 7) | 10/yr | 904 | cf | 0.83 | $0.00 | $0.00 |
| 3.2.2.8 | Strip and Rewax Resilient Floor Surfaces (Note 7) | 2/yr | 904 | cf | 0.17 | $0.00 | $0.00 |
| 3.2.2.9 | Vacuum Carpets (Note 8) | 2/wk | 5,133 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.9 | Vacuum Carpets (Note 9) | 2/wk | 13,613 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.9 | Vacuum Carpets, Rugs and Throwrugs (Note 10) | 1/wk | 73,962 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.11 | Clean Carpets, Rugs and Throwrugs (Note 11) | AO | 92,708 | cf | $0.00 | $0.00 | |
| 3.2.2.14 | Dust Furnishings/Structural Elements < 6-1/2' AFF (Note 12) | 97,563 | cf | $0.00 | $0.00 | ||
| 3.2.2.14 | Dust Furnishings/Structural Elements < 6-1/2' AFF (Note 13) | 2/mo | 16,685 | cf | 2.00 | $0.00 | $0.00 |
| 3.2.2.15 | Dust Furnishings/Structural Elements > 6-1/2' AFF (Note 12) | 97,563 | cf | $0.00 | $0.00 | ||
| 3.2.2.20 | Clean Walls, Doors, and Windows (Note 18) | 1/wk | 350 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.22 | Clean Interior Door and Window Glass (Note 14) | 1/wk | 782 | sf | 4.33 | $0.00 | $0.00 |
| 3.2.2.23 | Clean Exterior Door Glass (Note 15) | 1/wk | 510 | sf | 4.33 | $0.00 | $0.00 |
| 3.2.2.24 | Clean Exterior Window Glass (Note 16) | AO | 7,485 | sf | $0.00 | $0.00 | |
| 3.2.2.25 | Clean Drinking Fountains | 5/wk | 6 | ea | 21.66 | $0.00 | $0.00 |
| 3.2.2.26 | Clean Kitchen/Kitchenette Sink (17) | 2/wk | 5 | ea | 8.33 | $0.00 | $0.00 |
| 3.2.2.27 | Clean Countertop (17) | 2/wk | 24 | lf | 8.33 | $0.00 | $0.00 |
| 3.2.2.34 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 5/wk | 20 | ea | 21.66 | $0.00 | $0.00 |
| 3.2.2.36 | Clean Toilets and Seats | 5/wk | 22 | ea | 21.66 | $0.00 | $0.00 |
| 3.2.2.37 | Clean Urinals | 5/wk | 11 | ea | 21.66 | $0.00 | $0.00 |
| 3.2.2.38 | Clean Shower Stalls and/or Bathtubs | 5/wk | 4 | ea | 21.66 | $0.00 | $0.00 |
| 3.2.2.39 | Scrub and Disinfect Rest Room Floors; 9 for | 5/wk | 1,742 | cf | 21.66 | $0.00 | $0.00 |
| Total Calculated Price Per Month | $0.00 |
| CUSTODIAL SERVICE JOB ORDER | 1 March 2019 | Page 2 of 2 | |||||
| Price Calculation | |||||||
| PWS | Times | Calculated | |||||
| Para- | Custodial Tasks | Quan- | Per | Unit | Price Per | ||
| graph | Continued From Previous Page | Freq | tities | Unit | Month | Price | Month |
| Notes: |
| 1. Command Group Suite Only. |
| 2. Rest Rooms and Break Rooms Only. |
| 3. All Areas Except Command Group Suite and Rest Rooms. |
| 4. Resilient and Porcelain Tile in Entry Lobby, 1st Floor Elevator Lobby, Elevators, and Main Stairway Only. |
| 5. Resilient and Porcelain Tile in Command Group Suite, 1st Floor Service Corridor, and Break Rooms Only. |
| 6. All Concrete, Resilient and Porcelain Tile Floor Areas Except in Entry Lobby, 1st Floor Elevator Lobby, Main Stairway, Command Group Suite, and Break Rooms. |
| 7. All Resilient Floor Areas Except Raised Access Floor Systems. |
| 8. Carpeted Command Group Suite Only. |
| 9. Carpeted Corridors and 2nd and 3rd Floor Elevator Lobbies Only. |
| 10. All Carpeted Areas Except Command Group Suite, Corridors, and 2nd and 3rd Floor Elevator Lobbies. |
| 11. All Carpeted Areas. |
| 12. All Spaces Except Rest Rooms and Janitor Closets. |
| 13. Entry Lobby, Main Stairway, and All 1st, 2nd, and 3rd Floor Corridors and Elevator Lobbies. |
| 14. Elevator Lobbies and Command Group Suite Door and Window Glass, Both Sides, Up To 7'-0" AFF. |
| 15. Main Entry and Vestibule Door and Window Glass, Both Sides, Up To 7'-0" AFF. |
| 16. All Exterior Prime Windows Including Main Entry and Vestibule Door and Window Glass, Both Sides, Over 7'-0" AFF. |
| 17. Kitchenette Sinks and Countertops in Break Rooms and Command Group Suite. |
| 18. Clean Walls, Doors, and Trim in Both Elevators. |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | RAF-C | RAF-T | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 33,989 | 704 | 1,822 | 1,534 | 3,200 | 142 | 800 | 41,391 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 30,196 | 100 | 0 | 0 | 599 | 530 | 448 | 31,425 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 21,568 | 100 | 0 | 0 | 599 | 530 | 448 | 22,797 |
| 1/yr = 1/12 = 0.0833 Times Per Month | Cmd Gp: | 5,133 | 0 | 0 | 0 | 63 | 0 | 46 | 5,196 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 90,886 | 904 | 1,822 | 1,534 | 4,461 | 1,202 | 1,742 | 100,809 |