00500.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- Custodial Services
- Solicitation number
- W911RX-19-B-0006
About this file
Bldg 500
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Active
| CUSTODIAL SERVICE JOB ORDER | 1 March 2019 | Page 1 of 2 | |||||
| Project & Contract Numbers & Title: F1-00007-7J 19-D-0000 Custodial Service for Fort Riley, Kansas | |||||||
| Building & Location: 500, Huebner Rd., Main Post | Square Feet of Floor Area: 40,230 | ||||||
| Price Calculation | |||||||
| PWS | Summerall Hall - USAG Headquarters | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 3.2.2.1 | Collect and Remove Trash (Note 1) | 15 | ea | $0.00 | $0.00 | ||
| 3.2.2.1 | Collect and Remove Trash (Note 2) | 2/wk | 13 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.1 | Collect and Remove Trash (Note 3) | 160 | ea | $0.00 | $0.00 | ||
| 3.2.2.2 | Sweep and/or Dust Mop Floors and Stairways (Note 4) | 2/wk | 1,825 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.2 | Sweep and/or Dust Mop Floors and Stairways (Note 5) | 1/wk | 607 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.4 | Mop Floors and Stairways (Note 4) | 2/wk | 1,825 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.4 | Mop Floors and Stairways (Note 5) | 1/wk | 607 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.5 | Machine Scrub Grouted Tile Floor Surfaces (Note 17) | AO | 1,322 | cf | $0.00 | $0.00 | |
| 3.2.2.7 | Scrub and Rewax Resilient Floor Surfaces (Note 6) | 10/yr | 0 | cf | 0.83 | $0.00 | $0.00 |
| 3.2.2.8 | Strip and Rewax Resilient Floor Surfaces (Note 6) | 2/yr | 0 | cf | 0.17 | $0.00 | $0.00 |
| 3.2.2.8 | Strip and Rewax Resilient Floor Surfaces (Note 7) | 1/yr | 383 | cf | 0.08 | $0.00 | $0.00 |
| 3.2.2.9 | Vacuum Carpets (Note 9) | 1/wk | 3,824 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.9 | Vacuum Carpets (Note 10) | 2/wk | 7,081 | cf | 8.66 | $0.00 | $0.00 |
| 3.2.2.9 | Vacuum Carpets, Rugs and Throwrugs (Note 11) | 1/wk | 25,051 | cf | 4.33 | $0.00 | $0.00 |
| 3.2.2.11 | Clean Carpets, Rugs and Throwrugs (Note 12) | AO | 35,986 | cf | $0.00 | $0.00 | |
| 3.2.2.14 | Dust Furnishings/Structural Elements < 6-1/2' AFF (Note 13) | 26,273 | cf | $0.00 | $0.00 | ||
| 3.2.2.15 | Dust Furnishings/Structural Elements > 6-1/2' AFF (Note 14) | 12,776 | cf | $0.00 | $0.00 | ||
| 3.2.2.17 | Polish Metal Work (In All Public Spaces) (Note 15) | 1/wk | 41 | ea | 4.33 | $0.00 | $0.00 |
| 3.2.2.22 | Clean Interior Door and Window Glass | AO | sf | $0.00 | $0.00 | ||
| 3.2.2.23 | Clean Exterior Door Glass (Note 16) | 1/wk | 24 | sf | 4.33 | $0.00 | $0.00 |
| 3.2.2.24 | Clean Exterior Window Glass | AO | sf | $0.00 | $0.00 | ||
| 3.2.2.25 | Clean Drinking Fountains | 2/wk | 8 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.26 | Clean Kitchen/Kitchenette Sink | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 3.2.2.27 | Clean Countertop | 1/wk | 12 | lf | 4.33 | $0.00 | $0.00 |
| 3.2.2.34 | Clean Lavatories, Vanities, Dispensers, Mirrors, Shelves | 2/wk | 20 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.36 | Clean Toilets and Seats | 2/wk | 21 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.37 | Clean Urinals | 2/wk | 6 | ea | 8.66 | $0.00 | $0.00 |
| 3.2.2.38 | Clean Shower Stalls and/or Bathtubs | 1/wk | 3 | ea | 4.33 | $0.00 | $0.00 |
| 3.2.2.39 | Scrub and Disinfect Rest Room Floors; 13 for | 1/wk | 1,322 | cf | 4.33 | $0.00 | $0.00 |
| Total Calculated Price Per Month | $0.00 |
| CUSTODIAL SERVICE JOB ORDER | 1 March 2019 | Page 2 of 2 | |||||
| Price Calculation | |||||||
| PWS | Times | Calculated | |||||
| Para- | Custodial Tasks | Quan- | Per | Unit | Price Per | ||
| graph | Continued From Previous Page | Freq | tities | Unit | Month | Price | Month |
| Notes: |
| 1. Garrison Command Areas Only. |
| 2. Rest Rooms Only. |
| 3. All Areas Except Garrison Command and Rest Rooms. |
| 4. Resilient and Porcelain Tile Corridors and Stairways Only. |
| 5. All Resilient Floor Areas Except Corridors, Stairways, and Rest Rooms. |
| 6. Resilient Corridors and Stairways Only. |
| 7. All Resilient Floor Areas Except Corridors and Stairways. |
| 8. All Resilient Floor Surfaces. |
| 9. Carpeted Garrison Command Areas. |
| 10. Carpeted Corridors. |
| 11. All Carpeted Areas Except Garrison Command and Corridors. |
| 12. All Carpeted Areas. |
| 13. All Areas Except Garrison Command, Corridors, Stairways, and Rest Rooms. |
| 14. Garrison Command, Corridors, and Stairways Only. |
| 15. All Brass Door Hardware and Railings in Public Areas. |
| 16. Main Entry Doors. |
| 17. All Ceramic Tile Areas in Restrooms and Main Entry |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | RVSTL | Athletic | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 4,905 | 308 | 178 | 520 | 488 | 0 | 234 | 6,399 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 15,976 | 135 | 438 | 0 | 663 | 0 | 419 | 17,212 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 5,779 | 0 | 438 | 0 | 485 | 0 | 415 | 6,702 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | GC Areas: | 3,824 | 46 | 0 | 0 | 50 | 0 | 50 | 3,920 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 3rd Floor: | 5,472 | 0 | 297 | 0 | 228 | 0 | 204 | 5,997 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 35,956 | 489 | 1,351 | 520 | 1,914 | 0 | 1,322 | 40,230 |
&"Courier,Regular"&7 &"Courier New,Regular"
File details come from the government source that posted it.