DEPARTMENT OF THE ARMY

US ARMY INSTALLATION MANAGEMENT COMMAND

US ARMY GARRISON DPW

NATICK SOLDIERS SYSTEMS CENTER

15 GENERAL GREENE AVENUE

NATICK MA 01760

CONSTRUCTION SUBMITAL CHECKLIST*

March 15, 2019

ADMINISTRATIVE / GENERAL REQUIREMENTS

GANTT SCHEDULE OF WORK IN DETAIL TO COMMUNICATE ALL MAJOR ELEMENTS/TRADES

FOR EIGHT WEEK CAFETERIA CLOSURE CONSTRUCTION PERIOD, DOWN-TIME FOR KITCHEN,

UTILITIES, GOVERNMENT INSPECTIONS, MOBILIZIATION, SITE CLEAN-UP/RESTORATION,

ADMINISTRATIVE (PRE-CONSTRUCTION MEETING, NOTICE TO PROCEED (NTP), SUBMITTALS

(i.e. HEALTH AND SAFETY PLAN), PUNCHLIST, TRAINING, AS-BUILTS, CLOSEOUT), ETC. THAT

ADD TIME TO CONSTRUCTION SCHEDULE

CONTRACTOR DAILY LOG OF ALL MAJOR ON SITE CONSTRUCTION ACTIVITY – TO BE

PROVIDED TO COR AT CLOSE OF EACH BUSINESS DAY. CAN BE PROVIDED VIA EMAIL AND

WITHOUT FORMAL SUBMITTAL

CONTRACTOR WEEKLY MEETING AGENDA – SUBMIT VIA EMAIL, WITHOUR FORMAL

SUBMITTAL, TO COR THROUGHOUT THE PERFORMANCE PERIOD TO REVIEW AND REPORT

CURRENT STATUS AND SCHEDULE OF THE JOB’S PROGRESS AS WELL AS COORDINATE

BETWEEN VARIOUS TASKS OF THE PROJECT AND THE IMPACTS UPON NSSC SUCH AS UTILITY

SHUTDOWNS, PHYSICAL SECURITY, OTHER OCCUPANTS ON POST, ETC.

EQUIPMENT & FURNITURE

PRODUCT DATA FOR EACH PIECE

SHOP DRAWINGS

FINISH SAMPLES

WARRANTIES

MILLWORK / CASEWORK / STAINLESS STEEL FOOD SERVICE LINE

SHOP DRAWINGS TO INCLUDE DIMENSIONS, LOCATIONS, MATERIALS, FASTENING, PLANS,

ELEVATIONS & DETAILS

SAMPLES FOR FINISH SELECTION

COUNTER TOP PRODUCT DATA ON MATERIAL, FASTENERS, ADHESIVE, SEALANT AND

SAMPLES FOR COLOR SELECTION.

STAINLESS STEEL FOOD SERVICE LINE COUNTER WITH CUTOUTS FOR KITCHEN EQUIPMENT,

CONCEALED ELECTRICAL AND PLUMBING CHASES, ACCESS PANELS AND LOCATIONS

PREPARED FOR UTILITY CONNECTIONS

06100: ROUGH CARPENTRY

BLOCKING PLAN

07910: SEALANTS

PROVIDE PRODUCT DATA AND MSDS SUBMITTALS

08411: ALUMINUM FRAMED ENTRANCES AND STOREFRONTS

PROVIDE SUBMITTAL WITH PRODUCT DATA OF DOOR, FRAME & HARDWARE

SHOP DRAWING TO SHOW ELEVATION AND PLANS OF ALL COMPONENTS

05400: METAL FRAMING / 09250: GYPSUM DRYWALL

PROVIDE SUBMITTAL FOR PRODUCT DATA OF FRAMING, DRYWALL AND ACCESSORIES TO BE

USED.

Attachment 6 W911QY19R0010

09300: PORCELAIN TILE

PROVIDE SUBMITTAL WITH PRODUCT DATA FOR TILE, MORTAR, GROUT AND ACCESSORIES

WARRANTIES

SAMPLES OF COLOR AND TEXTURE OPTIONS WITHIN PRODUCT LINE OF SELECTED PRODUCT

PROVIDE SHOP DRAWING FOR TILE PLACEMENT BY COLOR, STYLE AND CONTROL JOINTS AS

REQUIRED BY MANUFACTURER

09510: ACOUSTICAL CEILING TILE

SUBMIT PRODUCTS FOR THE FOLLOWING: MANUFACTURER'S TECHNICAL DATA FOR EACH

TYPE OF ACOUSTICAL CEILING UNIT AND SUSPENSION SYSTEM REQUIRED, SAMPLE TILE AND

PRODUCT LITERATURE FOR EACH COMPONENT USED.

09651: VINYL WALL BASE

PROVIDE SUBMITTAL WITH PRODUCT DATA ON MATERIAL WITH COLOR OPTIONS AND

ADHESIVES.

07200: DECORATIVE FIBERGLASS REINFORCED WALL PANELS

PROVIDE PRODUCT DATA ON PANELS, ADHESIVES AND TRIM.

PROVIDE PRODUCT SAMPLES FOR COLOR SELECTION OF PANELS AND TRIM SAMPLES FOR

FINISH.

PROVIDE SHOP DRAWINGS TO CONFIRM LAYOUT OF PANELS AND SEAMS

09900: PAINT

PROVIDE SUBMITTAL WITH PRODUCT DATA AND MSDS FOR PRIMER AND PAINT TO BE USED

114000: FOOD SERVICE EQUIPMENT

● PROVIDE EQUIPMENT SUBMITTALS FOR CONTRACTOR FURNISHED EQUIPMENT AS SHOWN

ON SCHEDULES AND DRAWINGS

123661: SIMULATED STONE COUNTERTOPS

● PROVIDE QUARTZ SURFACE COUNTERTOP SAMPLES AND SPECIFICATIONS

123623: PLASTIC LAMINATE

● PROVDE PLASTIC LAMINATE SAMPLES AND SPECIFICATIONS FOR FDA APPROVED

APPLICATIONS FOR FOOD SERVICE LINE FRONT FAÇADE PANEL AND ACCESS PANELS

230000: HVAC

● PROVIDE SUBMITTALS FOR THERMOSTAT, SUPPLY AND RETURN GRILL DIFFUSERS

260000: ELECTRICAL

● PROVIDE SUBMITTALS FOR ALL ELECTRICAL FIXTURES, DEVICES AND CONTROLS TO

INLCLUDE BUT NOT LIMITED TO LIGHTING, CONTROLS, OUTLETS, COVER PLATES, BREAKERS, ETC.

270000: COMMUNICATIONS

● PROVIDE SUBMITTALS FOR ALL TELEPHONE AND DATA DEVICES AND CONTROLS TO

INLCLUDE BUT NOT LIMITED TO JACKS, COVER PLATES, ETC.

283112: FIRE ALARM

● PROVIDE SUBMITTALS FOR ALL FIRE ALARM FIXTURES, DEVICES AND CONTROLS

330000: UTILITIES

● PROVIDE SUBMITTALS FOR ALL PLUMBING FIXTURES, DEVICES AND CONTROLS

*This checklist is provided for the Contractor’s convenience. Contractor shall provide submittals as required by the documents and to execute the design intent of the drawings. List does not include all items as required in SOW and accompanying documents including but not limited to Drawings and all references.