DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
US ARMY GARRISON DPW
NATICK SOLDIERS SYSTEMS CENTER
15 GENERAL GREENE AVENUE
NATICK MA 01760
CONSTRUCTION SUBMITAL CHECKLIST*
March 15, 2019
ADMINISTRATIVE / GENERAL REQUIREMENTS
GANTT SCHEDULE OF WORK IN DETAIL TO COMMUNICATE ALL MAJOR ELEMENTS/TRADES
FOR EIGHT WEEK CAFETERIA CLOSURE CONSTRUCTION PERIOD, DOWN-TIME FOR KITCHEN,
UTILITIES, GOVERNMENT INSPECTIONS, MOBILIZIATION, SITE CLEAN-UP/RESTORATION,
ADMINISTRATIVE (PRE-CONSTRUCTION MEETING, NOTICE TO PROCEED (NTP), SUBMITTALS
(i.e. HEALTH AND SAFETY PLAN), PUNCHLIST, TRAINING, AS-BUILTS, CLOSEOUT), ETC. THAT
ADD TIME TO CONSTRUCTION SCHEDULE
CONTRACTOR DAILY LOG OF ALL MAJOR ON SITE CONSTRUCTION ACTIVITY – TO BE
PROVIDED TO COR AT CLOSE OF EACH BUSINESS DAY. CAN BE PROVIDED VIA EMAIL AND
WITHOUT FORMAL SUBMITTAL
CONTRACTOR WEEKLY MEETING AGENDA – SUBMIT VIA EMAIL, WITHOUR FORMAL
SUBMITTAL, TO COR THROUGHOUT THE PERFORMANCE PERIOD TO REVIEW AND REPORT
CURRENT STATUS AND SCHEDULE OF THE JOB’S PROGRESS AS WELL AS COORDINATE
BETWEEN VARIOUS TASKS OF THE PROJECT AND THE IMPACTS UPON NSSC SUCH AS UTILITY
SHUTDOWNS, PHYSICAL SECURITY, OTHER OCCUPANTS ON POST, ETC.
EQUIPMENT & FURNITURE
PRODUCT DATA FOR EACH PIECE
SHOP DRAWINGS
FINISH SAMPLES
WARRANTIES
MILLWORK / CASEWORK / STAINLESS STEEL FOOD SERVICE LINE
SHOP DRAWINGS TO INCLUDE DIMENSIONS, LOCATIONS, MATERIALS, FASTENING, PLANS,
ELEVATIONS & DETAILS
SAMPLES FOR FINISH SELECTION
COUNTER TOP PRODUCT DATA ON MATERIAL, FASTENERS, ADHESIVE, SEALANT AND
SAMPLES FOR COLOR SELECTION.
STAINLESS STEEL FOOD SERVICE LINE COUNTER WITH CUTOUTS FOR KITCHEN EQUIPMENT,
CONCEALED ELECTRICAL AND PLUMBING CHASES, ACCESS PANELS AND LOCATIONS
PREPARED FOR UTILITY CONNECTIONS
06100: ROUGH CARPENTRY
BLOCKING PLAN
07910: SEALANTS
PROVIDE PRODUCT DATA AND MSDS SUBMITTALS
08411: ALUMINUM FRAMED ENTRANCES AND STOREFRONTS
PROVIDE SUBMITTAL WITH PRODUCT DATA OF DOOR, FRAME & HARDWARE
SHOP DRAWING TO SHOW ELEVATION AND PLANS OF ALL COMPONENTS
05400: METAL FRAMING / 09250: GYPSUM DRYWALL
PROVIDE SUBMITTAL FOR PRODUCT DATA OF FRAMING, DRYWALL AND ACCESSORIES TO BE
USED.
Attachment 6 W911QY19R0010
09300: PORCELAIN TILE
PROVIDE SUBMITTAL WITH PRODUCT DATA FOR TILE, MORTAR, GROUT AND ACCESSORIES
WARRANTIES
SAMPLES OF COLOR AND TEXTURE OPTIONS WITHIN PRODUCT LINE OF SELECTED PRODUCT
PROVIDE SHOP DRAWING FOR TILE PLACEMENT BY COLOR, STYLE AND CONTROL JOINTS AS
REQUIRED BY MANUFACTURER
09510: ACOUSTICAL CEILING TILE
SUBMIT PRODUCTS FOR THE FOLLOWING: MANUFACTURER'S TECHNICAL DATA FOR EACH
TYPE OF ACOUSTICAL CEILING UNIT AND SUSPENSION SYSTEM REQUIRED, SAMPLE TILE AND
PRODUCT LITERATURE FOR EACH COMPONENT USED.
09651: VINYL WALL BASE
PROVIDE SUBMITTAL WITH PRODUCT DATA ON MATERIAL WITH COLOR OPTIONS AND
ADHESIVES.
07200: DECORATIVE FIBERGLASS REINFORCED WALL PANELS
PROVIDE PRODUCT DATA ON PANELS, ADHESIVES AND TRIM.
PROVIDE PRODUCT SAMPLES FOR COLOR SELECTION OF PANELS AND TRIM SAMPLES FOR
FINISH.
PROVIDE SHOP DRAWINGS TO CONFIRM LAYOUT OF PANELS AND SEAMS
09900: PAINT
PROVIDE SUBMITTAL WITH PRODUCT DATA AND MSDS FOR PRIMER AND PAINT TO BE USED
114000: FOOD SERVICE EQUIPMENT
● PROVIDE EQUIPMENT SUBMITTALS FOR CONTRACTOR FURNISHED EQUIPMENT AS SHOWN
ON SCHEDULES AND DRAWINGS
123661: SIMULATED STONE COUNTERTOPS
● PROVIDE QUARTZ SURFACE COUNTERTOP SAMPLES AND SPECIFICATIONS
123623: PLASTIC LAMINATE
● PROVDE PLASTIC LAMINATE SAMPLES AND SPECIFICATIONS FOR FDA APPROVED
APPLICATIONS FOR FOOD SERVICE LINE FRONT FAÇADE PANEL AND ACCESS PANELS
230000: HVAC
● PROVIDE SUBMITTALS FOR THERMOSTAT, SUPPLY AND RETURN GRILL DIFFUSERS
260000: ELECTRICAL
● PROVIDE SUBMITTALS FOR ALL ELECTRICAL FIXTURES, DEVICES AND CONTROLS TO
INLCLUDE BUT NOT LIMITED TO LIGHTING, CONTROLS, OUTLETS, COVER PLATES, BREAKERS, ETC.
270000: COMMUNICATIONS
● PROVIDE SUBMITTALS FOR ALL TELEPHONE AND DATA DEVICES AND CONTROLS TO
INLCLUDE BUT NOT LIMITED TO JACKS, COVER PLATES, ETC.
283112: FIRE ALARM
● PROVIDE SUBMITTALS FOR ALL FIRE ALARM FIXTURES, DEVICES AND CONTROLS
330000: UTILITIES
● PROVIDE SUBMITTALS FOR ALL PLUMBING FIXTURES, DEVICES AND CONTROLS
*This checklist is provided for the Contractor’s convenience. Contractor shall provide submittals as required by the documents and to execute the design intent of the drawings. List does not include all items as required in SOW and accompanying documents including but not limited to Drawings and all references.
Attachment 6 W911QY19R0010