W911QY19R0010, Attachment 5 Building 1, Cafeteria Expansion

INSPECTION LOG 15 MAR 2019

# Inspection item Scheduled

Date Review Date

Comments Open Closed COR

COR/COTR

Electrical Mechanical

Wall framing Fire stopping

Removal of old material to source Panels Conduit Outlets

Removal of old material to source New piping and venting

Design of new Fire Alarm Wiring, connections

Removal of old material to source Panels Conduit Outlets

Removal of old material to source New piping and venting

FINAL ELECTRICAL

FINAL PLUMBING

DEMOLITION ‐ Review at completion

ROUGH FIRE PROTECTION / ALARM

ROUGH FRAMING

ROUGH ELECTRICAL

ROUGH PLUMBING

Contract #W911QY Building 1, Cafeteria Expansion

INSPECTION LOG 20‐Dec‐18

Removal of old material to source Mounting of equipment

Final device and system testing

FINAL HVAC

FINAL FIRE PROTECTION / ALARM