W911QY-17-R-0024.pdf

PDF 215 KB Posted

Attached to
Aviation Body Armor
Solicitation number
W911QY-17-R-0024
Issued by

About this file

Solicitation - W911QY-17-R-0024

View the file

Other files

File Type Posted
Amendment_W911QY-17-R-0024-0001.pdf PDF
Conformal_W911QY-17-R-0024-0001.pdf PDF
Q&A_2_07102017.docx DOCX document
Q&A_07062017.docx DOCX document
Exhibit_A_-_Materials_Test_Report_-_CDRL_A001.pdf PDF
Attachment_0001_-_Test_Procedures.pdf PDF
Exhibit_B_-_Use_and_Care_Pamphlet_-_CDRL_B001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until local time

X

A X B X C X D

EX

X

G F 27 - 33

34 - 43 H 44 - 50

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 50

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W911QY 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

1 - 2 3 - 6

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

7 - 12

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 16 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

17 - 25

PART II - CONTRACT CLAUSES

W6QK ACC-APG NATICK

CONTRACTING DIVISION

BLDG 1 GENERAL GREENE AVENUE

NATICK MA 01760-5011

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

27 Jun 2017

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W911QY-17-R-0024

Section A - Solicitation/Contract Form

A.1. REQUEST FOR PROPOSAL (RFP)

This RFP is in support of United States Army Special Operations Command (USSOCOM) and Program Manager – Special Operations Forces – Survival, Sustainment, and Equipment Systems (PM-SOF SSES).

The Government is requesting a modular Aviation Body Armor Vest (ABAV) capable of being configured for operations from USSOCOM specific airframes (MH-60M, AH-6, MH-60 DAP, MH-60 Assault; MH-47)) that operate over land and water. The personnel requiring the use of a new ABAV system includes pilots and crews of these aircraft.

It is anticipated a three year, firm fixed price (FFP), indefinite delivery / indefinite quantity (IDIQ) contract will be awarded to one Offeror. Any resultant contract will be for a quantity of no more than 3,000 ABAVs.

Vendors may submit more than one offer, but not more than two.

A.2. NOTICE OF INTENT

A Notice of Intent (NOI) shall be submitted no later than 15 days after the release of this RFP by each Offeror for each proposal. Only those Offerors who submit an NOI will receive the RFP attachments and may submit a proposal that will be considered by the Government.

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 3,000 Each Aviator Body Armor Vest (ABAV)

FFP

The Offeror shall provide ABAVs in accordance with this contract.

FOB: Destination

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 UNDEFINED

Technical Data

FFP

The Offeror shall provide all Technical Data in accordance with this contract and the applicable Exhibits.

UNIT UNIT PRICE MAX AMOUNT

0002AA UNDEFINED Each Exhibit A - Materials Test Report

FFP

The Contractor shall suibmit Materials Test Report in accordance with Exhibit A - CDRL A001 and Paragraph C.8.1.2.

UNIT UNIT PRICE MAX AMOUNT

0002AB UNDEFINED Each Exhibit B - Use and Care Pamphlet

FFP

One Use and Care Pamphlet shall be provided with each ABAV that is delivered to the Government in accordance with Paragraph C.4 and Exhibit B. This CLIN is Not Separately Priced. The price of this CLIN is included in CLIN 0001.

UNIT UNIT PRICE MAX AMOUNT

0003 1 Lot OPTION First Article Testing

FFP

The following sizes and quantities of ABAVs shall be provided for Government

FAT.

Extra Small: 2 units Small: 2 units Medium: 2 units Large: 2 units Extra Large: 2 units

CONTRACT MINIMUM/MAXIMUM VALUE

The minimum contract value for all orders issued against this contract shall not be less than the minimum contract value stated in the following table. The maximum contract value for all orders issued against this contract shall not exceed the maximum contract value stated in the following table.

MINIMUM

AMOUNT

MAXIMUM

$3,500.00 TBD

MAXIMUM

3,000 ABAVs

DELIVERY ORDER MINIMUM/MAXIMUM ORDER VALUE

The minimum order value for each Delivery/Task Order issued shall not be less than the minimum order value stated in the following table. The maximum order value for each Delivery/Task Order issued shall not exceed the maximum order value stated in the following table.

MINIMUM

AMOUNT

MAXIMUM

$3,500.00 TBD

MAXIMUM

3,000 ABAVs

Section C - Descriptions and Specifications

C.1 STATEMENT OF WORK

This Statement of Work (SOW) covers the requirements for fabrication, engineering, configuration control, quality assurance, test and evaluation, and program management of the Aviation Body Armor Vest (ABAV). The Contractor shall furnish the necessary personnel, facilities, equipment and materials to produce and deliver the ABAV in accordance with this document.

A firm fixed price, indefinite delivery / indefinite quantity contract will be established. The ordering period of this contract will be for three years, and will be for a quantity of not more than 3,000 ABAVs.

C.2. KEY PERFORMANCE PARAMETERS (KPPs)

The contractor shall produce the ABAV to the following performance capabilities:

1. Must be capable of supporting the following items:

a. Spear Cut Generation V Stand-alone, Swimmer Cut Front, Back, and Side Plates

b. Under-Arm Flotation System Modular Water Wing Design

c. SEA LV2 (Emergency Breathing Device)

d. M-4 Magazines (Qty: 3)

e. M-9 Magazines (Qty: 2)

f. CAT Tourniquet

g. Individual Medical Aircrew Kit (5.5”L x 5.5”W x 3.25”D)

h. Individual Survival Aircrew Module (5.5”L x 5.5”W x 3”D)

i. Universal radio pouch capable of holding the CSEL or 148 series Radio with Thales GPS

Side Mate Module Assembly

j. IZLID 200P

k. Modular holster for M-9 Beretta capable of being mounted and reconfigured between the vest and belt, and capable of being mounted vertically, horizontally, or angled on the vest.

2. Must have an integrated extraction / retention system capable of supporting a 400lb (weight of individual with kit) for rescue hoisting from both the belt and chest connection points.

a. The belt shall function for daily use capable of mounting the holster and fit 2” belt loops and fit waist sizes 26-50” through adjustment and or multiple sizes.

b. The belt shall be capable of being used independently as a method of extraction and retention.

c. The belt must be rated in accordance with NFPA 1983-2012 test method - 3000lbs for 1.5min.

d. The criteria for the static pull test of the belt is a minimum break strength of 3000 lbs in an upright and inverted position. Pull Test in the Horizontal & vertical directions with max buckle slippage of 25 mm (1 in).

e. Chest connection point shall be capable of being used independently for retention and be capable of being used for extraction independently and/ or in conjunction with the belt while maintaining the chest connection point as the single point of attachment to the hoist line. The connection point shall be compatible with lanyard part numbers AMTC-S1379 (7') & AMTC-S1380 (12') & 001-HSLSOCOM. The criteria for the static pull test of the chest connection is a minimum break strength of 3,000 lbs. for 1.5 minutes in horizontal, vertical, and angular directions.

f. Any harness worn with the belt must not diminish the pull strength in any way.

3. Must be available in Multicam and be capable of being printed in other patterns. ABAV must meet minimal requirements for not creating Visual and Near IR (VIS/NIR) offenders. If non-printed materials are used, they must be in Tan #499 and meet VIS/NIR Tan #499 compliance.

4. Outer shell fabric must be flame resistant when tested according to ASTM D6413. Average char length shall be no longer than 4.5 inches, average after flame shall be no more than 3.0 seconds and average afterglow shall be no more than 10 seconds for both warp and fill directions. The average number of molten droplets that occur after removal of the ignition source shall be less than 1 droplet. Fabric samples shall be tested as received (0 laundering cycles) and after 5 laundering cycles. Laundering shall be conducted according to AATCC Method 135

5. Provide equal weight distribution and be configurable for additional load carriage.

6. The ABAV must be easily usable and adjustable while wearing a wet suit, exposure suit, and/or cold weather gloves to the maximum extent practicable.

7. Fine adjustments to fit shall be easily made while in minimally and maximally loaded configurations. This includes the need for fine adjustments of any straps, harnesses, cummerbunds, or any other type of adjustment system while wearing the entire ensemble without removing it.

8. Environmental conditions cannot degrade the ABAV to the extent they cannot be used for its intended mission (e.g. buckles and fasteners must operate in extreme cold and hot conditions and be resistant to sand and debris).

9. Must withstand the effects of full climatic range of operations ranging from -50F to 130F.

10. Must withstand storage temperatures ranging from -50F to 185F.

11. Must be resistant to rot, mildew, DEET, Petroleum, Oil and Lubricants (POL), chlorine, UV light, and salt water.

12. Must be backward compatible with all currently issued SPEAR Load Carriage items.

13. Shall provide adequate amount of surface area for carrying mission essential equipment tailored to duty position (e.g. rifleman, medic, engineer, etc). The ABAV shall be compatible with existing USSOCOM equipment when minimally or fully loaded in accordance with operational practices.

Existing USSOCOM equipment includes Military Free Fall (MFF) equipment, fast rope and static line parachute equipment, combat swimming equipment, backpacks, equipment belts, and NBC gear (MOPP 4).

C.3. KEY SYSTEM ATTRIBUTES (KSAs)

1. Materials and designs of the ABAV must provide maximal comfort, full range of dynamic anatomical motion, and maximal agility during movement in all environments.

2. Must not hinder or significantly interfere with the operator entering or exiting SOF ground vehicles, aviation platforms, movement through hatches or doorways, and must maximize comfort while riding on SOF/Service aviation platforms.

3. All Accessories should firmly attach to the ABAV in a way that minimizes relative motion between equipment-filled pockets and the ABAV. Fastening mechanisms shall be simple, easy to use, and durable for all operational environments.

4. Provide flotation system with the following characteristics:

a. ABAV and Accessories must be able to integrate with a low profile, under arm, modular floatation system that has an easily installable bladder capable of providing no less than 70 lb. of positive buoyancy when inflated on the surface with 40 lbs. at 1 ATM. Modular flotation sub-components shall not reduce or will only minimally reduce the area available for Accessory attachment. Bladders and floatation capability shall be removable and capable of being manually inflated.

5. Shall be capable of fitting the 5th to 95th percentile chest size (33” circumference, 16” torso length to 49” circumference, 24 ¼” torso length.

6. Must releasable when unloaded or fully loaded in all combat environments, including submerged / maritime environments where crashed aircraft is possible.

7. The holster must be capable of being transitioned from mounting on the vest in a horizontal, angled, or vertical configuration, to mounting on a belt.

8. The ABAV shall minimize water retention, maximize drainage, and minimize drying time.

9. ABAV and accessories must have durability and abrasion resistance during extended land operations.

10. All aspects of the design and integration of the ABAV and its Accessories shall be simple, easy, and intuitive to use. The ABAV must be easily setup prior to use, and easily adjustable during use.

11. The ABAV must be simple to use, minimize bulk, retain necessary equipment, and allow easy access for removal and replacement of equipment into the pocket or pouch.

12. When fully loaded, the ABAV must allow the operator to bring and maintain all weapons to a good firing position or adjust firing position. These weapons include M-9, M-4, and crew served weapons.

13. Shall have a shelf life of not less than five years in a sealed package.

C.4. USE AND CARE PAMPHLET (Exhibit B – CDRL B001)

The Contractor shall prepare and deliver one paper copy of the Use and Care Pamphlet for each ABAV that is delivered to the Government. The Use and Care Pamphlet must explain how the system is assembled, the purpose(s) of each component or module, proper fitting of the system, proper donning and doffing, safe use, cleaning and maintenance instructions, and when to turn the ABAV in for repair or exchange.

C.5. DELIVERY SCHEDULE

Contractor must be capable of delivering at least 50 ABAVs per month.

C.6. ENGINEERING

The Contractor shall assign and employ personnel necessary for successful contract performance. The Contractor shall design and implement processes that ensure successful production of all items required under this contract.

The Contractor’s personnel and processes shall be dynamic enough to allow for development and incorporation of product improvements. Commercial products, processes, and practices shall be used whenever practicable to reduce costs.

C.6.1. Configuration Control

Beginning with the submission of the product demonstration models, the Contractor shall establish and use configuration control procedures to manage any proposed changes, The Contractor shall not alter the design in form, fit, function, materials, components, or manufacturing processes without submitting an Engineering Change Proposal (ECP), request for deviation (RFD) or request for waiver (RFW) to the Contracting Officer. The Contractor must receive written approval from the Contracting Officer to proceed. Once approved, a contract modification will be prepared by the Contracting Officer to incorporate the change into the contract as well as any equitable adjustment (if appropriate) to the contract price or other contract terms and conditions as a result.

C.6.2. Quality Assurance

The Contractor shall establish, maintain, and operate a quality system in accordance with the following requirements.

C.6.2.1. Quality Validation Plan:

The Contractor shall document their approach to establish and maintain control over the quality of items delivered on this contract, and assure all systems meet their performance requirements in a Quality Validation Plan. The plan shall document how the Contractor shall ensure quality system effectiveness, to include how collected data will be managed, reviewed, and how the results will be used to indicate trends and progress in the quality of the fabrication, assembly, test, and acceptance of the ABAV.

C.6.2.2. Inspection and Test Records:

The Contractor shall maintain complete and accurate records of all inspections and tests, and shall make those records available for review or audit by the Government upon request at any time.

C.6.2.3. Supplier Management:

The Contractor is responsible for the work performed by their suppliers, including any inspections and tests performed by the suppliers. The Contractor shall maintain documented evidence their suppliers meet all criteria related to the contract’s materials and processes.

Suppliers of components or processes controlling key/critical characteristics shall be identified, including names and contact information of key supplier personnel. The Contractor shall maintain documented evidence that its suppliers meet and monitor all criteria related to components or processes controlling key/critical characteristics. The Government reserves the right to review and audit any suppliers of these components and processes. Review/audit of any suppliers by the Government will NOT relieve the Contractor of responsibility for their suppliers

C.7. PROGRAM MANAGEMENT

The Contractor shall implement the following Program Management processes.

C.7.1. Primary Point of Contact (POC)

The Contractor shall designate a single individual to serve as the primary point of contact between the Government and the Contractor, and to be responsible for the coordination of all Contractor activities related to this contract.

This individual shall have the authority to commit the Contractor to specific courses of action and accept direction from the Contracting Officer or from the Contracting Officer’s authorized representatives. This individual shall be responsible for coordinating all meetings between the Government and the Contractor, and shall be responsible for bringing to the Contracting Officer’s attention any problems that could adversely affect the Contractor’s ability to meet the contract quality, cost, production/delivery schedule, or other performance requirements.

C.7.2. Subcontractor Management

The Contractor shall ensure subcontractor compliance with all aspects of the contract requirements. The Contractor shall notify the Contracting Officer of any problems with subcontractors that might impact the contract, as soon as practicable, and shall make every effort to resolve problems or other issues quickly, so as to minimize any negative impact on contract performance.

C.7.3. Post Award Conference (PAC)

A Post Award Conference will be held if deemed necessary by the Government or requested by the Contractor. The conference shall be hosted by the Contractor within thirty (30) days after execution of the first delivery order; all significant subcontractors shall participate in a Post Award Conference if held. The purpose of the conference is to ensure mutual understanding of contract requirements and procedures. Discussions at the conference will focus upon project orientation, clarification and transfer of applicable background information, contract requirements, review and analysis of the product description, quality assurance plan review, and identification of points of contact from the Contractor and Government organizations. An overarching goal of the Post Award Conference is the establishment of efficient and effective communication mechanisms among the parties, including but not limited to e-mail, teleconferencing, video teleconferencing, and any other technologies available to facilitate timely communication at the minimum cost.

C.7.4. Meetings and Meeting Minutes

The Contractor shall ensure that appropriate Contractor team members are present at meetings. All Contractor initiated meetings shall be conducted at a location agreed upon by the Government and Contractor. The Contractor shall be responsible for providing meeting minutes within 30 days of the completion of all meetings.

C.8. TEST AND EVALAUTION

The Contractor shall provide laboratory test reports from an independent testing laboratory for the material, all applicable Certificates of Conformance or test reports, and Quality Conformance inspections. All testing shall be made available to the Government when requested. Materials shall be unacceptable for use in production of end items if any sample unit fails to meet any requirement specified. All test reports shall contain the individual values utilized in expressing the final results. It is solely the Contractor’s responsibility to schedule testing and obtain reports. Test facilities, equipment, and procedures used shall be identified to the Government and will be subject to approval by the Contracting Officer

C.8.1. Government First Article Test (Optional CLIN 0002)

The Government reserves the right to conduct the FAT at the Contractor’s facility. The Government may inspect first articles for dimensions, visual defects, general quality, and workmanship. Inspection shall be performed to determine whether the ABAV’s materials meet the requirements of the item specifications submitted. The Government’s approval of FAT may also include an assessment of the Contractor’s Quality Management System (QMS) in place for the production of the ABAV and Accessories. The Government reserves the right to perform additional FAT if significant changes are implemented. The Contractor shall produce both the first article units and the production quantity units at the same facility using the same manufacturing processes. FAT quantities shall be per place of performance and shall include all sizes that will be manufactured at that facility over the life of the contract.

Size FAT Quantities Extra Small 2

Small 2

Medium 2 Large 2

Extra Large 2

TOTAL 10

If Optional CLIN 0002 is exercised, the Contractor must provide the above quantities and sizes of ABAV.

C.8.1.1. Government Standard Samples:

Upon Government approval, one Medium Size ABAV shall be labeled as “Government Standard Sample.” This sample shall be used as the standards for dimensions and quality workmanship. Unless the Contracting Officer otherwise notifies the Contractor in writing, the Government Standard Samples shall be used by the Contractor and Government when performing inspection and acceptance.

C.8.1.2. Material and End Item Testing:

Each lot of fabric and the end item will be subjected to the applicable tests and verification. In accordance with Exhibit A – Materials Test Report (CDRL A001), the Contractor shall provide laboratory test reports from an independent testing laboratory for each lot of material and all applicable Certificates of Conformance or test reports for lots of subcomponents as part of the First Article and Quality Conformance inspections. Approved lot testing shall be made available by the Contractor to the Government when requested. The material lot shall be unacceptable for use in production of end items if any sample unit fails to meet any requirement specified. All test reports shall contain the individual values utilized in expressing the final results. It is solely the Contractor’s responsibility to schedule testing and obtain reports. Test facilities, equipment, and procedures used shall be identified to the Government and will be subject to approval by the contracting officer

C.9. BERRY AMENDMENT

This acquisition is subject to the Berry Amendment, USC Title 10 2533a, and Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.225-7012 Preference for Certain Domestic Commodities. The Prime Contractor and the entire supply chain are required to adhere to the Berry Amendment. The Prime Contractor shall educate and mentor the entire supply chain in the implementation and maintenance of Berry Amendment compliance. The Prime Contractor shall assess the entire supply chain for compliance to the Berry Amendment, and shall maintain documentation of Berry product compliance, supply chain education, mentoring, and assessments.

The Government shall reserve the right to assess the Prime Contractor’s compliance to the Berry Amendment at any point in time.

The Government cannot accept noncompliant equipment, and the Contractor shall not be paid for any items in violation of the Berry Amendment. If a Berry Amendment violation is determined to have occurred after the Government has accepted delivery, the Contractor is required to replace the item in violation of the Act with an item from a domestic source, at their own expense. Once the Contractor has provided items from an acceptable source, the Government may again accept delivery. The Government may pursue additional claims against the Contractor if the Government incurred other damages due to non-compliance.

Section D - Packaging and Marking

CLAUSES INCORPORATED BY REFERENCE

252.211-7003 Item Unique Identification and Valuation MAR 2016 252.211-7006 Passive Radio Frequency Identification JUN 2016

Section E - Inspection and Acceptance

52.246-2 Inspection Of Supplies--Fixed Price AUG 1996 52.246-16 Responsibility For Supplies APR 1984

Section F - Deliveries or Performance

F.1. DELIVERY LOCATIONS

Deliveries of all ABAVs will likely be made to:

5749 Briar Hill Rd Bldg 221, Door 7 Lexington, KY 40516

However, delivery may occasionally be required to other CONUS locations.

52.211-17 Delivery of Excess Quantities SEP 1989 52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991 52.247-48 F.O.B. Destination--Evidence Of Shipment FEB 1999

Section G - Contract Administration Data

G.1 GOVERNMENT CONTRACT ADMINISTRATION

In no event shall any understanding or agreement, contract modification, change order, or other matter in deviation from the terms of this contract between the Contractor and a person other than the Contracting Officer be effective or binding upon the Government. All such actions must be formalized by a proper contractual document executed by the Contracting Officer.

G.2 PROCURING CONTRACTING OFFICER

TBD

G.3 CONTRACT SPECIALIST

TBD

G.4 CONTRACTOR’S CONTRACT ADMINISTRATION

TBD

G.5 PAYMENT AND PAY OFFICE DODAACS

Payment will likely be made by:

HQ0490

DFAS Indianapolis (GFEBS) 8899 E. 56th Street Indianapolis, IN 46249

However, in accordance with FAR 52.232-37 – Multiple Payment Arrangements, other Pay Offices may be used.

The Pay Office will be specified on individual delivery orders.

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-37 Multiple Payment Arrangements MAY 1999 252.204-0001 Line Item Specific: Single Funding SEP 2009 252.204-0002 Line Item Specific: Sequential ACRN Order SEP 2009 252.204-7006 Billing Instructions OCT 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7006 Wide Area WorkFlow Payment Instructions MAY 2013 252.246-7000 Material Inspection And Receiving Report MAR 2008

Section I - Contract Clauses

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or

Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.203-17 Contractor Employee Whistleblower Rights and Requirement

To Inform Employees of Whistleblower Rights

APR 2014

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

OCT 2016

52.204-13 System for Award Management Maintenance OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

JUN 2016

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters

JUL 2013

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.211-5 Material Requirements AUG 2000 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-12 Subcontractor Certified Cost or Pricing Data OCT 2010 52.215-14 Integrity of Unit Prices OCT 2010 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits

(PRB) Other than Pensions

JUL 2005

52.215-19 Notification of Ownership Changes OCT 1997 52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-8 Utilization of Small Business Concerns NOV 2016 52.219-14 Limitations On Subcontracting JAN 2017 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies OCT 2016 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment

Exceeding $15,000

MAY 2014

52.222-21 Prohibition Of Segregated Facilities APR 2015

52.222-26 Equal Opportunity SEP 2016 52.222-35 Equal Opportunity for Veterans OCT 2015 52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans FEB 2016 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.223-6 Drug-Free Workplace MAY 2001 52.223-11 Ozone-Depleting Substances and High Global Warming

Potential Hydrofluorocarbons.

JUN 2016

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-9 Refund Of Royalties APR 1984 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-1 Payments APR 1984 52.232-8 Discounts For Prompt Payment FEB 2002 52.232-11 Extras APR 1984 52.232-17 Interest MAY 2014 52.232-23 Alt I Assignment of Claims (May 2014) - Alternate I APR 1984 52.232-25 Prompt Payment JAN 2017 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.242-13 Bankruptcy JUL 1995 52.243-1 Changes--Fixed Price AUG 1987 52.244-6 Subcontracts for Commercial Items JAN 2017 52.245-1 Government Property JAN 2017 52.245-9 Use And Charges APR 2012 52.247-64 Preference for Privately Owned U.S. - Flag Commercial

Vessels

FEB 2006

52.249-2 Termination For Convenience Of The Government (Fixed- Price)

APR 2012

52.249-8 Default (Fixed-Price Supply & Service) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7997 (Dev) Prohibition on Contracting with Entities that Require Certain

Internal Confidentiality Agreements (Deviation 2016-O0003)

OCT 2015

252.204-7000 Disclosure Of Information OCT 2016 252.204-7002 Payment For Subline Items Not Separately Priced DEC 1991 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

OCT 2016

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

MAY 2016

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.215-7000 Pricing Adjustments DEC 2012 252.215-7002 Cost Estimating System Requirements DEC 2012 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7004 Drug Free Work Force SEP 1988 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7001 Buy American And Balance Of Payments Program-- Basic

(Dec 2016)

DEC 2016

252.225-7002 Qualifying Country Sources As Subcontractors DEC 2016 252.225-7012 Preference For Certain Domestic Commodities DEC 2016 252.225-7048 Export-Controlled Items JUN 2013 252.226-7001 Utilization of Indian Organizations and Indian-Owned

Economic Enterprises, and Native Hawaiian Small Business Concerns

SEP 2004

252.227-7013 Rights in Technical Data--Noncommercial Items FEB 2014 252.227-7014 Rights in Noncommercial Computer Software and

Noncommercial Computer Software Documentation

FEB 2014

252.227-7016 Rights in Bid or Proposal Information JAN 2011 252.227-7017 Identification and Assertion of Use, Release, or Disclosure

Restrictions

JAN 2011

252.227-7019 Validation of Asserted Restrictions--Computer Software SEP 2016 252.227-7025 Limitations on the Use or Disclosure of Government-

Furnished Information Marked with Restrictive Legends

MAY 2013

252.227-7027 Deferred Ordering Of Technical Data Or Computer Software APR 1988 252.227-7028 Technical Data or Computer Software Previously Delivered to the Government

JUN 1995

252.227-7030 Technical Data--Withholding Of Payment MAR 2000 252.227-7037 Validation of Restrictive Markings on Technical Data SEP 2016 252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished

Property

APR 2012

252.245-7002 Reporting Loss of Government Property APR 2012 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal SEP 2016 252.247-7023 Transportation of Supplies by Sea APR 2014 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000

CLAUSES INCORPORATED BY FULL TEXT

52.209-4 FIRST ARTICLE APPROVAL--GOVERNMENT TESTING (SEP 1989)

If Optional CLIN 0003 is exercised:

(a) The Contractor shall deliver items specified on CLIN 0003 in 30 calendar days from the date of this contract to the Government for first article tests. Deliver to:

Natick Soldier Systems Center Scott Gaumont 15 General Greene Avenue, Bldg 4 Natick, MA 01760

The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

(b) Within 14 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government. The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor--

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor's expense.

(f) If the Government does not act within the time specified in paragraphs (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government. The Offeror/Contractor may request a waiver.

(End of clause)

52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN

CERTIFIED COST OR PRICING DATA -- MODIFICATIONS (OCT 2010)--ALTERNATE III (OCT 1997)

(a) Exceptions from cost or pricing data. (1) In lieu of submitting cost or pricing data for modifications under this contract, for price adjustments expected to exceed the threshold set forth at FAR 15.403-4 on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in the following subparagraphs. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable--

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Information on modifications of contracts or subcontracts for commercial items. (A) If--

(1) The original contract or subcontract was granted an exception from cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial item; and

(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial item to a contract or subcontract for the acquisition of an item other than a commercial item.

(B) For a commercial item exception, the Contractor shall provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Such information may include--

(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted.

Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.

(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.

(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation , access does not extend to cost or profit information or other data relevant solely to the Contractor's determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for cost or pricing data. If the Contractor is not granted an exception from the requirement to submit cost or pricing data, the following applies:

(1) The Contractor shall submit cost or pricing data and supporting attachments in accordance with Table 15-2 of

FAR 15.408.

(c) Submit the cost portion of the proposal via the following electronic media: .xls (Microsoft Excel)

As soon as practicable after agreement on price, but before award (except for unpriced actions), the Contractor shall submit a Certificate of Current Cost or Pricing Data, as prescribed by FAR 15.406-2.

52.216-19 ORDER LIMITATIONS. (OCT 1995)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $3,500.00, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor:

(1) Any order for a single item in excess of TBD;

(2) Any order for a combination of items in excess of TBD; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within seven days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

52.216-22 INDEFINITE QUANTITY. (OCT 1995)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance shall be made only as authorized by orders issued in accordance with the Ordering clause. The Contractor shall furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the "maximum". The Government shall order at least the quantity of supplies or services designated in the Schedule as the "minimum".

(c) Except for any limitations on quantities in the Order Limitations clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period shall be completed by the Contractor within the time specified in the order. The contract shall govern the Contractor's and

Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor shall not be required to make any deliveries under this contract after TBD.

52.243-7 NOTIFICATION OF CHANGES (JAN 2017)

(a) Definitions.

"Contracting Officer," as used in this clause, does not include any representative of the Contracting Officer.

"Specifically authorized representative (SAR)," as used in this clause, means any person the Contracting Officer has so designated by written notice (a copy of which shall be provided to the Contractor) which shall refer to this subparagraph and shall be issued to the designated representative before the SAR exercises such authority.

(b) Notice. The primary purpose of this clause is to obtain prompt reporting of Government conduct that the Contractor considers to constitute a change to this contract. Except for changes identified as such in writing and signed by the Contracting Officer, the Contractor shall notify the Administrative Contracting Officer in writing, within seven calendar days from the date that the Contractor identifies any Government conduct (including actions, inactions, and written or oral communications) that the Contractor regards as a change to the contract terms and conditions. On the basis of the most accurate information available to the Contractor, the notice shall state--

(1) The date, nature, and circumstances of the conduct regarded as a change;

(2) The name, function, and activity of each Government individual and Contractor official or employee involved in or knowledgeable about such conduct;

(3) The identification of any documents and the substance of any oral communication involved in such conduct;

(4) In the instance of alleged acceleration of scheduled performance or delivery, the basis upon which it arose;

(5) The particular elements of contract performance for which the Contractor may seek an equitable adjustment under this clause, including--

(i) What line items have been or may be affected by the alleged change;

(ii) What labor or materials or both have been or may be added, deleted, or wasted by the alleged change;

(iii) To the extent practicable, what delay and disruption in the manner and sequence of performance and effect on continued performance have been or may be caused by the alleged change;

(iv) What adjustments to contract price, delivery schedule, and other provisions affected by the alleged change are estimated; and

(6) The Contractor's estimate of the time by which the Government must respond to the Contractor's notice to minimize cost, delay or disruption of performance.

(c) Continued performance. Following submission of the notice required by (b) above, the Contractor shall diligently continue performance of this contract to the maximum extent possible in accordance with its terms and conditions as construed by the Contractor, unless the notice reports a direction of the Contracting Officer or a communication from a SAR of the Contracting Officer, in either of which events the Contractor shall continue performance; provided, however, that if the Contractor regards the direction or communication as a change as described in (b) above, notice shall be given in the manner provided. All directions, communications, interpretations, orders and similar actions of the SAR shall be reduced to writing and copies furnished to the Contractor and to the Contracting Officer. The Contracting Officer shall countermand any action which exceeds the authority of the SAR.

(d) Government response. The Contracting Officer shall promptly, within seven calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer shall either--

(1) Confirm that the conduct of which the Contractor gave notice constitutes a change and when necessary direct the mode of further performance;

(2) Countermand any communication regarded as a change;

(3)…