W911QY-16-R-0004_BK_Solicitation_Amendment_0002.pdf
PDF 209 KB Posted
- Attached to
- PMFSS Battlefield Kitchen Solicitation
- Solicitation number
- W911QY-16-R-0004
About this file
W911QY-16-R-0004 BK Solicitation Amendment 0002
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1. Provide the final questions and answ ers.
2. Make changes based on the questions and answ ers.
3. Extend the proposal due date in section A.1.5.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 44
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911QY-16-R-0004
X 9B. DATED (SEE ITEM 11)
06-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Jun-2016
CODE
W6QK ACC-APG NATICK
CONTRACTING DIVISION
BLDG 1 GENERAL GREENE AVENUE
NATICK MA 01760-5011
W911QY 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911QY-16-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The following have been modified:
SUPPLEMENTAL INFORMATION
A.1. The Army Contracting Command – Aberdeen Proving Ground (ACC-APG), Natick Contracting Division has a requirement for a Battlefield Kitchen (BK).
A.1.1. The Government plans to award a single Firm Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract with options. The anticipated contract is planned to be structured with a 3-year base developmental ordering period that consists of the engineering, design, fabrication and test of developmental prototypes, logistics deliverable preparation, and transition to low rate production. Following the 3-year developmental ordering period, the government anticipates 5 optional 1-year production ordering periods, the first will consist of fabrication of FAT systems, conduct of First Article Test, and transition to full rate production. The minimum contract value will be $269,000.00 and the maximum contract value will be $97,000,000.00.
A.1.2. This requirement is subject to the availability funds.
A.1.3. Proposals shall be valid for 180 days after the closing date of the solicitation. Contractors shall clearly indicate the period of validity.
A.1.4. Contractors will not be reimbursed for any proposal preparation costs.
A.1.5. Proposals are due NLT 2:00 P.M. EDT Monday 20 June 2016.
A.2. The Government anticipates awarding a single FFP IDIQ contract with options as a result of this solicitation;
however the Government reserves the right to award one or no contracts at the Governments discretion. Funds will be obligated for quantities ordered upon issuance of delivery orders and not by the basic contract.
A.3. This acquisition is for a 100% Small Business Set-Aside. The North American Industry Classification System NAICS Code is 332999, and the size standard is 750 employees.
A.-3.1. FAR Clause 52.219-14 Limitations on Subcontracting has been included by full text in section I of the solicitation applies to the resulting contract.
A.4. DFARS Clauses 252.211-7006 Passive Radio Frequency Identification (PRFID) and 252.211-7003 Item Unique Identification and Valuation (IUIDV) apply and are incorporated in Section I of the solicitation.
A.5. DFARS 252.225-7012 Preference for Certain Domestic Commodities (Berry Amendment) applies to the resultant contract.
A.6. The solicitation including Ammendments, Exhibits and Attachments listed in Section J, may be downloaded from the Natick Contracting Division website http://www3.natick.army.mil/Team/BK.aspx.
A.7. Proposals shall be addressed to the following:
Army Contracting Command – Aberdeen Proving Ground Natick Contracting Division (CCAP-SCN)
Natick B Branch ATTN: Sean Auld Subject: W911QY-16-R-0004 15 General Greene Avenue, Bldg 1, 3rd Floor Natick, MA 01760
A.7.1. Prior to hand delivering proposals offerors shall coordinate the delivery with Sean Auld via email at Sean.G.Auld.civ@mail.mil.
A.8. Offerors shall access http://www.assistdocs.com herein for all Mil-STD’s referenced in this document for complete up to date information.
A.9. Any changes in the agreed upon arrangements are to be submitted to the Contracting Officer in advance for approval. In the event of any conflict or ambiguity between the Contractor's Technical Proposal and the Government's Performance Specification, the Government's Performance Specification takes precedence.
A.10. Questions & Answers
Question 1: What is the allowable carbon dioxide emission (%) for each modular appliance?
Answer 1: There is no direct limit on the CO2 emissions for each appliance. The limits are indirect in that there are OSHA limits for the kitchen environment.
Question 2: Where is the carbon dioxide emission measured?
Answer 2: See answer 1.
Question 3: What is the control interface between Modular Appliances and the Modular Burner?
Answer 3: The interfaces are defined for reference in the solid models. The offeror may use, to the extent desired and provided, the included information. A firm requirement has not yet been defined for the control interface.
Alternate control interfaces will be considered.
Question 4: Is the external housing/cabinet/chassis that the Modular Burner slides into, a standard component with the Modular Burner?
Answer 4: The physical interface between the modular burner and the modular appliance are to be maintained as defined in the solid models and the interface drawing in the burner PPD. Yes, the physical interface can be considered a standard.
Question 5: Is the keypad interface, adjacent to the Modular Burner, a supplied component of the Modular Burner?
Answer 5: No components of the modular burner will be supplied for production. The purchase and/or assembly of the modular burner shall be the responsibility of the offeror; however, the modular burner and select appliance modules will be supplied as GFP to be used as reference during the developmental phase. See section H.3.
Government Furnished Property (GFP) and Government Furnished Information GFI) of the solicitation.
Question 6: What are the specifications for the keypad interface (inputs, outputs, etc.)?
Answer 6: The appliance controller (provided as a reference and not a design requirement) gets a few inputs. There are safety limit switches and on the thermostat controlled appliance, a thermostat input. There is also the 120 VAC power input. For outputs to the burner, there is the alarm switch, thermocouple switch (call for heat) and 120 VAC.
Other outputs are appliance specific (convection blower fans only operate when the appliance is powered up). It is the offerors responsibility to verify all inputs and outputs and correct operation of the burner/appliance combination.
Question 7: Is the keypad interface the “thermostatic controller” for the Griddle and Convection Oven?
Answer 7: Yes
Question 8: Is the keypad interface the “duty controller” for the Heater Tank?
Answer 8: Yes
Question 9: Since the Stove Top, Tilt Skillet, and Refrigerator do not have a “thermostatic controller” identified for these Modular Appliances, are they just power on/power off Modular Appliances only? It is very surprising that there is no heat control for the Stove Top and Tilt Skillet.
Answer 9: See 3.3.5 of the PPD for Modular Appliances. It describes the heat control for appliances that require either a duty cycle or a variable firing rate burner.
Question 10: What is the temperature setting/requirement for the Refrigerator?
Answer 10: The refrigerator shall be capable of maintaining a maximum temperature of 40°F without freezing the product.
Question 11: Is a vent hood always present on the Griddle, Tilt Skillet, and Stove Top?
Answer 11: The vent hood is always present during operation. However, it is probably necessary to easily remove the vent hood for transportation. See the PPD for the BK system for height limits of the system.
Question 12: Is the Vent Hood a semi-permanent attachment to the Griddle, Tilt Skillet, and Stove Top?
Answer 12: It is probably necessary to removable for transportation. See the PPD for the BK system for height limits during transportability.
Question 13: What is the preferred method to secure the Vent Hood to the Griddle, Tilt Skillet, and Stove Top?
With tools? Without tools?
Answer 13: The vent hood should be easily removable, preferably without tools. Tools can be lost and this may be counted as a weakness depending on the type and quantity of tools required. It is anticipated that the appliances need to be height reducible to approximately 50 inches to allow the BK to meet the height limitation of 8 feet.
Removing the hood will be counted in the time limitation to pack up the BK. See 3.4.2 of the system PPD for deployment and pack out requirements.
Question 14: Is the Stove Top considered a supervised appliance?
Answer 14: Normal care and supervision will be assumed for the stove top as with any large boiling vessel. It can be assumed that it will not be under constant surveillance and that it will be set to its task and the operator will perform other tasks that take their attention away for periods of time.
Question 15: What is the method for modulating the Vent Hood blower cfm from 100 cfm to 400 cfm?
Answer 15: The government is not aware of a requirement that requires the blower to modulate from 100 cfm to 400 cfm. See 3.3.1 of the System PPD.
Question 16: Is there a preferred material of construction and corrosion protection coating identified for the Modular Appliances?
Answer 16: Offerors are required to propose materials and methods of construction taking into account corrosion prevention as well as all of the requirements of the PPD’s and contract.
Question 17: There is a reference made regarding “delivery to government after refurbishment,” but there is nothing to address any deficiencies discovered during the refurbishment. Do you want “like new,” just clean, maybe painted? Please clarify.
Answer 17: Refurbishment will include all repairs necessary to bring the item back to good working order. The contractor will be responsible for correcting deficiencies of the design and or manufacturing process. Damage caused by the test that were not attributable to the design or manufacturing process (e.g. improvements based on new knowledge) will be negotiated prior to initiation of repair.
Question 18: You’ve mentioned “on-site tech support.” What is your expectation for this?
Answer 18: See C.2.17 for details. We cannot be more specific at this time due to unanticipated events during tests.
Question 19: What is your estimated timeframe for the required support? Where will this happen?
Answer 19: The timeframe will be based on the Offerors delivery schedule. The most likely location will be Aberdeen Test Center, MD. As an alternate, Yuma Proving Ground, AZ.
Question 20: When you refer to 10 days, are you saying 10 business days or 10 calendar days?
Answer 20: 10 business days.
Question 21: The content of the ASL is developed by the Government, so how can it be accurately priced?
Shouldn’t these CLIN's be negotiated upon approval of the ASL or perhaps you could provide a list to develop pricing for this proposal.
Answer 21: As part of Amendment 0002 the ASL CLIN’s to To Be Negotiated (TBN).
Question 22: You’ve asked for your contract line item numbers to be priced at an hourly rate, with FOB Destination.
What about reimbursement for travel costs?
Answer 22: Travel will be reimbursed based on actual costs. CLIN 0088 for travel will be added to the solicitation as part of Amendment 0002.
Question 23: PSPL has yet to be developed and approved. We respectfully request you consider pricing this kit after approval.
Answer 23: As part of Amendment 0002 the PSPL CLIN to To Be Negotiated (TBN).
Question 24: Under Corrosion, you’ve mentioned Mil-Std-872. Is that correct? Or do you mean Mil-Std 810?
Exactly what procedure are you referring to?
Answer 24: MIL-STD-872 is not correct. MIL-STD-810 is correct. PPD for the System 3.5.7. See paragraph 4.6.7 of the System PPD for the specific section of MIL-STD-810, salt fog test.
Question 25: Under the main exhaust system you’ve mentioned the requirement is a minimum 150 CFM per linear
ft. Please clarify if that is under ACFM or SCFM?
Answer 25: SCFM
Question 26: Due to design and performance criteria relevant to the commercial kitchen equipment that is included in the battlefield kitchen, will the government consider a sole source supplier for the kitchen appliances, similar to the MBU sole source?
Answer 26: The Government does not have a finalized configuration for the appliances (burner or system) and cannot provide them as GFE (or from a sole source). The offeror is required to develop a plan for procuring appliances by whichever means they choose to be appropriate, meeting the all the terms of the contract. It is the government's strong desire to avoid follow-on sole source procurements for the appliances. The intention of the Government is to make future buys of the appliances, burners, and BK systems as full and open, competitive procurements.
Question 27: Does the contracting officer know of any developers/manufacturers that may be interested in partnering with a burner manufacturer?
Answer 27: The contracting officer does not have any insight possible teaming and partnering opportunities. This is something that offerors will work our during proposal preparation.
Question 28: Will Natick provide sample appliances for the use of burner manufacturers wishing to participate in the solicitation?
Answer 28: No, Appliances will be provided as GFP to the successful offeror.
Question 29: Government purpose license rights (GPR); Would the following statements be a correct interpretation if the offeror chooses not to price the CLIN 0024, GPR for the burner? “The penalty is twofold. The first is a monetary penalty that take place during the evaluation of the non offerors’ total evaluated price (TEP) . The penalty is the highest proposed price that any other offeror that prices the CLIN 0024 on their proposal will be added to price of the TEP for the non offeror. The second is any other non monetary penalty dictated in the evaluation approach “
Answer 29: Section M.3.9.6.3 was updated as part of amendment 0001. Please refer to the amended solicitation.
Question 30: Is it possible that the GPR could be limited to the US military only and all other markets available to the designer / manufacturer of the burner?
Answer 30: This requirement is for GPR and are limited as such.
Question 31: Is it expected that at the solicitation award stage, the successful offeror for the solicitation will be expected to, or are able to, invite or entertain, submissions from third parties that have interest in participating in the modular burner development?
Answer 31: During proposal preparation potential offerors could be working on teaming/partnering agreements.
This is not something the government can answer as we are unaware of what potential offerors are planning on proposing.
Question 32: Can we submit burners without the kitchen if the burners are appropriately dimensioned and designed?
Answer 32: No, the requirement in this solicitation is for a complete Battlefield Kitchen System.
Question 33: What do they contemplate for the negotiations to have full rights to the technology following the submission of the winning bid?
Answer 33: The Government desires Government Purpose License Rights (GPLR) to the data for the products to be delivered under the resultant contract. The Government Purpose Rights would provide a paid up, royalty-free License Agreement that conveys all intellectual property rights necessary to effect a complete competitive re-procurement of the product, manufacture and use thereof for a Government Purpose (as defined in DFARS clause 252.227-7013).
Question 34: How many burners do they contemplate would be the subject of the purchase and when do they contemplate such purchases would first occur.
Answer 34: The number of burners required can be projected from the quantity of burners required for each BK system and the range of BK that may be purchased during the ordering period in question. There is no firm requirement for the number of burners provided with each BK system so it is possible for the total quantity to vary based on each offerors proposed design.
Question 35: Are small businesses given an advantage in pursuing this contract?
Answer 35: This requirement is a small business set-aside.
Question 36: The Generator high temperature specification is not consistent with the Battlefield Kitchen high temperature requirement. Attachment B-3 (BK PPD) Section 3.5.1 states that the BK system must perform from - 25F to 125F. The mobile electric power, 3kW Tactical Quite Generation Set Appendix A, states the Generator is only rated from -25F to 120F. Will the Government waive any generator performance issues between 120F and 125F?
Answer 36: Yes
Question 37: A.1.1. Is the First Article Testing for the various components to be conducted at the same time?
Answer 37: Testing will be consolidated as much as practical so long as it will generate the necessary data for evaluation.
Question 38: Section B Item 0005 Have the burners already been tested?
Answer 38: Yes, they have been tested for firing rate, power, and compatibility with the appliances. To date the testing has been promising with minor issues; however, we do not have a formal test report suitable for release. The fact that we have not yet proven performance in all areas is the main reason we will consider and evaluate offers of alternate burners. We have just begun more formal testing at BNL that will evaluate the function as well as the long term performance. This testing is planned to conclude in approximately three months. It is the responsibility of the offeror to evaluate the solid model (and in essence, the design) of the modular burner and make the determination as to it suitability to this effort considering the evaluation criteria for award.
Question 39: Section B Item 0006 If burners have already been tested, is there a current test report?
Answer 39: See answer 38.
Question 40: Section B Item 0006 If burners have already been tested and current test reports are available, how would that affect the retesting and overlapping results?
Answer 40: Testing to date will not affect any testing associated with this developmental contract. It is not anticipated that any testing will be waived based on previous testing.
Question 41: Section B Item 0017 What is the purpose of this line (“Test Support for Developmental Testing”)?
Answer 41: During Government testing, Contractor support will be required for some anticipated tasks, and many that cannot be anticipated. An example of an anticipated task will be training personnel on the operation and maintenance of the equipment. The contractor may also be required when/if there is an issue with the technical documentation. Any circumstance where it would be more advantageous for the contractor to provide support as opposed to the government project office. See section C.2.17.
Question 42: Section B Item 0017: How will “Test Support for Developmental Testing” be used in the evaluation?
Answer 42: The information provide in an offerors Management Volume should support an offerors ability to provide Test Support for Developmental Testing CLIN 0017 is excluded from the TEP as stated in section M.3.9.6.1. of the solicitation.
Question 43: Section B Item 1009: What constitutes long term storage?
Answer 43: See C.3.10, after 90 days.
Question 44: Section B Item 1009: This section states that long term storage CLIN occurs after 90 days. What are the storage requirements prior to 90 days (days 1-89) if the units are not shipped?
Answer 44: The Contractor is required to store up to 90 days of production inventory.
Question 45: Section B Item 1009: At what point after production do kitchen components go into long term storage?
Answer 45: Components will not go into long term storage, only complete BK systems.
Question 46: Section C.1.12. Contractor Test Authorization: How are travel rates for testing to be priced?
Answer 46: Travel will be reimbursed based on actual costs. CLIN 0088 for travel will be added to the solicitation as part of Amendment 0002.
Question 47: Section L.10.1.2. Section II: Does the Government intend for the Offeror to include a complete “Section G Contract Administration Data” with its submission?
Answer 47: Yes, L.10.1.2. (b) which covers Section G was inadvertently left out of the solicitation. This will be updated in amendment 0002.
Question 48: Section L.10.1.2. Section II: Where should the Offeror include its completed “Section G Contract Administration Data”?
Answer 48: Offerors should include a completed Section G in Section II of the administrative volume. This will be spelled out in the solicitation when amendment 0002 is released.
Question 49: Section L.10.3.3. Can the Offeror propose the schedule included in Attachment 0003 BK Program Schedule/Planned Delivery Schedule (with modifications adding meetings events leading to data submittals, pre-production, manufacturing activities and contractor and government testing as needed) to meet the requirement of this section?
Answer 49: The offeror can propose the schedule of their choice and it will be evaluated according to the evaluation criteria.
Question 50: Attachment 0004 BK Data Rights Assertions List: What is the overall purpose of this attachment and form?
Answer 50: The overall purpose is for the government to see a detailed breakout of the proposed license rights for the entire effort. This completed form will help the government see exactly what rights are being offered for all commercial and non-commercial items.
Question 51: Attachment 0004 BK Data Rights Assertions List: How does the government desire for this to be completed?
Answer 51: Below is an example of how to complete attachment 0004.
CDRL: C001
CLIN: 0021
Data Item Title (Subtitle): BK Technical Data Package (TDP); Modular Appliances, Modular Burner, BK Platform.
License Rights: Government Purpose License Rights
SOW: C.5.
Question 52: Attachment 0004 BK Data Rights Assertions List: Please clarify what is needed in order to supply the correct information.
Answer 52: See answer to questions 51. If an offeror is offering Government Purpose License Rights for the entire BK System and all its Components then attachment 0004 can be completed by the offeror providing a statement that explains the offeror is providing Government Purpose License Rights for the entire BK System and all its Components.
Question 53: BK Attachment A-1 OMSMP Appendix G System Training Plan (STRAP) – PENDING: When will this appendix be made available?
Answer 53: Appendix G was unintentionally left attached to the OMSMP. Please disregard.
Question 54: BK Attachment B-3 PPD BK System: What is driving the weight requirement for the trailer?
Answer 54: The tow capacity of the vehicle minus a safety margin for future weight gain.
Question 55: BK Attachment B-3 PPD BK System : Is the weight requirement specifically limited to the vehicle towing the trailer?
Answer 55: The weight requirement is driven by the vehicle tow capacity, but not directly as there is a safety margin.
Question 56: BK Attachment B-3 PPD BK System : Can a different vehicle be used to tow the kitchen?
Answer 56: All requirement are based on the capabilities of the LMTV and all testing will be performed using the LMTV. The prime mover will not change. In actual use, other vehicles may tow the BK if they have a compatible interface and capacity (e.g. the MTV), but the prime mover will be the LMTV.
Question 57: BK Attachment B-3 PPD BK System: 3.2.8. Battlefield Kitchen major component layout: How many fire extinguishers will be required (quantity currently “TBD”)?
Answer 57: Three
Question 58: BK Attachment B-3 PPD BK System Section 3 Requirements 3.3.3.1. Main Exhaust System In reference to “Minimum capacity of 150 cu. ft. per linear feet” for the ventilation system, was this supposed to be 150 cfm?
Answer 58: More correctly, this should be 150 cfm/linear foot of vent hood. Determining the proper exhaust rate for appliances that do not require vent hoods (i.e. oven) will be the responsibility of the offeror.
Question 59: BK Attachment B-3 PPD BK System Section 3 Requirements 3.3.4.2. Blackout Light What is the upper limit for the wavelength of the red required for the blackout light?
Answer 59: The upper limit is when it is no longer visible.
Question 60: We are unclear on the scope of the Contractor Developmental Test Plan vs. the Government Developmental Testing Production Prove-out Test (PPT). Is the government’s intent to perform all Verification Testing per Section 4 of the PPDs twice, once by the contractor and once by the government?
Answer 60: It is the Government’s intention to perform testing sufficient to verify conformance to all of the requirements while using available funding efficiently. Redundancy will be eliminated as appropriate.
Question 61: Is it acceptable for the Contractor Developmental Testing to be performed only on high risk areas and on subcomponents as necessary to provide confidence that the system will pass the Government Developmental Testing?
Answer 61: The contractor should propose a test plan that they believe will give the government confidence that the items will pass Government testing as delivered.
Question 62: Question 3: Why does the Government, on a FFP contract, require CDRL C0002, Production Cost Breakdown – Actual Costs?
Answer 62: The information will be used for estimating the costs of future contracts.
Comment: C.1.3.2 – This RFP is for a two phase program with the completion of the design and then the production of prototypes and FAT’s. There appears to be no specified or guaranteed number of production units that will be ordered by the Government as a part of the procurement. This procurement appears to be an R & D effort with the Government retaining ownership and license rights (GPRL) to the design and engineering.
Question 63: We believe that this RFP structure puts potential bidders at a great deal of risk in making a decision to participate in this effort. Would the Government consider changing the solicitation to include issuing a multi-unit, multi-year production order for BK’s as identified in CLIN’s 1005, 2001, 3001, 4001, 5001?
Answer 63: The effort is initially to develop the BK. If successful, production options may be exercised. Bidders should carefully consider and factor risk into their proposals.
Question 64: In addition would the Government consider changing the solicitation to remove the evaluation penalty for not pricing the CLIN to grant the license rights for the design that is completed by the successful bidder remain the property of the awardee?
Answer 64: The Government desires to obtain Government Purpose License Rights (GPLR) to the data for the products to be delivered under the resultant contract. It is intended that the Government will receive Government purpose rights that enable a competitive procurement of the BK after the conclusion of a resultant contract. As a result of amendment 0001 section M.3.9.63 has been changed. There is no penalty for not providing GPR. The contractors cost and technical proposal will be evaluated as presented. There is an incentive adjustment for providing the GPR and technical data to support future full and open competitive contracts.
Question 65: C.1.3.3 - Reference is made to "delivery to Govt. after refurbishment" There is a requirement to correct deficiencies discovered during PPT, but there is no requirement for "refurbishment". What is the Government's intent? Should the prototypes be brought back to "like new" condition? Re-paint? clean? Recondition equipment?
Needs clarification.
Answer 65: C.1.3.3 was intended as a high level requirement. See paragraphs C.2.18 for more detail as to the purpose and nature of refurbishment.
Question 66: C1.3.5 - Is the on-site tech support only to address failures or does the Government have other expectations?
Answer 66: See section C.2.17 of the solicitation for the anticipated requirements of contractor on-site support.
Question 67: In reading Section L.10.4.1 and .2, one could read into it either: Up to five Past Performance citations for the Offeror (and Team) in total, or Up to five Past Performance citations for the Offeror, and then additional ones (up to five?) for Key Subcontractors. Which is correct?
Answer 67: Past performance will be limited to five (5) for each company providing over 30% of the work.
Question 68: Solicitation, L.10.1 VOLUME I ADMINISTRATIVE 146 L.10.1.5, Section V Financial Documentation: Will a summary page suffice for the Line of Credit information (considering these files are very large)? Or does the Government require full documentation, which amounts to over 100 pages?
Answer 68: A summary page is sufficient for the Line of Credit information.
Question 69: Solicitation L.10.4 VOLUME IV PAST PERFORMANCE L.10.4.2 Experience, Is the offeror limited to up to five (5) past performance contracts for the whole proposal, or can each company providing over 30% of the work effort submit up to five (5) contracts each?
Answer 69: Past performance will be limited to five (5) for each company providing over 30% of the work.
Question 70: The Online Representations and Certifications Application (ORCA) documentation required by this section is unavailable because the site has been replaced by the System for Award Management (SAM). In order to remain compliant with the solicitation requirements, will the Offeror’s printed FAR 51.219-1 Small Business Program Representations from SAM suffice as a substitute for the ORCA documentation?
Answer 70: The reference to ORCA was inadvertently included in the solicitation and will be removed in amendment 0002. SAM and section K of the solicitation are the representations and certifications that need to be completed by offerors.
Question 71: The Online Representations and Certifications Application (ORCA) documentation required by this section is unavailable because the site has been replaced by the System for Award Management (SAM). In order to remain compliant with the solicitation requirements, will the Offeror’s printed FAR 51.219-1 Small Business Program Representations from SAM suffice as a substitute for the ORCA documentation?
Answer 71: The reference to ORCA was inadvertently included in the solicitation and will be removed in amendment 0002. SAM and section K of the solicitation are the representations and certifications that need to be completed by offerors.
Question 72: For the Past Performance Volume, does the total of five past performance contracts include those of the prime and any subconsultants, or can the offeror send up to five for themselves and five for each sub?
Answer 72: Past performance will be limited to five (5) for each company providing over 30% of the work.
Question 73: Request the government to extend the submission deadline by a minimum of two weeks?
Answer 73: In amendment 0002 the proposal due date will be extended, see section A.1.5.
Question 74: Can the Government please grant a three week extension on the due date of this proposal to allow offerers sufficient time to incorporate answers to questions into their proposal and provide the thorough response the Government requires?
Answer 74: In amendment 0002 the proposal due date will be extended, see section A.1.5.
Question 75: Please extend the bid due date to July 5th.
Answer 75: In amendment 0002 the proposal due date will be extended, see section A.1.5.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 1006
The CLIN extended description has changed from:
See statement of work section C.3.7. Offerors shall propose their step-ladder pricing for this CLIN in section B.2.
Additional Pricing of the solicitation.
To:
See statement of work section C.3.7. Offerors shall not submit any pricing information for this CLIN. The price for this CLIN will be negotiated when the ASL is complete..
The cost constraint TBN has been added.
CLIN 1012
Production year 1 Initial Spares per PSPL (Non-Repair Items). See statement of work section C.3.13.
To:
Production year 1 Initial Spares per PSPL (Non-Repair Items). See statement of work section C.3.13. Offerors shall not submit any pricing information for this CLIN. The price for this CLIN will be negotiated when the PSPL is complete..
CLIN 2002
See statement of work section C.3.7. Offerors shall propose their step-ladder pricing for this CLIN in section B.2.
Additional Pricing of the solicitation.
To:
See statement of work section C.3.7. Offerors shall not submit any pricing information for this CLIN. The price for
CLIN 3002
See statement of work section C.3.7. Offerors shall propose their step-ladder pricing for this CLIN in section B.2.
Additional Pricing of the solicitation.
To:
See statement of work section C.3.7. Offerors shall not submit any pricing information for this CLIN. The price for
CLIN 4002
See statement of work section C.3.7. Offerors shall propose their step-ladder pricing for this CLIN in section B.2.
Additional Pricing of the solicitation.
To:
See statement of work section C.3.7. Offerors shall not submit any pricing information for this CLIN. The price for
CLIN 5002
See statement of work section C.3.7. Offerors shall propose their step-ladder pricing for this CLIN in section B.2.
Additional Pricing of the solicitation.
To:
See statement of work section C.3.7. Offerors shall not submit any pricing information for this CLIN. The price for this CLIN will be negotiated when the ASL is complete..
CLIN 0088 is added as follows:
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0088 Job Travel
FFP
Offerors shall not submit any pricing information for this CLIN. Travel is anticipated during the performance of this requirement. These costs cannot be accurately forecast at this time and are therefore awarded on a cost reimbursable basis and may be partially funded as indicated on the award document. Travel costs are limited to the constraints of FAR 31.205-46 and the Joint Travel Regulations.
All requests for travel must be submitted to the Contracting Officers Representative for approval at least 5 days prior to incurring costs. Travel will be reimbursed to the extent allowable pursuant to the Federal Travel Regulations
(FTR).
FOB: Destination
MAX
NET AMT
B.2. ADDITIONAL PRICING
B.2.1. Additional BK Developmental Prototypes Step-Ladder Pricing
CLIN 0013 (Additional BK Developmental Prototypes)
From: To: Unit Price:
1 2 3 5
B.2.2. Contractor Support Pricing (CLINS 0017, 1004, 1008, 2004, 3004, 4004 and 5004)
CLIN 0017 (Test Support for Developmental Testing)
Labor Categories
Proposed Fully Burdened
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
Engineer IV $
Engineer V $
CLIN 1004 (Contractor Test Support for IOT)
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
CLIN 1008 (Production Year 1 Contractor Support)
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
CLIN 2004 (Production Year 2 Contractor Support)
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
CLIN 3004 (Production Year 3 Contractor Support)
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
CLIN 4004 (Production Year 4 Contractor Support)
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
CLIN 5004 (Production Year 5 Contractor Support)
Hourly Rates
Technician I $
Technician II $
Technician III $
Technician IV $
Technician V $
Engineer I $
Engineer II $
Engineer III $
B.2.3. BK System Production Step-Ladder Pricing
CLIN 1005 (Production Year 1)
1 30 31 60 61 90 91 120 121 +
CLIN 2001 (Production Year 2)
31 60 61 90
CLIN 3001 (Production Year 3)
31 60 61 90
CLIN 4001 (Production Year 4)
31 60 61 90
CLIN 5001 (Production Year 5)
31 60 61 90
B.2.4. Long Term Storage Stepladder Pricing
CLIN 1009 (Production Year 1 Storage)
31 60 61 90
CLIN 2005 (Production Year 2 Storage)
31 60 61 90
CLIN 3005 (Production Year 3 Storage)
31 60 61 90
CLIN 4005 (Production Year 4 Storage)
31 60 61 90
CLIN 5005 (Production Year 5 Storage)
31 60 61 90
B.2.5. Modular Appliances and Accessories Pricing
CLIN 1011 (Production Year 1 Modular Appliances and Accessories)
Modular Burner
1 2 3 50 51 +
Modular Oven with Burner
1 2
Modular Griddle with Burner
Modular Cook top with Burner
1 2
Modular Steamer with Burner
1 2
Modular Tilt Skillet with Burner
1 2
Modular Refrigerator
1 2
Modular Hand Wash Sink
1 2
Ventilation Kit for dismounted Operation
1 2
CLIN 2007 (Production Year 2 Modular Appliances and Accessories)
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
CLIN 3007 (Production Year 3 Modular Appliances and Accessories)
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
CLIN 4007 (Production Year 4 Modular Appliances and Accessories)
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
CLIN 5007 (Production Year 5 Modular Appliances and Accessories)
1 2
1 2
1 2
1 2
1 2
1 2
1 2
1 2
SECTION E - INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0088:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
SECTION L
L.1. INTRODUCTION
L.1.1. This requirement is subject to the availability funds.
L.1.2 Offer expiration date is one hundred and eighty (180) days after the closing date of the solicitation.
L.1.3 Contractor Nondisclosure Agreements. The Government will utilize the contactors listed below to provide administrative support during the evaluation of proposals submitted in response to this RFP. These contractors are restricted by the "Organizational Conflict of Interest" provision of their respective contracts from participating as a contractor, sub-contractor, or consultant on the proposed program other than on a non-competitive basis under a prime contract with the Government. Each individual from these contractors will execute a "Certificate of Non- Disclosure" prior to review of the proposal. By submitting a proposal, the offeror agrees to permit the contractor(s) listed below to view proposal information to the extent necessary to provide administrative support to the Government's proposal review process.
Pursuant to FAR Part 9.505-4, and if requested by an offeror, the contractors listed below must execute an agreement with each offeror that states that they will protect the offeror's information from unauthorized use or disclosure for as long as it remains proprietary, and refrain from using the information for any purpose other than that for which it was furnished. To expedite the evaluation process, each offeror must contact the contractors to effect execution of such an agreement prior to the submission of proposals. Each offeror shall submit copies of the agreement with their proposal. The Agreements shall be attached to Volume I as an appendix, and will not be included in the page count. The list of contractors supporting this source selection is:
Kenneth Wade Evolutions Enterprises Inc.
Cost & Price Analyst (Contractor) Army Contracting Command- CCAP-SCN Aberdeen Proving Ground Natick Contracting Division General Greene Ave, Bldg 1 Room A307 Natick, MA 01760-5011 Email: kenneth.d.wade.ctr@mail.mil Commercial: 508-233-6165
DSN: 256-6165
L.2. PRE-AWARD SURVEY
L.2.1. A Pre-Award Survey may be conducted to examine the Offeror's record of integrity and business ethics (which includes satisfactory compliance with the law including tax, labor and employment, environmental, antitrust, and consumer protection laws), technical ability, production capacity, management structure, quality, financial capability, accounting systems, security controls/clearances, labor resources, performance record, and ability to meet required schedules.
L.3. PRE-CONTRACT COSTS
L.3.1. The Contractor shall not be reimbursed for any costs incurred prior to the effective date of the contract.
L.4. QUESTIONS CONCERNING THIS SOLICITATION
L.4.1. Questions concerning this solicitation shall be submitted to Sean Auld via email (Sean.G.Auld.civ@mail.mil) no later than 5:00 PM on Friday May 27th 2016 with a Subject Line of: “Questions: BK Solicitation W911QY-16- R-0004 - (Offeror’s Company Name). The questions shall be submitted as an email attachment in either a Microsoft Word or PDF format with the following document naming convention: “Questions: BK Solicitation W911QY-16-R- 0004 - (Offeror’s Company Name). The Government will not guarantee a response to any question and/or clarifications after the submission deadline.
L.5. PROPOSAL SUBMISSION
L.5.1. The proposals shall be complete, shall arrive by the date and time indicated, and shall undergo a review of proposal compliance with all instructions. The offeror shall refer to Section L (Instructions, Conditions, and Notices to Offerors) for proposal preparation. Non-conformance with the instructions in Section L may result in an unfavorable proposal evaluation. Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors or subfactors. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale.
L.5.2. Proposals shall be submitted in accordance with the instructions contained within this solicitation and shall arrive no later than date and time specified in this solicitation at the below address. Prior to hand delivering proposals offerors shall coordinate the delivery with Sean Auld via email at Sean.G.Auld.civ@mail.mil.
Army Contracting Command – Aberdeen Proving Ground Natick Contracting Division (CCAP-SCN) Natick B Branch ATTN: Sean Auld Subject: W911QY-16-R-0004 15 General Greene Avenue, Bldg 1, 3rd Floor Natick, MA 01760
L.5.3. Email and faxed copies of proposals shall NOT be accepted.
L.5.4. All proposals documents delivered in response to this solicitation shall reflect the following on the address label:
a. Solicitation Number
b. The legend shall state TO BE DELIVERED UNOPENED TO, Sean Auld Contract Specialist
c. The volumes and copy numbers in each box
L.5.5. Please do not submit a transmittal letter with your proposal. Such a letter is unnecessary and statements therein frequently create conflicts or ambiguities, raising the possibility that your proposal takes exception to the terms and conditions of the solicitation.
L.5.6. All cost or pricing information shall be addressed ONLY in the Cost/Price Proposal Volume.
L.6. DISCLOSURE OF PROPOSAL
L.6.1. Information contained in the Offerors technical, management or price proposal must be released under the Freedom of Information Act (5 U.S.C. 552) upon request from the public except to the extent it contains trade secrets and privileged or confidential commercial or financial information. If the Offerors proposal contains material meeting this description which is customarily maintained in confidence in the course of the Offerors business and is not otherwise publicly available and if the Offeror does not want it disclosed to the public, he shall mark the title page with the legend that follows:
"This proposal, furnished in response to Solicitation W911QY-16-R-0004, contains trade secrets and/or privileged or confidential commercial or financial information. This information is maintained in confidence in the course of the Offerors business and is not otherwise publicly available. The Offeror submits this information to the Government in confidence and understands that it is received with that intent. This information shall not be released or disclosed outside the Government under the Freedom of Information Act (5 U.S.C. 552) or under any other circumstances."
L.6.2. Proposals so marked will be accepted by the Government in confidence and will not be released provided that: The Offeror and/or the Government can show upon request under the Freedom of Information Act, that disclosure would either (1) impair the Government's ability to obtain necessary information in the future or (2) cause substantial harm to the competitive position of the Offeror.
L.7. DISCLOSURE OF UNIT PRICE INFORMATION
L.7.1. This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987) of our intention to release unit prices of the awardees in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the Contracting Officer is notified of your objection to such release prior to submission of initial proposals.
L.8. SEQUENCE OF EVENTS DURING PROPOSAL EVALUATION
L.8.1. The Government shall employ best value techniques to evaluate proposals, conduct negotiations, and determine the successful offer in this acquisition. "Offerors", for the purposes of this solicitation, shall be defined as a response to the solicitation that, if accepted, would bind the offerors to perform the resultant contract. The offerors can expect the following conditions and responses during proposal evaluation and negotiation:
L.8.2. Upon receipt, the proposals shall be reviewed for completeness and compliance with RFP requirements. The proposals shall receive a detailed evaluation employing the process and criteria identified in Section M of this RFP.
L.8.3. If the Contracting Officer decides that discussions with offerors are needed, a competitive range determination will be made. The competitive range will be comprised of all of the most highly rated proposals, unless the range is further reduced for purposes of efficiency. The Contracting Officer will notify offerors promptly in writing when their proposals are excluded from the competitive range or otherwise eliminated from the competition. That notice shall state the basis for the determination and that a proposal revision will not be considered.
L.8.4. THE GOVERNMENT INTENDS TO CONDUCT DISCUSSIONS BUT RESERVES THE RIGHT TO
AWARD A CONTRACT(S) BASED ON INITIAL SUBMISSION WITHOUT ORAL PRESENTATION,
EXCHANGES AND/OR DISCUSSIONS. Therefore, the Offeror’s initial proposal shall contain the Offerors best terms.
L.8.5. In accordance with FAR 15.306, the Government may conduct limited exchanges with offerors after receipt of proposals or award without discussions. Such exchanges shall not be used to cure proposal deficiencies or material omissions, materially alter the technical or price elements of the proposal, and/or otherwise revise the proposal.
L.8.6. In the event the Government conducts discussions, the Government shall render a competitive range determination and conduct discussions with only those Offerors remaining in the competitive range. In accordance with FAR 15.306(c), the competitive range shall consist only of those offers that are the most highly rated offers, however, in accordance with FAR Part 15.306(c)(2) the number of proposals in the competitive range may be limited for purposes of efficiency.
L.8.7. In the event a competitive range has been established, Offerors shall be prepared to enter into discussions. For those Offerors in the competitive range, the Government shall submit Discussion Items, which shall be answered by the Offerors.
L.8.8.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .