W16H1F210301EM PR 77716732 Statement of Work SOW.docx
DOCX document 34 KB Posted
- Attached to
- SPANCO CRANE RAILS & WELD JIBS
- Solicitation number
- W911PT-22-Q-0041
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W16H1F210301E5 PR 77716463 Statement of Work SOW.docx | DOCX document | |
| W911PT-22-Q-0041-U00001.pdf | ||
| PR 73007674 W16H1F11170048 Statement of Work SOW.docx | DOCX document | |
| W911PT-22-Q-0041.pdf | ||
| WD 15-4143 rev 20.txt | TXT text file | |
| W911PT-22-Q-0041.pdf | ||
| 75409180 (SOW).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
INSTALL ANTI-COLLISON SYSTEM ON THREE (3) CRANES BLDG 135
AT
Watervliet Arsenal Building 135
W16H1F210301EM / PR 77716732
Support Division (TAWV-ODR)
PART 1 GENERAL
1.01 Overview.
A. This Statement of Work (SOW) defines the effort required for the Installation of anti-collision systems provided by the Watervliet Arsenal on three (3) cranes (B109, B271 & B330) in bldg. 135
1.02 Hours of Operation.
1.03 General Requirements.
A. Work will be performed at the Watervliet arsenal facility, bldg. 135.
B. The contractor shall supply all tools, materials, supplies, equipment, labor, temporary utilities and supervision necessary for the complete execution of the requirements within the contract documents and requirements of this SOW.
C. The contractor shall, prior to submitting a proposal, review (i) all contract documents, and (ii) the project work site, and shall provide written notice to Contracting Specialist detailing any discrepancies that are found between the contract documents and the project work site.
1.04 Safety Requirements.
1.05 Period of Performance.
A. The contractor shall be required to (i) commence work under this contract within 7 calendar days after the date the contractor receives notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than [30] calendar days after notice to proceed was given. The time stated for completion shall include final cleanup of the premises.
1.06 Project Schedule.
1.07 Permits.
1.08 Equipment Identification.
1.09 Applicable Documents.
1.010 Submittals.
PART 2 PRODUCTS
2.01 General.
PART 3 ITEMS OF WORK
A. General.
The contractor shall coordinate with WVA personnel to gain access
Install anti-collision systems provided by WVA on three cranes B109, B271 and B330 located in Bldg 135
1. Install four (4) Magnetek LG2-H-4-25 Laserguard Systems on referenced cranes per manufacturer’s installation instructions.
1. Two (2) to be installed on B330 and one (1) each to be installed on B109 and B271
1. Settings for distance and slow down directions will be determined at time of installation.
1. Equipment furnished shall, except as otherwise noted, comply in all respects with the requirements of the following standards:
| *CMAA | Crane Manufacturer’s Association of America | |
| Specifications for Top Running Bridge & Gantry Type Multiple |
Girder Electric Overhead Traveling Cranes - No. 70 (2010)
*ANSI/ASME
American National Standards Institute/American Society of Mechanical Engineers ANSI/ASME B30.2 - 201 Overhead and Gantry Cranes (Top Running Bridge, Single or Multiple Girder, Top Running Trolley Hoist) OSHA Occupational Safety and Health Administration Part 1910.179 – Overhead and Gantry Cranes
| NEMA | National Electric Manufacturer’s Association |
| NEC | National Electric Code – 2014 |
*Compliance to this standard is limited to the extent such standard is incorporated into and made mandatory by OSHA regulations.
WARRANTY
Upon final acceptance of the systems, a Standard Commercial Warranty shall commence for duration of One Year, to include as a minimum, parts and labor for the duration of the warranty, at no cost to the Government. The one year period shall commence from the date of notification by the Contracting Officer of the final acceptance. Final acceptance is defined as the act of an authorized representative of the Government, by which the Government assumes ownership of existing supplies/equipment and/or approves specific services rendered, as partial or complete performance of the contract (i.e. testing, training, and delivery of all required technical documentation).
PART 1 CLOSEOUT REQUIREMENTS
1.01 Cleanup of Work Site.
1.02 Final Repairs and Restoration to Work Site.
PART 2 APPENDICES
A. Consolidated List of Submittals B. Quality Assurance Surveillance Plan (QASP)
APPENDIX A: Consolidated List of Submittals
| Line |
| Item Submitted |
| Submittal Needed By |
| Submittal Reviewed By (Office) |
| 1 |
| Safety Data Sheets for Hazardous Materials (SDS) |
| NLT 7 Calendar Days After Award |
| Safety Office |
| 2 |
| Signed Contractor Asbestos Notification Form |
| NLT 7 Calendar Days After Award |
| Environmental Office |
| 3 |
| Signed Lockout/Tagout (LOTO) Notification Acknowledgement Record |
| NLT 7 Calendar Days After Award |
| Safety Office |
| 4 |
| Project Schedule |
| NLT 7 Calendar Days After Award |
| COR |
| 5 |
| Contractor Safety Plan (1.05.A.) |
| NLT 7 Calendar Days After Award |
| COR |
APPENDIX B: Quality Assurance Surveillance Plan (QASP)
PURPOSE
This Quality Assurance Surveillance Plan (QASP) will be used as a guide to Government Quality Assurance Personnel (QAP). It provides a systematic method to evaluate the services the contractor is required to furnish.
SURVEILLANCE PROCEDURES
Timeliness: Progress is maintained to assure compliance with completion time.
Quality: Conformance with statement of work and industry standards.
Tasks: Performed according to statement of work requirements.
Problem Resolution: Contractor submits deliverables in accordance with the contract and resolves any deficiencies identified by the government in the final submission. Following final submission, contractor resolves any additional deficiencies identified by the government and resubmits and or corrects within one week.
Delivery: Contractor submits each deliverable in accordance with the statement of work and terms of the contract.
PERFORMANCE AREAS
Management Responsiveness: Evaluate the adequacy of the contractor’s responsiveness and their ability to keep the government informed of work progress and provides for early problem identification and effective corrective action plans.
Schedule Control: Evaluate the contractor’s adherence to completion schedule.
Performance: The contractor will be evaluated as to the workmanship and adherence to the statement of work.
EVALUATION CRITERIA
(Outstanding). Indicates performance clearly exceeds contractual requirements. The area of evaluation contains few minor problems for which corrective actions appear highly effective.
(Satisfactory). Indicates performance clearly meets contractual requirements. The area of evaluation contains some minor problems for which the corrective actions appear satisfactory.
(Unsatisfactory). Indicates the contractor failed to satisfy contractual requirements and recovery is not likely in a timely manner. The area of evaluation contains serious problems for which the corrective actions were ineffective.
DOCUMENTATION
Documentation used to perform surveillance will consist of random government inspections and inspection records, as well as the evaluation of final work product delivery by the project COR/COTR.
RATING
Contractor will be given an overall rating of Outstanding, Satisfactory, or Unsatisfactory by the Government Technical point of contact or Contracting Specialist Representative, if appointed, 3 using the above evaluation criteria.