75409180 (SOW).docx

DOCX document 16 KB Posted

Attached to
SPANCO CRANE RAILS & WELD JIBS Federal contract opportunity
Solicitation number
W911PT-22-Q-0041
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to SPANCO CRANE RAILS & WELD JIBS, newest first.
File Type Posted
PR 73007674 W16H1F11170048 Statement of Work SOW.docx DOCX document
W911PT-22-Q-0041-U00001.pdf PDF
W16H1F210301E5 PR 77716463 Statement of Work SOW.docx DOCX document
W16H1F210301EM PR 77716732 Statement of Work SOW.docx DOCX document
W911PT-22-Q-0041.pdf PDF
WD 15-4143 rev 20.txt TXT text file
W911PT-22-Q-0041.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK PR 75409180 / W16H1F129101ID

1. FURNISH AND INSTALL 28’ SECTION OF SPANCO CEILING MOUNTED MONORAIL TRUSS TRACK, CAPACITY 2,000 LBS. TRACK TO BE SUSPENDED FROM ROOF TRUSSES ON 25’ CENTERS WITH AN 18” CANTILEVER ON EACH END, MOUNTING – DROP MOUNT HANGER RODS 4” WITH TWO STANDRAD MOUNT DROP KITS TO ACCOMDATE FLANGE WIDTH OF EXISTING TRUSSES. BRACING TO BUILDING STEEL FOR LATERAL AND LONGITUDINAL STABILITY INCLUDED (4 SWAY BRACES). FESTOON HOIST AND CONTROL CABLE WILL BE INCLUDED.

2. PROVIDE ELECTRIC HOIST OR EQUIVALENT: COFFING, MODEL EC201632B, 460-3-60 POWER SUPPLY, 115V CONTROL VOLTAGE, 28’ – 0” LIFT, SUSPENSION – RIGID UPPER HOOK, LIMIT SWITCH – UPPER AND LOWER ROTARY LIMIT.

3. INSTALL RADIO REMOTE SYSTEM MAGNETEK FLEX-4EX2-09-2T: CONSISTING ON ONE (1) 110VAC RECEIVER, TWO (2) - TRANSMITTERS, WITH CAPABILITY TO CONTROL BOTH HOIST AND TROLLEY FUNCTIONS (2 SPEED FOR HOIST AND SINGLE SPEED FOR TROLLEY) WITH E-STOP/OFF/ON/START.

4. INSTALL TRL-460 - SPANCO MOTORIZED TROLLEY WITH CONTROL PANEL AND TOW BAR.

5. PROVIDE INTERLOCK MULTILEVEL CRANES (TO PREVENT LOWER TRACK CRANE FROM STRIKING HIGHER MONORAIL HOIST LOAD BLOCK OR LOAD CHAIN) - PUT MAIN LINE FUSED POWER DISCONNECT AND CONTACTOR IN AN ENCLOSURE FOR MOUNTING AT FLOOR LEVEL WITH 2 POSITION SELECTOR TO SELECT "LOW" OR "HIGH" MONORAIL - THE CONTACTORS ARE REVERSING CONTACTORS SO IT WILL ONLY BE 1 ENERGIZED AT A TIME. PROVIDE 30mm PUSH TO TEST INDICATING LIGHTS TO INDICATE WHICH IS POWERED. INCLUDE ANOTHER LIGHT TO INDICATE THAT THE LOAD BLOCK ON THE HIGH CRANE IS IN THE HIGH POSITION. BE INTERLOCKED WITH THE CONTACTOR FOR THE LOW CRANE, SO THAT THE CONTACTOR WILL NOT BE APPLIED TO THE MAIN RAILS OF THE LOW CRANE UNTIL THE HOOK ON THE HIGH CRANE IS IN THE HIGH POSITION.