Scope of Work Project Number: AD002495P
Construct Miscellaneous Paving Requirements
1. PROJECT NUMBER AND TITLE: AD002495P, Miscellaneous Paving Contract, Fort Hood, Texas.
2. DESCRIPTION OF WORK: THE CONTRACTOR shall provide all plant, supervision, labor, materials, equipment, supplies and transportation necessary to complete this scope of work. All work shall comply with all State, local and Federal laws and regulations, industry and construction codes and standards, manufacturer’s specifications and recommendations, and all contract special provisions, terms and conditions. The Contractor shall be responsible for obtaining all required licenses and permits to perform construction work on a Federal installation, be properly bonded and insured in accordance with FAR requirements and perform all necessary soil and compaction tests, and provide test results to the Government prior to continuing with construction.
b. The Contractor shall provide written verification of being in the normal business of road work and paving construction as a prime contractor for a minimum of 10 years performing new road construction, road resurfacing, and parking lot construction, utilizing the NAICS 237310, Highway, Street and Bridge Construction. The Prime Contractor's Project Manager, Superintendent, and Quality Control Manager must each have a minimum of ten (10) years of documented experience in road construction, and be knowledgeable of all aspects of industry codes and specifications. The Contractor’s Project Manager, Superintendents, and Quality Control Manager must be direct employees of the prime contractor and may not be the Contractor’s principal.
c. Work under the contract consists of the following tasks. This is a partial list, comprising the majority of work required under the contract; however, tasks omitted here may be identified and described elsewhere in the contract and bid schedule. Work may be performed at any location that is owned by the Fort Hood Reservation. Detailed specifications can be found in the Technical Exhibits.
- General pavement maintenance including but not limited to:
o thermoplastic or water-based striping o placement of raised reflective markers o placement of reflective beads o placement of traffic control devices
- Flexible pavement maintenance including but not limited to:
o construct new bituminous pavements;
o resurface existing pavements;
o surface treatment of existing pavements;
o removal of flexible pavements o cold milling of flexible pavements o cold mix asphalt patching o pulverization of flexible pavements
- Training facility maintenance including but not limited to:
o repair of existing gravel-surfaced tank trails o constructing new gravel surfaced tank trails o addition of asphalt stabilizer o constructing concrete low water crossings
- Earthwork including but not limited to:
o excavation with offsite haul o import of general and select fill material o reprocessing of existing base material o preparation, grading, and compaction of subgrade o placement and installation of riprap
- Landscape work including but not limited to:
o tree removal o land clearing o mulch, seed, or sod placement and soil stabilization o placement of landscape aggregate
- Concrete work such as:
o concrete pavement in roadways and motor pools o reinforced concrete retaining walls o concrete curbs and gutters o concrete erosion retard o concrete sidewalks o concrete headwalls o concrete box inlets/manholes o conventional, wire, or fiber reinforcement for concrete pavements) o resealing of joints in rigid pavements o removal of reinforced and unreinforced concrete
- Additional facility maintenance including but not limited to:
o Adjusting valve boxes/manholes to grade o Installing corrugated metal pipe o Installing corrugated metal pipe culverts o Installing reinforced concrete pipe
---END OF SCOPE OF WORK---