Solicitation No. W91151-16-B-XXXX
TECHNICAL EXHIBIT B SPECIFICATIONS
For Bidding purposes only
Headquarter III Corps, Fort Hood
Directorate of Public Works (DPW)
Technical Exhibit “A”
Open End Paving Contract
SPECIFICATIONS
Award Date: TBD
Contract No. W91151‐16‐B‐XXXX
Directorate of Public Works Engineering Division
US Army, III Corps 4612 Engineer Dr.
Fort Hood, TX 76544
DIVISION 1
Division 1 removed. See Technical Exhibit “G” for Division 1.
Series 000 (General Requirements)
Section Page Subject
001 (6 ) Performance Bond
002 ( 7 ) As-Built Drawings
003 ( 13 ) Miscellaneous Project Elements
004 ( 15 ) Surveying
Series 100 (Earth Work and Landscape)
Section Page Subject
101 ( 20 ) Saw Cutting
102 ( 22 ) Removal of Flexible Pavements
103 ( 24 ) Removal of Reinforced Concrete
104 ( 26 ) Rubbish Handling (Dumpster & Rental)
105 ( 28 ) Remove Pipe Culverts
106 ( 30 ) Cold Milling of Asphaltic Concrete
107 ( 33 ) Clear & Grubbing
108 ( 36 ) Fill Material (Importing from Off-Site, Compacted)
109 ( 43 ) Excavation (Exporting to Off-Site)
110 ( 49 ) Cut & Fill (Stays On-Site, Compacted)
111 ( 57 ) Landscape Aggregate
112 ( 58 ) Geotextile Material
113 ( 62 ) Plant Native 2” Texas Tree
114 ( 64 ) Top Soil with Seeding
115 ( 71 ) Erosion Control
116 ( 74 ) Herbicide
117 ( 76 ) Top Soil with Sodding
Series 200 (Subgrade Treatments and Base)
201 ( 81 ) Reprocess Existing Base (Plow/ Re-compact)
202 ( 86 ) Compact & Fine Grade Soil (Repair/ Prepare)
203 ( 91 ) Lime Stabilization (Stabilize In-Place Material)
204 ( 101 ) Washed Sand (Utility Bedding)
205 ( 102 ) Flexible Base Material (In-Place, Compacted)
Series 300 (Surface Courses and Pavement)
301 ( 107 ) Bituminous Prime and/or Tack Coat
302 ( 110 ) Hot-Mix Asphaltic Concrete
303 ( 127 ) Asphalt Stabilized Base
304 ( 149 ) Double Bituminous Surface Treatment
305 ( 155 ) Emulsified Asphalt Base Treatment
306 ( 158 ) Seal Coat Jennite A.E. (2 Coats)
307 ( 162 ) Concrete Pavement (Roadways & Motorpool)
308 ( 195 ) Reinforcement for Concrete Pavement
309 ( 198 ) Slurry Seal Surface Treatment (Type II)
310 ( 206 ) Fog Seal
311 ( 208 ) Pulverization (Full Depth Reclamation)
Series 400 (Structures)
401 ( 212 ) Rip Rap Rock (Installed)
402 ( 218 ) Wheel Stop Removal and/or Replacement
403 ( 220 ) Corrugated Metal Pipe Culverts
404 ( 224 ) Reinforced Concrete Pipe (Installed)
405 ( 230 ) French Drains (Installed)
406 ( 232 ) Beam Guard Fence (Installed)
407 ( 238 ) Valve Box Adjusted to Grade
408 ( 240 ) Manhole Adjusted to Grade
409 ( 242 ) Structural Steel Fabrication
410 ( 249 ) Detectable Warning Paver
Series 500 (Rigid Pavement)
501 ( 251 ) Miscellaneous Concrete
502 ( 257 ) Concrete Retaining Wall
503 ( 264 ) Concrete Curb & Gutter
504 ( 274 ) Concrete Sidewalk
505 ( 284 ) Concrete Headwall
506 ( 290 ) Concrete Box Inlet/Manhole
507 ( 297 ) High Strength Epoxy Concrete Patching
Series 600 (Signing, Markings and Signal Equipment)
601 ( 300 ) Permanent Signs (Installed)
602 ( 304 ) Delineators (Installed)
603 ( 306 ) Painting/Striping Marking Removal
604 ( 309 ) Pavement Marking Surface Preparation
605 ( 312 ) Pavement Stripping & Marking (Installed)
606 ( 318 ) Raised Reflective Markers on Concrete (Installed)
607 ( 322 ) Raised Reflective Markers on Asphaltic (Installed)
608 ( 326 ) Temporary Flexible Roadway Marker Tabs
Series 700 (Maintenance)
701 ( 328 ) Cold Mix Asphalt Patching
702 ( 330 ) Crack Seal (Cold Applied)
703 ( 333 ) Crack Seal (Hot Applied)
704 ( 336 ) Resealing of Joints in Rigid Pavement
SECTION 001
PERFORMANCE BOND
(LINE ITEMS: 001)
1. DESCRIPTION
A performance bond is a surety bond issued by an insurance company or band to guarantee satisfactory completion of a project by a contractor. Refer to Division 1 for greater detail, specifically in Section AA (Summary of Work) and Section CC (Submittal Procedures).
2. MATERIALS
(NOT SPECIFIED)
3. EQUIPMENT
4. CONSTRUCTION OR WORK METHODS
5. MEASUREMENT
The unit of measure for the performance bond will be Lump Sum (LS)
6. PAYMENT
Refer to the Measurement Section above.
--- END OF SECTION ---
SECTION 002
RECORD DRAWINGS
(LINE ITEMS: 002)
This item shall govern for the preparation and submittal of record drawings.
This Section covers the following line items:
002: Record Drawing
Record Drawings: Record drawings shall be a record of the construction as installed and completed by the Contractor. They include all the information reflected on the delivery order scope of work and a record of all deviations, modifications, or changes from the scopes of work, however minor, which were incorporated in the work; all additional work not reflected in the scope of work; and all changes which are made after final inspection of the delivery order work. The location and size of all uncharted existing utilities encountered, shall be included when specifically requested by the COR. In event the Contractor accomplishes additional work which changes the as-built conditions of the work after submission of the record drawings, the Contractor shall furnish revised and/or additional drawings, both hard copies and CADD files as required to depict as-built conditions. The requirements for these additional drawings will be the same as for the record drawings included in the original submission. CADD files shall conform to the CADD requirements of the Fort Hood CADD System and shall be demonstrated to work on the designated Government computer systems.
CADD files shall be error and virus free.
Submittal of Working Drawings: A copy of the working drawings which the Contractor has produced from the delivery order scope of work, shall be furnished to the Contracting Officer's representative prior to start of work on each delivery order.
The working drawings shall be generated from the Fort Hood CADD System. The CADD files will be provided to the Contractor in Bentley MicroStation Format. The working drawings shall be in enough detail to show the extent of the work required by the delivery order and shall show the following information, but not be limited thereto:
The location and description of any utility lines or other installation of any kind or description known to exist within the construction area. The location of known exterior utilities shall be shown by actual measured horizontal distances from utilities to permanent facilities or features. These measurements shown at sufficient points to permit easy location of utilities for future maintenance purposes. Measurements shall be shown for all change of direction points and all surface or underground components such as valves, manholes, drop inlets, cleanouts, meter, etc. The general depth range of each underground utility line shall be indicated. The description of exterior utilities includes the actual quantity, size, and material of utility lines.
Proposed grade or alignment of roads, structures or utilities.
Proposed elevations to the nearest tenth of a foot using a working bench mark as a basis.
The topography and grades of all drainage features to be installed or affected as a part of the project construction.
Submittals of Preliminary Record Drawings: For each delivery order, the Contractor shall, within 30 days after the final acceptance inspection, produce from the working drawings two sets of blue line or black line prints to show all requirements of the scope of work, all changes from the scope of work which are made in the work or additional information which might be uncovered in the course of construction, including uncharted utilities, shall be accurately and neatly recorded as they occur by means of details and notes. All changes and/or required additions to the preliminary record drawings shall be clearly identified in a color contrasting to the blue or black line drawings and which is compatible with reproduction of the preliminary record drawing. Blue or black line prints shall be full size, 22" by 34" image on 24" by 36" sheet.
Drawings shall be produced at a scale acceptable to the Contracting Officer. All blue or black line prints shall exhibit good readable print with clear, sharp, dark lines, and shall not be smeared, faded, double imaged, or have torn or ragged edges. The blue or black line drawings will be jointly inspected for accuracy and completeness by the Contracting Officer's representative and the assigned representative of the Contractor's Quality Control Organization prior to submission. If upon review, the drawings are found to contain errors and/or omissions, they will be returned to the Contractor for corrections.
Failure of the Contractor to make timely delivery of the preliminary record drawings on any or all items of work will be cause for the Government to delay substantial completion and to assess liquidated damages in accordance with the terms and conditions of the contract. The record drawings shall show the following information, but not be limited thereto:
The location and description of any utility lines or other installation of any kind or description known to or found to exist within the construction area.
The location of exterior utilities includes actual measured horizontal distances from utilities to permanent facilities/ features. These measurements shall be shown at sufficient points to permit easy location of utilities for future maintenance purposes. Measurements shall be shown for all change of direction points and all surface or underground components such as valves, manholes, drop inlets, cleanouts, meter, etc. The general depth range of each underground utility line shall be indicated.
The description of exterior utilities includes the actual quantity, size, and material of utility lines.
Correct grade or alignment of roads, structures or utilities if any changes were made from delivery order working drawings.
Correct elevations if changes were made in site grading.
Changes in details of design or additional information obtained from working drawings prepared by the Contractor including but not limited to fabrication, erection, installation plans and placing details, pipe sizes, insulation material, dimensions of equipment foundations, etc.
The topography and grades of all drainage installed or affected as a part of the project construction.
Final Record Drawings: Upon approval of the preliminary record drawings, the contractor will modify the original drawings as may be necessary to correctly show all the features of the project as it was constructed by bringing the contract set into agreement with the preliminary record drawings, including adding additional drawings as may be necessary. The original drawings are part of the permanent records of this project and the Contractor shall be responsible for the protection and safety thereof until returned to the Contracting Officer. Drawings or CADD files damaged or lost by the Contractor shall be satisfactorily replaced by the Contractor at the Contractor's expense.
Verifying the Accuracy of Measurement and Location of Site Location in reference to the Fort Hood Data Base:
The accuracy of the final record drawing shall be verifiable. There are two types of project site locations that are distinguished by their proximity to permanent facilities. One type of a project site location is in a location that is in eye contact with existing permanent facilities.
The other type of project site location is in a remote area without eye contact with existing permanent facilities. The following procedures shall be engaged such that accuracy of work and verification of site locations are verifiable.
Project Site Locations near Existing Permanent Facilities: Place a #3 bar, 6-inches in length, painted orange, flush with the ground at the perimeter of the work zone in a location that will not be disturbed. Employing an Electronic Distance Meter, reference this point by angel and distance to three building corners that are more than 90 degrees apart. Also, reference from the same reference point a minimum of ten distinct construction elements by distinctive points. A few examples are: north-east corner of headwall, back of curb, start of radius of curb return, center of cleanout, center of manhole, etc.
Project Site Locations in Remote Area not in eye contact with Existing Permanent Facilities: In this situation start at the nearest hard surfaced road that is identifiable on the Fort Hood Data Base.
Place two #3 bar, 6-inches in length, painted orange flush with the ground, 100 feet apart at a location that will not be disturbed. At each of these points place cross-ties to aide with relocating the points.
Employing an Electronic Distance Meter create a coordinate route to the project site location. At each turn in the coordinate route place a #3 bar painted orange flush with the ground at a location that will not be disturbed. Upon reaching the site location record the angle and distance to a minimum of ten distinct construction elements.
Drafting: Only personnel proficient in the preparation of engineering drawings shall be employed to prepare contract drawings and additional new drawings. All additions and corrections to the contract drawings shall be neat, clean, and legible and shall match the adjacent existing line work and/or lettering being annotated in type, density, size, and style. All drawings, modifications and new drawings shall conform to applicable requirements of the
Southwestern Division Architectural and Engineering Instruction Manual available from the DPW-Master Planning Office. The Contracting Officer will review all record drawings for accuracy and conformance to the above specified drafting and standards. The Contractor will make all corrections, changes, additions, and deletions required to meet these standards.
Title Blocks and Border Sheets: The title block and border sheet format to be used for any record drawings shall be as provided by the Government.
Final Revisions:
Title Block Additions: When final revisions have been completed, place the words "REVISED AS-BUILT DRAWING," in letters at least 3/16 inch high, and the date of completion in the revision block above the latest existing revision notation on each drawing CADD file. The contractor shall procure from the Government the applicable Drawing Management Index (DMI) numbers and place these numbers in the appropriate block of the title block. Also, drawings shall use the DMI# as the file name.
Copies of the Final Record Drawings: Blue line or black line prints shall be full size sheet; 22" by 34" image on 24" by 36" sheet. All blue or black line prints shall exhibit good readable print with clear, sharp, dark lines, and shall not be smeared, faded, double imaged, or have torn or ragged edges.
CADD Files:
Standards: The Contractor shall incorporate all information from the final record drawings into CADD files that conform to the CADD requirements of the Fort Hood CADD System and shall be demonstrated to work on the designated Government computer systems. CADD files shall be error and virus free. CADD files shall be provided on either compact disks (CD) or 3-1/2 inch diskettes.
Drafting Qualifications: Only personnel proficient in the preparation of engineering drawings and CADD shall be employed to prepare contract drawings, additional new drawings, and the CADD files. Furnish for approval the qualifications and experience of the personnel, and types of equipment and software, to be used for this work.
Modification of CADD files will not proceed until the resulting CADD files have been acceptably demonstrated to work on Fort Hood DPW CADD systems. CADD files shall conform to the Fort Worth District CADD Operating Procedures Manual available from the DPW-P&P Office. The Contracting Officer will review all CADD files for accuracy and conformance to the above specified drafting and standards.
The unit of measure recording drawings shall be for each (EA) project.
Drawings are to include surveyed information with elevations, angles, and distances. Where calculations are required rather than true point measure, surveying calculations should be stamped by a registered surveyor.
Payment shall be at the contract unit price per each (EA) per project for recording drawings.
SECTION 003
MISCELLANEOUS PROJECT ELEMENTS
(LINE ITEMS: 003)
This Section covers the following line items:
003: Miscellaneous Project Elements
Materials will be specific to the particular task order. Type of material used and submittals required will be determined and agreed upon before the task order is awarded.
When the Government determines that an existing line item does not adequately meet the specifications, intent, and/or pricing of a particular item of work; this Line Item may be used to ensure the Government receives the materials and/or services needed to complete the project. The Government will request the contractor submit a detailed cost estimate and break-out of the requested work to the Contracting Officer. The cost estimate will be reviewed by the Contracting Officer and Project Manager for accuracy. The scope of work and cost will be agreed upon by the Contracting Officer and the Contractor before the task order is awarded.
Examples of the type of work to be performed include but are not limited to the following:
Installing a different hot-mix design
Installing PVC piping in sizes other than the ones specified
Installing a specific size culvert or French drain other than the sizes specified.
Vegetative watering
The unit of measure for Miscellaneous Project Elements shall be by Lump Sum (LS), or percentage thereof, identified on the corresponding task order that is completed and accepted by the Contracting Officer.
The payment will be at the contract unit price.
SECTION 004
SURVEYING
(LINE ITEMS: 004.1, 004.2)
1. DESCRIPTION
This work consists of performing surveying, staking, calculating, and recording data for the control of work, surveying existing conditions and performing as-built surveys. See FAR Clause 52.236-16 Quantity Surveys (Alternate I) and 52.236-17 Layout of Work. Line items used to perform surveying tasks are set forth as the following:
004.1: Level 1 Survey: Project Control and Realignment
004.2: Level 2 Survey: Existing, As-built’s and Construction
2. QUALIFICATIONS
Conform to the following:
(a) Provide a crew supervisor on the project whenever surveying and staking are in progress.
(b) Provide technically qualified survey crews experienced in roadway and site construction surveying, as-built surveying and control surveying. Provide personnel capable of performing in a timely and accurate manner.
(c) Supervision by registered, professional land surveyor (RPLS) ONLY where survey control establishment is required or design adjustments regarding horizontal and vertical roadway realignment occur(Level 1 Survey). Supervision by an RPLS for survey work completed under the Level 1 line item may be submitted via a stamped, signed and dated field record book, report or drawing. Realignment is defined as the significant change in horizontal curve geometry beyond minor widening of roadways and a significant change in vertical geometry beyond minor elevation changes due to surface courses. All other surveying tasks are to be paid for under line item 004.2, Level 2 Survey.
Furnish survey instruments and supporting equipment capable of achieving the specified tolerances:
(a) Surveying Equipment
a. All surveying equipment shall be appropriately calibrated per the manufacturer’s guidance or according to the Texas Society of Professional Surveyors (TSPS) Manual of Practice prior to use on a government project.
b. The contractor shall furnish and use GPS enabled RTK base stations and rovers for all Level 2 surveys, or an approved alternate on a case by case basis.
c. The contractor shall furnish and use
(b) Material
Furnish acceptable tools and supplies of the type and quality suitable for roadway survey work. Furnish stakes, flags and hubs of sufficient length to provide a solid set in the ground with sufficient surface area above ground for necessary legible and durable markings.
a. Record survey and measurement field data in an approved format.
Submit as-staked data and corrections made to the Government with furnished survey data. Submit survey and measurement data on a weekly basis, unless otherwise approved by the Contracting Officer’s representative. Field data and supporting documentation become the property of the Government upon completion of the work.
b. Data relating to horizontal and vertical alignment, theoretical slope stake catch points, and other design data will be furnished, at the discretion of the Government. Reformatting and additional calculations may be required for the convenient use of the Government-furnished data. Provide immediate notification of apparent errors in the initial staking or in the Government-furnished data.
c. Acceptance of the construction survey staking does not relieve the Contractor of responsibility for correcting errors discovered during the work and for bearing additional costs associated with the error.
d. Maintain legibility of stake markings for the duration of the project or until notified in writing the stakes are no longer needed. Replace stakes if necessary to ensure markings are maintained.
e. Remove and dispose of flagging, paint, lath, stakes, and other staking material after the project is complete.
(a) Permanent Survey Benchmarks (Level 1 Survey, only)
Where required, the Government shall supply survey benchmark monument discs. If directed, the contractor shall place the survey bench mark at a project location, set within concrete or a hard, durable and immovable surface according to the TxDOT Survey Manual, section ‘C’ Monumentation.
The Contractor shall submit GPS solution coordinate information to the National Geodetic Survey Online Positioning User Service (NGS OPUS) and furnish the benchmark data sheets to the project’s contracting officer’s representative.
(b) Control Points (Level 1 Survey, only)
Contractor shall place control points, where needed. Relocate initial horizontal and vertical control points in conflict with construction to areas that will not be disturbed by construction operations. Furnish the GPS coordinates, elevations, and supporting documentation for all control points to the contracting officer’s representative. Set durable monuments for survey control that uniquely identify the points.
(c) Centerline Establishment
Establish or reestablish centerline at roadway design cross-section locations and as necessary to construct the work. Reestablish the centerline when construction survey and staking work does not meet the tolerances.
(d) Original Ground, Topographic and As-built Surveying (Level 2 Survey, only)
The contractor shall furnish electronic CADD data (‘.DWG’ or ‘.DGN’ format) and survey point northing, easting and elevation data in ‘.CSV’ or ‘.TXT’ format to the Government. Survey data shall include, but not limited to the following:
a. Roadway edge, centerline and curb locations
b. Drainage features (culvert invert elevations, ditches, headwalls, outlets, inlets, etc.)
c. Signage locations and descriptions
d. Apparent utility locations (utility poles, manholes, utility vaults, etc.)
(e) Culverts.
Verify and set culvert locations at the inlet, outlet, and inlet basin points according to the plans. Perform the following if culvert design does not fit field conditions:
(1) Survey and record the ground profile along the culvert centerline;
(2) Determine the slope catch points at the inlet and outlet;
(3) Set reference points and record information necessary to determine culvert length and end treatments;
(f) Miscellaneous survey and staking.
Survey and stake other work (such as guardrail, curb and gutter, turf establishment, utilities, and excavation limits for structures) to the proper location and required tolerances.
Table 004-1 Construction Survey and Staking Tolerances (1)
Staking Phase Horizontal Vertical
Control points set from existing Government control points or Benchmarks
±0.03 feet
±0.01 feet × N (1)
Mapping, topography, and cross-section points
±0.16 feet
Centerline points (2) including
(PC), (PT),
(POT),(POC), and references
±0.06 feet
Slope-stake and slope-stake references (3)
Culverts, ditches, and minor drainage structures stakes
Retaining walls stakes ±0.06 feet
Curb and gutter stakes ±0.06 feet
Clearing and grubbing limit stakes
±1.00 feet
Roadway subgrade finish stakes (4)
Roadway finish grade stakes (4) ±0.16 feet
(1) N is the number of instrument setups.
(2) Centerline points: PC - point of curve, PT - point of tangent, POT - point on tangent, POC - point on curve.
(3) Take the cross-sections normal to the centerline ±1 degree.
(4) Includes ditches
Surveying will be measured and paid by the acre (AC) of surface area for the following types of surveys:
004.1: Level 1 Survey: Project Control and Realignment
004.2: Level 2 Survey: Existing, As-built’s and Construction
9. PAYMENT:
The work performed in accordance with this specification and measured as provided under "MEASUREMENT" will be paid for at the unit price for the extent of work shown on plans or specified in scope of work.
SECTION 101
SAW CUTTING
(LINE ITEMS: 101.1, 101.2, 101.3 & 101.4)
Line items used to perform Saw Cutting through Asphalt and Concrete Pavements
Under this item, the contractor shall saw cut existing asphalt pavement, concrete pavement, asphalt surface course, or asphalt concrete overlay on concrete pavement at the locations indicated on the plans:
101.1: Asphalt to 3” Depth
101.2: Additional 1” (Asphalt)
101.3: Concrete to 3” Depth
101.4: Additional 1” (Concrete)
Existing pavement and overlay shall be saw cut perpendicular to the roadway surface along neat lines, and to the depth indicated on the plans and typical sections. A power saw approved by the COR shall be used for cutting asphalt surface course and asphalt overlay. A power saw shall be used for cutting concrete pavement. After the existing asphalt pavement, concrete pavement, asphalt surface course or overlay has been saw cut through, the contractor may use pry bars, pneumatic tools or other methods approved by the Contractor Officer’s Representative (COR), to pry loose the existing pavement from that pavement which is to remain. A pavement breaker, under the supervision of the COR, may be used to break up the pavement to be removed after the pavement has been completely saw cut through and completely free from the pavement to remain.
Any existing pavements and curbs not indicated to be removed that are damaged by the contractor's operations, shall be repaired by him to the satisfaction of the Contracting Officer.
The unit of measure for saw cutting shall be determined by linear foot.
The number of feet of saw cutting done in accordance with the plans, typical sections and the directions of the Project Manager.
The unit price bid per feet of saw cutting shall include the cost of all labor, materials, and equipment necessary to complete the work.
Payment for removal and disposal of cut pavement shall be paid for under the appropriate excavation item.
The unit of measure for saw cutting shall be determined by linear foot, once the work is completed work will be accepted by the Contracting Officer.
SECTION 102
REMOVAL OF FLEXIBLE PAVEMENTS
(LINE ITEMS: 102)
Line item used to perform the Removal of Flexible Pavements
102.1: Removal of Flexible Pavements, to 4” Depth
102.2: Removal of Flexible Pavements, Beyond 4” Depth
All existing material shall be completely removed or an existing layer shall be removed as necessary for construction of new paving, transitional areas, and for other construction operations requiring removal. Edges to be matched to new and/or existing construction shall be saw cut, this is required for flexible pavements. Existing reinforcing steel at the junction of new and partially removed old concrete shall be incorporated into the new construction where applicable. All bituminous materials binder and aggregate shall be thoroughly removed. Any damage occurring to surfaces of pavements to remain due to Contractor's operations shall be repaired at the contractor’s expense. Removal shall be by approved methods, and the materials removed shall be disposed of as directed by the Contracting Officer’s Representative. Material shall be segregated and disposed of by type. Please see Technical Exhibit “G,” Section LL (Environmental Protection) for further details.
102.1 - The unit of measure for removal of the first four inches of depth of flexible pavement shall be the square yard.
102.2 – The unit of measure for removal of flexible pavement for depths greater than four inches shall be the cubic yard.
102.1 - Payment shall be at the contract unit price per square yard for removal of flexible pavement for the first four inches of depth.
102.2 – Payment shall be at the contract unit price per cubic yard for removal of flexible pavement beyond four inches deep.
SECTION 103
REMOVAL OF REINFORCED CONCRETE
(LINE ITEMS: 103)
Line item used to perform the Removal of Reinforced Concrete
103: Removal of Reinforced Concrete shall be removed as necessary for construction of new paving, transitional areas, and for other construction operations requiring removal. Edges to be matched to new and/or existing construction shall be saw cut; this is required for concrete pavements. Existing reinforcing steel at the junction of new and partially removed old concrete shall be incorporated into the new construction where applicable. All concrete and reinforcing steel shall be thoroughly removed. Any damage occurring to surfaces of pavements to remain due to Contractor's operations shall be repaired at the contractor’s expense. Removal shall be by approved methods, and the materials removed shall be disposed of as directed by the Contracting Officer’s Representative. The concrete that is removed must be broken down into pieces no larger than 3 feet by 3 feet.
Protruding steel is not acceptable, the steel must be cut off flush with the concrete. Material shall be segregated and disposed of by type.
Please see Technical Exhibit “G,” Section LL (Environmental Protection) for further details.
The unit of measure for removal of reinforced concrete (all types) shall be the cubic yard.
Refer to the Measurement Section above.
SECTION 104
RUBBISH HANDLING
(LINE ITEMS: 104)
Line item used to perform the Rubbish Handling
104: Rubbish Handling (Dumpster & Rental) shall be removed as necessary for construction of new paving, transitional areas, and for other construction operations requiring removal. Edges to be matched to new and/or existing construction shall be saw cut, this is required for flexible pavements as well as concrete pavements. Existing reinforcing steel at the junction of new and partially removed old concrete shall be incorporated into the new construction where applicable. All concrete, bituminous materials, binder, aggregate, and reinforcing steel shall be thoroughly removed. Any damage occurring to surfaces of pavements to remain due to Contractor's operations shall be repaired at the contractor’s expense. Removal shall be by approved methods, and the materials removed shall be disposed of as directed by the Contracting Officer’s Representative. The concrete that is removed must be broken down into pieces no larger than 3 feet by 3 feet. Protruding steel is not acceptable, the steel must be cut off flush with the concrete. Material shall be segregated and disposed of by type. Please see Technical Exhibit “G,” Section LL (Environmental Protection) for further details.
The unit of measure for the removal of assorted debris shall be by the day.
Payment shall be at the contract unit price per day for rubbish handling.
Unit item includes all labor and equipment expenses associated with relocating debris, placing debris in the dumpster, dumpster rental, and hauling off the dumpster. The dumpster is to be hauled off a maximum of two times per week.
SECTION 105
REMOVE PIPE CULVERT
(LINE ITEMS: 105.1, 105.2 & 105.3)
Remove, transport, clean, and re-lay existing culvert and storm drain pipe.
Line item used to perform the Removal of Pipe Culverts
105.1: Less than 36” Diameter
105.2: 36” Diameter or Greater
105.3: Clean Out Clogged Culverts
References: Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TSDHSB), 2004 - in its entirety.
TSDHSB Item 460 Protective Coating
TSDHSB Item 480 Cleaning Existing Culverts
Bituminous coating must meet the requirements of Item 460(TSDHSB), “Protective Coating.”
Culvert and storm drain pipe to be removed will be shown on the plans.
Remove debris and sediment within the culvert and storm drain pipe.
Clean joints to facilitate proper re-laying. Install concrete pipe in accordance with Section 404, “Reinforced Concrete Pipe (Installed).”
Install corrugated metal pipe in accordance with Item 403, “Corrugated Metal Pipe Culverts.” Excavate, bed, and backfill in accordance with Section 109, “Excavation” Prevent damage to the pipe and fittings. Make connections as shown on the plans and in conformance to the requirements for connections as described in pertinent pipe specifications. Connect reinforced concrete pipe to corrugated metal pipe with a suitable concrete collar having a minimum thickness of 4
in. or as shown on the plans. Use a coating of bituminous material to insulate portions of aluminum pipe that are to be in contact with metal other than aluminum. Extend coating 1 ft. minimum beyond area of contact. Mark the top and bottom of reinforced concrete pipe before removal and reinstall in the same position. If shown on the plans, reuse headwall, aprons, or other appurtenances by severing from the culvert and moving to the new position. Make connections for joining sections of pipes in accordance with pertinent sections.
At all times pipes shall be cleared or installed in a manner which ensures positive flow.
If items designated for reuse are damaged by the Contractor, replace them with new material or restore them to previous condition, as approved. The Contractor may remove and dispose of existing structures and construct new structures at no expense to the Government in accordance with pertinent specifications and designs shown on the plans or as approved.
For waste disposal please see Technical Exhibit “G,” Section LL (Environmental Protection) Section 3.9.3 Fort Hood Landfill.
Removal of pipe (all types) shall be paid by the linear foot of pipe removed. The cleaning out and repair of clogged culverts will be measured by each culvert regardless of size or length.
Line Item 105.1: Less than 36” Diameter (LF)
Line Item 105.2: 36” Diameter of Greater (LF)
Line Item 105.3: Clean Out Clogged Culverts (EA)
Payment shall constitute full compensation for all labor, equipment, disposal and incidentals to the removal.
SECTION 106
COLD MILLING OF ASPHALTIC CONCRETE
(LINE ITEMS: 106.1, 106.2 & 106.3)
This specification shall govern for milling/planning of existing asphaltic pavement in accordance with the requirements herein.
Line item used to perform Cold Milling of Asphaltic Concrete pavements
106.1: 0 to 2” Depth
106.2: >2” to 3” Depth
106.3: >3” to 4” Depth
The equipment for removing the pavement surface shall be a power operated planing machine with a minimum six foot cutting width. For detail work and for cutting widths less than six feet, equipment with less than six foot cutting widths will be allowed. The equipment shall be self-propelled with sufficient power, traction and stability to maintain accurate depth of cut and slope. The equipment shall be capable of cutting four inches of asphaltic concrete pavement in one continuous operation.
Grade Control System: The equipment shall be equipped with an approved automatic dual longitudinal grade control system and a transverse control system. The longitudinal controls shall be capable of operating from any longitudinal grade reference, including string line, ski, mobile string line, or matching shoe. The transverse controls shall have an automatic system for controlling cross slope at a given rate.
Grade Reference: The grade reference used by the Contractor may be of any type approved by the Contracting Officer. Control points shall be established for the finished profile. These points shall be set at intervals not to exceed 50 feet. Therefore the Contractor shall set the grade intervals not to exceed 50 feet The Contractor shall set the grade reference from the control points. The grade reference shall have sufficient support so that the maximum deflection shall not exceed 1/8-inch between supports.
Manual System: The machine shall have a manual system providing for uniformly varying the depth of cut while the machine is in motion, thereby making it possible to cut flush to all inlets, manholes, or other obstructions within the paved area.
Loading and Reclaiming: The machine shall be equipped with integral loading and reclaiming devices to immediately remove material being cut from the surface of the roadway and discharge the cuttings into a truck, all in one operation. The machine shall be equipped with devices to control dust created by the cutting action.
Street Sweeper: A street sweeper equipped with a water tank, spray assembly to control dust, a pick-up broom, a gutter broom, and a dirt hopper shall be required. The street sweeper shall be capable of removing cuttings and debris from the planed pavement.
The pavement surface shall be removed for the length, depth and width and to the typical section shown on sketches or plan drawings and to the line and grades established.
Milling/Planning Regions: The intent is that the milling/planning regions will be from the centerline of road to the curb line or on top of existing curb. There will be other regions required such as radius turn-outs at intersecting streets.
Removal of Milled Material: Material that is removed shall be transported in accordance with division 1 requirements. The KO or COR may designate a closer disposition location on a case by case basis.
Material that is removed shall be stockpiled at a specified location within a 10-mile radius of the project site. The Contracting Officer Representative will provide the specified location. The material shall be stockpiled in such a manner to prevent segregation or contamination.
Preparation of Surface: The pavement surface shall be cleaned of excessive dirt, clay, or other foreign material immediately prior to milling/planning the pavement and at the end of each work day.
Weather Limitations: Milling/Planning shall not be performed while raining or if there is accumulation of snow or ice on the pavement surface. The contractor will wait till the pavement surface is dry before beginning/continuing the operation.
Traffic Control: Reference Division 1, Summary of Work, Section 1.4 paragraph 1.4.1.
Underlying Portland Cement Concrete Surface: When removing an asphaltic concrete pavement from an underlying Portland cement concrete surface, all of the asphaltic concrete pavement shall be removed.
Vertical Longitudinal Face: Any vertical or near vertical longitudinal face exceeding 1-1/4 inches in height in the pavement surface open to traffic at the end of a work period shall be sloped a minimum of 1V:3H fillet. Transverse faces that are present at the end of a work period shall be tapered. Transitions between different depths of cut and at the beginning/end of a mill shall be 0.5 inch for every 10ft.
Removing asphaltic Concrete Adjacent to Obstructions: Pavement that is not removed by the planning machine adjacent to steep curbs, inlets, manholes or other obstructions shall be removed by other methods.
Grade: The finished milled/planed surfaces shall conform to the lines, grades, and cross sections indicated. The finished milled-pavement surfaces shall vary not more than 0.06 foot from the established plan grade line and elevation. Finished surfaces at a juncture with other pavements shall coincide with the finished surfaces of the abutting pavements.
Surface Smoothness: Finished surfaces shall not deviate from the testing edge of a 12-foot straightedge more than 1/4-inch in the transverse or longitudinal direction.
Milling/Planing of pavement will be measured by the square yard of surface area for the various ranges of depths shown on the plans or sketches. Square yard calculations will be based on the neat dimensions shown on the plans or sketches.
Depth: Measurement will be based on the range of depth:
Line Item 106.1: 0 to 2-inch depth as shown for each bid item regardless of the number of passes required.
Line Item 106.2: >2-inch to 3-inch depth as shown for each bid item regardless of the number of passes required.
Line Item 106.3: >3-inch to 4-inch depth as shown for each bid item regardless of the number of passes required.
The work performed in accordance with this specification and measured as provided under "MEASUREMENT" will be paid for at the unit price for the range of depth shown on the plans or sketches. This price shall be full compensation for removing all material to the depth shown, loading, hauling, unloading, and satisfactory stock piling of the material, for all sweeping, and for all, labor, tools, and equipment.
SECTION 107
CLEARING & GRUBBING
(LINE ITEMS: 107.1, 107.2, 107.3 & 107.4)
Clearing shall consist of the felling, trimming, and cutting of trees into sections and removal. Areas of light brush, shrubs, and other vegetation that can be cut with a brush, scythe, or mowing machine shall not be measured for clearing as this work shall be considered incidental for bid items associated with earthwork.
Line item used to perform the Clearing and Grubbing including: <3-Inch diameter, 3-Inch to 7-Inch, Per Tree 3 to 7 Inch diameter and Per Tree 8 Inch or Larger diameter.
107.1: Clearing & Grubbing <3” Diameter
107.2: Clearing & Grubbing 3” to 7” Diameter
107.3: Per Tree 3” to 7” Diameter
107.4: Per Tree 8” or Larger Diameter
Trees, including stumps to a minimum depth of one foot below grade or as necessary to provide access for repairs, shall be carefully removed to avoid damage to surrounding areas where the repairs are being done.
As soon as repairs are complete, the area shall be made to match surrounding surface conditions (turf if necessary).
Disposal of Materials: Trees and stumps shall be brought to the Fort Hood Compost Center or as otherwise directed by the Contracting Officer Representative. Tree roots shall be free of dirt. Please see Technical Exhibit “G,” Section LL (Environmental Protection) Section 3.9.3 Fort Hood Landfill Use for further details. Clearing debris (LCD) shall be taken to the Fort Hood Compost Center for disposition. Tree trunks and limbs shall not exceed 4 feet in length. Root balls shall be free of dirt. Submittals: Verifiable measurements of trees or acres of trees to be removed shall be submitted for approval prior to the removal.
Submittals: Verifiable measurements of trees or acres of trees to be removed shall be submitted for approval prior to the removal.
Clearing shall be measured by the Contractor and shall be verifiable.
The measurements shall be submitted for approval prior to the accomplishment of work.
Line Item 107.1: Less than 3-inches in diameter - Measured Per Acre.
Line Item 107.2: 3-inches to 7-inches in diameter - Measured Per Acre.
Measured Tree Removal: When scattered removal of trees will prove less expensive for the Government, the Contractor shall submit for approval verifiable measurements of individual trees for the measurement categories below:
Line Item 107.3: 3 to 7-inches In Diameter – Measured Per Tree (Each).
Line Item 107.4: 8-Inches Or Larger In Diameter - Measured Per Tree (Each).
Payment for Clearing will be made at the contract unit price for bid Item Clearing under the applicable sub - Item Measured Acre Tree Removal or by diameter of individual tree under sub-item Measured Tree Removal.
SECTION 108
FILL MATERIAL (IMPORTING FROM OFF-SITE, COMPACTED)
(LINE ITEMS: 108)
This line item includes relocation of material to job site by hauling.
Line item used to install compacted Fill Material
108: Fill Material (Importing from Off-Site, Compacted)
Definitions:
Satisfactory Materials shall comprise any materials classified by ASTM D 2487 as GW, GP, SW, GM, GC, SC, SP, SM, CL, and CH.
Unsatisfactory materials shall comprise any materials classified by ASTM D 2487 as Pt, OH and OL.
Cohesionless materials include materials classified in ASTM D 2487 as GW, GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are non-plastic. Testing required for classifying materials shall be in accordance with ASTM D 4318, ASTM C 136, ASTM D 422, and ASTM D 1140.
Degree of compaction required is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D 1557, Method C.
This will be abbreviated below as a percent of laboratory maximum density.
References: The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)
ASTM C 136 (2006) Sieve Analysis of Fine and Coarse Aggregates
ASTM D 422 (1963; R 2014) Particle-Size Analysis of Soils
ASTM D 1140 (2000; R 2006) Amount of Material in Soils Finer than the No. 200 (75-um) Sieve
ASTM D 1556 (2007) Density of Soil In Place by the Sand-Cone Method
ASTM D 1557, Method C (2012) Moisture-Density Relations of Soils and Soil-Aggregate Mixtures
ASTM D 2167 (2008) Density and Unit Weight of Soil In-Place by the Rubber Balloon Method
ASTM D 2487 (2011) Classification of Soils for Engineering Purposes
ASTM D 6938 (2010) Density of Soil and Soil-Aggregate In Place by Nuclear Methods (Shallow Depth)
ASTM D 2937 (2010) Density of Soil in Place by the Drive-Cylinder Method
ASTM D 3017 (2005) Moisture Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth)
ASTM D 4318 (2010; E 2014) Liquid Limit, Plastic Limit, and Plasticity Index of Soils
Compacted Fill: Grading shall be in conformity with the typical sections shown and the tolerances specified in paragraph "Finishing."
Selection of Borrow Material: Borrow material shall be selected to meet the requirements and conditions of the particular fill or embankment for which it is to be used, for each individual task order. Borrow material shall be obtained from the borrow areas that are within reservation boundaries and specifically identified as borrow pits by the Directorate of Public Works. The contractor shall, in addition to obtaining a dig permit, complete borrow material request form DPW Maintenance Division, Roads and Grounds and submit to the COR for documentation and approval prior to the excavation of borrow material. Borrow material, from approved areas on the installation, may be obtained without payment of royalties.
Unless specifically provided, no borrow material(s) shall be obtained within the limits of the project site without prior written approval of the COR.
Necessary clearing, grubbing, satisfactory drainage, haul route(s) cleanness, reclamation of borrow pits, and the disposal of debris thereon shall be considered related operations of the borrow excavation and shall be performed as required by the Contractor at no additional cost to the Government. Additionally, any violation of the conditions set in Section “Selection of Borrow Material” will lead to the complete termination of access to borrow material from within the installation boundaries and the contractor will be responsible to provide borrow material from off-post for the contract negotiated price.
Compacted Backfill: All backfill, including backfill adjacent to any and all types of structures, shall be placed and compacted to at least 90 percent laboratory maximum density for cohesive materials or 95 percent laboratory maximum density for cohesionless materials as tested by Method C, ASTM D1557, in such a manner as to prevent wedging action or eccentric loading upon or against any structure. The material shall be placed in successive horizontal layers of loose material not more than 8 inches in depth uncompacted. Ground surface on which backfill is to be placed shall be prepared as specified in paragraph "Preparation of Ground Surface for Fill." Compaction requirements for backfill materials shall also conform to the applicable portions of paragraphs "Preparation of Ground Surface for Fill," "Fill," and "Subgrade Preparation," below and Section 109 Excavation. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, vibratory compactors, or other approved equipment well suited to the material being compacted, to a minimum of four passes.
Preparation of Ground Surface for Fill: Ground surface on which fill is to be placed shall be stripped of live, dead, or decayed vegetation, rubbish, debris, and other unsatisfactory material; plowed, disked, or otherwise broken up; pulverized; moistened or aerated as necessary;
thoroughly mixed; and compacted to at least 90 percent laboratory maximum density for cohesive materials or 95 percent laboratory maximum density for cohesionless materials as tested by Method C, ASTM D1557. Compaction shall be accomplished by sheepsfoot rollers, pneumatic-tired rollers, vibratory compactors, or other approved equipment well suited to the material being compacted, to a minimum of four passes. The prepared ground surface shall be scarified and moistened or aerated as required just prior to placement of embankment materials to assure adequate bond between embankment material and the prepared ground surface.
Fill: Fill shall be constructed from satisfactory materials free of organic or frozen material and rocks with any dimension greater than 3 inches. The material shall be placed in successive horizontal layers of loose material not more than 6 inches in depth. Each layer shall be spread uniformly on a soil surface that has been moistened or aerated as necessary and scarified or otherwise broken up in such a manner that the fill will bond with the surface on which it is placed.
This is the start of the file's text. The full file is on GovTribe.