ATTACHMENT 0005 DPGDS PERFORMANCE REQUIREMENTS SUMMARY
PWS
Performance
Para.
Performance Measure
Performance Standard
AQL
Method of
Surveillance
First Article Hardware
(SOW 3.1)
Quality Schedule
(1) Received three (3) each MEP-PU-810 C and D Model First Article PPUs by the due date specified in narrative for each
CLIN.
(2) Includes the content identified in narrative for each
CLIN.
No deviation
100% Inspection and Testing of hardware identified in CLIN
Feedback from COR.
Production Hardware
(MEP-PU-810C/D
DPGDS PPUs) (SOW Para 3.2)
Quality Schedule
1) Received by the due date specified in narrative for each
CLIN.
(2) Includes the content identified in narrative for each
CLIN.
No deviation
100% Inspection and Testing of hardware identified in CLINs 1004, 1005, 2004, 2005, 3004, and 3005
Feedback from Commissioning Tests.
3-year Extended Warranty (SOW Para
3.13.3 – 3.13.17)
Cost Schedule
(1) Received by the due date specified in narrative for each
CLIN.
(2) Includes the content identified in narrative for each
CLIN.
(3) Warranty Reports due to Government every quarter once production begins.
No deviation
100% Review of Warranty Documents identified in CLIN 0003.
Received quarterly Warranty Reports
Feedback from COR
Initial Spares and Repair Parts (SOW 3.11.2)
Quality Schedule
(1) Received by the due date specified in narrative for each
CLIN.
(2) Includes the content identified in narrative for each
CLIN.
No deviation
100% Inspection of Initial Spares and Repair Parts identified in CLINs 1002, 2002, Investment Spares (SOW Para 3.11.1)
Quality Schedule
(1) Received by the due date specified in narrative for each
CLIN.
(2) Includes the content identified in narrative for each
CLIN.
No deviation
100% Inspection of Investment Spares identified in CLINs 1001, 2001, and 3001
Mission Readiness
Quality Schedule
(1) Received by the due date specified in
No deviation 100% inspection of
Spares Package (MRSP) Kits (SOW Para 3.11.3) narrative for each
CLIN.
(2) Includes the content identified in narrative for each
CLIN.
MRSP Kits as identified in CLINs 1003, 2003, and 3003
Contract performance Report / Contract Funds and Status Report (SOW Para
3.3.2 & 3.3.3)
Schedule
(1) Received by the due date specified in Block 16 for each
CLIN.
(2) Includes the content identified in Block 16 for each
CLIN.
> 10 days Late = Failure
100% Review of Written Documents identified in CLINs A001 and A004
Feedback from COR.
Integrated Master Schedule/ Contract Work Breakdown Structure. (SOW Para 3.3.2)
Schedule
(1) Received by the due date specified in Block 16 for each
CLIN.
(2) Includes the content identified in Block 16 for each
CLIN.
> 10 days Late = Failure
100% Review of Written Documents identified in CLINs A002 and A003
Logistics Management Information / Logistical Reports (entire SOW para 3.14)
Quality Schedule
(1) Received by the due date specified in Block 16 for each
CLIN.
(2) Includes the content identified in Block 16 for each
CLIN.
> 10 days Late = Failure
100% Review of Written Documents identified in CLINs A007, A008, A009, A015, A027, A028, A029, A033, A034, A035, A036, A037, & A038
Feedback from government logistics representative.
Technical Data/Reports (SOW Para’s 3.1 – 3.15)
Quality Schedule
(1) Received by the due date specified in Block 16 for each
CLIN.
(2) Includes the content identified in Block 16 for each
CLIN.
> 10 days Late = Failure
100% Review of Written Documents identified in CLINs A006, A010, A011, A012, A013, A014, A016, A017, A018, A019, A020, A021, A022, A023, A024, A025, A026, A032, A039, A040, & A041.
Feedback from Government engineer representative.
Color Photograph Prints (SOW Para 3.4.5)
Quality Schedule
1) Received by the due date specified in Block 16 for each
CLIN.
No deviation
100% Review of all color photographs identified in CLIN
(2) Includes the content identified in Block 16 for this CLIN.
Feedback from COR.
Training / Training Products (SOW Para 3.14.9.1, 3.14.9.1.1 – 3.14.8.1.10)
Quality Schedule
(1) Received / executed by the due date specified in Block 16 for each CLIN.
(2) Includes the content identified in Block 16 for each
CLIN.
No deviation
100% Review of Written Documents or executed training as identified in CLINs A030, A031, and 0004
Feedback from DPGDS team members and customers.
Winterization Kit (PD 6115-0132, paragraph 3.5.7.2)
Quality Schedule
1) Received winterization kit either installed on MEP-PU- 810 C and D, or delivered as separate kit by the due date specified in narrative for each CLIN.
(2) Includes the content identified in narrative for each
CLIN.
No deviation
100% Inspection and Testing of Winterization Kit (identified in CLINs 1006, 2006, and 3006) during the commissioning test.