A07_W909MY-16-R-H002.pdf
PDF 235 KB Posted
- Attached to
- W909MY16RH002 DPGDS RECAPITALIZATION
- Solicitation number
- W909MY-16-R-H002
About this file
Solicitation W909MY-16-R-H002
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W909MY-16-R-H002
X
2016MAY25
2016JUN2703:00pm
DOA7
2016MAY25 SEE SCHEDULE
W909MY
ARMY CONTRACTING CMD-APG
10205 BURBECK RD
FORT BELVOIR, VA 22060-5863
PAUL EASTON
(703)704-0834
CCAP-CCV
PAUL.A.EASTON.CIV@MAIL.MIL
1 121
X 1
X 4 X 67
X 68 X 69
X 74
X 76
X 77
X 97
X 98
X 103
X 112
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: PAUL EASTON
Buyer Office Symbol/Telephone Number: CCAP-CCV/(703)704-0834
Type of Contract 1: Fixed Price Incentive (Cost Based)
Type of Contract 2: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
1. Funding:
Funds are presently available for this acquisition. The requirement is included and provided for in the financial plan for fiscal year
2016. Funding will be at the Task Order level only.
2. Description of Supplies/Services:
This Request for Proposal (RFP) is to procure requirements for Deployable Power Generation and Distribution System (DPGDS). The U.S.
Army requires recapitalization of the DPGDS Prime Power Unit, MEP-PU-810 A/B to provide reliable electric power generation capability at or greater than 800kW (Kilowatt).
3. Program Objective/Needs:
The purpose of this requirement is to solicit and award an Indefinite Delivery Indefinite Quantity (IDIQ) type contract for the recapitalization of DPGDS' Prime Power Units (PPU). The DPGDS is a single integrated system designed to be modular to provide power for different Department of Defense (DoD) agencies' missions globally. The recapitalization of the PPUs will upgrade the current system meeting the DoD's need to supply Prime Power until FY2033 when the next generation power unit is scheduled to enter production.
4. The range quantities, associated deliverables, and delivery schedules are contained within Section B of this solicitation.
5. The following illustrates the relationship of Contract Line Items (CLINs) to Phases:
First Article Testing (FAT) Phase - CLINs 0001 through 0006
Ordering Period 1 (28 months) - CLINs 1001 through 1008
Option Ordering Period 1 (12 months) - CLINs 2001 through 2008
Option Ordering Period 2 (12 months) - CLINs 3001 through 3008
Option Ordering Period 3 (12 months) - CLINs 4001 through 4008
Option Ordering Period 4 (12 months) - CLINs 5001 through 5008
Option Ordering Period 5 (12 months) - CLINs 6001 through 6008
6. The Period of Performance will be as follows:
FAT- 0 - 960 days after date of award
Ordering Period 1 - 961 - 1800 days after award
Option Ordering Period 1 - 1801 - 2160 days after award
Option Ordering Period 2 - 2161 - 2520 days after award
Option Ordering Period 3 - 2521 - 2880 days after award
Option Ordering Period 4 - 2881 - 3240 days after award
Option Ordering Period 5 - 3241 - 3600 days after award
7. The Phases ordering periods will be as follows:
First Article Testing - 0 - 960 days after date of award
Ordering Period 1 - after completion of FAT Phase (28 month duration).
Option Ordering Period 2 (Option 1) - Contractor notification of Government intent to exercise 30 days before completion of previous active Ordering Period 1 and Option can be exercised up to 1 day before end of previous ordering period. (12 month duration).
Option Ordering Period 3 (Option 2)- Contractor notification of Government intent to exercise 30 days before completion of previous active Ordering Period 1 and Option can be exercised up to 1 day before end of previous ordering period. (12 month duration).
Option Ordering Period 4 (Option 3)- Contractor notification of Government intent to exercise 30 days before completion of previous active Ordering Period 1 and Option can be exercised up to 1 day before end of previous ordering period. (12 month duration).
Option Ordering Period 5 (Option 4)- Contractor notification of Government intent to exercise 30 days before completion of previous active Ordering Period 1 and Option can be exercised up to 1 day before end of previous ordering period. (12 month duration).
Option Ordering Period 6 (Option 5)- Contractor notification of Government intent to exercise 30 days before completion of previous active Ordering Period 1 and Option can be exercised up to 1 day before end of previous ordering period. (12 month duration).
2 121
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
8. Contract Types:
CLINs 0001, 0002, 0003, and 0006 shall be performed on a Fixed Price Incentive (Firm Target) basis. The ceiling price is 'no more than 120% of the target cost' of CLINs 0001, 0002, 0003, and 0006 and 100% of CLIN 0005 and the share ratio is 50/50 for overruns and 70/30 (Contract/Government) for underruns. CLIN 0005 and SLIN A001 shall be performed on a Firm Fixed Price basis.
CLINs 1001-1008, 2001-2008, 3001-3008, 4001-4008, 5001-5008, and 6001-6008 if exercised, shall be performed on Firm Fixed Price
Basis.
9. Contract Ceiling price will be the total ceiling price for First Article Phase calculated at 120% of the target price set forth on
CLINs/SLINs 0001, 0002, 0003, 0006, in addition to 100% of the target price of A001 and 0005 and the total weighted Firm Fixed Price of all production phase CLINs in Section B.
10. NOTE: Evaluation will be based only on the information submitted in proposals; the government will not consider information outside of proposals.
11. Quality Assurance Requirements:
All inspection and acceptance will be conducted in accordance with (IAW) the Statement of Work (SOW), Section J, Attachment 0001.
12. Type of Contract:
The RFP will result in an award of a single award Fixed Price Incentive Firm Target (FPIFT) and Firm Fixed Price (FFP) IDIQ.
13. Format of the Contract:
The First Article Phase of the IDIQ will be FPIFT and the Production Phase will be FPIFT and FFP. A renegotiation provision will be included so that the pricing can be revisited at the conclusion of the First Article Phase.
14. Minimum Gaurantee: The awardee is guaranteed a minimum of at least one (1) order, valued at $7,000,000.00, for First Article Units.
14. Source Selection Methodology:
The Government intends to award one contract using Full and Open Competition, IAW FAR 15.101-1, Best Value Tradeoff.
15. Questions:
Offerors shall submit all questions to the Government no later than 3:00 PM, Eastern Standard Time, Day, June 06, 2016. All questions shall be submitted in Microsoft Excel format via email to Contracting Officer, Undra Robinson (undra.n.robinson.civ@mail.mil) and
Contract Specialist, Paul Easton (paul.a.easton.civ@mail.mil).
16. Contractor Support:
Solicitation documentation was developed by the Government, with assistance from Government support contractors employed by CACI
Technologies Inc. and Jacobs Technology Inc. Additionally, these support contractors may support the post award administration of the resulting contract. Any Offeror who is affiliated with, or who is contemplating a contractual relationship with, the cited firms must notify the Contracting Officer by the date of proposal submission. Further, all Offerors must make arrangements with CACI Technologies
Inc. and Jacobs Technology Inc. for execution of agreements required by FAR 9.505-4(b). See Proposal Submission Requirements Volume VI, in Section L regarding the FAR requirement.
*** END OF NARRATIVE A0001 ***
3 121
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 MODIFICATION WORK ORDER $ $ _______________________ ______________ __________________
COMMODITY NAME: MEP810 A/B MWO
CLIN CONTRACT TYPE:
Fixed Price Incentive (Cost Based)
Mfr CAGE: 00000
Mfr Part Number: 000000000000000
All work shall be performed in accordance with paragraph 3.1 of Attachment 0001: Statement of Work.
The Prime Power Units will be provided to the
Contractor as Government Furnished Property, as defined in the Statement of Work.
This is a Fixed-Plus Incentive Firm Target effort, adherent to clause 52.216-16 of this contract, entitled "INCENTIVE PRICE REVISION--FIRM TARGET" The fee payable under this contract shall be the target fee increased by 30 cents for every dollar that the total allowable cost is less than the target cost or decreased by 50 cents for every dollar that the total allowable cost exceeds the target cost. Ceiling Price is 120% of Target Cost.
TARGET COST: ________________
TARGET PROFIT: ________________
TARGET PRICE: ________________
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Government Approval/Disapproval Days: 420
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0002 FIRST ARTICLE UNITS $ $ ___________________ ______________ __________________
4 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
COMMODITY NAME: MEP810A/B FIRST ARTICLE UNITS
CLIN CONTRACT TYPE:
Fixed Price Incentive (Cost Based)
Mfr CAGE: 00000
Mfr Part Number: 000000000000000
All work shall be performed in accordance with paragraph 3.1 of Attachment 0001: Statement of Work.
The Prime Power Units will be provided to the
Contractor as Government Furnished Property, as defined in the Statement of Work.
This is a Fixed-Plus Incentive Firm Target effort, adherent to clause 52.216-16 of this contract, entitled "INCENTIVE PRICE REVISION--FIRM TARGET" The fee payable under this contract shall be the target fee increased by 30 cents for every dollar that the total allowable cost is less than the target cost or decreased by 50 cents for every dollar that the total allowable cost exceeds the target cost. Ceiling Price is 120% of Target Cost.
TARGET COST: ________________
TARGET PROFIT: ________________
TARGET PRICE: ________________
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Government Approval/Disapproval Days: 420
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0003 CONTRACTOR PRE-PRODUCTION TESTING $ $ _________________________________ ______________ __________________
COMMODITY NAME: MEP810A/C-B/D FAT
CLIN CONTRACT TYPE:
Fixed Price Incentive (Cost Based)
5 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Mfr CAGE: 00000
Mfr Part Number: 000000000000000
All work shall be performed in accordance with paragraph 3.9.3 of Attachment 0001: Statement of
Work.
This is a Fixed-Plus Incentive Firm Target effort, adherent to clause 52.216-16 of this contract, entitled "INCENTIVE PRICE REVISION--FIRM TARGET" The fee payable under this contract shall be the target fee increased by 30 cents for every dollar that the total allowable cost is less than the target cost or decreased by 50 cents for every dollar that the total allowable cost exceeds the target cost. Ceiling Price is 120% of Target Cost.
TARGET COST: ________________
TARGET PROFIT: ________________
TARGET PRICE: ________________
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Government Approval/Disapproval Days: 420
Deliveries or Performance _________________________
FOB POINT: Destination
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0004 CONTRACT DATA REQUIREMENTS LIST _______________________________
A001 Service Data Item - Priced $ __________________________ __________________
SERVICE REQUESTED: TECHNICAL DATA PACKAGE
CLIN CONTRACT TYPE:
Firm Fixed Price
Technical Data Package (TDP)
6 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
***PRICED SERVICE DATA ITEM***
See Exhibit A Page 1, Data Item No. A001 Product
Drawings/Models and Associated Lists
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
A002 INTEGRATED MASTER SCHEDULE 1 LO $ ** NSP ** __________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 2, Data Item No. A002 Integrated
Master Schedule (IMS).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A003 CONTRACT WORK BREAKDOWN STRUCTURE 1 LO $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 3, Data Item No. A003 Contract
7 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Work Breakdown Structure (WBS).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A004 CONTRACT FUNDS STATUS REPORT 1 LO $ ** NSP ** ____________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 4, Data Item No. A004 Contract
Funds Status Report (CFSR).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A005 COLOR PHOTOGRAPH PRINTS 1 LO $ ** NSP ** _______________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 5, Data Item No. A005 Color
Photograph Prints.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and
8 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A006 SCIENTIFIC AND TECHNICAL REPORTS 1 LO $ ** NSP ** ________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 6, Data Item No. A006 Scientific and Technical Reports.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A007 CONTRACT PERFORMANCE REPORT 1 LO $ ** NSP ** ___________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 7, Data Item No. A007 Contract
Performance Report (CPR).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
9 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A008 PREPCA CONFIGURATION AUDIT SUMMARY REPORT 1 LO $ ** NSP ** _________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 8, Data Item No. A008
Configuration Audit Summary Report, PREPCA
Configuration Audit Summary Report.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A009 CONFIGURATION AUDIT SUMMARY REPORT PRODUCTION PCA _________________________________________________
REPORT 1 LO $ ** NSP ** ______ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 9, Data Item No. A009
Configuration Audit Summary Report, Production PCA
Report.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
10 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A010 TEST PLAN 1 LO $ ** NSP ** _________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 10, Data Item No. A010
Configuration Test Plan.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A011 TEST/INSPECTION REPORT CONTRACTOR PRE PRODUCTION ________________________________________________
MODEL EXAM 1 LO $ ** NSP ** __________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 11, Data Item No. A011
Configuration Test/Inspection Report, Contractor Pre
Production Model Exam/Test Report.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
11 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A012 S&T REPORTS PRE-PRODUCTION TEST INCIDENT REPORTS 1 LO $ ** NSP ** ________________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 12, Data Item No. A012 Scientific and Technical Reports, Pre-Production Test Incident
Report(s) (TIR).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A013 S&T REPORTS PPT FAILED ITEM ANALYSIS REPORTS ____________________________________________
(FIAR) 1 LO $ ** NSP ** ______ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 13, Data Item No. A013 Scientific and Technical Reports, PPT - Failed Item Analysis
Reports (FIARs).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
12 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A014 SAFETY ASSESSMENT REPORT (SAR) 1 LO $ ** NSP ** ______________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 14, Data Item No. A014 Safety
Assessment Report (SAR).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A015 PROPOSED SPARE PARTS LIST AND MRSP LIST 1 LO $ ** NSP ** _______________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 15, Data Item No. A015 Initial
Spares/Repair Parts, Missions Readiness Spares
Packages (MRSP) Kits List.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
13 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A016 S&T REPORTS WARRANTY STATUS REPORT 1 LO $ ** NSP ** __________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 16, Data Item No. A016 Scientific and Technical Reports, Warranty Status Report.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A017 S&T REPORTS SUPPORTABILITY ANALYSIS 1 LO $ ** NSP ** ___________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 17-18, Data Item No. A017
Scientific and Technical Reports, Supportability
Analysis.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A018 TECHNICAL REPORT - STUDY/SERVICES, LEVEL OF ___________________________________________
REPAIR ANALYSIS 1 LO $ ** NSP ** _______________ __________________
14 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 19, Data Item No. A018 Technical
Report - Study/Services, Level of Repair Analysis
(LORA).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A019 TECHNICAL REPORT - STUDY/SERVICES, FMECA 1 LO $ ** NSP ** ________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 20, Data Item No. A019 Technical
Report - Study/Services Failure Modes Effects and
Criticality Analysis (FMECA).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A020 S&T REPORTS SUPPLY SUPPORT ALTERNATIVES PLAN 1 LO $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
15 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
See Exhibit A Page 21, Data Item No. A020 Scientific and Technical Reports, Supply Support Alternatives
Plan.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A021 S&T REPORTS LOG SUPPORT INPUT DATA 1 LO $ ** NSP ** __________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 22, Data Item No. A021 Scientific and Technical Reports, Log Support Input Data.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A022 TECHNICAL REPORT-STUDY/SERVICES MAINTENANCE ___________________________________________
ALLOCATION CHART 1 LO $ ** NSP ** ________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 23, Data Item No. A022 Technical
Report-Study/Services, Maintenance Allocation Chart
16 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(MAC).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A023 S&T REPORTS XML SOURCE FILE / ETMS 1 LO $ ** NSP ** __________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 24, Data Item No. A023 Scientific and Technical Reports, XML Source File/ ETMs.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A024 S&T REPORTS TECHNICAL MANUALS DEVELOPMENT PLAN 1 LO $ ** NSP ** ______________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 25, Data Item No. A024 Scientific and Technical Reports, Technical Manuals (ETM)
Development Plan.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and
17 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A025 S&T REPORTS ETM ID1 OUTLINE 1 LO $ ** NSP ** ___________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 26, Data Item No. A025 Scientific and Technical Reports, ETM ID1 Outline.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A026 S&T REPORTS ETM ID2 TECHNICAL DATA INCORPORATION 1 LO $ ** NSP ** ________________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 27, Data Item No. A026 Scientific and Technical Reports, ETM ID2 Technical Data
Incorporation.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
18 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A027 LMI DATA PRODUCTS PROVISIONING PARTS LIST LSA 36 1 LO $ ** NSP ** ________________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 28, Data Item No. A027 Logistics
Management Information (LMI) Data Product(s), Provisioning Parts List LSA 36.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A028 LMI DATA PRODUCTS DESIGN CHANGE NOTICE (DCN) 1 LO $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 29, Data Item No. A028 Logistics
Management Information (LMI) Data Product(s), Design
Change Notice (DCN).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
19 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A029 LMI SUMMARIES ENGINEERING DATA FOR PROVISIONING _______________________________________________
(EDFP) 1 LO $ ** NSP ** ______ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 30, Data Item No. A029 Logistics
Management Information (LMI) Summaries, Engineering
Data for Provisioning (EDFP).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A030 TRAINING MATERIALS TRAINING SUPPORT PACKAGES (TSP) 1 LO $ ** NSP ** __________________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 31, Data Item No. A030 Training
Materials, Training Support Packages (TSP).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
20 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A031 INSTRUCTIONAL MEDIA PACKAGE CBT 1 LO $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 32, Data Item No. A031
Instructional Media Package, Computer Based Training
(CBT).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A032 S&T REPORTS MODIFICATION WORK ORDER (MWO) 1 LO $ ** NSP ** _________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 33, Data Item No. A032 Scientific and Technical Reports, Modification Work Order (MWO).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
21 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A033 PROVISIONING AND OTHER PRE PROCUREMENT SCREENING ________________________________________________
DATA 1 LO $ ** NSP ** ____ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 34, Data Item No. A033 Logistics
Management Information (LMI) Summaries, Provisioning and Other Pre Procurement Screening Data.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A034 MANUFACTURING READINESS ASSESSMENTS 1 LO $ ** NSP ** ___________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Pages 35-36, Data Item No. A034
Manufacturing Risk and Readiness, Manufacturing
Readiness Assessments.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
22 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A035 ITEM UNIQUE IDENTIFICATION REPORT 1 LO $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 37, Data Item No. A035 Item Unique
Identification (IUID) Report.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A036 DMSMS IMPLEMENTATION PLAN 1 LO $ ** NSP ** _________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Pages 38-39, Data Item No. A036 Source
Data for Diminishing Manufacturing Sources and
Material Shortages (DMSMS) Implementation Plan.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A037 SOFTWARE VERSION DESCRIPTION (SVD) SOFTWARE NOR 1 LO $ ** NSP ** _______________________________________________ __________________
23 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 40, Data Item No. A037 Software
Version Description (SVD) Software NOR.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A038 SOFTWARE REQUIREMENTS SPECIFICATION (SRS) _________________________________________
SOFTWARE NOR 1 LO $ ** NSP ** ____________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 41, Data Item No. A038 Software
Requirements Specification (SRS) Software NOR.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A039 S&T REPORTS INTERFACE CONTROL DOCUMENTS (ICD) 1 LO $ ** NSP ** _____________________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
24 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
See Exhibit A Page 42, Data Item No. A039 Scientific and Technical Reports, Interface Control Documents
(ICD).
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A040 S&T REPORTS SOFTWARE LOADING PROCEDURES 1 LO $ ** NSP ** _______________________________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 43, Data Item No. A040 Scientific and Technical Reports, Software Loading Procedures.
Contract Data Requirements Lists (CDRLs) in accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
A041 S&T REPORTS FAMILY TREE 1 LO $ ** NSP ** _______________________ __________________
SERVICE REQUESTED: SERVICE DATA ITEM - NSP
See Exhibit A Page 44, Data Item No. A041 Scientific and Technical Reports, Family Tree.
Contract Data Requirements Lists (CDRLs) in
25 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
accordance with the requirement, quantities and schedules as set forth in DD Form 1423, Exhibit A and the Statement of Work, Attachment 0001. Delivery will be in accordance with DD Forms 1432.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DLVR SCH PERF COMPL
REL CD QUANTITY DATE ________ ______________ __________
001 1 SEE DD FORM 1423
0005 FAT UNITS 3 YEAR WARRANTY $ $ _________________________ ______________ __________________
COMMODITY NAME: 3 YEAR WARRANTY
CLIN CONTRACT TYPE:
Firm Fixed Price
Mfr CAGE: 00000
Mfr Part Number: 00000000000000000
Three (3) Year Extended Warranty.
Warranty requirements are in accordance with paragraph 3.13 of Attachment 0001: Statement of Work.
(End of narrative B001)
Packaging and Marking _____________________
Government Approval/Disapproval Days: 0
Deliveries or Performance _________________________
FOB POINT:
SHIP TO:
(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE
(SHIP-TO) WILL BE FURNISHED PRIOR
TO THE SCHEDULED DELIVERY DATE FOR
ITEMS REQUIRED UNDER THIS
REQUISITION.
0006 FAT TRAINING IAW SOW 3.14.9 $ ___________________________ __________________
SERVICE REQUESTED: FAT TRAINING
CLIN CONTRACT TYPE:
Fixed Price Incentive (Cost Based)
26 121
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
All work shall be performed in accordance with paragraph 3.14.9 of Attachment 0001: Statement of
Work.
This is a Fixed-Plus Incentive Firm Target effort, adherent to clause 52.216-16 of this contract, entitled "INCENTIVE PRICE REVISION--FIRM TARGET" The fee payable under this contract shall be the target fee increased by 30 cents for every dollar that the total allowable cost is less than the target cost or decreased by 50 cents for every dollar that the total allowable cost exceeds the target cost. Ceiling Price is 120% of Target Cost.
TARGET COST: ________________
TARGET PROFIT: ________________
TARGET PRICE: ________________
(End of narrative B001)
Deliveries or Performance _________________________
1001 ORDERING PERIOD 1 - MEP-PU-810A/C RECAP $ _______________________________________ __________________
See Range Pricing
COMMODITY NAME: MEP-PU-810A TO MEP-PU-810A/C
CLIN CONTRACT TYPE:
Firm Fixed Price
Range Quantities ________________
FROM TO UNIT PRICE ____ __ __________
1 4 $
5 19 $
20 50 $
Ordering Period 1 (28 month duration)- MEP-810A with
Modification Work Order (MWO) to MEP-PU-810C.
This ordering period begins after…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .