AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Constrcut Bldg. 375

PN: KKGA 129066

See Attached

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-May-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W901UZ-16-B-0001

X 9B. DATED (SEE ITEM 11)

29-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-May-2016

CODE

W5ALXT NDARNG JFHQ

OUSPFO FOR NORTH DAKOTA

ATTN: P&C, PO BOX 5511

BLDG. 50, FRAINE BARRACKS

BISMARCK ND 58506-5511

W901UZ 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W901UZ-16-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002 BLDG 375

CONSTRUCT BUILDING #375

HECTOR IAP, FARGO, ND

PROJECT NO. KKGA129066

SUBJECT: Amendment 0002 DATE: May 27, 2016

DRAWINGS: The following additions, deletions and / or changes shall be made to the

DRAWINGS:

1. Sheet A5.1 – Clarification, no feminine napkin dispensers or disposals required on this project.

2. Sheet A3.1 - Clarification, no hard surface surround required at the mop sink in Room 118.

3. Sheet A3.1, Room 130 – Owner provided ceiling mounted projection screen to be Advantage

Deluxe Electrol manufactured by DA-LITE

SPECIFICATIONS: The following additions, deletions and / or changes shall be made to the SPECIFCATIONS:

1. Clarification – No City of Fargo and/or Cass county building permit will be required on this job.

2. Section 05 5000 METAL FABRICATION, 2.02 – Remove paragraph B in its entirety.

NOTE: IF SUBMITTING A BID ENSURE YOU ACKNOWLEDGE RECEIPT OF ALL

AMENDMENTS ON SF 1442 (BACK)

Attachment 01 incorporated into Amendment 0001, Contractors are to ensure they include the document with their bid.

The following paragraph was incorporated into Amendment 0001, but the revised drawing sheet was omitted. It is included in Amendment 0002. See Attachment

7. Sheet C5.0 – Paving Plan (Base Bid) - See attached revision sheet R1/C5.0 for revised note regarding the temporary contractor access gate. It should be part of the base bid, not ABI #1.

PRIOR APPROVALS

Section 26 5100 – Interior Luminaires Type Manufacturer Series J1 Fail Safe FCC L1 Nulite RG2LED

Section Product Approved Manufacturer

W901UZ-16-B-0001

03 3000 Underslab Vapor Retarder VaporBlock

End of Amendment 0002

(End of Summary of Changes)