Amendment 0001 Bldg. 375
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Construct Bldg 375
PN: KKGA 129066
See Attached
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W901UZ-16-B-0001
X 9B. DATED (SEE ITEM 11)
29-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-May-2016
CODE
W5ALXT NDARNG JFHQ
OUSPFO FOR NORTH DAKOTA
ATTN: P&C, PO BOX 5511
BLDG. 50, FRAINE BARRACKS
BISMARCK ND 58506-5511
W901UZ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W901UZ-16-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0001 BLDG 375
CONSTRUCT BUILDING #375
HECTOR IAP, FARGO, ND
PROJECT NO. KKGA129066
SUBJECT: Amendment 0001 DATE: May 26, 2016
DRAWINGS: The following additions, deletions and / or changes shall be made to the
DRAWINGS:
1. Sheet ACOVER detail 1 and Civil Sheets show three sets of dashed lines around the building at 4 meters, 9 meters, & 10 meters, these are ATFP standoff distances and are for Owner reference.
2. Sheet A3.1 - First Floor Plan, Room 134 Server, revise the note in the room to read, “25% of the access panels in this room shall be vented style. Coordinate location with Owner.”
3. Sheet A3.2 – Omit this sheet entirely.
4. Sheet A3.3 - Window Types – Revise type “C” to be Service and Teller Window, see spec.
5. Sheet A4.2 – Detail 2, the note in the attic spaces requires two continuous runs of fire treated plywood.
The truss manufacturer shall provide steel framing supports at locations indicated on each truss, the plywood will be screwed to these supports. Provide supports between trusses to the attic access panels on each side of the attic. Coordinate exact locations with truss designs.
6. Sheet A6.2 – Omit Detail 1 Reflected Ceiling Plan Alternate Bid Item 5. The remainder of the details on the sheet apply.
7. Sheet C5.0 – Paving Plan (Base Bid) - See attached revision sheet R1/C5.0 for revised note regarding the temporary contractor access gate. It should be part of the base bid, not ABI #1.
8. Sheet S1.1 the date on the stamp should be revised to be 3-31-2016.
9. All Structural Sheets the concrete slab on grade reinforcing shall be #4 @ 24” O.C.E.W.
10. Sheet S4.1 detail 6; add note “loosely compact fill under the stoop slab.”
11. Sheet M1.1 – First Floor Plan - Plumbing
a. Mechanical room 120: 1-1/2” vent pipe in northwest wall (near fire sprinkler riser) shall be routed exposed in mechanical room 120. Exposed vent pipe shall be no hub cast iron, refer to specifications.
b. Change note for room 117, 118 & 119 riser diagrams: See 2/M1.0 & 3/M1.0 for plumbing riser diagrams.
c. Freeze proof wall hydrant WHY-1 located on east exterior wall is shown under base bid. If ABI #5 (conventional walls) is accepted, WHY-1 shall be located in wall between office 108 and office 108.
d. Mechanical/Electrical room 131: move heat pump HP-6 and 1” condensate pipe 4’ to west. 1- 1/2” vent for EWC-1 shall be routed on east side of wall and back into mechanical room over the door. Coordinate installation of piping and heat pump with ladder and attic access located in southeast corner of the mechanical room.
12. Sheet M2.0 – First Floor Plan - Ventilation
a. Mechanical/Electrical room 131: move heat pump HP-6 and 4’ to west. 24x14 sa and 24x14 ra ductwork for HP-6 shall be routed into mechanical room over the door. Coordinate installation of ductwork and heat pump with ladder and attic access located in southeast corner of the mechanical room.
13. Sheet M2.1 – Large Scale Mechanical Rooms
a. 2/M2.1 Mechanical/Electrical room 131: move heat pump HP-6 and 4’ to west. 24x14 sa and
24x14 ra ductwork for HP-6 shall be routed into mechanical room over the door. Coordinate installation of ductwork and heat pump with ladder and attic access located in southeast corner of the mechanical room.
14. Sheet M3.0 – First Floor Plan - Hydronic
a. Mechanical/Electrical room 131: move heat pump HP-6 and 1-1/4” HPS/HPR piping 4’ to west.
Coordinate installation of piping and heat pump with ladder and attic access located in southeast corner of the mechanical room.
b. Water detection system in OPS 127, OPS 129 & Server 134 shall be included in base bid. Delete text indicating to provide water detection system as ABI#11.
15. Sheet M4.0 – First Floor Plan – Fire Sprinkler
a. A flow test was conducted 8/27/2014, static and residual were obtained from the hydrant outside of building 370 along 14th while pitot reading was obtained from fire hydrant north of the existing Hush House.
b. Static Pressure: 54 PSI
c. Residual Pressure: 48 psi
d. Gallons Flowing: 1061 gpm
e. Number of outlets flowing: 1 (2-1/2” connection)
16. Sheet M5.3 – Mechanical Control Details
a. 1/M5.3 Global Control and Scheduling: Delete text indicating to provide floor leak detection as alternate bid item: ABI #10. Floor leak detection shall be included in base bid.
17. Sheet E0.1 Legend – Luminaire Schedule
a. Type P1 – Fixture should be 1100 lumens/foot nominal, and approximately 82W per fixture in 8 foot sections.
b. Add Type P2 – Same as Type P1, except P2 shall be 12 foot sections and approximately 123W per fixture.
c. Add Type U1 – 24” Lithonia Rayzer LED undercabinet fixture or equal, provide with 24V transformer and linking cables.
d. Type F3 should be a 4’ 3500 lumen SNLED Series fixture with clear lens in lieu of 8’ 6000 lumens as indicated on the fixture schedule.
18. Sheet E0.4 – Site Plan
a. Panel LP1 shall be a 100A, 480/277V, Type 3R-12 panel with 50A MCB and 35,000AIC rating. Provide (12) 20A/1 pole breakers.
19. Sheet E2.0 First Floor Lighting Plan
a. Change Type P1 fixtures in Conference Room 115 to Type P2, 12 foot lengths.
b. All Cat6 cabling between addressable nLight enabled fixtures shall be installed in minimum ¾” conduit separate from line voltage conductors.
20. Sheets E3.0/E3.1 First Floor Power Plan
a. Revise Alternate #10 – All power connections associated with computer room cooling unit #2 (motor #27 in room 131) shall be provided under alternate bid item #8 in lieu of base bid.
b. Floorboxes - (2) separate floorboxs are to be installed in each floorbox location shown on the floorplan in operations rooms 127, 128, and 129. Refer to details 2-4 on sheet E4.0 for more specific requirements. Each floorbox location shown (Type A, B, and C) shall have (2) 120V circuits, one circuit per floorbox installed in that location.
c. For all demountable walls, power shall be provided to each partition via a wall mounted junction box containing circuits indicated on Sheets E3.0 & E3.1.
Junction box shall be located where the partition meets a permanent stud wall.
Electrical devices shall be provided by the wall supplier with circuit selection by contractor similar to standard wired office furniture. Exact locations for rough-ins shall be coordinated with partition supplier prior to installation.
21. Sheet E4.0 First Floor Systems Plan
a. For all demountable walls, contractor is responsible for providing data and communications cabling through chases provided by partition manufacturer. All device openings are to be factory cut and all data and communications devices shall be provided by contractor.
22. Sheet E6.0 Panel Schedules
a. Panel H1 - Ckt 41,43,45 & Ckt 47,49,51 shall be 45A/3 pole breakers for computer room AC units.
b. Panel H1 – Ckt 38,40,42 shall be 15A/3 pole breakers for HP-7 in lieu of 20A.
23. Sheets E6.1/E6.2 Panel Schedules
a. Panel L3 – Ckt 41 shall be a 25A/1 pole breaker in lieu of 30A for ERU-2
SPECIFICATIONS: The following additions, deletions and / or changes shall be made to the SPECIFCATIONS:
1. All Sections - General Requirements - Manufacture of items or products, must be manufactured in the United States (U.S.). U.S. companies that manufacture items or products outside of the U.S. will not be approved or accepted. Refer to Section 01 1000 Summary of Work for further detail.
2. ADD Section 01 3514.01 LEED NC 2009 CREDIT, in its entirety (see attached four pages).
3. Section 01 3515 LEED CERTIFICATION PROCEDURES, 1.01, paragraph A. Revise the paragraph to read; “This project has been designed to achieve the LEED Silver (minimum of 50 points)…” remainder of paragraph remains the same.
4. Section 03 3000 CAST IN PLACE CONCRETE, 2.05, A; Omit notes referring to PVC waterstop, not required on this project.
5. Section 07 4113-2 METAL ROOF PANELS, 2.02, B.1 – Revise the metal panels to be as follows: Metal Panels: Factory-formed panels with factory-applied finish.
a. Steel Panels:
i. Zinc-coated steel conforming to ASTM A653/A653M; minimum G60
(Z180) galvanizing.
ii. Continous hot-dipp coated on both sides with factory applied Kynar 500 coating.
iii. Color selected: Colonial Red
iv. Steel Thickness: Minimum 0.0236 inch (0.060 mm). Equal to 24 gauge.
b. Profile: Standing seam, with minimum 2.0 inch (51 mm) seam height; concealed fastener system for field seaming with special tool.
c. Factory applied sealant for all seams on panels. Mechanically seamed at jobsite on the roof.
d. Texture: Smooth, with intermediate ribs for added stiffness.
e. Width: Maximum panel coverage of 16 inches (406 mm).
f. Minimum yield point of 50,000psi.
6. Section 07 4213 METAL WALL PANELS, 2.02, B, 2. The Side Seams shall be overlapped and tight fitting.
7. Section 27 1005 – Structured Cabling for Voice and Data – Inside Plant
a. The use of fiber optic patch cables for connection between data racks in room 134 and the distributed floor boxes and wall jacks shall be permitted.
b. Suitable manufacturer for fiber optic patch cables include those manufactured by Alliance Fiber
Optic Products, Inc., Sunnyvale CA.
PRIOR APPROVALS
Section Product Approved Manufacturer 23 6313 Dry Cooler Colmac Coil, Chandler 23 7224 Energy Recovery Unit Dais No Section Terminal Heating Coils Trane, Diakin, RAE, Aerofin
Drawing sheets A3.1 and A3.2 state 10 ABI’s are included in the project. On those two sheets ABI #4, Conventional Walls & Doors and ABI #7, Optional Light Pollution Reduction (LEED) will be deleted. Total ABI’s for the project is eight (8). The ABI’s as listed are in the correct priority and reflect how they are listed in the solicitation, items 0002 thru 0009. The ABI’s as they in the drawing sheets read:
ABI #1 - Provide Parking Lot ABI #2 – Provide Parking Lot Lighting Whole Design ABI #3 – Storm Water Separator (LEED) ABI #4 – Conventional Walls and Doors ABI #5 – Additional Landscaping (LEED) ABI #6 - Optional Plumbing Fixture Water Use Reduction (LEED) And Airflow Measuring Stations – AHUS (LEED) ABI #7 – Optional Light Pollution Reduction (LEED) ABI #8 – Additional Electrical & Communication Drops ABI #9 – Optional Photovoltaic Solar Energy System (LEED) ABI #10 – 2nd Computer Room Cooling Unit
Are hereby changed to read:
ABI #1 - Parking Lot ABI #2 – Parking Lot Lighting ABI #3 – Eliminate Dry Retention Pond ABI #4 – Additional Landscaping (LEED) ABI #5 – Optional Plumbing Fixture Airflow Measuring Stations (LEED) ABI #6 – Additional Electrical & Communication Drops ABI #7 – Optional Photovoltaic Solar Energy System (LEED) ABI #8 – 2nd Computer Room Cooling Unit
1. Section 00010 – Solicitation Contract Form and Section 01 1000 – Summary of Work, 1.12 A Section 01 1000, 1.2 A states to “Provide a unit price per cubic yard for removal of existing buried construction materials encountered during construction.” Section 00010 – Solicitation Contract Form does not have a provision or Item No for this entry. This section is hereby deleted.
2. Section 00010 - Solicitation Contract Form and Section 01 1000 – Summary of Work, 1.12 B Section 01 1000, 1.2 B states to “Provide in the Base Bid but identify separately the cost of the Raised Floor System and the carpet tile system installed on it.” Section 00010 – Solicitation Contract Form does not have provision in Item No 0001 for this entry. See Attachment 01
3. Section 00800 - Special Contract Requirements, Article 6 – Paperless Contracting, paragraph 6.1 and Section 01 3000 - Submittals, 1.04 E Submittals will be done electronically
4. Project Performance period is 365 calendar days as stated on the front page of the SF 1442.
SECTION 01 3514.01
LEED-NC 2009 CREDIT SUMMARY
PART 1 GENERAL
1.01 DEFINITIONS
A. LEED Rating System: LEED-NC 2009 edition.
B. Required: Achievement of this credit is essential for certification of this project.
C. Preferred: Achievement of this credit would be desirable but is not mandatory.
D. Not Required: Achievement of this credit is not expected or not possible for this project.
PART 2 CREDIT SUMMARY
2.01 CERTIFICATION TO BE ACHIEVED: SILVER, REQUIRING MINIMUM OF 50 POINTS.
2.02 SUSTAINABLE SITES (SS): UP TO 24 POINTS TO BE ACHIEVED.
A. SS Prerequisite 1 - Required - No points - Construction Activity Pollution Prevention.
1. During Construction:
a. Preventive measures and remediation are specified in Section 01 5713.
b. Dust control and basic surface drainage are specified in Section 01 7000.
c. Preventive measures prescribed by state law will be followed.
2. Permanent erosion and sedimentation prevention features are to be provided:
a. Grading for sediment traps and retention ponds is specified in Section 31 2200.
B. SS Credit 1 - Required- 1 point - Site Selection.
1. The project is not located on any of the inappropriate or environmentally sensitive lands defined for this credit.
C. SS Credit 2 - Required - 5 points - Development Density & Community Connectivity.
1. The project is on a site that meets the criteria for Option 2, Community Connectivity.
D. SS Credit 4.1 - Required - 6 points - Alternative Transportation: Public Transportation Access.
1. The project is located on a site that meets the criteria for Option 2, Bus Stop Proximity.
E. SS Credit 4.2 - Undecided - 1 point - Alternative Transportation: Bicycle Storage & Changing Rooms.
1. Secure bicycle storage and shower and changing facilities are to be provided.
F. SS Credit 4.3 - Required - 3 points - Alternative Transportation: Low-Emitting & Fuel-Efficient Vehicles.
1. Preferred parking spaces have been provided, in the quantity required.
G. SS Credit 4.4 - Required - 2 points - Alternative Transportation: Parking Capacity.
1. Parking space is sized to meet this requirement.
H. SS Credit 5.2 - Required - 1 point - Site Development: Maximize Open Space.
1. The building footprint and open space are designed to meet this requirement.
I. SS Credit 6.1 - Required - 1 point - Storm water Design: Quantity Control.
1. The site design reduces runoff rate and quantity by at least 25 percent.
J. SS Credit 6.2 - Required - 1 point - Storm water Design: Quality Control.
1. Natural on-site storm water treatment to remove sediment is provided as base bid.
2. A mechanical treatment system to remove sediment is provided on-site, specified in
Section ABI #3.
K. SS Credit 7.1 - Required - 1 point - Heat Island Effect: Non-Roof.
1. The site design reduces thermal gradient differences by:
a. Using concrete paving with reflectance of at least 0.35:
L. SS Credit 7.2 - Required - 1 point - Heat Island Effect: Roof.
1. The roofing design reduces thermal gradient differences by:
a. Using high reflectance and high emissivity roofing for at least 75 percent of roof area.
M. SS Credit 8 - Undecided - 1 point - Light Pollution Reduction.
1. Lighting control devices for automatic control of interior lighting are specified and exterior lighting meets site and exterior max. foot-candles at site boundary.
2.03 WATER EFFICIENCY (WE): UP TO 6 POINTS TO BE ACHIEVED.
A. WE Prerequisite 1 - Required - No points - Water Use Reduction, 20% Reduction.
B. WE Credit 1.1 - Required - 2 points - Water Efficient Landscaping: Reduce by 50%.
1. The landscaping does not require irrigation and no permanent irrigation system is provided.
C. WE Credit 3.1 - Required - 2 points - Water Use Reduction, 30% Reduction.
1. Appropriate high efficiency and/or waterless fixtures are specified.
D. WE Credit 3.1 - Required - 1 point for 35% Reduction - Water Use Reduction.
1. Low flow plumbing fixture for 40% reduction are included in ABI #6.
2.04 ENERGY & ATMOSPHERE (EA): UP TO 16 POINTS TO BE ACHIEVED.
A. EA Prerequisite 1 - Required - No points - Fundamental Commissioning of Building Energy Systems.
1. Commissioning performed by and under the supervision of an independent commissioning authority is included in the Contract Documents.
B. EA Prerequisite 2 - Required - No points - Minimum Energy Performance.
1. The building envelope, HVAC, lighting, etc., have been designed to meet the criteria.
C. EA Prerequisite 3 - Required - No points - Fundamental Refrigerant Management.
1. New equipment: No CFC-based refrigerants are used in any equipment. Non-CFC refrigerants are specified in the following sections:
2. New equipment: No CFC-based refrigerants are used in any equipment. Non-CFC refrigerants are specified in heat pumps.
D. EA Credit 1 - Required - 11 points - Optimize Energy Performance.
1. The building envelope, HVAC, lighting, etc., have been designed to meet the criteria for the number of points indicated.
E. EA Credit 2 - optional, ABI #9 - 1 point - On-Site Renewable Energy.
1. The following on-site systems, along with utility net metering, are provided:
a. Photovoltaic power generation specified in Section 26 3100.
F. EA Credit 3 - Undecided - 2 points - Enhanced Commissioning.
G. EA Credit 4 - Required - 2 points - Enhanced Refrigerant Management.
1. Refrigerants and HVAC&R systems minimize or eliminate the emission of compounds that contribute to ozone depletion and global climate change.
2.05 MATERIALS & RESOURCES: UP TO 1 POINT TO BE ACHIEVED.
A. MR Prerequisite 1 - Required - No points - Storage & Collection of Recyclables.
1. Bins, waste cans, can crushers, etc., are considered furnishings and are therefore not part of the construction contract.
B. MR Credit 5.1 - Undecided - 1 point - Regional Materials: 10% Extracted, Processed & Manufactured Regionally.
1. For the purposes of the contract documents, the term "regionally-sourced" is used instead of "regional materials" and is defined in Section 01 6000 in the same way as for this credit.
2.06 INDOOR ENVIRONMENTAL QUALITY: UP TO 11 POINTS TO BE ACHIEVED.
A. EQ Prerequisite 1 - Required - No points - Minimum IAQ Performance.
1. The building ventilation has been designed to meet the minimum requirements of
ASHRAE 62.1-2007.
B. EQ Prerequisite 2 - Required - No points - Environmental Tobacco Smoke (ETS) Control.
1. Owner intends to prohibit smoking in the building.
2. Exterior smoking areas are located at least 25 feet away from entries, outdoor air intakes, and operable windows.
C. EQ Credit 1 - Optional ABI #6 - 1 point - Outdoor Air Delivery Monitoring.
D. EQ Credit 3.1 - Required - 1 point - Construction IAQ Management Plan, During Construction.
1. Contractor is required to perform either a full building flush-out or air quality testing prior to occupancy, both of which are specified in Section 01 5721.
E. EQ Credit 3.2 - Required - 1 point - Construction IAQ Management Plan, Before Occupancy.
1. Contractor is required to perform either a full building flush-out or air quality testing prior to occupancy, both of which are specified in Section 01 5721.
F. EQ Credit 4.1 - Required - 1 point - Low-Emitting Materials, Adhesives & Sealants.
1. Product criteria and reporting requirements for VOC-restricted products are specified.
G. EQ Credit 4.2 - Required - 1 point - Low-Emitting Materials, Paints & Coatings.
1. Product criteria and reporting requirements for VOC-restricted products are specified.
H. EQ Credit 4.3 - Required - 1 point - Low-Emitting Materials, Flooring Systems.
1. Product criteria and reporting requirements for VOC-restricted products are specified for carpet.
2. Adhesives used in connection with carpet systems.
I. EQ Credit 4.4 - Undecided - 1 point - Low-Emitting Materials, Composite Wood & Agrifiber Products.
1. Product criteria and reporting requirements for VOC-restricted products are specified.
J. EQ Credit 5 - Required - 1 point - Indoor Chemical & Pollutant Source Control.
1. At High Volume Entryways: Permanent grilles or grates to capture dirt, etc., are provided.
2. Rooms Where Hazardous Gases or Chemicals May Be Present: Independent exhaust is provided for each room; this is a design solution involving building construction and
HVAC.
3. Air Filtration Media: Outside air and return air are to be provided with filtration media meeting the criteria.
K. EQ Credit 6.1 - Required - 1 point - Controllability of Systems: Lighting.
1. Lighting controls meeting the criteria are provided.
L. EQ Credit 6.2 - Required - 1 point - Controllability of Systems: Thermal Comfort.
1. HVAC Controls: Individual controls are to be provided for at least 50 percent of occupants in regularly occupied areas.
M. EQ Credit 7.1 - Required - 1 point - Thermal Comfort: Design.
1. Thermal comfort meeting the credit criteria is to be provided, with ventilation by mechanical means only.
N. EQ Credit 7.2 - Undecided - 1 point - Thermal Comfort: Verification.
1. A survey of building occupants will be conducted by Owner within 6 to 18 months after building occupancy to determine level of comfort; Owner will develop a plan for corrective action if more than 20 percent of occupants report dissatisfaction with thermal comfort in building.
2.07 INNOVATION & DESIGN PROCESS (ID): 1 POINTS TO BE ACHIEVED.
A. ID Credit 2 - Required - 1 point - LEED(tm) Accredited Professional.
2.08 REGIONAL PRIORITY (RP): UP TO 2 POINTS TO BE ACHIEVED.
A. RP Credit 1.1 - Undecided - 1 point - Region Specific Environmental Priority: Light Pollution Reduction, see SS creidt 8. Region.
B. RP Credit 1.2 - Undecided - 1 point - Region Specific Environmental Priority: WE credit 355 water use reduction. Region.
END OF SECTION
GENERAL WAGE DETERMINATION
General Decision Number: ND160021 05/20/2016 ND21
Superseded General Decision Number: ND20150021
State: North Dakota
Construction Type: Building
County: Cass County in North Dakota.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 02/26/2016 2 03/04/2016 3 05/20/2016
BOIL0647-006 01/01/2014
Rates Fringes
BOILERMAKER......................$ 32.75 26.42
* BRND0001-002 05/01/2016
Rates Fringes
BRICKLAYER.......................$ 28.20 18.75
ELEC1426-004 06/01/2014
Rates Fringes
ELECTRICIAN (Excludes Low Voltage Wiring)..................$ 27.59 11.37
IRON0512-006 05/01/2015
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 29.80 23.74
PLAS0633-001 05/01/2015
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 27.90 13.60
PLUM0300-016 01/04/2016
Rates Fringes
PIPEFITTER.......................$ 31.99 13.82
PLUMBER..........................$ 31.99 13.82
SFND0669-002 01/01/2016
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 30.67 16.02
SHEE9010-002 06/09/2014
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 26.45 13.95
SUND2012-002 08/18/2014
Rates Fringes
CARPENTER (Drywall Finishing/Taping Only)...........$ 21.22 7.11
CARPENTER, Excludes Drywall Finishing/Taping, Drywall Hanging, and Metal Stud Installation.....................$ 19.24 4.89
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 21.36 0.00
ELECTRICIAN (Low Voltage Wiring Only).....................$ 21.14 5.73
INSULATOR - MECHANICAL
(Duct, Pipe & Mechanical System Insulation)...............$ 15.80 2.60
LABORER: Common or General......$ 13.05 2.92
LABORER: Mason Tender - Brick...$ 15.32 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 14.54 3.41
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 26.00 3.82
OPERATOR: Crane.................$ 26.18 9.39
OPERATOR: Forklift..............$ 23.06 15.47
OPERATOR: Loader................$ 23.75 0.00
PAINTER (Brush and Roller).......$ 21.86 8.41
ROOFER...........................$ 16.37 2.84
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 27.27 7.76
TRUCK DRIVER: Dump Truck........$ 19.81 5.42
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)