Facility_layout.pptx

PPTX presentation 4 MB Posted

Attached to
RFP Abrams Engine Diagnostic and Troubleshooting Trainer (ED/TT)
Solicitation number
W900KK-17-R-0044
Issued by

About this file

Facility Layout, Ft Benning

View the file

Other files

File Type Posted
RFP_Amendment_02,_W900KK-17-R-0044,_Abrams_EDTT.pdf PDF
Attachment_2,_Abrams_EDTT_SRD_rev5_FINAL.pdf PDF
RFP_Amendment_02,_W900KK-17-R-0044,_Abrams_EDTT_(Conform_Copy).pdf PDF
Attachment_7,_Past_Performance_Evaluation_Questionnaire_(PPQ).docx DOCX document
QA_RFP_20170714.pdf PDF
Ft_Lee_EDTT_Layout.pptx PPTX presentation
QA_RFP_20170712.pdf PDF
QA_RFP_20170706.pdf PDF
RFP_Amendment_01,_W900KK-17-R-0044,_Abrams_EDTT.pdf PDF
RFP_Amendment_01,_W900KK-17-R-0044,_Abrams_EDTT_(Conform_Copy).pdf PDF
Attachment_7,_Past_Performance_Evaluation_Questionnaire_(PPQ).docx DOCX document
QA_Draft_RFP_20170623.pdf PDF
Exhibit_C_CDRL_Abrams_EDTT_20-Jun-17.pdf PDF
Exhibit_A_CDRL_Abrams_EDTT_3-May-17.pdf PDF
Exhibit_B_CDRL_Abrams_EDTT_3-May-17.pdf PDF
Attachment_1,_Abrams-EDTT-SOW_rev6_FINAL.pdf PDF
Attachment_7,_Past_Performance_Evaluation_Questionnaire_(PPQ).docx DOCX document
Attachment_3,_EDTT_GFP_SmartForm.pdf PDF
Attachment_6,_Distro_Agreement_Contractor_20170130.pdf PDF
W900KK-17-R-0044_Abrams_EDTT_FINAL.pdf PDF
Attachment_4_GFI_List.pdf PDF
Attachment_8,_Small_Business_Participation_Form.pdf PDF
Attachment_5,_Data_Rights_(DR)_Attachment.xlsx XLSX spreadsheet
Attachment_2,_Abrams_EDTT_SRD_rev4_FINAL.pdf PDF
QA_Draft_RFP_20170613.pdf PDF
W900KK-17-R-0044_Abrams_EDTT_FINAL_DRAFT_Rev1_20170607.pdf PDF
Attachment_4,_GFI_List.pdf PDF
QA_FBO_Notice_20170531.pdf PDF
W900KK-17-R-0044_Abrams_EDTT_FINAL_DRAFT.pdf PDF
Exhibit_B_CDRL_Abrams_EDTT_3-May-16.pdf PDF
Abrams-EDTT_SOW_rev4_FINAL.pdf PDF
Q&A_Updated_3-May-20173.pdf PDF
Exhibit_A_CDRL_Abrams_EDTT_3-May-16.pdf PDF
Exhibit_C_CDRL_Abrams_EDTT_3-May-16.pdf PDF
Q&A_FBO_Notice_20170411.docx DOCX document
Q&A_FBO_Notice_20170309.docx DOCX document
Abrams_EDTT__SOW_rev3.1_final.pdf PDF
CLIN_Structure_Abrams_EDTT_2017-01-09.xlsx XLSX spreadsheet
Abrams_EDTT_SRD_rev3_final.pdf PDF
EDTT_GFP_SmartForm.xlsx XLSX spreadsheet
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ED/TT Facility

32 “ double seal pedestrian door 36 “ double seal pedestrian door 32 Ft.

25 Ft.

Driver’s Station Engine Fuel Cell Battery Box 16 Ft.

9 Ft.

Eye wash station w/ drain

Student’s

Tables and

Chairs

Exhaust Fan Vent 30’ high Exhaust Fan Vent 30’ high Roller Door 10’ x 10’ 20 Amp 250 Volt 2 pole outlet

Smoke Detector 15 Ft. High Carbon Monoxide Detector 7 Ft. High Carbon Monoxide Detector 15 Ft. High Ceiling 36’ - 40’ high Fire alert audio/ visual Fire alert audio/ visual A/C inlet vent 25’ high 15 Amp 110 Volt outlet Overhead lighting throughout room Light switch Light switch Temperature: 59 to 85 degrees F.

Relative humidity: 30 percent to 80 percent at 70 degrees F non‑condensing.

Ceiling vent w/ plenum Water hose Spigot 15 Amp 110 Volt outlet 15 Amp 110 Volt outlet

Engine, pulse jet w/ driver’s station

Ceiling Vent for engine exhaust

10’ Roller Door

Carbon Monoxide Detector

Shower, Eye Wash

Eye Wash drain

Water hose spigot

Student Tables and Chairs image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg

File details come from the government source that posted it. Updated .