Autoclaves Questions and Answers Final.docx

DOCX document 41 KB Posted

Attached to
WRAIR Autoclaves RFQ
Solicitation number
W81XWH20Q0053
Issued by

About this file

This document is a request for quotation for the procurement of autoclaves to replace aging equipment at various facilities of the Walter Reed Army Institute of Research. The solicitation requests quotes for the removal and disposal of thirteen existing autoclaves and replacement with new autoclaves of specified dimensions and capabilities. The autoclaves must meet requirements for sterilization chambers, control systems, utilities, safety features, and training. Quotes are due by August 2020 and installation must be completed in phases with all work finished by February 2021. The contract will be a firm-fixed-price award with on-site preventative maintenance and a minimum fifteen-year vessel warranty required. The United States Army Medical Research Acquisition Activity is the contracting agency on behalf of the end-user, Walter Reed Army Institute of Research.

View the file

Other files

File Type Posted
Autoclaves Questions and Answers 3.docx DOCX document
W81XWH20Q0053 Amendment 06.docx DOCX document
W81XWH20Q0053 Amendment 05.docx DOCX document
W81XWH20Q0053 Amendment 04.docx DOCX document
Autoclaves Questions and Answers 2.docx DOCX document
Polimers (floor mat).jpeg JPEG file
503-G fp.pdf PDF
503-3 fp.pdf PDF
Floor type.pdf PDF
W81XWH20Q0053 Amendment 03.docx DOCX document
503-2 fp.pdf PDF
GE03 Room Diagram.jpg JPG image
503-1 fp.pdf PDF
W81XWH20Q0053 Amendment 01.docx DOCX document
Solicitation W81XWH20Q0053.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers

#
Question
Answer
1
Our bulk size autoclave we have is 49x49x86. The specification states 49x64x100. Would our size offering for the bulk unit be acceptable?
No. This autoclave is heavily used and requires maximum throughput. The larger autoclave is required to support our mission.
2
Vendors were asked to provide pricing for flooring replacement. This is not typical for an autoclave manufacturer representative. It would require any bidder to have to sub contract an appropriate flooring company. A General Contractor would offer a better service for that. Please advise on whether flooring is required. If so, please provide the acceptable flooring type, color and square footage per room.
Yes, flooring is required. Offeror usually have a third party that does the service for them.

Material needs to be epoxy.

Each vendor needs to get their measurements.

3
During the site visit it was mentioned that steam filters should be included in the bid. This is not listed in the scope of work. Please advise.
It is listed on the MECs and listed on page 17 of the solicitation.
4
All equipment was requested to be removed from the installed location and then transported from the building. The solicitation states that the equipment would be left on the dock. Please advise.
Yes, offeror will need to dispose of all equipment. Change was made due to transportation issue on Logistics.
5
We are under the impression that the existing bulk unit would be a direct replacement. The current unit utilizes transfer carts and carriages. The solicitation reads that it would be replaced with a floor loading type autoclave. Is the solicitation correct in the specification or are you looking for a direct replacement for the unit in the cage wash area?
The solicitation is correct.
6
The specifications says 44"+6" tolerance so we are at maximum width of 50" on the medium units throughout the building. Can you extend that measurement to 53.5"?
The width of the door opening must be appropriate for the specified dimensions requested for the door (49” x 64” x 100”).
7
Is a 7" touch screen acceptable? The solicitation asks for "Approximately 10" touch screen operator interface panel"
Yes A 10” screen is preferable, but a 7” would be acceptable.
8
Section B - Supplies or Services and Prices – Item No. 0003 Autoclave FFP Sterilizer 49” x 64” x 100”

A. Single Door – Autoclave Log on page 16 describes a double door unit, confirm this is a double door unit B. Unit size – We would like to propose our standard sized autoclave series GSS-R/L 121422 49”w x 57”h x 86”D is this size acceptable for replacement? The standard size will reduce cost and improve leadtime over a custom chamber size.

C. Room location – Section 2 Scope states the equipment location for this autoclave GE03 is the correct location GE01 or GE03?

D. Facility floor levels - Please clarify if “01” or “03” designate the facility floor on these designations?

a. No, unit is a single door.

b. No. This autoclave is heavily used and requires maximum throughput. The larger autoclave is required to support our mission.

c. GE01 to get access to the unit, GE03 loading side of the unit.

d. No, this unit is located on the ground level.

9
Section 2 Scope – “Turnkey”

A. We understand the scope to be remove 13 existing machines and replace with 13 new machines. We are an equipment manufacturer and not a general contractor. The assumption is a general contractor hired by WRAIR would handle the doorways, walls and repairs along the ingress/egress pathways. The General Contractor would also handle any utility supply modifications as well as flooring repair.

B. Will we be excluded from this project if we do not include the repairs and modifications to the facility in our scope?

a. No, WRAIR is asking for turnkey. All required work needs to be done by whomever wins the bid.

b. Yes, project is a turnkey product.

10
Section 2 Scope – “Training”

A. Preventative maintenance and repair training. States the training will take place off site, please provide where the training will take place and how many people will attend the training sessions. Is WRAIR requesting classroom type training for this event? This type of remote training will incur additional cost.

B. As standard we provides basic operator and maintenance training at the machine and during the startup activity at no additional cost. No more than (4) Four people are at this free training due to size and space limitations around the machines during this activity. The free training must take place between the hours of 8am-5pm Monday through Friday.

A. The offsite training is for biomedical technicians and the training location needs to be the manufacturer training site. Two biomedical technicians will take the training WRAIR will pay for the travel.

B. Operator training will be on-site. No more than four people per training session.

11
PERIOD OF PERFORMANCE - August 2020 TO August 2021

A. Is August 2020 the planned award date?

B. Is August 2021 the planned completion date for the project?

C. What is the required date for the autoclaves to be delivered to site?

A. Yes, that is the expectation.

B. No, 26 February 2021.

C. First two units to be delivered no later than 1 October 2020

12
5.1 General Requirements – Freight elevator size and weights

A. What is the size of the freight elevators that will be available for use?

B. What is the weight capacity of these elevators?

a. 72”w x 100” d x 106”

b. 6000 lbs

13
5.2.2 Installation of New Equipment (Deliverable 2)

A. We are an equipment vendor and do not provide Turnkey Solutions. Will we be excluded from this project if we do not include the repairs and modifications to the facility in our scope?

Turnkey is the requirement. Offeror shall provide a turnkey solution in order to be considered for award.

14
5.2.4 Installation of Information Plate (Deliverable 4)

A. All of our autoclaves are provided with an ASME nameplate. This plate is located on the side of the machine in clear view in the service area. This plate contains the following information, is this sufficient for the project?

· Manufacturer

· Chamber MAWP, MAEWP and Design temperature

· Jacket MAWP, MAEWP and Design temperature

· MDMT

· Equipment serial number

· Year Built Data plate information meets the requirement.

15
5.2.5 Safety Training (Deliverable 5) – Safety Orientation

What is the duration of this training and is it on site?

No more than 30 minutes. Yes on site.

16
5.2.7 Training (Deliverable 7) - Basic operation, maintenance and troubleshooting training, (2) Two (4) Four hour sessions.

· Is this the same training described in Section 2 Scope – “Training”? If so, where is this training expected to place?

Yes, Operator training;

basic operator and maintenance training at the machine and during the startup activity.

17
DELIVERABLES – 5.2.1

5.2 Specific Tasks / Requirements states “The contractor shall be responsible for disconnecting, disassembling and placing the existing equipment on the building 503 loading dock for removal by the government.” 5.2.1 states disposing existing equipment to the DMRO office with completion of DD 1348? Are we only responsible to dispose to loading dock or do we need to follow 5.2.1?

Follow 5.2.1, disposition of old equipment at the DRMO of Fort Meade, MD.

18
DELIVERABLES – 5.2.2

A. A site visit has already taken place on June 29, 2020. We would require another site visit prior to the bid due date to assess ingress/egress and freight elevators by our installation manger and rigger. Is that possible?

B. What are the ingress/egress dimensions for removal and installation from dock to final locations?

a. No, an additional site visit is not within our time parameters.

b. Please see the drawing attachments.

19
PERFORMANCE REQUIREMENTS SUMMARY MATRIX - Contractor personnel shall complete AT/OPSEC training.

Is the site safety training described in “5.2.5 Safety Training (Deliverable 5) – Safety Orientation or is it something additional?

AT/OPSEC training is different and separate from 5.2.5 Safety Training.

20
Autoclave Log GW58 – Air Differential Barrier

A. Does this single door unit require an air differential barrier?

B. Please confirm this is a single-door autoclave?

a. Air Differential Barrier is not required.

b. Confirmed, single door unit.

21
Autoclave Log GW58 – Modular Wall

A. What is the w x h of the modular wall, is there a layout for this are that can be provided?

B. What are the materials of construction for the modular wall (type of stainless steel, single sided or double sided, insulation required)?

a. Offeror needs to see GW58. Offeror shall get their own measurements to ensure they got the correct dimensions.

b. Same material of current unit. Stainless Steel, single sided, non-insulated.

22
Autoclave Log - 1N53, 2N10, 2N45, 2S21, 2W117, 3E13, 3W47, 3N57, 3N81, 3W24, 3W74 and GW58

A. Liquid Cycles – Are the liquids in open/vented or sealed containers?

B. House Steam – Specification calls for 80 PSIG. Typically the steam is regulated down by site MEP contractor. Is 50-70 PSIG acceptable?

A. Open/vented container.

B. No, sterilizers need to have an integrated steam regular to reduce the steam to manufacturer specifications.

23
Autoclave Log - 1N53, 2N10, 2N45, 2S21, 2W117, 3E13, 3W47, 3N57, 3N81, 3W24, 3W74

Does the number in front of the room# indicate what level of the facility these machines are located on, i.e. “1”N53 does this mean the machine is located on the first floor?

Yes, first number indicates the floor level.

24
Autoclave Log – Autoclave VSP GE01 – Dirty Cage Wash

What level is the cage wash area on?

Ground floor, next to sterilizer.

25
Autoclave Log – Autoclave VSP GE01 – Ramps

Our typical floor mounted machines uses an external loading trolley to load the load carts (shelf racks) into the autoclave. The load trolley docks to the chamber via a docking device. The chamber loading height would be 11 ¾” above floor. Ramps are not provided or required, is this acceptable?

Would need to review the interior dimensions to ensure maximum usable space is available. Carts are preferred.

26
Autoclave Log – Autoclave VSP GE01 – Load Carts

A. Vendor shall provide 6 load carts – The GSS-L/R 121422 is designed to fit two load carts (shelf racks) end to end per load. The load carts (shelf racks) are approx. 48”w x 43”d. Why are 6 load carts (shelf racks) required?

B. Is the intent to use existing load carts for this machine or can the vendor propose load carts designed to fit their machine?

C. What is the intent of 3 sided load carts with a removable or hinged door? Our standard load carts (shelf racks) are an open design with adjustable perforated shelves for easy loading/unloading. Is this acceptable?

A. The carts as described allow dirty equipment to be placed in the cart at the room and rolled directly into the autoclave; therefore, reducing handling.

B. The vendor can propose load carts.

C. Additional load carts are available even when loads are running. Yes, standard load carts are acceptable.

27
Autoclave Log – Autoclave VSP GE01 – Knockdown footprint

The GSS-L/R 121422 has a knockdown shipment of 74”w x 81”h x 102”d. Is there another opening this machine can be moved in through?

No

28
Autoclave Log – Autoclave VSP GE01 – Autoclave shall be placed along the left wall (see room diagram below)

There is no room diagram included in this solicitation; can you please provide one for review?

Yes, diagram has been provided.

29
Autoclave Log – Autoclave VSP GE01 – Contractor shall install a new modular wall to separate the GE01 mechanical space from room GE03, dirty cage wash

A. Please provide room diagram with dimensions so we can determine how much modwall is required.

B. What are the materials of construction for the modular wall (type of stainless steel, single sided or double sided, insulation required)?

Stainless Steel, single sided, non-insulated. Mod wall approximately 133”W x 109”H (contractor will need to take final measurements).

30
Autoclave Log – Autoclave VSP GE01 – ramp not to exceed 5’W x 10’L with no more than a 10” rise to the chamber entrance

A. Our solution does not require a ramp as indicated under #27. Is our solution acceptable?

B. Shall have touch screen operator interface panel on the load and unload side. Please confirm this is a double door autoclave?

C. Specification calls for a printer. Will this printer be mounted on the fascia, on the load or unload end or both?

A. No, ramp is required.

B. The autoclave is a single-door, not a pass through.

C. GE01/GE03 is not a pass through, load/unload is on the same door.

31
Autoclave Log – Autoclave VSP GE01 - Sterilization chamber shall be a minimum of 48” W x 62” H x 100” L

We would like to propose our standard sized autoclave series GSS-R/L 121422 49”w x 57”h x 86”D is this size acceptable for replacement? The standard size will reduce cost and improve leadtime over a custom chamber size.

No. This autoclave is heavily used and requires maximum throughput. The larger autoclave is required to support our mission.

32
Autoclave Log – Autoclave VSP GE01 – Steam Filter

Typically, the site MEP contractor handles the steam filter and not the vendor. Is this acceptable?

No, we are asking for steam filter for all 13 units.

33
Autoclave Log – Autoclave VSP GE01 – Liquids

Liquid Cycles – Are the liquids in open/vented or sealed containers?

Open/vented.

34
Autoclave Log – Autoclave VSP GE01 - Utilities

A. Typically, house steam to be regulated down by the site MEP contractor, is this acceptable?

B. Our autoclave requires a maximum steam pressure of 45 psig, is this acceptable?

C. 3ph Electrical - Specification calls for 230/460V. Is 480V acceptable?

D. Compressed Air - Specification calls for 80 PSI. Is 85-115 PSIG acceptable?

a. No

b. Sterilizers need to have an integrated steam regular to reduce the steam to manufacturer specifications

c. No, no three phase available.

d. No, 80 PSI is the max

35
Autoclave Log – Autoclave VSP GE01 – Enclosure dimensions (Room GE01): 133”W x 109” H x 144”D

The GSS-P 121422 Has external dimensions of 139”w x 92 ½”h x 109”d. We may be able to reduce the width but require a room layout to verify, can this be provided?

Room Layout/Diagram provided.

36
DELIVERY INFORMATION – FOB: Destination

Our standard is FOB Factory, is this acceptable?

No, the solicitation requests FOB: Destination.

37
AutoCAD drawings of the floor plans available to determine modwall wall width by height and equipment general fit?
Yes, provided.
38
What are the materials of construction for modwalls, is 304 stainless steel single sided, non-insulated box panels acceptable?
Yes, 316 stainless steel is also acceptable.
39
What other programs are required, what will you be processing? Is effluent decontamination required? Animal bedding, cages, hard goods, textiles?
All items mentioned are possible.
40
What seal is on the bulk autoclave, it appears a cross contamination barrier is sufficient?
The mod wall is not sealed. Wall separates dirty cage wash from autoclave mechanical space.
41
Union installation or prevailing wage labor required?
No to both.
42
What if any staging is required for equipment removal?
No more than 2 units at one time.
43
What if any staging is required for new autoclave delivery, rigging and staging?
No more than two units on the loading dock at one time.
44
Is there going to be preference given to products made in the US under the buy America Act?
No preference will be made.
45
Would you accept proposals which include only the 12 medium sized autoclaves, not including the bulk sterilizer (item 0003)?
No it would not meet the requirements of 12 autoclaves and 1 sterilizer.
46
Page 16 MECS Autoclaves: The existing autoclave in GW58 does not have an air-differential seal. It is simply recessed in a stainless steel wall. Please confirm it will not be upgrading to an air-differential seal. (Air Differential Seal is required for applications that require a negative or positive air pressure differential between two rooms adjoined with an autoclave. The seal prevents the bulk passage of air between areas maintained at a pressure differential. A stainless steel barrier flange is welded to the periphery of the sterilizer and solid-silicone gasket secures the welded seal to the wall and permits normal expansion and contraction of the building).
Air Differential Seal is not required.
47
Specification calls for Approximately 10” touch screen operator interface control panel. Is a 7” touchscreen acceptable?
Yes, 7” is acceptable.
48
Specification calls for a Thermal Printer. Is an impact printer acceptable?
Thermal printer is required
49
The specification calls for the 12 autoclaves (LOG) is for 316L SS chamber and 304L SS jackets. If the vendor offers the same warranty and performance on a 316L SS chamber with carbon steel jackets, is that acceptable? Cost savings would be seen across 12 sterilizers if carbon steel jackets are allowed.
Yes.
50
The specification states: Sterilizer shall have two loading levels: The existing sterilizers have loading carts & carriages. Are loading carts & carriages required on all sterilizers or are 2 chamber shelves sufficient?
Yes and Yes.
51
What is the building cold water pressure for the water lines running to the autoclave rooms?
City water pressure 60 – 80 PSI.
52
Are backflow preventers going to be provided by WRAIR
No, backflow preventers are part of the current units.
53
Are inline steam filters required for the new sterilizers?
Yes.
54
The spec states under 5.2.1 that “placing the existing equipment on the building 503 loading dock for removal by the government”. It is our understanding is that removal and disposal of old sterilizers is now the responsibility of the vendor (as opposed to leaving them on the dock), is this correct?
Section has been updated. Yes, vendor is expected to dispose old units.
55
During the site visit it was discussed that the vendors need to provide floor work. Is there a scope of work for the floor work? We would request a new site walk with the flooring company. Is there a list of approved contractors who would provide similar flooring work at WRAIR.
The PWS has been updated to include flooring information. The contractor must demolish existing flooring, level prep, and apply new epoxy flooring and cove base. Currently there are no approved list of contractors.
56
Are the bi-weekly status meetings allowed to be virtual/remote? - 5.3.2 Bi-Weekly Status Meeting (Deliverable 10)
Virtual is acceptable.
57
There seem to be 2 distinct requests for training WRAIR personnel - 5.2.7 Training (Deliverable 7):

a. Operator Training

i. Please clarify what is meant by “one session on-site user training to include basic operation, operator level maintenance and troubleshooting for two sessions for not less than four hours” - does this mean two 4+ hour sessions? Or two sessions totaling 4+ hours? Is it separate trainings for each sterilizer, or would it be combined into groups of 2 at a time in conjunction with the desired delivery schedule?

ii. Approximately how many end users need to participate?

iii. Would these trainings take place on site?

b. Repair/Maintenance Training

i. “The training will be conducted off-site as on-site is not an option for biomedical technicians, and instead is only a requirement for clinical personnel at the contractor facility.” – Would WRAIR prepare the off site space on their campus for this training?

ii. Approximately how many WRAIR personnel need to participate?

a. Operator

i. Two sessions totaling 4+ hours.

ii. No more than four per session.

iii. Yes, on site.

b. Repair/ Maintenance

i. No, the training will be at the manufacturer training facility.

ii. Biomedical training for two technicians.

58
Is vendor provided preventative maintenance necessary if the vendor is training WRAIR personnel on performing the maintenance themselves?
Yes, WRAIR biomedical technicians will provide scheduled maintenance. Vendor will provide labor and materials during warranty.
59
During the walk through it was stated that deliveries & install/de-install would be scheduled 2 at a time. Please confirm if this is the requirement.
Yes, two units every two weeks.
60
Please confirm the power supplied (phase, voltage, etc) to the bulk autoclave. (room GE01)

Page 18 Autoclave (VSP) Shall have the following minimum available utilities:

▪ 115V, 1Ph, 15A

▪ 230/460, 60HZ, 3 phase

▪ 1” NPT House steam 80 PSIG dynamic pressure

▪ 80 PSI compressed air

▪ 1 1/2 “ Floor Drain

▪ 1” NPT Cold Water 40-60 PSI, 20 GPM

- Power in autoclave rooms are 120VAC, 15 Amp, single phase, 60 Hz.

- Steam pressure 50-60PSI.

- Pneumatic Air pressure 80-110 PSI.

- Floor drain varies 3".

- City water pressure 60-80 PSI.

61
Will the floor in the area of the bulk autoclave (room GE01) need to be refinished prior to the new autoclave being installed? If so, whose responsibility will this be?
Yes. Contractor responsibility.
62
Will a more detailed specification be provided for the loading carts? If not, vendor will provide standard loading carts.
Standard loading carts are acceptable.
63
Is this a firm-fixed-price contract? (Ref. refinishing of floor mentioned at site walk-thru)
Yes.
64
VSP Autoclave (Room GE01): A room diagram is referenced, however was not provided. Will it be sent?
Yes.
65
VSP Autoclave (Room GE01): Is the intent to replace the unit with a chamber of “like size” or larger? The chamber dimensions listed in the solicitation are larger for all three dimensions (W x L x H) and could present facility related challenges.
Yes, this autoclave is heavily used and requires maximum throughput. The larger autoclave is required to support our mission.
66
VSP Autoclave (Room GE01): A loading ramp is specified. Ramps are not standard and typically avoided for ergonomic and safety reasons related to Operators. Since the unit is floor mounted, would standard transfer carriage and loading cart system be acceptable as an alternative?
The carts as described allow dirty equipment to be placed in the cart at the room and rolled directly into the autoclave; therefore, reducing handling.

Additional load carts are available even when loads are running.

67
VSP Autoclave (Room GE01): Six “Quarter Sized” Loading Carts (four per chamber) are specified. Half size (two per chamber) are more typical and take up less of the lab footprint. Would three of these be acceptable as an alternative?
Would need to see overall dimensions and usable space available. The smaller carts are preferred to provide flexibility in operations.
68
VSP Autoclave (Room GE01): Will the Government remove the doors on the ingress path to allow for the full 70.0” of width as published in the solicitation?
The Government will not provide this service. It is the contractor responsibility to restore to original, of any damaged property during the demolition or installation.
69
All units: After the existing units are de-installed and moved to the loading dock area, who is responsible for disposal/scrap/removal from the site (Government or Contractor)?
PWS section has been updated. Contractor is responsible.
70
All units: The specifications mention “prepare site” as part of the scope. Does this include replacement of the existing flooring (like for like)? If so, is epoxy flooring required in the mechanical room for the VSP autoclave (Room GE01)?
No, all autoclave room shall receive new Epoxy flooring and cove base
71
All units: How many Technicians will attend the formal Maintenance Program at Contractor’s site?
Two.
72
All units: How many mobilizations will be required to complete the twelve rooms for the Medium sized sterilizers?
Six maximum.
73
It is our understanding that flooring is to be provided for multiple rooms in the facility. Can you provide detail on the type of flooring and which rooms require flooring? a. Is removal of the existing floor coating required? If so, please provide a full scope of work for the flooring work required.

b. Should moisture remediation be included in the flooring proposal? If it is not required for specific rooms, this cost can be deducted on invoices as necessary.

- All autoclave room shall receive new Epoxy flooring and cove base see above question.

- The contractor is responsible to demolish and remove existing flooring prior to installing new epoxy flooring and cove base.

- Moisture remediation as needed.

74
Section 5.2.7: With regards to the WRAIR personnel training on preventative maintenance and repairs, will a full manufacturer’s service training be required? How many attendees will be joining in the offsite training?
Yes and two attendees.
75
Section 5.1: To schedule shipments, how many autoclaves can be held onsite at one time? It is our understanding that autoclaves will be installed two at a time with the exception of the bulk autoclave. Shipping costs will be affected by the number of shipments and storage space onsite. If two or more autoclaves can be stored onsite at a time, shipments can be minimized to 4 trucks (three with 4 medium autoclaves and a fourth with the bulk autoclave).
No more than two at the loading dock.
76
Section 5.2.6 under section 6: Is there a minimum autoclave vessel warranty required (typically 15 years) in addition to the 1 year parts and labor warranty?
Yes, 15 years.
77
Section MECS (LOG) Autoclave: Does the autoclave in room GW58 require an air differential seal? It was our understanding that the fascia panel mating up to the existing modular wall would suffice. Please confirm.
Air differential seal is not required.
78
Section MECS (LOG) Autoclave: With regards to the 11 free standing autoclaves, a wider autoclave can fit in the rooms so please confirm that a 61” total width is acceptable.
Yes.
79
Section MECS (LOG) Autoclave: With regards to the medium autoclaves, are the minimum chamber dimensions 26”x36”x48”?
Yes.
80
Section MECS (LOG) Autoclave: Please confirm there is no air available for all of the medium autoclaves (26”x36”x48” internal chamber dimensions).
No air available.
81
Section MECS (LOG) Autoclave: Please confirm there is no 3-phase power for the medium autoclaves.
No three phase power available.
82
Is 10” screen size required for all autoclaves?
7” is acceptable.
83
Section MECS Autoclave (VSP): Please clarify if a horizontally sliding door is required for the bulk autoclave.
Yes, horizontal door required.
84
Section MECS Autoclave (VSP): For GE01, is 15 or 25 programmable cycles needed? 25 is spec’d for the medium autoclaves but only 15 for the large.
Follow requirements. See page 18 of Solicitation
85
Section MECS Autoclave (VSP): For GE01, is 3 or 4 authorization cycles needed? 4 is spec’d for the medium autoclaves but only 3 for the large.
Follow requirements. Minimum three, four is acceptable.
86
Is it required to provide the same control interface for all autoclaves to minimize training?
Yes.
87
With regards to “the ability to monitor the life cycle of parts,” PRIMUS monitors the number of times major components are cycled and alerts the user/maintenance personnel when the parts are close to the estimated end of life. This allows maintenance personnel to predict when parts may need to be replaced and therefore allows them to order parts ahead of time to minimize downtime. Is this what is being specified? If not, can more detail be provided on this requirement?
Yes. Tracking of major components replacement and useful life is a requirement.
88
Are steam pressure regulators required for all autoclaves?
Yes.
89
What is the minimum required chamber finish for the autoclaves? Note that a higher-grade finish (<10Ra) will ease the cleaning of the autoclave and increase autoclave longevity.
10 Ra is sufficient.
90
Can more detail on the vacuum source for each autoclave be provided? The specification states “a vacuum source that reduces water consumption.” It is our understanding that a water recirculation system utilizing a water ejector is required for the medium autoclaves and a liquid ring vacuum pump is required for the bulk autoclave. Can you confirm this requirement?
Water recirculation system utilizing a water ejector is required for the medium autoclaves and liquid ring vacuum pump is required for the bulk autoclave.
91
Is NFPA 70e compliance required for all autoclaves?
Yes.
92
Are steam filters required for all autoclaves? Steam filters are only specified for the bulk autoclaves in the current specification. Can you provide more detail to the type of steam filters you are specifying?
Yes. Same steam filter that is currently on most sterilizers.

401469 Steam Filter Housing 20" 1"NPT IDL12GN16J7

401470 Steam Filter 20" for 401469 MBS1002PHJ7

93
The specification states “non-proprietary parts.” Please clarify if US dimensioned parts and pluming are required for consistency in parts around the facility.
US dimensioned parts and pluming are required.
94
Section B – Is it possible to please remove “hinged” from “Single door hinged” in the autoclave descriptions? Hinged doors are outdated. Newer doors are one touch button and sliding.
Yes, section has been updated.
95
Minimal Essential Characteristics:

Autoclaves (LOG)

- Minimum Available Utilities Autoclave:

120V, 1Ph, 30A Autoclave (VSP)

- Minimum Available Utilities Autoclave:

115V, 1Ph, 15A

Can you please add...”if autoclaves do not meet Mechanical, Electrical, or Plumbing requirements then an explanation as to what needs to be done along with the associated cost will need to be included in the proposal. Contractor will be fully responsible for mechanical, electrical, or plumbing upgrades to the facility as part of this solicitation.”

Language in Section 5.2.2 has been updated for clarity.