PSS-T_Base_QASP.docx
DOCX document 107 KB Posted
- Attached to
- DRAFT Persistent Surveillance Systems - Tethered
- Solicitation number
- W56KGY18R0019
About this file
This document is a Quality Assurance Surveillance Plan (QASP) for engineering/technical, logistics, and flight operations services for the Persistent Surveillance Systems-Tethered (PSS-T) program. The QASP outlines performance standards and monitoring methods for the PSS-T Base contract. Key performance standards include submitting all required data deliverables on time, maintaining threshold values for PBL metrics according to the PWS and CDRL F010, and 100% compliance with security training, financial reporting, and maintenance requirements. Performance will be monitored through formal reviews, audits, site inspections, review of CDRL submissions, and customer feedback. Performance will be documented using a Performance Assessment Report and corrective actions will be addressed in a Corrective Action Report if needed. Roles and responsibilities are defined for the Procuring Contracting Officer, Contract Specialist, Administrative Contracting Officer, and Contracting Officer's Representative in monitoring contractor performance.
This related federal contract opportunity is a special notice to solicit industry feedback on draft documents for engineering/technical, logistics, and flight operations services for the PSS-T program, which may be set aside for small businesses. A solicitation is projected to be issued in June 2018 with potential places of performance including contractor facilities, Army bases, and depots in the continental U.S. and overseas locations in CENTCOM, AFRICOM, PACOM, EUCOM and SOUTHCOM. This notice is not a request for proposal and the government is under no obligation to award a contract.
Base QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PSS-T_Base_CDRLs.pdf | ||
| PSS-T_Base_PWS.docx | DOCX document | |
| PSS-T_TO-0001_QASP.docx | DOCX document | |
| PSS-T_TO-0002_CDRLs.pdf | ||
| PSS-T_TO-0001_PWS-Appendix-A.docx | DOCX document | |
| PSS-T_TO-0002_QASP.docx | DOCX document | |
| PSS-T_TO-0002_PWS.docx | DOCX document | |
| PSS-T_TO-0002_PWS-Appendix-A.docx | DOCX document | |
| PSS-T_TO-0001_PWS.docx | DOCX document | |
| PSS-T_Base_PWS-Appendix-A.docx | DOCX document | |
| PSS-T_TO-0001_CDRLs.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan 23 March 2018
Quality Assurance Surveillance Plan (QASP) for
Product Director (PD) Aerostats Persistent Surveillance Systems – Tethered (PSS-T) Base Version 1.0
23 March 2018
PD Aerostats 6580 Surveillance Loop, Bldg 6006 Aberdeen Proving Ground, MD 21005
PAGE INTENTIONALLY BLANK
Table of Contents
| 1. | INTRODUCTION | 1 |
| 1.1 | Purpose | 1 |
| 1.2 | Performance Management Approach | 1 |
| 1.3 | Performance Management Strategy | 2 |
| 2. | ROLES AND RESPONSIBILITIES | 2 |
| 2.1 | Procuring Contracting Officer (PCO) | 2 |
| 2.2 | Contract Specialist (KS) | 3 |
| 2.3 | Defense Contract Management Agency & Administrative Contracting Officer | 3 |
| 2.4 | Contracting Officer’s Representative (COR) | 3 |
| 3. | IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS / QUALITY LEVELS | 3 |
| 4. | METHODOLOGIES TO MONITOR PERFORMANCE | 4 |
| 5. | QUALITY ASSURANCE DOCUMENTATION | 5 |
| 6. | ANALYSIS OF QUALITY ASSURANCE ASSESSMENT | 5 |
| 6.1 | Determining Performance | 5 |
| 6.2 | Reporting | 5 |
| 6.3 | Reviews and Resolution | 5 |
| ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY | 7 | |
| ATTACHMENT 2: PSS-T MAINTENANCE QUALITY ASSURANCE / QUALITY CONTROL CHECKLIST | 8 | |
| ATTACHMENT 3: PERFORMANCE ASSESSMENT REPORT | 12 | |
| ATTACHMENT 4: CORRECTIVE ACTION REPORT (CAR) | 13 |
FOR OFFICIAL USE ONLY
Quality Assurance Surveillance Plan 23 March 2018 v
PAGE INTENTIONALLY BLANK
INTRODUCTION
This QASP is pursuant to the requirements listed in the performance work statement (PWS) titled “Persistent Surveillance Systems - Tethered (PSS-T) Engineering/Technical, Logistics, and Flight Operations Support.” This plan sets forth the procedures and guidelines that PD Aerostats will use in ensuring performance standards or service levels are achieved by the Contractor.
Purpose The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance (QA) documentation requirements, and describes the analysis of QA monitoring results.
Performance Management Approach The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the Contractor should perform the work (i.e., results, not compliance). This QASP defines the performance management approach taken by PD Aerostats to monitor and manage the Contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the Contractor.
Performance management represents a significant shift from the more traditional QA concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome.
A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the Contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
The Government reserves the right to survey all services called for in the contract to determine if the performance objectives and goals were met. The Contractor will be evaluated as to the quality and timeliness of the output of their work and results will be documented in the COR file. The Performance Requirements Summary can be found within the Attachment 1.
Performance Management Strategy The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by Contractor employees or by subcontractors. The Contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will develop and implement a performance management system with processes to assess and report its performance to the designated Government representative. This QASP enables the Government to take advantage of the Contractor’s QC program.
The Government representative(s) will monitor performance and review performance reports furnished by the Contractor to determine how the Contractor is performing against communicated performance objectives. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
Performance will be evaluated to determine whether or not it meets the performance requirements as defined in the PWS. Performance will be evaluated to determine whether or not it meets the performance standards. The Contractor shall provide the Government with a written response explaining why performance standards were not met, how performance will be returned to acceptable levels, and how a reoccurrence will be prevented.
ROLES AND RESPONSIBILITIES
Procuring Contracting Officer (PCO) The PCO is responsible for safeguarding the interest of the United States within contractual relationships. Only a PCO is authorized to bind the Government, and only to the extent of the authority delegated to them through the issuance of a warrant. The PCO shall assure the Contractor receives impartial, fair, and equitable treatment under this contract. The PCO will designate a COR as the Government authority for performance management. The PCO shall monitor contract compliance, contract administration, cost control, and resolve any difference between the observations documented by the COR and the Contractor. The PCO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance. The PCO delegates authority for inspection and/or acceptance in accordance with (IAW) the terms of the contract, and informs the Contractor of the name, duties, and limitations of authority for all QA personnel for this contract.
Contract Specialist (KS) The KS acts as a liaison between the Contractor and PD Aerostats, as well as a liaison between the Contractor and Army Contracting Command – Aberdeen Proving Ground.
Defense Contract Management Agency & Administrative Contracting Officer Contract administrative responsibilities shall be assigned IAW the PCO’s delegation letter.
Contracting Officer’s Representative (COR) The COR is designated in writing by the PCO to act as an authorized representative to assist in administering the contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the PCO for action. The COR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the Contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
At the end of each month, the COR will prepare a written report for the PCO summarizing the overall results of the QA surveillance of the Contractor’s performance. This written report, which includes the Contractor’s submitted monthly report, will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including technical, schedule, and cost objectives. The following information should be contained in a surveillance folder:
QASP
Contractor’s Quality Plan The task order and PWS, modifications, and contract data requirement lists (CDRLs) COR appointment letter and training certificates Certification of services documentation Corrective action requested Monthly surveillance status reports Minutes / memorandums / miscellaneous correspondence
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS / QUALITY LEVELS
The Contractor will be evaluated on the quality and timeliness of their work and deliverables, with the results documented in the COR’s file, against the performance standards and/or quality levels included in the PWS and in Attachment 1 to this document, “Performance Requirements Summary.” It is the Government’s expectation that the Contractor meet the acceptable quality level for all items cited in Attachment 1. Specifically, the performance based logistics (PBL) metrics monitoring and reporting requirements listed as “level 1” in the PSS-T PWS are critical. This level of performance are key to the overall mission performance.
METHODOLOGIES TO MONITOR PERFORMANCE
The Government will utilize the following mechanisms to monitoring contract performance:
· Formal Reviews: PD Aerostats will conduct regular reviews with the Contractor, including program management review, business management review, technical interchange meetings, integrated Product Support Manager (PSM) integrated product team (IPT) meetings, and integrated baselines reviews.
· Audit/Witness: DCMA will also support monitoring the EVMS system, property inventories, hardware and software deliverables, and invoices. The COR and other Government representatives will have the opportunity to audit and witness property inventories, quality programs, training certifications, testing and configuration audits.
· Site Inspections/Investigations: The OCONUS COR will conduct rotating site inspections each month. The OCONUS COR will utilize Attachment 2, “PSS-T Maintenance Quality Assurance / Quality Control Checklist” to assist in the assessment of performance OCONUS. The OCONUS COR will also be responsible for conducting investigations as required for damages or losses and preparing a Financial Liability Investigation of Property Loss (FLIPL) IAW DD Form 200.
· CDRLs: The COR will gather input from PD Aerostats on CDRL submissions. The CDRLs are reviewed for accuracy and completeness IAW with CDRL narrative and data item description requirements, technical adequacy, format, and consistency with other technical/cost data. The Government will also conduct in-process reviews and demonstrations for larger CDRLs.
· Inspections of Government furnished databases: The Government randomly inspects the data in Government Furnished management systems. The databases are inspected for accuracy/completeness of data and frequency of updates.
· Feedback: United States Army and/or Department of Homeland Security customers may provide direct feedback regarding the Contractor. The Government will review the feedback in conjunction with PWS requirements and performance standards.
QUALITY ASSURANCE DOCUMENTATION
The Government’s quality assurance (QA) surveillance, accomplished by the COR, will be reported using the Performance Assessment Report in Attachment 3. The forms, when completed, will document the Government’s assessment of the Contractor’s performance under the contract to ensure that the required results for quality levels are being achieved. The COR will retain a copy of all completed QA surveillance forms.
The Product Lead plans on holding weekly IPT meetings with the KO, CORs, DCMA, and product team functional leads to discuss contractor performance. The PCO will have regularly teleconferences with the Contractor to discuss performance concerns and will provide Performance Assessment Reports to the Contractor as required.
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
Determining Performance The Government shall use the monitoring methods cited in Attachment 1 to determine whether the performance standards/service levels/AQLs have been met. If the Contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
Reporting At the end of each month, the COR will prepare a written report for the PCO summarizing the overall results of the QA surveillance of the Contractor’s performance. This written report, which includes the Contractor’s submitted monthly report and the completed Performance Assessment Reports (Attachment 3), will become part of the QA documentation. It will enable the Government to demonstrate whether the Contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
Reviews and Resolution The COR may require the Contractor’s project manager, or a designated alternate, to meet with the PCO, PD Aerostats, and other Government IPT personnel, as deemed necessary to discuss performance evaluation. The COR will define a frequency of in-depth reviews with the Contractor, including appropriate self-assessments by the Contractor; however, if the need arises, the Contractor will meet with the COR as often as required or per the Contractor’s request. The agenda of the reviews may include:
a) Monthly performance assessment data and trend analysis
b) Issues and concerns of both parties
c) Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
d) Recommendations for improved efficiency and/or effectiveness The COR must coordinate and communicate with the Contractor to resolve issues and concerns regarding marginal or unacceptable performance. The COR and Contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO.
If the COR determines a formal written corrective action report (CAR) (Attachment 0004) is required, the COR shall prepare and present it to the Contractor’s representative. The Contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the Contractor has to present this corrective action plan to the COR. The Government shall review the Contractor’s corrective action plan to determine acceptability. CARs may become supporting documentation for contract payment deductions, fixed fee deductions, or other actions deemed necessary by the PCO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
| Required Services |
| Performance standards |
| Acceptable Quality Levels |
| Method of Surveillance |
| Submit all data deliverables ordered under this contract (Contract Exhibits A through U) |
| 100% |
| 100% |
| Review of data deliverables and date of receipt |
| The Contractor shall maintain threshold values for PBL metrics IAW paragraphs PWS 3.3.2.1.2 and 3.3.2.2.1 IAW CDRL F010. |
| 100% compliance with the PWS and CDRL |
| 100% |
| Review of data deliverables and date of receipt |
| Contractor Manpower Reporting IAW 52.237-9001 Enterprise-wide Contractor Manpower Reporting Application (eCMRA) Reporting. |
| 100% compliance with the PWS |
| 100% |
| Periodic monitoring and review of data |
| Compliance with all mandatory security training IAW DD Form 254. |
| 100% compliance with the PWS |
| 100% |
| Periodic inspection of certificates of completed training |
| The Contractor shall provide financial/resource reporting by contract line item number (CLIN), sub-line item number (SLIN), and work breakdown structure (WBS) to segregate costs incurred IAW PWS paragraph 3.1.3.1 and CDRL A004, and IAW PWS paragraph 3.1.3.3 and CDRL A005. |
| 100% compliance with PWS and CDRLs |
| 100% |
| Review of data |
| The Contractor shall perform all PMCS within scheduled timeframes IAW PSS-T TMs. |
| 100% compliance with scheduled timeframes in PSS-T TMs |
| 100% |
| Review of Government Furnished database logs |
| The Contractor shall provide complete system reconstitution following up an aerostat crash/incident IAW PWS paragraph 3.3.6.5. |
| 100% compliance with PWS |
| 100% |
| Review of Situational reports/commander’s critical incident report |
ATTACHMENT 2: PSS-T MAINTENANCE QUALITY ASSURANCE / QUALITY CONTROL CHECKLIST
Scoring Metrics:
1 - Unsatisfactory 2 - Marginal 3 - Satisfactory 4 - Very Good 5 - Excellent
| System Safety and Health Hazards (PWS 3.3.10 and its subparagraphs): |
| Yes/No/NA |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
The Contractor shall maintain the material safety data sheets library on every hazardous material (HAZMAT) procured, stored, or used within each site. (3.3.10.5)
The Contractor shall reduce excess hazardous waste disposal by optimizing procedures for reuse of material, rotation of stocks to ensure the use prior to expiration date, and protecting storks from damage by weather and poor handling. (3.3.10.5)
The Contractor shall ensure all HAZMAT containers are labeled and stored IAW Occupational Safety and Health Administration (OSHA) Part 1910 and AR-200-1. (3.3.10.6)
The Contractor will ensure they have qualified, licensed/certified personnel familiar with OCONUS requirements, to prepare/package HAZMAT for transport on military airlift IAW Air Force manual 24-204.(3.3.10.7)
The Contractor shall be required to turn in HAZMAT and associated waste to the installation/site collection points IAW regulations and policies of the sites. (3.3.10.8)
COMMENTS:
Supply Support (PWS 3.3.3 and subparagraphs):
Does site have required supply of repair parts to maintain Ao 90%? (3.3.3.1)
Does site have required supply of consumables? (3.3.3.1)
Has site ordered parts for required maintenance actions? (3.3.3.1)
Does site have master inventory listing of site system parts? (3.3.3.4)
- of consumables? (3.3.3.4)
COMMENTS:
Aerostat Operations (PWS 3.4.3 and subparagraphs):
Are site unique support equipment (USE) services performed (generators, power distribution platform (PDP), forklift, site personnel lift equipment, site transport vehicles)? (3.4.3.1)
Are ground control station / transportation, maintenance, and office shelter environmental control unit PMCS being performed? (3.4.3.1)
Are mooring platform hydraulic Preventative Maintenance Checks and Services (PMCS) being performed? (3.4.3.1)
Are tether drum PMCS services performed? (3.4.3.1)
Has all equipment cleaned IAW PMCS procedures? (3.4.3.1)
Is repair/testing equipment serviceable? (3.4.3.1)
Does site have maintenance records for all services performed/required? (3.4.3.2)
Does site have equipment maintenance services documentation? (3.4.3.2)
COMMENTS:
Package Handling, Storage, and Transportation (PWS 3.3.5)
Has site identified parts obsolete and/or requiring relocation? (3.3.5.10)
Are parts requiring relocation/retrograde scheduled for movement? (3.3.5.10)
COMMENTS:
Training (PWS 3.3.11)
The Contractor shall provide annual PSS-T aerostat crew re-certification IAW furnished PSS-T certification POI. The Contractor shall document all re-certification training within a Government furnished database. (3.3.11.5)
COMMENTS:
Quality Program (3.2.8):
Is a copy of the Contractor’s Quality Policy, Quality Objectives, and Quality Manual readily available to the workforce? (3.2.8.1)
Is the quality documentation used by the workforce appropriate for the work performed at this facility? (3.2.8.1)
Are quality metrics and/or objectives established and posted where the workforce can routinely see them? (3.2.8.1)
COMMENTS:
Government Property (FAR 52.245-1) :
Does the local facility receive, use or store any Government furnished property, equipment, parts , components, materials, consumables, ground support equipment, other support equipment or any article of any type belonging to the Government? (52.245-1)
If Yes: Is the Government property maintained in a clean, protected, functional, corrosion controlled, and organized manner? (52.245-1)
If Fail: Note specific deficiency:
COMMENTS:
ATTACHMENT 3: PERFORMANCE ASSESSMENT REPORT
PERFORMANCE ASSESSMENT REPORT (PAR)
| 1. CONTRACT/TASK ORDER NUMBER |
| 2. CONTRACTOR |
| 3. TYPE OF SERVICES |
4. QUALITY ASSURANCE PERSONNEL (QAP) SIGNATURE AND DATE
| 5. QAP PHONE |
| 6. SUSPENSE DATE |
I. PERFORMANCE
7. |_| DEFICIENCY (CHECK ALL BOXES THAT APPLY)
|_| NEW
|_| REPEAT
|_| NO DEFICIENCY NOTED
8. SERVICES SUMMARY or SOW PARAGRAPH ITEM REVIEWED
| 9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS CHECKED) |
| 10. DETAILED PERFORMANCE ASSESSMENT |
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE |_| CONCUR |_| NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF QAP CITED DEFICIENCY
III. ACTION CORRECTED
14. |_| CONCUR |_| NON-CONCUR QAP SIGNATURE AND DATE
15. QAP REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS
ATTACHMENT 4: CORRECTIVE ACTION REPORT (CAR)
CORRECTIVE ACTION REPORT
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY |_| MAJOR |_| MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
|_| ACCEPTED |_| REJECTED
12. CLOSE DATE
image1.jpeg