PSS-T_Base_CDRLs.pdf

PDF 961 KB Posted

Attached to
DRAFT Persistent Surveillance Systems - Tethered
Solicitation number
W56KGY18R0019
Issued by

About this file

This special notice solicits industry feedback on draft documents to support engineering, technical, logistics, and flight operation services for the Persistent Surveillance Systems-Tethered program. Services may be set aside for small businesses or procured through full and open competition.

Potential performance locations include CENTCOM, AFRICOM, PACOM, EUCOM, SOUTHCOM, and NORTHCOM areas including Tobyhanna US Army Depot, Yuma Proving Ground, Joint Base McGuire-Dix-Lakehurst, and Sierra Army Depot. The Army intends to issue a solicitation in June 2018 for these services. This special notice is not itself a request for proposal and does not obligate the government to award any contracts. It seeks industry input on draft documents to support a future competitive procurement.

Base CDRLs

View the file

Other files

File Type Posted
PSS-T_Base_PWS.docx DOCX document
PSS-T_TO-0001_QASP.docx DOCX document
PSS-T_TO-0002_CDRLs.pdf PDF
PSS-T_TO-0001_PWS-Appendix-A.docx DOCX document
PSS-T_TO-0002_QASP.docx DOCX document
PSS-T_TO-0002_PWS.docx DOCX document
PSS-T_TO-0002_PWS-Appendix-A.docx DOCX document
PSS-T_TO-0001_PWS.docx DOCX document
PSS-T_Base_QASP.docx DOCX document
PSS-T_Base_PWS-Appendix-A.docx DOCX document
PSS-T_TO-0001_CDRLs.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATA ITEM

NO.

DATA ITEM TITLE AUTHORITY PWS REFERENCE

A001 Management Plan DI-MGMT-80004A 3.1.2.1

A002 Phase-Out Transition Plan DI-MGMT-81945 3.1.2.2

A003 Contractor's Progress and Status Report - Monthly

DI-MGMT-81928 3.1.1.4, 3.1.3.1 & 3.2.3.2

A004 Contract Funds Status Report

(CFSR)

DI-MGMT-81468 3.1.3.1

A005 Contract Invoicing and Payment Report

DI-MGMT-81651 3.1.3.3

A006 Critical Defect Investigation Report DI-MGMT-81989 3.2.1.5

A007 DIACAP and RMF Deliverable Data DI-MGMT-82000 3.2.5.2.2, 3.2.5.2.3, 3.2.5.3.4 & 3.2.5.4.1

A008 DMSMS Management Plan DI-MGMT-81948 3.3.4.4

A009 Status Report - Daily Status DI-MGMT-80368A 3.4.1.1 & 3.4.1.3

A010 Mobilization Plan DI-MGMT-81837 3.4.5.5

A011 Operations Security (OPSEC) Plan DI-MGMT-80934C 3.1.1.9

A012 Government Property Inventory Report

DI-MGMT-80441C 3.3.3.8

B001 Presentation Materials DI-ADMN-81373 3.1.1.3, 3.1.1.5, 3.2.2.13 & 3.3.1.2

B002 Conference Minutes DI-ADMN-81250B 3.1.1.6, 3.2.2.14 & 3.3.1.3

B003 Program Protection Implementation Plan (PPIP)

DI-ADMN-81306 3.2.11.1

C001 Training Support Package

TRADOC Pamphlet 350-70-14

3.3.11.6

D001 Personnel Report DI-MISC-81419 3.1.3.4

D002 Technical Report – Study/Services DI-MISC-80508B 3.2.6.7.4

D003

Training Device Inventory Checklist/Record (Monthly Inventory Status Report)

DI-MISC-81191B 3.3.3.6

D004 Site Survey Report DI-MISC-82104 3.4.3.5

E001

Reliability - Centered Maintenance (RCM) Failure Mode and Effects Analysis (FMEA) Data

DI-PSSS-80980B 3.2.1.2

E002 Level of Repair Analysis (LORA) Input Data

DI-PSSS-81872A 3.3.7.2.1

E003 Reliability-Centered Maintenance (RCM) Procedure Validation Report

DI-PSSS-80987 3.3.7.2.2

F001 Failure Summary and Analysis Report

DI-SESS-80255A 3.2.1.3

F002 Systems Engineering Management Plan (SEMP)

DI-SESS-81785 3.2.2.9

F003 Supplier's Configuration Management Plan (CMP)

DI-SESS-80858C 3.2.6.3

F004 Request for Variance DI-SESS-80640D 3.2.6.5.1 and 3.3.8.2

F005 Engineering Change Proposal (ECP) DI-SESS-80639D 3.2.6.6.1 and 3.2.6.6.3

F006 Configuration Status Accounting (CSA) Information

DI-SESS-81253C 3.2.6.7.1

F007 Configuration Audit Plan DI-SESS-81646B 3.2.6.8.1

F008 Configuration Audit Summary Report and Certification

DI-SESS-81022D 3.2.6.8.5

DATA ITEM TITLE AUTHORITY PWS REFERENCE

F009 Technical Data Package (TDP) DI-SESS-80776A 3.2.7.1.1, 3.2.7.1.2, 3.2.7.1.3 & 3.2.7.2.1

F010 Logistics Product Data Summaries DI-SESS-81759A 3.3.2.1.1 & 3.3.2.2.1

G001 Software Requirements Specification (System/Subsystem Specification)

DI-IPSC-81431A 3.2.2.4

G002 Software Requirements Specification DI-IPSC-81433A 3.2.2.4

G003 Software Design Description (SDD) DI-IPSC-81435A 3.2.3.7

G004 Software Version Description (SVD) DI-IPSC-81442A 3.2.3.12

G005 Software Test Plan (STP) DI-IPSC-81438A 3.2.3.9

G006 Computer Software Product DI-IPSC-81488

3.2.2.5, 3.2.3.11, 3.2.7.4.2, 3.2.7.4.3 & 3.2.7.4.4

G007 Software Documentation DI-IPSC-81756 3.2.7.4.1

G008 Software Test Description (STD) DI-IPSC-81439A 3.2.3.10

G009 Interface Design Document (IDD) DI-IPSC-81436A 3.2.3.13

G010 Software Test Report (STR) DI-IPSC-81440A 3.2.9.8

G011 Software Development Plan DI-IPSC-81427B 3.2.3.6 & 3.2.9.2

H001

DoD Modeling and Simulation (M&S) Verification and Validation (V&V) Report

DI-MSSM-81752 3.2.2.7

J001

Information Assurance (IA) Design Review Information Package (DRIP) (Network Designs)

DI-MGMT-81845 3.2.4.7

J002 Network Management Plan DI-MGMT-81911 3.2.4.10

K001 Parts Management Plan DI-SDMP-81748 3.2.7.2.2

L001 Quality Program Plan (QPP) DI-QCIC-81722 3.2.8.1

M001 Test/Inspection Report DI-NDTI-80809B 3.2.9.7

M002 Test Plan DI-NDTI-80566A 3.2.9.11

N001 Test Program Set Documentations

(TPSD)

DI-ATTS-80284B 3.3.9.5

P001 Diminishing Manufacturing Sources and Material Shortages

SD-22 3.3.4.5

Q001

Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report

DI-QCIC-80125B 3.3.4.6.4

Q002 Government Industry Data Exchange Program (GIDEP) Alert Response

DI-QCIC-80126B 3.3.4.6.5

R001 Equipment Technical Manual (Sanitized)

DI-TMSS-81675A 3.3.12.1, 3.3.12.2 & 3.3.12.3

R002 Technical Manual Validation Certificate

DI-TMSS-81819A 3.3.12.4

R003 Technical Manual Verification Discrepancy/Disposition Record

DI-TMSS-81820 3.3.12.7

R004 Technical Manual Verification Incorporation Certificate

DI-TMSS-81821 3.3.12.8

R005 Equipment Technical Manual (Sanitized)

DI-TMSS-81675A 3.4.4.3

R006 Technical Manual Validation Plan DI-TMSS-81818 3.3.12.9

S001 Electronic Reliability Design Handbook

MIL-HDBK-338B 3.3.7.2.3

DATA ITEM TITLE AUTHORITY PWS REFERENCE

T001 Safety Assessment Report (SAR) DI-SAFT-80102C 3.3.10.1

T002 Accident/Incident Report DI-SAFT-81563 3.4.4.5

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

Adobe Professional 8.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Management Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80004A

5. CONTRACT REFERENCE

PWS 3.1.2.11

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

R/ASR

12. DATE OF FIRST SUBMISSION

Proposal

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

Draft Final

Reg Repro

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft Word file format. Contractor format is acceptable.

This plan should address the following:

Management: This plan shall outline the organization, assignment of functions, duties, and responsibilities, management procedures and policies, and reporting requirements.

The Contractor shall augment the following sections of the DiD accordingly:

- Section 3.5: with an approach to communications and interactions with military leadership, as well as an approach to communicate tasks with team personnel and subcontractors and monitor task progression, description of the procedures for supply chain management and execution, description of the policies and procedures utilized to provide training certification and re-certification management and oversight and procedures for management of regular maintenance.

- Section 3.5a: with an approach to manage multiple source of funding.

- Section 3.6.b: with an approach to monitor quality of personnel.

Transition: Provide details of how the Contractor will mitigate interruption in services during the phase-in period. The plan shall identify how the transition will minimize the impact on current mission/activities, while ensuring the completeness of the transition. It shall also identify who / what is impacted by the transition, the activities that need to be accomplished in order to successfully effect the transition, the impact on the organization, and the roles and responsibilities of all who participate in the transition. It shall include the detailed schedule to be followed in order to successfully effect the transition and how any issues or discrepancies will be resolved.

Data management plan: The plan shall cover content regarding management, configuration control, automated workflows, protection of third party intellectual property, and integration into the PD Aerostats enterprise. The Government requires online access to all data (released, work in process, archive) in near real time. Online access would be limited to maximum level of FOUO and the system would be required to meet all security and IA requirements for hosting of Government data.

BLOCK 4 (Cont’d): OCI: Shall identify all actual or potential Contractor organizational conflicts of interest (OCIs), presently and in the future, and the various techniques that are and will be used to avoid, mitigate, or neutralize any OCI, such as: bars on present or future work or structural barriers, internal corporate controls of various types, firewalls, "walled Subcontractors," or any other permissible remedy.

SFAE-IEW-TA 1 1

CCAP-CCC 1 1

DCMA 1

See Block 16 1 1

15. TOTAL 3 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

Matthew Chellin

J. DATE

Reset

DD FORM 1423-1, FEB 2001 Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

MGMT TDP TM OTHER

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

16. REMARKS (Continued)

BLOCK 8: The Government will have the opportunity to review and provide comments within 15 days of receipt of the deliverable. Revisions shall be due NLT seven (7) days after receipt of Government comments.

BLOCK 10: The Contractor shall submit revisions to the plan upon receipt of comments from the Government, as well as upon any changes to the management structure or critical process.

BLOCK 13: The Contractor shall submit additional submission upon revisions/changes to the plan. Revisions shall be due NLT seven (7) days after receipt of Government comments.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil;

Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox: usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

DD FORM 1423-1, FEB 2001

PREVIOUS EDITION MAY BE USED.

Page of Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Phase-Out Transition Plan

3. SUBTITLE

Phase-Out Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81945

5. CONTRACT REFERENCE

PWS 3.1.2.2

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

ONE/P

12. DATE OF FIRST SUBMISSION

DFDEL

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

Draft Final

Reg Repro

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft Word file format. Contractor format is acceptable. The plan shall detail how the Contractor would support phase-out to another contractor for up to 150-180 days before work may be ceased. The plan shall identify how the transition will minimize the impact on current mission/activities while ensuring the completeness of the transition. It shall also identify who/what is impacted by the transition, the activities that need to be accomplished in order to successfully effect the transition, the impact on the organization, and the roles and responsibilities of all who participate in the transition. It shall include a detailed schedule to be followed in order to successfully effect the transition and how any issues or discrepancies will be resolved. The overall transition plan shall focus on maintaining operational readiness while also ensuring an efficient transfer of critical data. At a minimum, the following areas shall be addressed:

• Training of operators

• Transfer of GFP

• Systems engineering plan

• Reachback support plan

• Technical data management plan

• Knowledge and information/data transfer methodology

• Identify projected risks and mitigation plans

• Operations and logistics support functions

• Master schedule

BLOCK 8: The Government will have the opportunity to review and provide comments within 15 days of receipt of the deliverable. Revisions shall be due NLT seven (7) days after receipt of Government comments.

BLOCKS 12 & 13: The first submission of this plan shall be within 200 days prior to the end of the period of performance. Revisions shall be due NLT seven (7) days after receipt of Government comments.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox: usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

SFAE-IEW-TA 1 1

CCAP-CCC 1 1

See Block 16 1 1

15. TOTAL 3 4 0

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Contractor’s Progress and Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81928

5. CONTRACT REFERENCE

PWS 3.1.1.4, 3.1.3.1 & 3.2.3.2

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

MTHLY

12. DATE OF FIRST SUBMISSION

EOM

8. APP CODE

N/A

11. AS OF DATE

O

13. DATE OF SUBSEQUENT

MTHLY

Draft Final

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft Word file format, with Figures 1-3 submitted in editable Microsoft Excel file format.

Contractor format is acceptable.

In addition to the information required by the authority cited in Block 4, the deliverable shall address the following topics:

1) The Contractor shall include a graph for each software development project.

2) Status of the contractor’s progress on achieving all system accreditations and continuous monitoring activities of sustaining current ATOs.

3) Status of the contractor’s progress on approved ECPs.

BLOCK 11: Report should reflect data as of the end of the previous month.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative

SFAE-IEW-TA 1

CCAP-CCC 1

See Block 16 1

15. TOTAL 0 4 0

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

A004

Contract Funds Status Report (CFSR)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81468

5. CONTRACT REFERENCE

PWS 3.1.3.1

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

MTHLY

12. DATE OF FIRST SUBMISSION

60DAC

8. APP CODE

A

11. AS OF DATE

O

13. DATE OF SUBSEQUENT

SUBMISSION

MTHLY

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft Excel file format. Deliverables shall provide financial/resource reporting by contract line item number (CLIN), sub-line item number (SLIN), and work breakdown structure (WBS) to segregate costs incurred. Contractor format is acceptable.

BLOCK 8: The Government will have the opportunity to review and provide comments within 30 days of receipt of the deliverable. Revisions shall be due NLT 15 days after receipt of Government comments.

BLOCK 11: Report shall reflect data as of the end of the previous month.

BLOCK 13: After the first submission, the Contractor shall deliver this report no later than the tenth calendar day of every month. The Contractor shall submit a final report within 30 days for the last month in a period of performance (to include all option periods, extensions, etc.).

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox:

usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

DCMA 1

See Block 16 1 1

15. TOTAL 3 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

A005

Contract Invoicing and Payment Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81651

5. CONTRACT REFERENCE

PWS 3.1.3.3

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

ASGEN

12. DATE OF FIRST SUBMISSION

ASGEN

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft Word/Excel/PowerPoint/Project file format. Contractor format is acceptable.

In addition to the information required by the authority cited in Block 4, the report shall also include:

For other than direct costs (ODC): Shall include trip request authorization number, dates of travel, destination, and trip cost, and; item/name, description, unit cost, number of units, extended costs for ODCs/material.

For services: This report shall include labor category, rate, current and cumulative hours (both straight time and overtime) and costs for the contractor and subcontractors.

BLOCK 10 & 12: This report will be submitted with each invoice and or credit memo submission.

BLOCK 13: This report will be submitted with each invoice and or credit memo submission.

Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox: usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

SFAE-IEW-TA 1

CCAP-CCC 1

DCMA 1

See Block 16 1

15. TOTAL 0 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

A006

Critical Defect Investigation Report

3. SUBTITLE

Root Cause Analysis

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81989

5. CONTRACT REFERENCE

PWS 3.2.1.5

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

DFDEL

12. DATE OF FIRST SUBMISSION

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Draft

Final

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in an editable Microsoft Word file format. Contractor format is acceptable.

BLOCKS 10, 12 & 13: Delivery shall be upon request of the Government. Revisions shall be due NLT seven (7) days after receipt of Government comments.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox:

usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

DCMA 1

See Block 16 1

15. TOTAL 0 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

A007

DIACAP and Risk Management Framework (RMF) Deliverable Data

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-82000

5. CONTRACT REFERENCE

PWS 3.2.5.2.2, 3.2.5.2.3, 3.2.5.3.4 & 3.2.5.4.1

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

MTHLY

12. DATE OF FIRST SUBMISSION

MTHLY

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

MTHLY

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. The format required must be .csv for Nessus, .xml and .html for SCC, and .ckl for STIGs. Contractor format is acceptable.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil;

the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox: usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

DCMA 1

See Block 16 1

15. TOTAL 0 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

A008

Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81948

5. CONTRACT REFERENCE

PWS 3.3.4.4

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

SEMIA

12. DATE OF FIRST SUBMISSION

Proposal

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

SEMIA

Draft

Final

Reg Repro

16. REMARKS

Word/Excel/Powerpoint/Project file format. Contractor format is acceptable.

Plan shall address managing the loss, or impending loss, of manufacturers or suppliers of parts and/or material required for performance of this contract. At a minimum, the plan shall address the following:

- Means and approach for providing the Government with information regarding obsolescence and DMSMS issues

- Planned resolution of current obsolescence and DMSMS issues

- Parts list screening

- Parts list monitoring

- Receiving, processing and disseminating Government-Industry Data Exchange Pro-gram (GIDEP) DMSMS Notices

- Receiving, processing and disseminating Defense Logistics Agency (DLA) DMSMS Alerts

- Communication with and availability of information to the Government

- Means and approach for establishing obsolescence and DMSMS solutions

- Plan for conducting DMSMS predictions.

after receipt of Government comments.

BLOCK 12: Draft Plan is due at the time of proposal submission. The final plan is due 60 days after contract award.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative

DCMA 1

See Block 16 1 1

15. TOTAL 3 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

A009

Status Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

PWS 3.4.1.1 & 3.4.1.3

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

DAILY

12. DATE OF FIRST SUBMISSION

14DAC

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

DAILY

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft Word file

BLOCK 11, 12 & 13: Submit reports via a Government furnished operations database management program, as follows:

- Daily Operations Status Report

- Mean Time Between Failures

- Site Configuration Status Report

- Daily Operational Status Teleconference

Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox: usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

SFAE-IEW-TA 1

CCAP-CCC 1

DCMA 1

See Block 16 1

15. TOTAL 0 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

A010

Mobilization Plan

3. SUBTITLE

Demobilization Plan

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-81837

5. CONTRACT REFERENCE

PWS 3.4.5.5

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

See Blk 16

12. DATE OF FIRST SUBMISSION

See Blk 16

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: This deliverable shall be submitted electronically in editable Microsoft Word/Excel/Powerpoint/Project file format. Contractor format is acceptable.

within 15 days of receipt of the plan. Revisions shall be due NLT seven (7) days after receipt of Government comments.

BLOCK 10 & 12: The Contractor shall submit a demobilization plan within 90 days after requested by the Contracting Officer.

BLOCK 13: The Contractor shall update every 30 calendar days after incorporation of the plan into the contract, or as otherwise directed by the Contracting Officer.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox: usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil.

SFAE-IEW-TA 1 1

CCAP-CCC 1 1

DCMA 1

See Block 16 1 1

15. TOTAL 3 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

A011

Operations Security (OPSEC) Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80934C

5. CONTRACT REFERENCE

PWS 3.1.1.9

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

ONE/R

12. DATE OF FIRST SUBMISSION

90DAC

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

DFDEL

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: Reports shall be submitted electronically in Microsoft Word file format.

Contractor format is acceptable.

The Contractor’s plan shall align with the PD Aerostats OPSEC Plan dated 26 February 2014. The plan shall outline the Contractor’s process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected.

within 15 days of receipt of all reports. Revisions shall be due NLT seven (7) days after receipt of Government comments.

BLOCK 13: The Contractor will update the OPSEC Plan to align with any PD Aerostats changing OPSEC requirements. The Government will notify the Contractor in writing and the Contractor will have 30 days to submit a change to the OPSEC plan, for Government review and approval. The requiring office must approve all subsequent revisions to the OPSEC plan prior to initiation of any changes.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox: usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

SFAE-IEW-TA 1 1

CCAP-CCC 1 1

DCMA 1

See Block 16 1 1

15. TOTAL 3 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY:

TDP TM OTHER MGMT

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

A012

Government Property Inventory Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80441C

5. CONTRACT REFERENCE

PWS 3.3.3.8

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

See Blk 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft/Excel/Powerpoint/Project file format. Contractor format is acceptable.

BLOCK 10, 12 & 13: The Contractor shall deliver this report 10 business days after each 10% monthly inventory and 100% annual cyclic inventory.

Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox: usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

SFAE-IEW-TA 1

CCAP-CCC 1

DCMA 1

See Block 16 1

15. TOTAL 0 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

B001

Presentation Materials

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81373

5. CONTRACT REFERENCE

PWS 3.1.1.3, 3.1.1.5, 3.2.2.13 & 3.3.1.2

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

See Blk 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See Blk 16

Draft

Final

Reg Repro

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft Office file format. Materials shall be submitted in accordance with the Government-provided template for PMRs and BMRs inclusive of an agenda. Contractor format is acceptable for TIM deliverables.

BLOCK 8: For PMR, the Government will have the opportunity to review and provide comments within seven (7) days of receipt of materials. Revisions shall be due NLT 48 hours prior to each program management review (PMR).

BLOCK 10, 12, & 13:

-For PMRs, submit draft presentation slides NLT two (2) weeks prior to each PMR and final slides NLT 48 hours prior to each PMR.

-For BMRs, submit final presentation slides NLT 48 hours prior to each BMR.

-For TIMs, submit final presentation slides NLT 48 hours prior to each TIM.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox: usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

SFAE-IEW-TA 1 1

CCAP-CCC 1 1

DCMA 1

See Block 16 1 1

15. TOTAL 3 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

B002

Conference Minutes

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81250B

5. CONTRACT REFERENCE

PWS 3.1.1.6, 3.2.2.14 & 3.3.1.3

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

See Blk16

12. DATE OF FIRST SUBMISSION

See Blk16

8. APP CODE

N/A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

Word file format. Contractor format is acceptable.

BLOCK 10, 12, & 13: Submit within seven (7) business days after the program kick-off meeting; each program management review (PMR); each business management review (cost and budget reviews) (BMRs), and each Product Support Manager integrated product team (PSM IPT) meeting. Submit within two (2) business days for each technical interchange meeting (TIM).

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox:

usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

SFAE-IEW-TA 1

CCAP-CCC 1

DCMA 1

See Block 16 1

15. TOTAL 0 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT C. CATEGORY:

TDP TM OTHER ADMN

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

B003

Program Protection Implementation Plan (PPIP)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DI-ADMN-81306

5. CONTRACT REFERENCE

PWS 3.2.11.1

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

See Blk 16

12. DATE OF FIRST SUBMISSION

8. APP CODE

A

11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

Reg Repro

16. REMARKS

BLOCK 4: Deliverables shall be submitted electronically in editable Microsoft Word file format. Contractor format is acceptable.

The Contractor shall supplement section 10.b of the DID by developing, documenting, and updating Table 4.3.3-1, Application of Software Assurance Countermeasures, IAW the table description provided in the DoD Program Protection Plan Outline & Guidance, dated 16 March 2017.

BLOCK 8: The Government will have the opportunity to review and provide comments within 15 days of receipt of the deliverable. Revisions shall be due NLT seven (7) days after receipt of Government comments.

BLOCKS 10, 12 & 13: The Contractor shall submit revisions to the plan upon receipt of comments from the Government, as well as upon any changes to the management structure or critical process. The Contractor shall submit additional submission upon revisions/changes to the plan. The Contractor shall submit the PPIP within 30 days of receiving countermeasures. Revisions shall be due NLT seven (7) days after receipt of Government comments.

DCMA 1

See Block 16 1

15. TOTAL 0 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C

C. CATEGORY:

TDP TM OTHER TRADOC Pamphlet

D. SYSTEM/ITEM

Persistent Surveillance Systems - Tethered

C001

Training Support Package

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

TRADOC Pamphlet 350-70-14

5. CONTRACT REFERENCE

PWS 3.3.11.6

6. REQUIRING OFFICE

SFAE-IEW-TA

7. DD 250 REQ

DD

ASREQ

12. DATE OF FIRST SUBMISSION

ASREQ

8. APP CODE

A

11. AS OF DATE

N;/A

13. DATE OF SUBSEQUENT

SUBMISSION

ASREQ

Draft

Final

Reg Repro

16. REMARKS

The Contractor’s delivery of the TSP shall include the program of instruction, lesson plans, quizzes, tests, practical exercises, checks on learning, student hand-outs, instructor guides, technical manuals, new equipment training package and materials, and the instructor and key personnel training package and materials.

after receipt of Government comments.

BLOCK 10: The Contractor shall submit deliver updates and/or revisions to the TDP as the baseline changes or upon receipt of comments from the Government.

BLOCK 13: The Contractor shall submit additional submission upon revisions/changes to the plan. Revisions shall be due NLT seven (7) days after receipt of Government comments.

BLOCK 14: Submissions shall be sent electronically to: Thomas Frank, Contracting Officers Representative at thomas.m.frank.civ@mail.mil; Jennifer Mattessino, Procuring Contracting Officer at jennifer.l.mattessino.civ@mail.mil; the assigned Administrative Contracting Officer of DCMA as well as the Government CDRL mailbox:

usarmy.apg.peo-iews.mbx.pm-ts-aerostatscdrls@mail.mil

SFAE-IEW-TA 1 1

CCAP-CCC 1 1

DCMA 1

See Block 16 1 1

15. TOTAL 3 4 0

G. PREPARED BY

Thomas Frank

H. DATE

23MAR18

I. APPROVED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.