This document summarizes questions and responses related to a solicitation for Flight Activity Maintenance and Modification Support Services (FAMMSS). The solicitation seeks maintenance, modifications, engineering, flight test, sensor integration, aircraft and avionics maintenance support, equipment modification, research and development, and prototype fabrication services for Communications Electronics Research, Development and Engineering Center (CERDEC) Flight Activity platforms. Target platforms include aircraft assigned to CERDEC Flight Activity and NVESD, as well as other customer aircraft delivered for service or modification. The solicitation is a total 8(a) small business set-aside issued by the Department of the Army Materiel Command Army Contracting Command. Questions covered pricing terms, labor categories, historical costs, documents required for proposal submission, and the industry day date. Responses clarified proposal requirements and addressed questions to facilitate offeror preparation of proposals due by July 5, 2018.
FAMMSS Q&A additional questions 43-45
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAMMSS_QA_10JUL18.xlsx | XLSX spreadsheet | |
| A07_W56KGU18R0002_AMD_0003_10JUL18.pdf | ||
| A07_W56KGU18R0002_AMD_0003_02JUL18.pdf | ||
| A07_-_FAMMSS_QA_28JUNE18.xlsx | XLSX spreadsheet | |
| CFA_Industry_Day_27June18.pptx | PPTX presentation | |
| A07_W56KGU18R0002_AMD_0002_26JUNE18.pdf | ||
| FAMMSS_QA_25JUNE18.xlsx | XLSX spreadsheet | |
| A07_FAMMSS_LOE_and_Plug_Numbers_V2.pdf | ||
| A07_W56KGU18R0002_AMD_0001_13JUNE18.pdf | ||
| Special Event EAL Instructions | — | |
| FAMMSS Industry Day Announcement.docx | DOCX document | |
| Directions to Industry Day Jun 18.pptx | PPTX presentation | |
| Special Event EAL Form SFFL 5.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FAMMSS Soliciation | ||||||||
| W56KGU18R0002 | ||||||||
| Question # | RFP Area | PWS Page Reference | PWS Paragraph Reference | Additional Cross Reference | Discussion | Question | ACC Response | |
| 1 | Section L | N/A | N/A | Section B | Currently the instructions provided in Section L do not require the offeror to provide a completed Section B | Please confirm that completed Section B should be included with Volume 4 | A completed section B should be included within Volume four in addition to the other cost submssion requirements. | |
| 2 | Section L | N/A | N/A | Section B | Currently the instructions provided in Section L do not require the offeror to provide a completed Section B | Please provide additional Clarity as to what should be submitted as CPFF Labor | Historically, cost plus fixed fee labor (CPFF) has been approximately 85 percent (or more) of the total cost of the requirement. CPFF labor will be issued at the task order level (if needed) and evaluated based on the requirements decribed there. | |
| 3 | Section L | N/A | N/A | Section B | Currently the instructions provided in Section L do not require the offeror to provide a completed Section B | Please provide additional Clarity as to what should be submitted as T&M Labor | Historically, time and Materials (T&M) labor has been approximately five percent of the total cost of the requirement. T&M will be utilized at the task order level for emergency repairs/maintenance as it occurs. | |
| 4 | Section L | N/A | N/A | Section B | Currently the instructions provided in Section L do not require the offeror to provide a completed Section B | Please provide additional Clarity as to what should be submitted as FFP Labor | Historically, firm fixed price (FFP) labor has been approximately less than 15% percent of the total cost of the requirement. FFP labor should be based on the requirements as described in the base Performance Work Statement. FFP labor will be utilized for routine, well established requirements identified at the task order level. | |
| 5 | Section L | N/A | N/A | Section L Pg, 86 of the solicitation | Transition-In is identified as the only awardable task. Section L, page 86 references “…each Awardable CPFF file…” as if there is more than one awardable task. | Please confirm that Transition is the only awardable task. | The Transition Task Order In requirement is the only awardable task included with the FAMMSS RFP. | |
| 6 | Section I | N/A | N/A | Section L Pg, 86 of the solicitation | Page 86 references FAR 52.222-44. This clause is not incorporated in Section I (52.222-43 is included). | Please clarify which clause is correct. | FAR Clause 52.222-44 referenced on page 86 of the solicitation will be incorproated into Amendment 0002 of the solictiation. | |
| 7 | N/A | N/A | Attachment " A07_FAMMSS_LOE_and_Plug_Numbers" | FAMMSS LOE and Plug Numbers – All of the hours are based off of 2080. | Is this assumed to be both productive hours and leave hours? | Yes, that is a correct assumption. | ||
| 8 | N/A | N/A | Attachment "A07_FAMMSS_LOE_and_Plug_Numbers" | FAMMSS LOE and Plug Numbers – All of the hours are based off of 2080. | If hours are productive hours, should the contractor propose OT for all hours in excess of the productive man-year? | No, overtime hours should not be proposed. | ||
| 9 | N/A | N/A | Attachment " A07_FAMMSS_LOE_and_Plug_Numbers" | FAMMSS LOE and Plug Numbers – All of the hours are based off of 2080. | If hours are productive hours, will the government specify the productive man-year for proposal purposes? | No, the Government will not be making this specification. | ||
| 10 | Section L | N/A | N/A | Par C-2 Key Personnel | States in last sentance… to include the extent to which they meet or exceed the minimum personnel qualifications requirements proved in (Section J of the RFP Labor Category Description/Qualifications). Section J and associated attachments provided with the solicitation do not include Labor Categories Description/Qualification | Will the government please provide the referenced attachment | The labor categories description/Qualification is included in the revised document entitled "A07_FAMMSS_LOE_and_Plug_Numbers_V2." The revision identifies key personnel and the descriptions associated with those categories. | |
| 11 | Section L | N/A | N/A | Vol III Cost / Price Factor Pg, 86, Par 2.a | States OCONUS labor rates shall be based on a 7-day, 84-hour workweek | Please confirm this should be 48 hour workweek for OCONUS | That is correct. The OCONUS work week is 48 hours. | |
| 12 | Section C | 33 of 94 | "Attachment 1" | Attachment A01_PWS_Attachment_1_Platforms | Section C indicates 1 each DASH 7, and DASH 8 aircraft, the Attachment A01_PWS_Attachment 1 indicates 1 Dash 7/8 acft | Please clarify which reference is correct. | The correct reference should be Dash 7 or Dash 8. The correct quanty is one (1) Dash 7/8. The solicitation has been revised to match the separate word document. | |
| 13 | Section M | N/A | N/A | Section A/Section B | Factor 5 a) of Section M states, "The five year ordering period and one Awardable Task Shall be proposed as CPFF and FFP for materials. Sections A and B indicate that Materials are Cost Reimbursable. | Please clarify if materials are to be proposed as CR or FFP. | Materials should be proposed as Cost Reimbursable for the purposes of this Solicitation and the awardable Task Order. However, after the Base IDIQ is awarded, there may be cirumstances where Materials are purchased on a FFP basis. This will be decided depending on the specific requirements of that Task Order. This will be updated in the Solicitation. | |
| 14 | Section B | Attachment " A07_FAMMSS_LOE_and_Plug_Numbers" | Is the FAMMSS LOE and Plug Numbers Attachment to be proposed as T&M? | No. Labor Shall be proposed as CPFF and Cost No Fee for materials. | ||||
| 15 | Section B | Attachment " A07_FAMMSS_LOE_and_Plug_Numbers" | Are the Plug numbers in the Attachment Inclusive of Indirect Burdens? | The plug numbers provided are not inclusive of contractor proprietary indirect burdens. | ||||
| 16 | Section B | Attachment " A07_FAMMSS_LOE_and_Plug_Numbers" | Are the Plug numbers (Materials) to be proposed as CR? | That is correct. The Material should be proposed as CR (or Cost-No Fee). | ||||
| 17 | Section L | Page 85 of 94, Cost and Price Factor, Par 1. | States:The proposal shall include, but is not limited to: cost breakdown spreadsheets ({}.xls), Sanitized (no costs) versions of each cost breakdown spreadsheet (SST{}.xls) and Bases of Estimate (BOE{}.xls) that correlate to the Awardable Task; | a) What specific information should be included in each file? | ||||
| b) Does the government plan to release file templates with the final solicitation | A) Offerors are provided submission and content instructions within the solicitation. |
B) File templates will not be included in any future amendments regarding the cost structure.
18 Section M Page 89 of 94, Corporate Experience: Factor 1 States: … a major subcontractor is defined as a subcontractor who performs more than 49 percent of the total cost of the requirement at the TO level. Is it the Governments intent that subcontractors experience be derived based on 49% of total cost of the requirement / Task Order based on Labor vs total cost of task which would include material?
| Clarification is requested as the current verbaige would enable a subcontractor performance to be used to satisfy the requirement when their only contribution for a task was materials purchase in support of the task order where task order total cost exceeded labor cost. | The Government's definiation of a "Major Subcontractor" in this instance would be "More than 49% of the Total Labor Cost". The Government understands and accepts the concern in question. Section M will be updated. | |||||
| 19 | Section B | Throughout the solicitation, Transition is identified as the awardable task. Section B does not provide a CLIN for Transition pricing. | Please clarify how contractor is to include pricing for transition. | The pricing should be included within the cost volume submission as separate documention in the same format as the base requirement for evaluation purposes. |
| 20 | Section C | Page 24 | C.3.2.32.1 | C.3.2.32.1 The contractor shall provide a Deployment Manager (DM) for technical operational support | |||
| Attachment A07 FAMMS LOE and plug number doesn’t identify this position. | Will this position be required at the time of award or will it be requested and funded by a specific Task Order? | This position will be requested and funded specific to Task Orders, when necessary. | |||||
| 21 | Section E | Page 34 | E-7a | States: "The contractor shall comply with the higher-level quality standard(s) listed below. Please see base PWS." | |||
| PWS does not indicate any higher level Quality Requirements. | Please provide clarification as to what Higher Level Quality standard is required, (ISO-9001/AS9110/AS9100) and minimum revision level acceptable? | The higher level quality standard is considered to be the Ground Flight Risk Clause 252.228-7001. Must be in compliance with DCMA Instruction 8210.2 | |||||
| 22 | Section L | Page 83 | Technical Factor Content: b.1 | Par b.1 indicates: "...This section of the technical volume shall include the following sub-sections: |
(i) Assumptions:...
(ii) Key Aspects/Challenges:…
| (iii) Resources: … | Will the Government please clarify the instructions. It appears that this instruction would only be applicable to the Transition and or other sample task as the solicitation does not provide sufficient workload data to support development of "man-hours; travel and materials to include components/hardware, software and any Government Furnished Equipment (GFE)" | The instruction for the Technical Approach is applicable to both the FAMMSS PWS requirements and the Transition In Requirments. The Contractor should propose for the to the LOE Plug numbers (attachment). It is incumbent upon the contractor to propose their level of effort for the transition in Task. The LOE attachment is representative of the entire FAMMSS effort, to include the Transition In effort. | |||||||
| 23 | Section J | Page 1 | Past Performance Questionnaire | The PPQ format | On the PPQ, in Part IB, there is a section to identify Offeror’s Representative. Would that be the [REDACTED] PM, AIMS KO or the person we are sending the PPQ to such as the COR or KO? | Part IB should identify the Offeror's representative who is sending the PPQ. |
Part II, subsection I - Respondent Identification, should be completed by the recipient of the PPQ.
| 24 | CFA, I2WD, and other organizations that are expected to utilize the FAMMSS contract are heavily supported by contractors providing SETA and or CAAS services. The solicitation does not currently provide direction regarding the exclusion of either SETA/CASS Contracts and or offerors providing these services from participating as either a Prime or Subcontractor in the solicitation and or subsequent contract/task orders. Companies that provide these type services are likely to possess advanced access to acquisition information, participate in the development of acquisition data, assessment of FAMMSS Contractor Products and Services, or may have been provided access to competitive sensitive data such as other contractor cost or pricing information to include rates and development of hours, technical approaches, contractors Key Personnel Rosters, contact list required for submission to Government, technical data and processes generated by a contractor and not readily available to the public, design and development information not readily available to the public. | 1. Requests the Government provide clarification regarding which if any SETA/CAAS contracts and or SETA/CAAS service providers are excluded from participation in this acquisition. | There are no SETA / CASS contractors or services providors excluded from participating in this acquisition - HOWEVER - this acquisition is restricted to 8(a) Small Business concerns only in terms of being the Prime offeror / awardee. There are no Subcontractor restrictions. | ||||
| 25 | 2. Requests the Government identify if they have received a Waiver regarding these services IAW Far Subpart 9.503 as it relates to this contract? | No SETA contractors have been privy to Source Selection information. | |||||
| 26 | Section L | N/A | N/A | Volume II (4) | The government indicates that the offeror can find the instructions for the Past Performance Point of Contact list, which is due within 10 days of RFP release, in Appendix D, Section J of the solicitation. | Can the government please provide this Appendix D with instructions? | Amendment 0002 to the RFP released Amendment 0001 to the solicitation extending the submission time for the PPQ POC list until the offeror submits a proposal. |
The reference to Appendix D was removed in Amendment 0001 of the solicitation document released in Amendment 0002 of the FBO RFP announcement.
| 27 | Industry Day | N/A | N/A | FOB Amendment 0001 | Directions to Industry Day Jun 18” vs “FAMMSS Industry Day Announcement.” | Can the Government please verify the date of the Industry Day – June 18 or June 27? | The Industry Day is currently scheduled for 27 June 2018. |
| 28 | Section L | N/A | N/A | Missing Attachment | Section L – “The Offerers shall discuss their management structure to ensure successful performance as a Prime contractor on the FAMMSS contract. To include the breadth and relevancy of the qualifications of the proposed key management personnel, to include the extent to which they meet or exceed the minimum personnel qualifications requirements proved in (Section J of the RFP Labor Category Description/Qualifications).” | Can the Government please provide the referenced “RFP Labor Category Description/Qualifications” and “experience criteria”? |
Can the Government please identify the key management personnel for which resumes are required with the proposal submission?
Based on these requirements, it appears that resumes are required under the “Key Personnel” deliverable that has a 5 page limit. Will the Government please exclude resumes from the page count?
A) The labor categories description/Qualification is included in the revised document entitled "A07_FAMMSS_LOE_and_Plug_Numbers_V2." The revision identifies key personnel and the descriptions associated with those categories.
B) See answer A). The revision identifies key personnel and the descriptions associated with those categories.
C) The 5 page limit does not include resumes
| 29 | Section M | N/A | N/A | Factor 3, 3rd Paragraph | “Each offerer shall provide resumes, for personnel with the appropriate education, relevant work experience and security clearance (Provided in Section J of the Request for Proposal (RFP) Labor Category Description/Qualifications) to support the following identified experience criteria:” |
| 30 | Section L | N/A | N/A | Pages 81-82 Vol. I - Technical Volume Page limits & pages 83-84, Volume I - Technical Factor Content | Deliverables “FAMMSS PWS Requirements,” and “Transition In” are listed as being part of the “Technical Approach” within the Technical Factor Content, and are listed as separate files/documents within the title formats and page limitations section. |
Deliverables “Techniques and Control,” “Key Personnel,” “Quality Control Plan,” and “Purchasing Plan,” are also listed as being part of the “Management Plan” within the Technical Factor content, and are listed as separate files/documents within the title formats and page limitations section, however, the Management Plan is ALSO listed as being a separate file/document within the title formats and page limitations section, with no independent requirement associated with it under the factor content section.
| Will the Government please remove the “Management Plan” as a separate file/document from page 82, and allocate those 25 pages across all Technical Volume deliverables, as the requirements within “Techniques and Control,” “Key Personnel,” “Quality Control Plan,” and “Purchasing Plan,” will cover all requirements of the Management Plan? | No, offerors should propose as instructed. This section will remain unchanaged. | |||||
| 31 | Section C | PWS Attachment 0001 | RFP Page 33 and PWS Attachment 0001 | Word Document provided separately |
The Activity/Platforms tables provided in these two areas do not match. Specifically, in the RFP Attach. 001, there are 3 RC-12s and 1 each DASH-7 and DASH-8. In the separate Word Attach. 001, there are 2 RC-12s and 1 DASH-7/8.
| Please confirm the correct quantities of RC-12 and DASH-7/8 platforms at CFA. | The correct quanties are two (2) C-12/RC-12 and one (1) Dash 7/8. The solicitation has been revised to match the separate word document. | |||||||
| 32 | Amendment 0002 | N/A | N/A | Cover Page, 1 of 39 | Amendment 0002 is designated “Amendment 001” in box 2. Box 9B “Dated” shows the Amendment date as 2018JUN05. No cover page was provided for Amendment 001 “FAMMSS Industry Day Announcement”, but SF-30s are required to be signed and included with the proposal | Please clarify Amendment 0002 number and issue date, and provide SF30 for Amendment 001. | Amendment 0002 (issued and dated 13 June 2018) to the RFP released Amendment 0001 to the solicitation extending the submission time for the PPQ POC list until the offeror submits a proposal. |
Amendment 0001 to the RFP made no changes to the solicitation document. It incorporated additional information related to the FAMMSS RFP, specifically the Industry Day announcement. There is no SF30 associated with Amendment 0001 to the RFP because no change was made to the solicitation document.
| 33 | General RFP | N/A | N/A | SETA Support Contractors | Can SETA contractors who are currently supporting CFA, I2WD and other organizations that heavily utilize FAMMSS be on a Prime team as either Prime or key SubK as a participant to the FAMMSS contract? | The FAMMSS requirement is restricted to 8(a) eligible prime contractors only. The government does not provide instructions on teaming arrangements. | |
| 34 | General RFP | N/A | N/A | CASS Contractors | Can CAAS contractors who are currently supporting CFA, I2WD and other organizations that heavily utilize FAMMSS be on a Prime team as either Prime or key SubK as a participant to the FAMMSS contract? | The FAMMSS requirement is restricted to 8(a) eligible prime contractors only. The government does not provide instructions on teaming arrangements. | |
| 35 | General RFP | N/A | N/A | OCI Contractors | In the 2012 solicitation for AIMS contract, site the reference, certain contractors were excluded from participation due to OCI. Does that rule apply? | There are currently no known contractors being excluded from participation due to the OCI. Should contractor OCI become an issue, an annoucement will be made via the FBO website. | |
| 36 | Section L | N/A | N/A | Page 27 of 39, Amedment 0002 | Section L (pg 27 of 39 – Amend 0002) references 8 documents for inclusion in offerors’ submissions. One of the required files is called Proposal (“ST1.xls”) and a Transition version called “SST1.xls”. | Will the government provide any templates or guidance regarding the specific format for the submission of pricing? | Templates will not be provided providing guidance on the specific format of the pricing submission. |
| 37 | Section L, Volume III | N/A | N/A | Cost/Price Factor Content 2)a) | “Labor rates must be provided for both On-Site and Off-Site locations.” |
Section M; Factor 5 Cost/Price Evaluation Approach (item c): “The Offeror and each team member/sub-contractor will provide their labor rates for separately priced On-Site and Off-Site work locations. Each labor rate will be multiplied by its corresponding hours proposed.”
Does the government require the provision of T&M Rates or Fully Burdened Cost Rates or both?
Would the government please clarify how many rates should be proposed:
| 1) separate rates for On-Site at Lakehust and Ft. Belvoir (2 rates) and separate rates for Off-Site at Lakehust and Ft. Belvoir (2 rates) for a total of 4 rates or 1 On-Site rate applicable at either site and 1 Off-Site rate applicable at each site. Should rates be proposed for the other 22 additional possible locations? | Offeror's should provide Fully Burdended Cost Rates. If T&M Rates are being proposed as well, then T&M Rates should be proposed seperately from the Fully Burdened Cost Rates. It is not necessary to propose rates at the other 22 additional possible locaitons. However, Rates for On-Site at Lakehurst / Ft. Belvoir as well as Off-Site Rates should be proposed (for a total of 2 rate sets using the method of at either site) | ||||||
| 38 | Section L | N/A | N/A | Labor Categories | Section L contains no reference to specific Labor Categories to be proposed. The Draft RFP included “A07_-_Base _LOE_and_Plug_Numbers” which provided Labor Categories and Hours. | Will the government be providing Labor Categories and related qualification (Educations/Experience) or shall the offeror’s develop their own? |
Document A07_-_Base _LOE_and_Plug_Numbers were provided with the Draft RFP
| Offerors are to propose using the labor categories provided in Document A07_FAMMSS_LOE_and_Plug_Numbers_V2 provided with the Final RFP. | |||
| 39 | N/A | N/A | Neither Section L nor the other RFP documents include any plug values for Travel and/or Materials. |
The Draft RFP included “A07_-_Base _LOE_and_Plug_Numbers” which provided plug values for Materials and Travel by Year.
| Will the government be providing plug values for materials and/or travel? How should offerors estimate materials for all periods if not provided? | Section J attachment A07_FAMMSS_LOE_and_Plug_Numbers_V2 of the final RFP includes plug numbers for materials and travel on page two of the document. | |||||||
| 40 | Section A | N/A | N/A | CLIN Structure | Section A (3): The anticipated CLIN Structure includes CLIN 0002: T&M Labor | Will the government explain when T&M labor will be applicable? Will the government be providing Labor Categories, quals, locations for the T&M rates? | Historically, time and Materials (T&M) labor has been approximately five percent of the total cost of the requirement. T&M will be utilized at the task order level for emergency repairs/maintenance as it occurs. | |
| 41 | Section M | N/A | N/A | Cost/price Evaluation Approach | (b): Offerors are cautioned that prime contractor profit will not be allowed on sub-contract-loaded labor rates, in accordance with FAR 52.232-7(b). Profit or fee will not be allowed to the prime or sub-contract on materials | FAR 52.232-7(b) is in reference to the Materials portion under a T & M/Labor Hour type contract. In accordance with FAR 52.232-7(a), the hourly rates for subcontractors may include profit. We would respectfully request the Government reevaluate the referenced section and clarify that it did not intend to prohibit the Prime from applying fee to subcontractor labor, rather it was the Government’s intent to prohibit a Prime or Subcontractor from applying profit on top of any MATERIALS IAW FAR 52.232-7(b)? | The Government has reviewed this clause, and agrees the the suggested update. Therefore, the lanauge will be updated to read as follows: In accordance with FAR 52.23207(b), Offerors are cautioned that Profit or fee will not be allowed to the prime or sub-contract on materials | |
| 42 | LOE & Plug Numbers | N/A | N/A | Amendment 0004 Additional questions | The government’s response to Question 14 states that the FAMMSS LOE and Plug Numbers attachment shall be proposed as CPFF for Labor and CR for Materials. Further, the government’s response to question 22 states, “The LOE attachment is representative of the entire FAMMSS effort, to include the Transition In effort.” The government’s response to questions 1-4 indicate that a populated Section B is required, and details the historical costs experienced. Nowhere in the RFP are tasks identified that shall be priced as T&M or FFP (as the LOE Plugs cover the FAMMSS PWS and the Transition-In PWS, and it is CPFF). | 1) Is it acceptable to provide pricing for the LOE and Plug Numbers in CLINS X001, X004, X005, X006 and price CLINS X002 and X003 at zero dollars? |
2) Please confirm that T&M and FFP Pricing are not required with proposal submission. If T&M and FFP pricing is required, please provide the specific paragraph number that defines the requirement.
3) Please confirm that T&M Rates are not required with proposal submission. If T&M rates are required, please provide the specific paragraph number that defines the requirement.
4) Please confirm that FFP Rates are not required with proposal submission. If FFP rates are required, please provide the specific paragraph number that defines the requirement.
1) Yes, this is an acceptable pricing method. Only Cost Plus Fixed Fee or CR pricing is going to be required for the evaluated Task Order, therefore, even a 'zero dollars' submission for CLINs X002 and X003 is not needed for the proposal. These CLINs may be used on future Task Orders, however.
2) T&M and FFP pricing are not required with the proposal submission.
3) T&M rates are not required with the proposal submission.
4. FFP Rates are not required with the proposal submission.
| 43 | LOE BOE | N/A | N/A | Section L | Section L requires the submission of a BOE as part of Volume III Cost/Price. However, Amendment 3 provided offerors with specific LOEs for the 5 Year Ordering period. | Since the solicitation now provides an LOE, are Offeror’s still required to provide a BOE for the 5yr Ordering Period? | Yes, offerors are still required to provide a BOE. |
| 44 | PWS and LOE | N/A | N/A | PWS and A07_FAMMSS_LOE_and_Plug_Numbers_V2: |
When comparing the LOE to the requirements of the PWS, it does not appear the LOE contains all of the labor categories required to complete the scope. For example, the PWS requires custodial services in PWS C.21.1.3.3.1; however, there is not an estimate for a custodian in the provided LOE but there is a Custodian LCAT in the CBA. A similar situation exists for PWS C.3.3.7.1 which requires purchasing services; however, a Buyer LCAT is not included in the LOE. There are also numerous other LCATs in the CBA that do not appear in the solicitation LOE.
Will the customer be updating the LOE to include all of the labor categories in the PWS or shall offerors just bid to the categories included in the LOE? If the latter, are offerors required to submit a BOE for the 5-year Ordering Period? The CBA is a reference document. The LOE is what the Government thinks is required to support the base contract.
The Offerors should bid to the categories in the LOE. The Offerors should submit a BOE for the 5-year ordering period.
45 General RFP N/A N/A Extension Request Will the government issue an extension to allow offerors an opportunity to update pricing files and BOEs in accordance with the new LOE file from Amendment 3 and answers to the to the items above? A decision on any proposal extension has not been decided at this time. However, offeror's are strongly encouraged to assume that no proposal extension will be granted, and the proposal due date remains 05 July until further notice is given