This solicitation requests proposals for Software Engineering Center Engineering Operations Support services. Offerors must propose to provide labor categories including program managers, operations specialists, quality assurance analysts, security specialists, technical writers, web developers, and media content editors to support the SEC headquarters. Proposals are due by October 10, 2018 and the period of performance is a one-year base period with four one-year option periods. The solicitation is set aside for HUBZone small businesses and requires a facility security clearance of Top Secret. Offerors must demonstrate the ability to recruit, hire and retain qualified staff and fill critical positions within 30 days and non-critical positions within 45 days. Cost proposals must include direct labor rates, indirect cost rates and fee in accordance with FAR guidance. Subcontractor proposals must include detailed cost backup documentation.

Solicitation amendment 0003

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Cost Plus Fixed Fee

W56JSR

ACC-APG Division E (W56JSR)

6565 SURVEILLANCE LOOP

APG, MD 21005-1846

MATTHEW W. CASEY

EMAIL: MATTHEW.W.CASEY2.CIV@MAIL.MIL

W56JSR-18-R-0002

2018AUG08

X

X 2018OCT10 09:00am

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 10

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MATTHEW W. CASEY

Buyer Office Symbol/Telephone Number: CCAP CCE/(443)861-0390

Type of Contract 1: Cost Plus Fixed Fee

Type of Contract 2: Cost No Fee

Kind of Contract: Service Contracts

*** End of Narrative A0000 ***

2 10

W56JSR-18-R-0002

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

L-1 CHANGED 52.252-3 ALTERATIONS IN SOLICITATION APR/1984

Portions of this solicitation amendment 0003 are altered as follows:

1. In response to proposals submitted by 07 September 2018, all of which had one or more disqualifying errors in meeting the

Quality Assurance Surveillance Plan (QASP) submission requirement, the QASP submission requirement is being removed from the solicitation.

2. A new proposal submission date is hereby established, as shown on the first page of this SF30 solicitation amendment. All interested parties may submit a new proposal to this solicitation by the new deadline. If an Offeror has already submitted a proposal and does not plan to make changes, the Offeror should send notification stating such. If an Offeror has already submitted a proposal and decides to make changes, the Offeror should only submitted the altered documents, and should highlight the text which has been altered.

(End of Provision)

SECTION L - INSTRUCTIONS TO OFFERORS____________________________________

L-1 General Information:

L-1.1 Acknowledgement/Acceptance/Agreement: Submission of a proposal to this Request For Proposal (RFP) constitutes acknowledgement/acceptance/and agreement to the following:

L-1.1.01 Costs incurred for Proposal Preparation, to include pre-award site visits, will not be reimbursed by the Government.

L-1.1.02 This RFP is competitive set-aside for Historically Under-utilized Business Zone (HUBZone) small businesses, per the Small

Business Administration (SBA) definition of a small business under North American Industry Classification System (NAICS) code 541611

"Administrative Management and General Management Consulting".

L-1.1.03 Offeror agrees to meet all the requirements incorporated in the RFP, including those detailed in the RFPs attachment and exhibit documents, and agrees to all the terms, conditions, and provisions set forth herein. If the Offeror does not intend to meet aspects of the requirement, or terms, conditions, or provisions/clauses of the RFP, this must be stated in the Offerors proposal. Non-compliance with the RFP may result in the proposal being determined ineligible for award.

L-1.1.04 The proposal (to include Cost/Price) shall be valid for a minimum of 180 calendar days from date of submission.

L-1.1.05 Offerors shall identify any potential Organizational Conflicts of Interest (OCI) resulting from performance of these requirements and shall propose a Risk Mitigation Plan for the same in accordance with FAR subpart 9.5. If the Offeror proposes personnel who have previously performed this work while employed by the Government or who are currently employed by the Government, the

Offeror must either provide a copy of the employees letter of separation from the Government identifying the employment restrictions or provide a description of the capacity in which the employee currently serves with the Government. Offerors having performed work related to the development of these requirements may not be permitted to propose without a Contracting Officer approved OCI risk mitigation plan. If the Offeror proposes a subcontractor which currently performs on a contract for the Software Engineering Center

(SEC), either as a prime contractor or subcontractor, the same requirement for an OCI risk mitigation plan applies.

L-1.1.06 This RFP is not an authorization to start work.

L-1.1.07 Offerors must have a valid U.S. facility security clearance of Top Secret in order to receive award of this requirement, RFP W56JSR-18-R-0002, as it includes a Department of Defense (DD) Form 254 Contract Security Classification Specification. All classified material must be handled in accordance with the National Industrial Security Program Operating Manual (NISPOM) (DoD 5220.22-

M) and Industrial Security Regulation (DoD 5220.22-R).

L-1.1.08 For informational purposes only, the Level Of Effort (LOE) for the anticipated first task order is in Solicitation Section

J "List of Attachments" as Attachment 0005. This is an estimate as of the release date of this solicitation, and does not bind the

Government in any future obligation.

L-1.1.09 All proposal information shall be confined to the appropriate volume. The offeror shall confine submissions to essential

3 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal.

Proprietary information shall be clearly marked. The following shall be included in the Narrative discussion:

L-2 Instructions to Offerors:

Offerors are required to submit ONLY one unclassified proposal (without citations for or links to websites) in response to this RFP. The

Proposal is to be prepared in accordance with Sections L-2.1 through L-2.4 of this RFP.

L-2.1 TIME LINES, PROPOSAL FORMAT, AND SUBMISSION INSTRUCTIONS:

L-2.1.1 Questions: Questions regarding this RFP must be in writing and submitted to the Federal Business Opportunities (FBO) website. All questions must be submitted to the FBO posted solicitation W56JSR-18-R-0002. The cut-off for questions is 7 calendar days after release of the RFP at 5:00PM Eastern Standard Time. All questions submitted before the cut-off will be answered electronically such that all the offerors will see both the question and the answer; however, the identity of the party asking the question will not be disclosed.

L-2.1.2 Proposal Submission: All proposal submissions are due as of 5:00PM Eastern Time Zone of the submission date set forth of the first page of the solicitation. It is the Offerors responsibility to assure its proposal is received by the date and time specified above. If an Offerors Proposal is not received at the initial point of entry to the Government (received through web-based system) by the exact date and time specified above, it will be determined late, will not be evaluated, and will not be considered for Award.

Proposal, as the term is used here, means ALL volumes and parts of the Proposal. Unless otherwise authorized in this RFP, Offerors are required to submit their proposals electronically via the Federal Business Opportunities (FBO) website in the files set forth below.

Files shall not contain classified data. The use of hyperlinks in proposals is prohibited. Submitted documents that do not comply with these requirements may be found to be non-compliant; proposal submissions containing non-complaint documents may not be further evaluated and may be found ineligible for award.

The URL for FBO is

"../../AppData/Local/Microsoft/AppData/Local/Microsoft/AppData/Local/mike.fusco/AppData/Local/Microsoft/Windows/INetCache/Content.Word/ww w.fbo.gov" . FBO User guides and Frequently Asked Questions can be accessed under the Getting Started tab on top of the FBO Logon page

(home page). For FBO technical assistance, Users may call the help desk by dialing 1-866-606-8220. The help desk is open between 8:00am to 8:00pm.

L-2.1.2.1 Offerors shall include a list of all subcontractors, including the subcontractors respective CAGE Codes and points of contact (POCs), in the submitted proposal. Subcontractor CAGE Codes and POC information is required for subcontractor proposal submission in FBO.

L-2.1.2.2 Subcontractors not submitting proposals through the Prime shall submit proposals via FBO in accordance with RFP paragraph L-

2.1.2. All subcontractor proposals shall clearly indicate the Prime Contractor for which they are proposing within the proposal and file name. File names shall be formatted as: PRIME-subcontractor-Volume XX.

L-2.1.3 Format: Pages are limited to 8.5 inches x 11 inches, with one (1) inch margins. Submit separate electronic documents by

Volume. Submit proposal documents in Times New Roman Font and in font size 11 point. All Excel files are to be submitted as .xls or xlsx and all Word document files must be submitted as .doc, docx, and/or .pdf. For purposes of Tables and Graphics, Offerors shall use Times New Roman Font with a font size not smaller than 10 point.

L-2.1.4 Content: Offerors are advised that [PWS 3.2.1-3.2.5 Security] and [PWS 3.2.12 Purchasing Agent Support] represent the more significant portion of the CECOM SEC HQ Engineering and Operations Support requirement, and should ensure that they are fully addressed in the proposal.

L-2.2 Proposal Content:

Proposal Volume Proposal Chapters Page Limitation File Name

Volume I, Technical Chapter 1: Technical-Management Plan 15 Pages Companyname_TECHNICAL.docx, .pdf

Chapter 2: (requirement removed) ___________________

Chapter 3: Facility Security Clearance Unlimited companyname_SECURITY.docx, .pdf

Adequate Accounting System

Chapter 4: OCI Statement / Risk Mitigation Plan Unlimited companyname_SECURITY.docx, / Separation Letters .pdf

Chapter 5: Prime and Subcontractor Identifying Unlimited companyname_ID.docx, .pdf

4 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Volume II, Past Performance Chapter 1: Past Performance References 15 Pages companyname_

PASTPERFORMANCE.docx, .pdf

Volume III, Cost/Price Chapter 1: Summary Cost Proposal Unlimited companyname_SUMMARY.xls or

.xlsx

Chapter 3: Pricing Methodology Unlimited companyname_PRMETH.docx, .pdf, .xls, or .xlsx

Chapter 4: Supporting Documents Unlimited companyname_CSUPPORT_1.docx, .pdf, .xls, or .xlsx

Information

* For each Chapter, the page count includes the total number of pages (cover to cover) and will be determined by counting all pages in chronological order. The page count will include any title pages, table of contents, and/or cover pages.

* Pages in violation of these instructions, either by exceeding the margin, font, or page limit for a particular chapter, will not be evaluated. Pages not evaluated due to violation of the margin or font will not count against the page limitations.

L-2.2.1 Volume I, Technical Proposal The offerors shall ensure their proposals comply with the instructions contained herein and completely address all requirements of this RFP (including all Attachments and Exhibits). Features that lessen performance risk should be considered when proposing staffing and management solutions.

L-2.2.1.1 Volume I Chapter I Management Plan

The Management Plan shall include:

L-2.2.1.1.1 Processes and Procedures. The proposal shall include management processes and procedures to ensure successful accomplishment of the tasks described in RFPs PWS. The offeror shall demonstrate an understanding and ability to manage the execution of the requirement. The offerors proposal shall include a description of the management approach for day-to-day operational execution of the requirements defined in the PWS. The offeror shall demonstrate its ability to manage multiple efforts with varying schedules and competing resource needs.

In addition to the information above, the offeror shall discuss to demonstrate a specific understanding of PWS 3.2.1 through PWS 3.2.5

(Security Support) including all subparagraphs and PWS 3.2.12 (Purchasing Agent Support) including all subparagraphs. This shall include a clear understanding of the requirement with supporting details and mitigation of risk.

L-2.2.1.1.2 Staffing Approach. The proposal shall provide a description of the offerors staffing approach for recruiting, hiring, and retaining a qualified workforce with sufficient personnel for PWS performance. The proposal will discuss how quickly labor positions will be filled, and how the workload of vacated positions will be handled until the position is refilled. The proposals must minimally propose to fill labor positions by the 30 and 45 calendar day intervals noted in the PWS respectively for Critical and Non-critical labor positions. Employee retention is a key issue, since employee turnover causes a disruption of support until a replacement employee is provided and becomes fully familiar with performing in the labor position.

L-2.2.1.2 Volume I Chapter II Quality Assurance Surveillance Plan (QASP)

(Requirement removed) ___________________

L-2.2.1.3 Volume I Chapter 3 - Facility Security Clearance & Adequate Accounting System.

This effort has Facility Security Clearance requirements, as detailed upon the Contract Security Classification Specification DD Form

254. Offerors shall attest that the facility security clearance requirement is understood, and will be met at the starting point for performance of the contract. The Government cannot "sponsor" Offerors by waiving the Facility Security Clearance requirement.

The awarded contract for this effort will contain cost reimbursable elements, and therefore the Offeror must have a cost accounting system adequate for accurately recording and reporting cost applicable to the contract. Offerors shall attest that the cost accounting system requirement is understood, and will be met at the starting point for performance of the contract.

The successful Offeror must confirm that they meet all requirements of the DD Form 254 and all provisions of the PWS security requirements at time of award so that at time of contract award, the awardee may immediately begin transitioning and performing. The

Government will neither sponsor prime contractors, nor can the Government wait for prospective contractors to obtain appropriate clearances.

L-2.2.4.2 Volume I Chapter 4 OCI Statement/Risk Mitigation Plan/Separation Letters

If applicable, offerors shall submit an OCI statement, Risk Mitigation Plan, and employment separation letters. The Contracting Officer will review the Risk Mitigation Plan to ensure that OCI risks are neutralized and/or reduced to an acceptable level. In the event that an offeror is the anticipated awardee, yet its Risk Mitigation Plan does not sufficiently reduce OCI risk, the Contracting Officer will notify the offeror, provide the reason(s) why the Risk Mitigation Plan fails to sufficiently reduce OCI risk, and allow the offeror a

5 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

reasonable opportunity to respond. If the offerors response does not neutralize and/or reduce OCI risk to an acceptable level, that offeror will be deemed not eligible for award.

L-2.2.4.3 Volume I Chapter 5 - Identification of Prime and Subcontractors

The following information shall be reported for the prospective Prime Offeror and any subcontractors:

a. Company name

b. Company address

c. CAGE code

d. Company security office (name, address, zip code)

e. Point Of Contact (POC) information (name, phone#, email address) for company representative

L-2.2.2 Volume II - Past Performance

Offerors shall submit no more than three (3) recent past performance references for work performed under government contracts. The past performance references may be from civilian agencies and commercial industry as well as Department of Defense (DoD) contracts. The cited past performance shall be for the similar work relative to this RFPs requirement. Recent efforts are defined as services and/or efforts during the past twenty-four (24) complete months from the issue date of this RFP. Offerors shall not propose a base IDIQ contract or a

Blanket Purchase Agreement (BPA) as an example, however offerors may propose individual orders/calls as examples.

Examples shall include the following:

a. Contract number, order number if applicable, CAGE code, DUNS number, and North American Industry Classification System (NAICS) code

b. Government contracting activity, Contracting Officer name, telephone number, and email address

c. Government Contracting Officer Representative (COR) and/or technical representative, telephone number, and email address

d. Government contract administration activity, Administrative Contracting Officer (ACO) name, telephone number, and email address

e. If offeror performed as a subcontractor, prime contractor company name, point of contact name, telephone number, and email address in lieu of or in addition to the contact information required in (b), (c), and (d) above

f. Contract type

g. Awarded price/cost

h. Final (actual) or projected final (if ongoing) price/cost

i. Final (actual) or projected final (if ongoing) start and end dates of the period of performance

j. Percentage of effort, based on the total cost of the work required in the referenced contract or order, performed by the offeror itself as prime contractor or subcontractor at the time of proposal submission

k. Description of the specific tasks or activities performed by the offeror itself under the contract, and to which PWS paragraph task under W56JSR-18-R-0002 the past performance would be associated.

l. Offerors shall provide a self-assessment for each past performance example. The self-assessment shall address performance, including if the contractor met the schedule and technical requirements within the original estimated cost. If the original cost, schedule, or technical requirements of the contract were not met, the offeror shall provide a brief explanation of the reason(s) the original requirements were not met and any corrective actions taken by the contractor. The offeror shall identify each time the schedule (period of performance) or cost ceiling was revised and provide an explanation of why each revision was necessary.

Offerors shall submit copies of any and all of the following received on any contract within the past twenty-four (24) months, including those not proposed in response to this RFP. There is no page limit for the required copies.

a. Termination for default (including the settlement agreement)

b. Notice of default (including the settlement agreement)

c. No-cost settlement (including the settlement agreement)

d. Show cause notice

e. Cure notice

f. Suspension or Debarment

g. Any security inspection or assessment ratings or reports indicating security programs or facilities are less than satisfactory, and/or any suspensions or revocations of a facility security clearance

h. Notifications received for violations of FAR Part 32.006

Offerors shall include a narrative explaining each event above, including any corrective actions taken, not to exceed one (1) page per event. If none of the above were received within the past twenty-four (24) months, the offeror shall state so in the proposal.

The offeror shall submit and identify the following information for cost reimbursement contract actions within the past twenty-four (24) months in which the offeror did not meet the requirement within the proposed cost (travel and material CLINs excluded), resulting in a cost overrun. The following information shall be provided regardless of whether the cost control issue was caused by the offeror or by the Government.

a. Contract Number and as applicable Task Order number.

b. Total Value of the contract/task order. State the proposed cost for the effort and the final performance cost or current projected cost for current efforts.

c. Procuring Contracting Officers (PCO) and/or Contract Specialists Name, Telephone Number and E-mail

d. A explanation of the reason(s) the offeror did not meet the requirements within the proposed cost and any corrective action(s)

6 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

taken to avoid recurrence. The offeror shall state each time costs incurred were higher than proposed and provide an explanation of why a revision was necessary.

e. For an Offeror that has not had any cost overruns or does not have any awarded Cost Reimbursement contracts, the offeror shall include a declaration affirming that it does not have any Cost Reimbursement task order information to submit which meets the criteria for disclosure on the Cost Control Factor volume.

f. The information described above will be considered by the Government during evaluations. It is imperative, therefore, that the offeror present the required information in a clear and complete manner. Offerors are advised, however, that the Government may contact third parties for cost control information, and the Government reserves the right to use any information received as part of its evaluation.

g. The Government does not assume the duty to search for data to cure problems it finds in cost control proposals. The burden of providing thorough and complete cost control information remains with the offeror. While the Government may elect to consider data obtained from external sources other than the proposal, the burden on providing thorough and complete information rests with the offeror.

Offerors shall state if they have no recent past performance.

L-2.2.3 Volume III, Cost/Price:

The Offeror shall comply with the following instructions:

This volume shall consist of all information required to support proposed costs and prices. Certified cost and pricing data are not currently required; however, the Government reserves the right to request such data prior to award. The information submitted in this volume shall comply with FAR 15.408, Table 15-2, and the requirements set forth below.

Submit the Cost/Price proposal in Microsoft Excel format utilizing Microsoft Office version 2007 or later. Spreadsheets must be provided in an unlocked workbook that includes all formulas and format information. Links to external worksheets or workbooks are unacceptable. Hard numbers are discouraged whenever possible; any cell with a value must be referenced to source documentation contained within the Cost/Price proposal. Print image is not acceptable.

Submitted documents that do not comply with these requirements may be found to be noncompliant; proposal submissions containing non-compliant documents may not be further evaluated and may be found ineligible for award.

L-2.2.3.1 If proposing subcontractors (all tiers), the proposal shall explicitly detail in the Cost/Price proposal the amount of work subcontracted in terms of dollars, percentage of total proposed cost, and type of contract. Subcontractors/Service Vendors may submit information that is proprietary directly to the Government via FBO in the same manner as prime contractors, as described in L-2.2.2 above.

As required, identify the information set forth FAR 52.215-22(c). Be advised that, if applicable, the description of the value-added will be evaluated as part of the technical evaluation. Interdivisional Entities (I/Es) are not considered subcontractors for purposes of

Limitations on Pass-Through Charges Clauses.

L-2.2.3.2 Volume III, Cost/Price shall consist of the following workbooks:

Volume III Chapter 1 - SUMMARY COST PROPOSAL: In accordance with FAR 15.403-1(b), data other than certified cost or pricing data is required to support cost realism. Each Offeror's and subcontractors cost proposal shall be broken out by cost element, as specified in

Table 15-2 of FAR 15.408 The summary cost proposal Microsoft Excel workbook (summary.xls or .xlsx) must consist of a total cost element summary, a detailed cost element worksheet for each CLIN, a direct labor rate worksheet, and an indirect cost rate worksheet.

The set of worksheets should repeat for the Prime and each subcontractor/ interdivisional entity (S/IE).

Each CLIN should have a worksheet detailed by cost element (see worksheet sample below). Instructions for Cost Elements are identified in the following subparagraphs of this section.

Worksheets: Prime offerors and any S/IEs submitting cost data should follow the below sample in providing their cost proposal Excel workbooks (companyname_summary.xls or .xlsx) for submission. Sample worksheets are provided for the CPFF and Cost CLINs. Below the worksheet samples are descriptions of how each cost element should be proposed within the workbook to provide the details necessary to conduct a cost realism analysis of the proposal.

*NOTE: The following worksheet samples are provided as examples and should only be used as a tool in guiding the Offeror in creating a cost proposal. An Offeror may adjust the worksheet(s) as necessary to accommodate the specifics of their proposal (including adding columns).

Contract Line Item Number (CLIN) Worksheet Sample_________________________________________________

CLIN 000X DD MON YYYY- DD MON YYYY Contractor Fiscal Year

7 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Direct Labor Hours/Base Cost Rate Dollars____________ __________ _________ _______

Labor Category 1 Hours Rate from Labor Rate Worksheet Formula (Hours * Rate) A

Labor Category 2 Hours Rate from Labor Rate Worksheet Formula (Hours * Rate) B

Labor Category 3 Hours Rate from Labor Rate Worksheet Formula (Hours * Rate) C

Subtotal Direct Labor Sum D=A+B+C

Fringe- if applicable Formula Base (=D) Rate from Indirect Rate Worksheet Formula (Base * Rate) E

Total Direct labor Sum F=D+E

Labor Overhead Formula Base (=F) Rate from Indirect Rate Worksheet Formula (Base *Rate) G

Subtotal Labor Sum H=F+G

S/IE 1 From S/IE Cost proposal K for applicable CLIN

S/IE 2 From S/IE Cost proposal L for applicable CLIN

S/IE 3 From S/IE Cost proposal for applicable CLIN M

Total S/IE Sum N=K+L+M

Subcontractor Handling Formula Base (=N) Rate from Indirect Rate Worksheet Formula (Base * Rate) O

General & Formula Base (=O+N+H) Rate from Indirect Rate Worksheet Formula (Base * Rate) P

Administrative (G&A)

Total Cost Input (TCI) Sum Q=P+O+N+H

Fee Formula Base (=Q) Rate from Indirect Rate Worksheet Formula (Base * Rate) R

Cost Of Money (COM)

Direct Labor COM Formula Base (D) Rate from Indirect Rate Worksheet Formula (Base * Rate) S

G&A COM Formula Base (=O+N+H) Rate from Indirect Rate Worksheet Formula (Base * Rate) T

Total COM Sum U=S+T

Total Proposed Sum V=Q+R+U

Direct Labor: On each CLIN worksheet, offerors shall provide a listing of each Direct Labor category with its base labor rate, corresponding amount of hours, and extended cost by Contractor Fiscal Year. The three column details (base/rate/dollars) (as included in the above sample) must be proposed per each 12-month ordering period. There shall be a separate entry for each labor category, per each of the 4 place of performance locations, per each of the 4 12-month ordering periods.

Direct Labor Hours: Offerors shall use the below table of direct labor hours for the proposal of each 12-month ordering period. This table represents an estimate of the direct labor hours that may be ordered within each 12-month ordering period, and actual task orders within an ordering period may add up to more hours, less hours, or a different distribution of hours. 1,920 labor hours represents full time employment of one labor position for one year.

__________Labor Category_______________ _Labor Hours_ ______________ ___________

Program Manager 1,920

Operation Specialist - Intermediate 11,520

Operation Specialist - Journeyman 17,280

Operation Specialist - Senior/Lead 15,360

Program Administrator - Intermediate 11,520

Quality Assurance Analyst - Senior/Lead 1,920

Security Specialist - Journeyman 11,520

Security Specialist - Senior/Lead 13,440

Technical Writer/Editor - Senior/Lead 1,920

Web Developer - Journeyman 1,920

Reporter/Correspondent - Intermediate 3,840

Media Content Editor - Journeyman 1,920

Media Layout Editor 960

Direct Labor Rate: The applicable labor rate must link to the Labor Rate worksheet within the Summary Excel file. The Labor Rate worksheet must list all applicable labor categories and provide the base labor rate per year. Prime offerors and subcontractor(s) must provide a direct correlation of proposed direct labor categories and other supporting rate information to the corresponding labor categories on the base contract. Offerors shall propose direct labor rates which are realistic, per the Cost Realism hourly rate table located in solicitation section M-1.2.3.2.

8 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Offerors and any subcontractor(s) are responsible for ensuring compliance with the Service Contract Act (SCA) for all applicable labor categories. If an offeror believes that labor categories are subject to the SCA, it must identify such labor categories as SCA Labor within the summary.xls/xlsx and prmeth.doc/docx/xls/xlsx/pdf proposal file(s). Offerors must also disclose the state and county in which the proposed SCA labor categories will be performing the effort, the Wage Determination Schedule used for the proposed SCA labor rates, and the Occupation Code and Title for each proposed SCA labor category. The proposal must specifically identify proposed compensated and uncompensated overtime hours in accordance with FAR 52.237-10.

*NOTE: For purposes of proposed SCA Labor, no escalation factor should be applied as adjustments are made pursuant to the Wage

Determination Schedule.

Indirect Costs: The proposed indirect cost rates (inclusive of applicable Facilities Capital Cost of Money (FCCM) Rates) are to be listed on the Indirect Rate worksheet within the summary.xls or .xlsx file. The costs on the CLIN worksheets for the base ordering period and all subsequent ordering period(s) must be the result of calculations using the rates on the indirect rate worksheet and must be referenced/linked from the Indirect Rate sheet. Hard numbered indirect rates are NOT acceptable.

Subcontractor/ Interdivisional Entity (S/IE): Proposed S/IE costs are to be listed on the CLIN worksheets for the base ordering period and any subsequent ordering period(s). An S/IE with a Cost Reimbursement arrangement with the Prime Contractor is to be proposed with the same level of detail and in the same format as required of the Prime Contractor. Each S/IE teammate, irrespective of contract arrangement with the Contractor, is to provide sufficient information to evaluate the proposed costs (see Section D Supporting

Documentation below). The proposed S/IE effort must trace to the applicable supporting documents. S/IE participants may submit proprietary information directly to the Government.

The offeror shall also provide supporting cost/price documentation for all proposed subcontractors, to include the total value of the proposed subcontract, the proposed type of subcontract, the rationale and/or justification for selection of this subcontract type, and how fee will be determined and paid. Additionally, the offeror shall provide a narrative detailing the processes it used to evaluate the cost and/or price of each of the subcontracts it is proposing, including the cost and/or price analysis (CAPA) conducted as appropriate for each subcontract. The offeror shall require its subcontractors to provide the government a complete labor rate build for each LCAT proposed by the subcontractor regardless of contract type; specifically, this will include the direct labor rate, fringe rate, overhead rate, G&A rate, profit or fee rate and any other applicable indirect rate in accordance with each subcontractors financial disclosure statement. Offerors subcontractor proposals that do not include this level of detail may be ineligible for award. If the proposed contract with the subcontractor is a Time and Materials (T&M) contract, the offeror shall provide information that validates the commerciality of the proposed T&M rates. If the proposed contract with the subcontractor is a cost-type contract, the offeror shall provide DCAA contact information and any other relevant cost/pricing data in addition to the supporting cost back-up documentation. It is the offerors responsibility to ensure the required information is submitted for all subcontractors. Subcontractors may submit any proprietary data directly to the Government or through the prime contractor in a separate, sealed envelope/file. Failure to provide complete supporting documentation for all proposed subcontractors may result in no further consideration of the offerors proposal.

Materials: For purposes of evaluation, government provided plug values of $0.00 for the base ordering period and each subsequent ordering period(s) apply for Materials costs. If Materials costs are later incorporated into the requirement, it shall be on a Cost

Reimbursable, No Fee basis.

Travel: For purposes of evaluation, offerors are to propose to the government provided plug values of $13,069 for the base ordering period and each subsequent ordering period, for total Travel of $65,345. The provided amount is a direct cost amount and should be allocated across the Prime offeror and each subcontractor in accordance with the offerors approach as a direct cost to the Prime or applicable S/IE. The government provided value is exclusive of all indirect loadings at the prime or subcontract level. Fee shall not be applied.

Other Direct Costs (ODCs): For purposes of evaluation, government provided plug values of $0.00 for the base ordering period and each subsequent ordering period apply for ODCs. If ODCs are later incorporated into the requirement, it shall be on a Cost Reimbursable, No

Fee basis.

Fee: The proposed fee shall be in accordance with FAR 15.404-4(c) (4) and must not exceed 10.0 percent (10.0%) of the contracts estimated cost, excluding fee.

Volume III Chapter 2 - PRICING METHODOLOGY: Offerors shall provide applicable Contractor And Government Entity (CAGE) codes and cognizant Defense Contract Audit Agency (DCAA) and Defense Contract Management Agency (DCMA) office contact information. Offerors shall provide the basis for all proposed direct and indirect rates. If a Forward Pricing Rate Agreement (FPRA), Forward Pricing Rate

Recommendation (FPRR), or Forward Pricing Rate Proposal (FPRP) is used, offerors shall include the applicable document in the supporting documents submission. If there is no FPRA, FPRR, or FPRP, offerors shall provide the basis of estimate (BOE) for the direct labor rates, to include salary survey data, payroll data, or employment agreement letters as applicable. If there is no FPRA, FPRR, or FPRP, offerors shall provide the BOE for the indirect pool components showing the calculation of the proposed rates and listing the general ledger accounts that make up each pool of expenses, which shall be provided in Supporting Documents. Offerors shall include a listing of individual Subcontractor /Interdivisional Entities identifying the company, its specific division or segment (including CAGE code), and providing the cognizant DCAA and DCMA office for each. Offerors shall map all proposed labor categories, including those proposed by

S/IE, to the RFPs labor categories and include descriptions for all labor categories where the proposed labor category titles do not

9 10

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

align to the corresponding labor categories listed in the RFP.

Volume III Chapter 3 - SUPPORTING DOCUMENTATION: For Direct Labor Rates and Indirect Rates, offerors shall provide the supporting documentation used for developing the proposed rates that are used in the proposal. Examples of supporting documentation include:

copies of existing FPRA, FPRR, or FPRP; copies of any recent Defense Contract Audit Agency (DCAA) reports; copies of any recent Defense

Contract Management Agency (DCMA) reports; and/or documentation for the proposed direct labor rates, such as recent actual direct labor rates supported by payroll records and/or paystubs, Letters of Intent (LOIs), or salary survey data.

If providing LOIs, the offeror and/or its subcontractor(s) shall include the direct hourly labor rate for the proposed employee, identify the position, submit the LOI on the offerors or subcontractors letterhead with both the prospective employees and employers signatures, and state that the LOI is for this RFP.

Documentation of indirect expense rates for an FPRP or other statement of current rates must include the proposed expense pool (by expense account) and allocation base detail, along with the last two years' actual pool and base information. The rates reflected in the FPRA, FPRR, FPRP, or DCAA/DCMA audit or review should directly match the proposed rates as detailed in the proposal; if the rates do not match, offerors shall provide sufficient detail explaining how the proposed rates are realistic for the offeror and/or its S/IE.

Offerors shall include narrative on any changes of ownership; significant expansion or contraction of business base; or extraordinary events that have occurred within the past year, anticipated to occur prior to award, or anticipated to occur within the contract period of performance; and any additional information on the selection or activities of the S/IE.

Supporting Documentation for S/IE proposed efforts shall include the following information:

- A breakout of costs for any S/IE in the same level of detail as required for the Prime Contractor when decision by the higher level is non-competitive;

- The Prime Contractors Cost or Price analysis that supported the offerors determination to propose the S/IE and the basis by which the Prime Contractor or upper level S/IE determined the vendors price reasonable;

- A statement that the S/IE has an adequate accounting system, as determined by the Government in accordance with DFARS subpart

242.75, under a cost-type contract or subcontract; and,

- All hours, labor categories, and ODCs for FFP and T&M S/IE efforts, which are to be identified at all tiers.

The Government anticipates that competition exists for this requirement; therefore, certified cost or pricing data is not required.

However, in the event that only one Offeror responds or the Contracting Officer determines that adequate competition does not exist, the

Government reserves the right to request additional cost or pricing information up to and including certified cost or pricing data.

*** END OF NARRATIVE L0001 ***