Expeditionary Water Packaging System (EWPS)
Solicitation number
W56HZV15R0225
Issued by

About this file

Amendment 0004

View the file

Other files

File Type Posted
Questions_and_Answers_as_of_28Apr16.docx DOCX document
Questions_and_Answers_as_of_27Apr16.docx DOCX document
Questions_and_Answers_as_of_19Apr16.docx DOCX document
Attachment_0001_-_ATPD_2418_dated_14_Apr_16.pdf PDF
Amendment_0011.pdf PDF
Amendment_0010.pdf PDF
Questions_and_Answers_as_of_14Apr16.docx DOCX document
Questions_and_Answers_as_of_12Apr16.docx DOCX document
Amendment_0009.pdf PDF
Amendment_0008.pdf PDF
Questions_and_Answers_as_of_30_Mar_16.docx DOCX document
Amendment__0007.pdf PDF
Questions_and_Answers_as_of_17_Mar_16.docx DOCX document
Amendment_0006.pdf PDF
Questions_and_Answers_as_of_16_Mar_16.docx DOCX document
Questions_and_Answers_as_of_14_Mar_16.docx DOCX document
Amendment_0005.pdf PDF
Questions_and_Answers.docx DOCX document
Questions_and_Answers.docx DOCX document
Attachment_0001_-_ATPD-2418_-_dated_23_Feb_16_FINAL_VERSION.pdf PDF
Questions_and_Answers.docx DOCX document
Attachment_0006_-_Product_Sample_Test_Plan_EWPS_v3.1_dated_23_Feb_16.docx DOCX document
Attachment_0001_-_ATPD-2418_-_dated_23_Feb_16.docx DOCX document
Amendment_0003_to_W56HZV15R0225.pdf PDF
W56HZV15R0225-0002.pdf PDF
Questions_and_Answers.docx DOCX document
Appendix_A_to_ATPD_2418_Higher_Resolution_Image_.pdf PDF
Questions_and_Answers.docx DOCX document
Questions_and_Answers_for_the_Expeditionary_Water_Packaging_System.docx DOCX document
Attachment_0001_-_EWPS_ATPD_2418_-_19_Jan_2016.pdf PDF
W56HZV15R0225-0001.pdf PDF
Attachment_0007_-Price_Evaluation_Worksheet__-_3_Feb_2016.xlsx XLSX spreadsheet
Attachment_0007_Price_Evaluation_Worksheet.xlsx XLSX spreadsheet
Attachment_0001_ATPD_2418.pdf PDF
Attachment_0006_Product_Sample_Test_Plan.pdf PDF
Attachment_0002_Sample_IBOM.pdf PDF
ATTACHMENT_0008_Scheduled_GFP.pdf PDF
Attachment_0005_Incoming_Transaction_Format.pdf PDF
Attachment_0004_Logistics_Product_Data.pdf PDF
Attachment_0003_-_Request_for_Use_of_Prohibited_Materials.docx DOCX document
W56HZV15R0225.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0004 2016MAR10

W56HZV

U.S. ARMY CONTRACTING COMMAND

WARREN, MICHIGAN 48397-5000

KATHERINE M. THOMAS

EMAIL: KATHERINE.M.THOMAS.CIV@MAIL.MIL

W56HZV-15-R-0225

2016FEB01

X

X

/SIGNED/

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 7

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: KATHERINE M. THOMAS

Buyer Office Symbol/Telephone Number: CCTA-HBF-P/(586)282-8230

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0004 is to:

1. Revise the definitions of the ordering period as stated in narrative A001 to CLIN 0011. (changes noted by underline)

FROM: ____

FIRST ARTICLE TEST (FAT) ORDERING PERIOD OF THE CONTRACT IS THE DATE OF AWARD PLUS 270 DAYS

FIRST PRODUCTION ORDERING YEAR OF THE CONTRACT IS 271 DAYS THROUGH 635 DAYS AFTER CONTRACT AWARD.

SECOND PRODUCTION ORDERING YEAR OF THE CONTRACT IS 636 DAYS THROUGH 1,000 DAYS AFTER CONTRACT AWARD.

THIRD PRODUCTION ORDERING YEAR OF THE CONTRACT IS 1,001 DAYS THROUGH 1,366 DAYS AFTER CONTRACT AWARD.

FOURTH PRODUCITON ORDERING YEAR OF THE CONTRACT IS 1,367 DAYS THROUGH 1,731 DAYS AFTER CONTRACT AWARD.

FIFTH PRODUCTION ORDERING YEAR OF THE CONTRACT IS 1,732 DAYS THROUGH 2,096 DAYS AFTER CONTRACT AWARD.

TO: __

FIRST ARTICLE TEST (FAT) ORDERING PERIOD OF THE CONTRACT IS THE DATE OF AWARD PLUS 270 DAYS

FIRST PRODUCTION ORDERING YEAR OF THE CONTRACT IS 271 DAYS THROUGH 635 DAYS AFTER CONTRACT AWARD.

SECOND PRODUCTION ORDERING YEAR OF THE CONTRACT IS 636 DAYS THROUGH 1,000 DAYS AFTER CONTRACT AWARD.

THIRD PRODUCTION ORDERING YEAR OF THE CONTRACT IS 1,001 DAYS THROUGH 1,366 DAYS AFTER CONTRACT AWARD.

FOURTH PRODUCITON ORDERING YEAR OF THE CONTRACT IS 1,367 DAYS THROUGH 1,731 DAYS AFTER CONTRACT AWARD.

FIFTH PRODUCTION ORDERING YEAR OF THE CONTRACT IS 1,732 DAYS THROUGH 1,825 DAYS AFTER CONTRACT AWARD. ______ ______

2. Correct the Government Approval/Disapproval Days in CLIN 0016 from 315 to 270. (Under the heading of Inspection/Acceptance in CLIN

0016)

3. Correct narrative E001 to CLIN 0016. (changes noted by underline)

FROM: ____

In accordance with C.10.2.5, the Contractor shall present the FAT unit under CLIN 0016 for inspection and acceptance. The FAT approval will be made IAW clause 52.209-4, and will include acceptance of the First Article unit at the final delivery destination.

Delivery of the FAT unit to APG shall be made within 225 days after award.

SHIP TO:

(SXC213)

DLA DISPOSITION SERVICES ABERDEEN

BLDG 507 ROOM 4 MULBERRY POINT RD

ABERDEEN PROVING GROUND

ABERDEEN PROVING GROUND, MD 21005

Approval/disapproval of the FAT unit will be within 315 days from receipt of the FAT unit at APG (within 495 days after award).

2 7

W56HZV-15-R-0225 0004

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

TO: __

In accordance with C.10.2.5, the Contractor shall present the FAT unit under CLIN 0016 for inspection and acceptance. The FAT approval will be made IAW clause 52.209-4, and will include acceptance of the First Article unit at the final delivery destination.

Delivery of the FAT unit to APG shall be made within 225 days after award.

SHIP TO:

(SXC213)

DLA DISPOSITION SERVICES ABERDEEN

BLDG 507 ROOM 4 MULBERRY POINT RD

ABERDEEN PROVING GRUND

ABERDEEN PROVING GROUND, MD 21005

Approval/disapproval of the FAT unit will be within 270 days from receipt of the FAT unit at APG (within 495 days after award). ___

4. Revise paragraph (c)(1)(i) for CLIN 0016AA on clause 52.242-4457 "Ordering Schedule for Delivery Orders"

FROM: ____

Start deliveries 180 days after the delivery order date; or FAT approval, whichever is later

TO: __

Start deliveries 225 days after the delivery order date; or FAT approval, whichever is later ___

5. Revise paragraph (b) to Clause 52.209-4 "FIRST ARTICLE APPROVAL --GOVERNMENT TESTING (Sep 1989) --ALTERNATE I (Jan 1997) AND

ALTERNATE II (SEP 1989). (changes noted by underline)

FROM: ____

(b) Within 315 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval

TO: __

(b) Within 270 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in ___ writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.

6. Except as provided herein, all other terms and conditions of this solicitation remain unchanged.

*** END OF NARRATIVE A0005 ***

3 7

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

SUPPLIES OR SERVICES AND PRICES/COSTS:

IN THE FOUR DIGIT ITEM NUMBERS

(CLINS) THAT FOLLOW, THE NUMBERING SYSTEM

THAT IS USED IS AS FOLLOWS:

THE FIRST THREE DIGITS SIGNIFY ITEM AND

THE FOURTH (LAST) DIGIT SIGNIFIES THE

APPLICABLE CONTRACT YEAR, i.e., CLIN 0011

IS FOR THE FIRST ITEM - FIRST ORDERING

YEAR, CLIN 0012 IS FOR THE FIRST ITEM -

SECOND ORDERING YEAR, CLIN 0013 IS FOR THE

FIRST ITEM - THIRD ORDERING YEAR, ETC.

THE FINAL LINE ITEM(S) ASSOCIATED WITH EACH

PART, SUCH AS FAT, TECHNICAL MANUALS, SERVICES,

OR TRAINING, WILL BECOME THE LAST ITEM NUMBER

IN NUMERICAL SEQUENCE FOR EACH ITEM, e.g.

0016 (5 YEAR LONG TERM CONTRACT) OR 0014

(3 YEAR LONG TERM CONTRACT). IF MORE THAN

ONE ITEM IS BEING PROCURED, THE NUMBERS WILL

BE 0026 OR 0024 DEPENDING ON THE LENGTH OF THE

LONG TERM CONTRACT.

THE FOLLOWING DEFINITIONS APPLY TO THE

ENTIRE SOLICITATION AND RESULTING CONTRACT:

FIRST ARTICLE TEST (FAT) ORDERING PERIOD OF THE

CONTRACT IS THE DATE OF AWARD PLUS 270 DAYS.

FIRST PRODUCTION ORDERING YEAR OF THE

CONTRACT IS 271 DAYS THROUGH 635 DAYS

AFTER CONTRACT AWARD.

SECOND PRODUCTION ORDERING YEAR OF THE

CONTRACT IS 636 DAYS THROUGH 1,000 DAYS

AFTER CONTRACT AWARD.

THIRD PRODUCTION ORDERING YEAR OF THE

CONTRACT IS 1,001 DAYS THROUGH 1,366 DAYS

AFTER CONTRACT AWARD.

FOURTH PRODUCTION ORDERING YEAR OF THE

CONTRACT IS 1,367 DAYS THROUGH 1,731 DAYS

AFTER CONTRACT AWARD.

FIFTH PRODUCTION ORDERING YEAR OF THE

CONTRACT IS 1,732 DAYS THROUGH 1,825 DAYS

AFTER CONTRACT AWARD.

NOTE: THE PRICE APPLICABLE TO AN INDIVIDUAL

ORDER IS THE PRICE FOR THE ORDERING YEAR IN

WHICH THE ORDER IS ISSUED. THE DELIVERY DATE

DOES NOT DETERMINE THE CONTRACT YEAR.

CAUTION: OFFERORS MUST SUBMIT OFFERS

ELECTRONICALLY, SEE PARAGRAPH (C) OF

4 7

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

CLAUSE 52.204-4016, WARREN ELECTRONIC

CONTRACTING, OF THIS SOLICITATION FOR

INSTRUCTION ON HOW TO SUBMIT YOUR OFFER.

OFFERORS MUST INCLUDE A SIGNED SF33/SF1449

COVER SHEET.

(End of narrative A003)

0011 FIRST PRODUCTION ORDERING YEAR 1 EA $ $ ______________________________ ______________ __________________

COMMODITY NAME: EWPS

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING CLAUSE

LEVEL PRESERVATION: Military

LEVEL PACKING: A

Inspection and Acceptance _________________________

INSPECTION: Origin ACCEPTANCE: Origin

5 7

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

0016 FIRST ARTICLE TEST - GOVERNMENT FAT 1 EA $ $ ____________________________________ ______________ __________________

COMMODITY NAME: EWPS

CLIN CONTRACT TYPE:

Firm Fixed Price

Mfr CAGE: 19207

Mfr Part Number: ATPD 2418

Packaging and Marking _____________________

PACKAGING/PACKING/SPECIFICATIONS:

SEE PACKAGING DATA

LEVEL PRESERVATION: Commercial

LEVEL PACKING: Commercial

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Government Approval/Disapproval Days: 270

In accordance with C.10.2.5, the Contractor shall present the FAT unit under CLIN 0016 for inspection and acceptance. The FAT approval will be made IAW clause 52.209-4, and will include acceptance of the

First Article unit at the final delivery destination.

Delivery of the FAT unit to APG shall be made within

225 days after award.

SHIP TO:

(SXC213)

DLA DISPOSITION SERVICES ABERDEEN

BLDG .507 ROOM 4 MULBERRY POINT RD

ABERDEEN PROVING GROUND

ABERDEEN PROVING GROUND, MD 21005

Approval/disapproval of the FAT unit will be within 270 days from receipt of the FAT unit at APG

(within 495 days after award).

(End of narrative E001)

6 7

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION F - DELIVERIES OR PERFORMANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

F-1 CHANGED 52.242-4457 DELIVERY SCHEDULE FOR DELIVERY ORDERS SEP/2008

(TACOM)

(a) Delivery under this contract must conform to the required schedule specified below, unless acceleration is acceptable.

(b) DEFINITIONS:

(1) DAYS means the number of days after the date of contract award when you must deliver the stated quantity (QTY) of supplies.

(2) DELIVERY is defined as follows:

FOB Origin - Contractor is required to deliver its shipment as provided in FAR 52.247-29(a)(1)-(4) by the time specified in the individual contract; or

FOB Destination - Contractor is required to deliver its shipment as provided in FAR 52.247-34(a)(1)-(2) by the time specified in the individual contract. The contractor must take into consideration the length of time necessary to deliver its shipment to the destination designated in the contract, to ensure that the item reaches its destination by the time reflected in the contract.

(c) The Government requires deliveries according to the following schedule on all orders:

(1) GOVERNMENT REQUIRED DELIVERY SCHEDULE:

CLIN 0011AA/0012AA/0013AA/0014AA/0015AA:

(i) Start deliveries 180 days after the delivery order date; or FAT Approval, whichever is later

(ii) You will deliver 1 unit every thirty days.

(iii) You may deliver more units every thirty days at no additional cost to the government with PCO approval.

CLIN 0016AA:

(i) Start deliveries 225 days after the delivery order date; or FAT Approval, whichever is later

(ii) You will deliver 1 unit every thirty days.

(iii) You may deliver more units every thirty days at no additional cost to the government with PCO approval.

(e) If an accelerated delivery schedule is not acceptable, the required delivery schedule above will apply. If it is acceptable, you may propose an accelerated delivery schedule at no additional cost; fill in the appropriate information here:

(1) CONTRACTOR PROPOSED ACCELERATED DELIVERY SCHEDULE:

(i) If FAT is required, deliveries will start ___ days after the delivery order date; or

(ii) If FAT is not required or FAT is waived, deliveries will start ___ days after delivery order date.

[End of clause]