B08-W52P1J-19-R-0075 FINAL.pdf

PDF 187 KB Posted

Attached to
Bulk Explosive Material Federal contract opportunity
Solicitation number
W52P1J-19-R-0075
Issued by
Department of the Army Materiel Command Joint Munitions Command

About this file

This is a solicitation for the procurement of trinitrotoluene (TNT) flake in accordance with MIL-DTL-248D. The Army Materiel Command Joint Munitions Command intends to award up to three firm fixed price indefinite-delivery/indefinite-quantity contracts for a total minimum guaranteed quantity of 3,000,000 pounds of TNT to be split equally among awardees. Each contract will consist of five ordering periods from fiscal year 2020 through fiscal year 2025. The solicitation utilizes lowest price technically acceptable source selection procedures and is open to all qualified offerors registered in the System for Award Management database. Proposals are due by January 8, 2020 at 4:00 PM Central Time.

View the file

Other files for this federal contract opportunity

Other files attached to Bulk Explosive Material, newest first.
File Type Posted
Attachment 0012- Industry Questions and Government Responses 02202020.pdf PDF
W52P1J19R0075-0009.pdf PDF
Attachment 0012- Industry Questions and Government Responses 02142020.pdf PDF
W52P1J19R0075-0008.pdf PDF
Attachment 0012- Industry Questions and Government Responses 02062020.pdf PDF
W52P1J19R0075-0007.pdf PDF
W52P1J19R0075-0006.pdf PDF
Attachment 0012- Industry Questions and Government Responses 02032020.pdf PDF
Attachment 0012- Industry Questions and Government Responses 27 JAN 2020.pdf PDF
W52P1J19R0075-0005.pdf PDF
Attachment 0006- Statement of Work 27 JAN 2020.pdf PDF
Attachment 0012- Industry Questions and Government Responses 13 JAN 2020.pdf PDF
W52P1J19R0075-0004.pdf PDF
Attachment 0012- Industry Questions and Government Responses.pdf PDF
Attachment 0006- Statement of Work.pdf PDF
W52P1J19R0075-0003.pdf PDF
Attachment 0012- Industry Questions and Government Responses (002).pdf PDF
W52P1J19R0075-0002.pdf PDF
B08- Attachment 0007- CDRL DISTRIBUTION LIST.pdf PDF
B08- Attachment 0003- MIL-DTL-248D (Amd 1).pdf PDF
B08- Attachment 0008- Bulk Explosives Pallet Unit AMXSV 4071 - Revision 1.pdf PDF
B08- Attachment 0004- TDP Part Number 7548645.pdf PDF
B08- Attachment 0009- Barcoding Drawing 12999545.pdf PDF
B08- Attachment 0006- Statement of Work.pdf PDF
B08- Attachment 0005- Section C Engineering Exceptions.pdf PDF
B08- Attachment 0011- WPM Drawing ACV00831.pdf PDF
B08- Attachment 0010- Marking Drawing ACV00561 REV G.pdf PDF
B08- Attachment 0001- Price Evaluation Spreadsheet.xlsx XLSX spreadsheet
B08- Attachment 0002- Past Performance Questionnaire.pdf PDF
B08- Exhibit A- TNT CDRLS.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W52P1J-19-R-0075 X

2019NOV19

2020JAN0804:00pm

DOA6

2019NOV19 SEE SCHEDULE

W52P1J

ARMY CONTRACTING COMMAND - RI

ROCK ISLAND, IL 61299-8000

BLDGS 60 & 62

ASHLEE G. ASPLUND

(309)782-2008

CCRI-AR

ASHLEE.G.ASPLUND.CIV@MAIL.MIL

1 72

X 1

X 4 X 6

X 9 X 10 X 17

X 23

X 25

X 28

X 53

X 54

X 61

X 69

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: ASHLEE G. ASPLUND

Buyer Office Symbol/Telephone Number: CCRI-AR/(309)782-2008

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

A.1. This Solicitation, W52P1J-19-R-0075, is issued under full and open competition for the procurement of trinitrotoluene flake (TNT) to be used for open detonation operations at various Army depots to support demilitarization (demil) operations. The Minimum Guarantee

Quantity (MGQ) of 3,000,000 pounds, to be split equally between all awardees, will be awarded concurrently with the award of each contract.

A.2. The U.S. Government intends to award up to three Firm Fixed Price (FFP), five year, multiple award Indefinite Delivery/Indefinite

Quantity (IDIQ) contracts. However, the U.S. Government reserves the right to make less than three awards if determined to be in its best interest. Lowest Priced Technically Acceptable (LPTA) Source Selection Procedures in accordance with FAR 15.101-2 will be utilized to select the successful offerors. Each IDIQ contract will consist of five, one-year ordering periods.

A.3. Offerors shall submit not to exceed ceiling unit prices for each quantity range and applicable First Article Tests (FATs) for all five ordering periods. All prices shall be entered on the Price Evaluation Spreadsheet, Attachment 0001. FAT costs are required to be included for each ordering period. However, if continuous production can be achieved, FAT may be waived. Offerors should not assume FAT will be waived and must provide FAT cost as required to be considered for award. You are reminded this is a competitive procurement action, although Offerors are required to submit not to exceed ceiling prices, these prices must be determined fair and reasonable to be considered for award.

A.4. Delivery Order 0001, which will consist of the MGQ, will be issued concurrently with each IDIQ award. The MGQ is 3,000,000 pounds

(to be split equally between all awardees) using the applicable unit prices identified on the Price Evaluation Spreadsheet, Attachment

0001. Once the MGQ has been met, Delivery Orders will be competed among awardees in accordance with the Fair Opportunities to compete provisions in FAR Part 16.505. Please refer to Section H.

A.5. The following are the Ordering Periods (OP) for executing delivery orders:

OP1 - Award date + 364 Days after Award (DAA)

OP2 - 366 DAA - 730 DAA

OP3 - 731 DAA - 1095 DAA

OP4 - 1096 DAA - 1460 DAA

OP5 - 1461 DAA - 1825 DAA

A.6. During the life of the ordering periods for this contract (Date of Award - 1825 DAA), the U.S. Government is entitled to order a maximum dollar amount of $188,170,265.00, considering all IDIQ awards.

A.7. LPTA Source Selection procedures in accordance with FAR 15.101-2 will be utilized to select the awardees. Awards will be made by selecting the offers which are technically acceptable and provide the lowest total evaluated prices with acceptable past performance.

There are three evaluation factors:

1) Technical

2) Price

3) Past Performance

A.8. Evaluation of the proposals shall be in accordance with the criteria stated in Section M.

A.9. The TNT procured through this solicitation will be shipped to any of the following: Anniston Munitions Center, Anniston, AL; Blue

Grass Army Depot, Richmond, KY; Crane Army Ammunition Activity, Crane, IN; Hawthorne Army Depot, Hawthorne, NV; Letterkenny Munitions

Center, Chambersburg, PA; McAlester Army Ammunition Plant, McAlester, OK; Tooele Army Depot, Tooele, UT. Final destinations will be provided in the contemplation letter for each delivery order.

A.10. All shipments will be FOB Destination, See Section F, Deliveries and Performance.

A.11. Offerors should note the provisions at FAR 52.215-1, "Instructions To Offerors - Competitive Acquisition" Alternate I. The U.S.

Government intends to award the contract(s) resulting from this solicitation with discussions. However, the U.S. Government reserves the right to not conduct discussions if determined not necessary by the Contracting Officer. Therefore, the Offerors shall ensure its initial proposals contain the best terms and that proposals are complete, including all fill-ins and blanks.

2 72

W52P1J-19-R-0075 REPRINT

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

A.12. This requirement shall be performed in accordance with Section C of this solicitation.

A.13. The Offeror's proposal shall be valid for 250 days after the closing date of this solicitation instead of the 60 days as stated on page one of this solicitation, block 12.

A.14. All proposals must be submitted in U.S. Dollars.

A.15. The U.S. Government anticipates price competition; therefore, cost or pricing data is not required to be submitted with the

Offeror's initial proposal. However, the U.S. Government reserves the right to require certified cost or pricing data in accordance with

FAR 15.403-4, Requiring Certified Cost or Pricing Data.

A.16. If an Offeror is in possession of and has received authorization to use Government Furnished Property (GFP) for any resultant contract awarded from this solicitation, and proposes to utilize alternative methodology to calculate rental charges for proposal evaluation purposes IAW FAR 52.245-9(e)(3), the alternate methodology and calculations, along with sound justification for using an alternative method, must be provided with the proposal submission.

A.17. Flowdown of requirements: All clauses and Contract Data Requirements List (CDRL) requirements of solicitation W52P1J-19-R-0075 and the resultant contract(s) must be flowed down to and met by all major/key subcontractors.

A.18. In the event of a discrepancy between any statements in Narrative A and another section of the solicitation exists, the other sections take precedence.

A.19. Prior to award, this solicitation should not be discussed with any U.S. Government employee without consent from the Contracting

Officer, Ms. Bridget Kramer or the Contract Specialist, Ms. Ashlee Asplund. Your comments and/or questions should be directed in writing to Bridget Kramer or Ashlee Asplund. Please reference the solicitation number, W52P1J-19-R-0075, in the subject line of all correspondence pertaining to this solicitation. POC: Ashlee Asplund, ashlee.g.asplund.civ@mail.mil, 309-782-2008, or Bridget Kramer, bridget.l.kramer.civ@mail.mil, 309-782-0896.

A.20. Only the U.S. Army Contracting Command, Rock Island (ACC-RI) is authorized to execute delivery orders under any contract(s) resulting from this solicitation.

*** END OF NARRATIVE A0001 ***

3 72

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

0001 FIRST ARTICLE ACCEPTANCE TEST $ $ _____________________________ ______________ __________________

NSN: 1376-00-628-3333

COMMODITY NAME: FIRST ARTICLE ACCEPTANCE TEST

Ordering Period 1: Award date + 364 Days after Award

(DAA)

Ordering Period 2: 366 DAA - 730 DAA

Ordering Period 3: 731 DAA - 1095 DAA

Ordering Period 4: 1096 DAA - 1460 DAA

Ordering Period 5: 1461 DAA - 1825 DAA

MGQ: 3,000,000 Pounds (to be split equally between awardees)

First Article Test (FAT) deliveries are due 270 days after award. The U.S. Government response time to determine if the FAT is approved is 30 days (300 days after date of award). Production deliveries are due

90 days after approval of FAT.

Offerors must complete the Price Evaluation

Spreadsheet (See Attachment 0001).

(End of narrative B001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Government Approval/Disapproval Days: 30

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

0002 TRINITROTOLUENE (TNT) $ $ _____________________ ______________ __________________

COMMODITY NAME: TRINITROTOLUENE (TNT)

CLIN CONTRACT TYPE:

4 72

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

Firm Fixed Price

Ordering Period 1: Award date + 364 Days after Award

(DAA)

Ordering Period 2: 366 DAA - 730 DAA

Ordering Period 3: 731 DAA - 1095 DAA

Ordering Period 4: 1096 DAA - 1460 DAA

Ordering Period 5: 1461 DAA - 1825 DAA

MGQ: 3,000,000 Pounds (to be split equally between awardees)

Offerors must complete the Price Evaluation

Spreadsheet (See Attachment 0001).

(End of narrative B001)

Packaging and Marking _____________________

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

Deliveries or Performance _________________________

FOB POINT: Destination

SHIP TO:

(Y00000) SHIPPING INSTRUCTIONS FOR CONSIGNEE

(SHIP-TO) WILL BE FURNISHED PRIOR

TO THE SCHEDULED DELIVERY DATE FOR

ITEMS REQUIRED UNDER THIS

REQUISITION.

0003 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________

The completion date for each CDRL is outlined in

Exhibit A. Contractor shall prepare and deliver the requirements in accordance with the CDRLs in Exhibit

A.

(End of narrative B001)

5 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1.0. Requirements

C.1.1. The Contractor shall produce and deliver Trinitrotoluene (TNT) in accordance with (IAW) MIL-DTL-248D with Amendment 01

(Attachment 0003) or an equivalent specification, and the packaging instructions labeled TDP Part Number 7548645 (Attachment 0004).

Palletization of TNT shall be IAW Attachment 0008.

C.1.2. During the life of any contracts resulting from this solicitation, the U.S. Government intends to amend the packaging instructions (Attachment 0004) to allow for the purchase of 25lb boxes of TNT. If this packaging instruction requires a change in price, the price will be negotiated prior to the revised packaging instructions being incorporated into the contract.

C.1.3. The Contractor shall have a quality management system (QMS) in place (e.g. ISO9001 certified). The Contractor shall submit its

QMS for approval IAW CDRL A013.

C.1.4. First Article Acceptance Test (FAT) shall be completed by the Contractor IAW paragraph 4.2 of MIL-DTL-248D. FAT is required prior to initiation of production or whenever a lapse in production of 90 days or greater is experienced and if a change occurs in the manufacturing process, material used, drawing, specification, sources of supply as to significantly affect product uniformity as determined by the U.S. Government. The Contractor shall submit its FAT report IAW CDRL A014 for review and approval. The U.S.

Government may elect to witness the FAT in person. Therefore, the Contractor shall provide the U.S. Government with a notification of no less than 15 days prior to the scheduled FAT.

C.1.5. Conformance testing shall be completed for each production lot of explosives IAW paragraph 4.3 of MIL-DTL-248D. The manufacturer shall provide a certificate of conformance with each lot.

C.1.6. The Contractor shall adhere to MIL-STD-1916, The Department of Defense Preferred Methods for Acceptance. Sampling methods for

FAT can be implemented using MIL-STD-1916.

C.1.7. Lot Formation and Identification shall be completed by the Contractor IAW MIL-STD-1168C.

C.1.8. Product Acceptance:

C.1.8.1 Product acceptance will be F.O.B Destination.

C.1.8.2. IAW DC-QCIC-81960 Measurement System Evaluation: Measurement and Inspection Equipment System Design Documentation for

Acceptance, the Contractor shall submit a completed Acceptance Inspection and Equipment list (IEL) and (AIE) Package. The intent of the

AIE package is to ensure equivalency between the U.S. Government and the Contractors inspection methods, test equipment, and acceptance criteria. The IEL and AIE package shall be supplied to the U.S. Government for review and approval, no less than 120 days after contract award, IAW CDRL A003, Measurement System Evaluation/Acceptance Inspection Equipment.

C.1.8.3. IAW CDRL A008, Acceptance Description Sheets (ADS), the Contractor shall submit ADS for each lot or batch processed.

C.1.9. Delivery

C.1.9.1. The Contractor/Subcontractor shall be responsible for all activities needed to import any foreign procured material into the continental United States to include, but not limited to, arranging for port clearance and docking, insuring the material is properly off-loaded from the transport vessel, arranging for customs entry and inspection, and arranging for overland transport within North

America and/or the continental United States. The explosive material must be safe to ship and store, requiring DOT approval and DOD coordination as well. The following ports can handle a substantial amount of Net Explosive Weight (NEW): Military Ocean Terminal Sunny

Point (MOTSU), Military Ocean Terminal Concord (MOTCO), and Brunswick Canada.

C.1.9.2. The Contractor shall submit a report of shipment to the Contracting Officer and Contract Specialist within 5 days of being completed IAW CDRL A004. The Contractor will be required to deliver the TNT to any of the following locations:

Anniston Munitions Center Anniston, AL, (ANMC), Blue Grass Army Depot, Richmond, KY, (BGAD), Crane Army Ammunition Activity, Crane, IN, (CAAA), Hawthorne Army Depot, Hawthorne, NV, (HWAD), Letterkenny Munitions Center, Chambersburg, PA (LEMC), McAlester Army Ammunition Plant, McAlester, OK, (MCAAP), Tooele Army Depot, Tooele, UT, (TEAD)

Exact location will be known prior to each delivery order being executed.

C.1.9.3. IAW CDRL A001, Certificate of Conformance, shall be included with the shipment and provided to the Contracting Officer

6 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

certifying that all TNT being delivered was produced IAW MIL-DTL-248D with Amendment 1 or another accepted specification.

C.1.9.4. Outside Continental United States sources: Delivery terms will be F.O.B Destination via a U.S. Flag Vessel destined for

North America.

C.1.10. Post Award Meeting and Program Management Reviews:

C.1.10.1. The Contractor shall host a Post Award Meeting within 60 days after contract award (ACA) to review contract terms and conditions to gain an understanding of the contract requirements.

C.1.10.2. Program Management Reviews (PMRs) shall be conducted within 180 days ACA and every 180 days thereafter until contract close out to evaluate the Contractor and subcontractors progress. At the Contracting Officers discretion, the frequency of the PMRs may be changed as needed. Meeting site, time, and date shall be mutually agreed upon between the U.S. Government and Contractor. Meeting

Agenda shall be provided for U.S. Government review and approval IAW CDRL A009. Presentations shall be in Contractor format and shall be submitted IAW CDRL A010, Presentation Material. The Contractor shall prepare meeting minutes in Contractor format and distribute in electronic format IAW CDRL A011. Prior to any scheduled PMR, the Contractor shall submit an Integrated Master Schedule IAW CDRL A012, which shall include major or critical subcontractor program activities, key events, and milestones.

C.1.11. Quarterly Progress Reports:

C.1.11.1. IAW CDRL A002, Program Progress Reports, the Contractor shall submit a progress report to the Contracting Officer and

Contract Specialist that includes the following information:

a. total quantity on contract

b. total quantity delivered and to where

c. any quantities that have been shipped but not yet received at final destination

d. schedule indicating when remaining quantities will be shipped and delivered

C.1.12. Integrated Product Team (IPT):

C.1.12.1. Monthly IPT meetings will be held throughout the duration of this contract. The Contracting Officer reserves the right to change the frequency of the IPT meetings or cancel them all together at any time.

*** END OF NARRATIVE C0001 ***

C0002 - CONFIGURATION CHANGE MANAGEMENT DOCUMENTATION

C.2.1. The Contractor may submit Engineering Change Proposals (ECPs) and Requests for Variances (RFVs) for the requirements in the

Government provided Technical Data Package (TDP). The Contractor shall prepare and submit ECPs, NORs, and RFVs as required by the applicable CDRL.

C.2.1.1. ECPs - The Contractor may request a permanent change to the requirements specified in the TDP or any other baseline documentation by submitting an ECP. ECPs shall be submitted to include all Notices of Revision (NORs) necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document. The Contractor shall not present any production items for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government the

ECP has been approved and incorporated in the contract.

C.2.1.1.1. Page 1 of DD Form 1692 (or equivalent) shall be submitted for all ECPs. Pages 2-7 of DD Form 1692 shall be submitted when required to properly explain all the potential logistics and technical impacts of the proposed change. DD Form 1695 NOR or DD Form

1695-1 Tabulated NOR (or equivalents) shall be submitted to completely describe the desired change on each affected document.

C.2.1.1.2. All ECPs submitted by the Contractor will be routine priority unless otherwise justified. If the Contractor considers the ECP to be emergency or urgent, they shall include justification within 48 hours of submittal of the ECP.

C.2.1.2. RFVs- The Contractor may request to temporarily depart from a requirement specified in the TDP or any other baseline documentation, by submitting an RFV. RFVs may be submitted either pre- production (formerly known as Request for Deviation (RFD)) or post- production and prior to acceptance by the Government (formerly known as Request for Waiver (RFW)). DD Form 1694 (or equivalent) shall be submitted for all RFVs. The Contractor shall not present any production items for acceptance with any nonconformance to the requirements in the TDP or other baseline documentation until notified by the Government the RFV has been approved and incorporated in the contract.

C.2.2. Submission of requested changes- The submission of an ECP or RFV by the Contractor does not affect the required delivery dates specified within the contract, shall not constitute excusable delay in the performance of this Contract by the Contractor or in any way

7 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

relieve the Contractor from compliance with the contract delivery schedule. If a delivery date change is needed, it must be negotiated with the Contracting Officer and documented via modification to the contract. The submission of an ECP and/or RFV by the Contractor shall not preclude the Government from exercising its rights under any clause of the Contract.

C.2.3. Specifications- Permanent proposed changes to specifications which are part of the TDP or baseline documentation shall be requested with an ECP and NOR (i.e. Specification Change Notices (SCNs) are not required).

*** END OF NARRATIVE C0002 ***

C0003 - OPERATIONS SECURITY (OPSEC) REQUIREMENTS

C.3.1. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation

Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in Contractor security matters or processes.

*** END OF NARRATIVE C0003 ***

8 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION D - PACKAGING AND MARKING

D.1. PACKAGING REQUIREMENTS

D.1.1. Packaging shall be in accordance with 7548645 revision AP, dated 12 July 2017.

D.1.2. When lot numbering is required, no more than one lot shall be packaged in an outer shipping container.

D.1.3. Marking shall be in accordance with 7548645, revision AP, dated 12 July 2017. 2-D barcodes are require in accordance with

12999545, rev J, dated 26 January 2018 (Attachment 0009).

D.1.4. The following shall apply to drawing 7548645, revision AP, dated 12 July 2017:

D.1.4.1. PERFORMANCE ORIENTED PACKAGING (POP)

D.1.4.1.1. Prior to shipment, the manufacturer shall make sure the container has been tested by a government approved Performance

Oriented Packaging (POP) Test laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulation.

Test will be to a weight at least 10% greater than the actual gross weight to be marked on the tested container. POP marking shall not be applied to the container until verified by the Government. The POP test report shall be generated by the Manufacturer/Laboratory following the test. The report must be kept on file by the Contractor and submitted as required by the Contract Data Requirement List.

(DI-PACK-81059) For multiyear contracts, the Contractor shall re-perform POP testing at a certified test laboratory if: the initial POP test report expires before the end of the contract or there is a change in container manufacturer or design of the exterior shipping container. No re-test is needed if all packaging was purchased during the period that the POP test was valid.

D.1.4.2. EXCEPTION TO POP MARKINGS

D.1.4.2.1. If the container is manufactured outside the USA, the Contractor shall not apply the UN POP certification mark provided in this contract (if applicable). The Contractor/container manufacturer (outside the USA) is responsible to perform the UN POP certification tests and apply the marking authorized by the Transportation Competent Authority of the country of manufacture.

D.1.4.3. POP VERIFICATION

D.1.4.3.1. In no case shall a container be shipped if the gross weight marked on the package is greater than the POP certified weight. If the average gross weight of the packed containers (determined by weighing two representative samples and averaging the weight) is greater than the certified weight, container marking operations shall cease and the procuring activity shall be contacted immediately.

D.1.4.4. Palletization shall be in accordance with AMXSV-4071 (Attachment 0008), revision 1, dated December 2012. Marking shall be in accordance with ACV00561, Revision G, dated 26 January 2018 (Attachment 0010). Wood Packaging Material (WPM) shall be in accordance with

ACV00831, Dated: 01 MAR 2010 (Attachment 0011). 2-D barcodes are required.

*** END OF NARRATIVE D0001 ***

9 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

https://www.acquisition.gov/

If the clause requires additional or unique information, then that information is provided immediately after the clause title.

Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________

E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996

E-2 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984

E-3 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014

(a) The contractor shall comply with the higher-level quality standard(s) listed below.

International Organization for Standardization 9001:2015, dated 15 Sept 2015.

(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require--

(i) Control of such things as design, work operations, in-process control, testing and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E0001 - MIL-STD-1916

The Department of Defense (DoD) Test Method Standard, the DoD Preferred Methods for Acceptance of Product. MIL-STD-1916, shall be used for this procurement action of Bulk TNT. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the

Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL VII for critical characteristics, VL IV for major characteristics and VL II for minor characteristics.

MEASUREMENT SYSTEM EVALUATION (Note: Definitions found in Section (S))

(a) Scope. This section establishes requirements for design, supply, performance, and maintenance of AIE used for product inspection and acceptance. In addition, this section establishes requirements for the preparation, submission, and approval of AIE documentation.

(b) AIE. The Contractor shall provide all AIE necessary to ensure conformance of components and end-items to contract requirements. AIE shall include inspection, measuring, and test equipment whether Government furnished or Contractor furnished (including commercially acquired) along with the necessary specifications and procedures for their use (see ISO 10012, paragraph 6.2.1). The AIE shall not create or conceal defects on the product being inspected. All AIE documentation shall contain sufficient information to permit evaluation of the AIEs ability to test, verify, and/or measure the applicable characteristics or parameters (see applicable DID referenced in DD Form 1423).

(c) AIE Designs & Government Furnished Gages. AIE designs are of two types Government designs (see (c)(1)) and Contractor designs (see

(c)(2)). When applicable, Government designs or Government furnished gages are designated in the TDP/contract; responsibility for all other AIE is assigned to the Contractor. The designs, associated inspection procedures, and theory of operation shall have the level of detail to demonstrate capability of the proposed AIE to perform the required inspection.

(1) Government AIE Designs. Government AIE designs may consist of detailed drawings necessary for the fabrication and use of the AIE.

Unless otherwise specified, the Contractor may submit alternate or modified contractor designs of Government AIE designs.

(2) Contractor AIE Designs. Contractor AIE design drawings shall meet the requirements of ASME Y14.100, ASME Y14.5, and ASME Y14.43 and may include commercial inspection equipment. [Commercial inspection equipment is defined as shown in paragraph (s)(4) below. It shall be fully described by catalog listings or other means which provide sufficient information to permit identification and evaluation by the Government and may include illustrations and engineering data.] Designs shall be submitted for any special fixture(s) to be used. Unless otherwise specified, Gage Tolerancing Policy shall be in accordance with ASME Y14.43, Absolute Tolerancing (Pessimistic

Tolerancing).

(3) Visual Inspection. Visual inspection standards used for the acceptance/rejection of product shall be submitted for approval.

10 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(d) AIE Package Submittals. The Contractor shall prepare the AIE package submittal in accordance with the DID referenced in the applicable Contract Data Requirements List (CDRL DD Form 1423). In addition, the Contractor shall adhere to the following requirements:

(1) Designs for Approval. Contractor designs and/or the submission for the use of Government designs shall be approved by the

Government. Partial submission of AIE designs is permissible in order to expedite the approval process; however, the response date for design review will be based on the date of the final complete submission of designs.

(2) Correspondence in English. The Contractor shall ensure all AIE correspondence and documentation are submitted in English.

(3) Units of Measurement. The units of measurement within the AIE package submittal shall be consistent with the requirements of the

Technical Data Package (TDP).

(4) AIE Flow Down. The Contractor shall flow down AIE requirements to sub-contractors at any tier who are performing acceptance inspections.

(e) Characteristics for Inspection. AIE documentation for Critical, Special, and Major characteristic inspections shall be submitted to the Government for approval in accordance with (IAW) the CDRL (see DD Form 1423). AIE for Minor characteristic inspections shall be submitted to the Government for approval IAW CDRL (see DD Form 1423) and as required below:

(1) [X] Listed Minor (characteristics displayed on specifications and/or drawings

(2) [ ] Government selected list (as attached or as provided herein):

(3) [ ] Not submitted

(f) Automated Acceptance Inspection Equipment. The AAIE shall accept only conforming material. All characteristics requiring AAIE per the TDP shall utilize inspection equipment with a minimum demonstrated reliability of 99.8% at a 90% confidence level to detect non-conforming material unless otherwise specified below.

(1) Reliability of 99.8% at a 90% Confidence Level for Critical/Special Characteristics

(2) Reliability of 99.8% at a 90% Confidence Level for Major Characteristics

(3) For inspection of major and minor characteristics where Contractor utilizes AAIE when it is not required by the TDP, the AAIE package shall be submitted to the Government for approval. If the Minor characteristic is not listed in paragraph (e)(2) or not required for submittal in paragraph (e)(3), then the AAIE requirements (e.g., verification, calibration, prove-out, etc.) of the inspection shall still be performed.

(4) All AAIE packages submitted to the Government for approval shall be in accordance with MIL-A-70625 (Automated Acceptance

Inspection Equipment Design, Testing and Approval of). Furthermore, the Contractor shall be responsible for producing the acceptance and rejection verification standards/masters representative of the characteristics the AAIE is designed to inspect. The verification standards and frequency of use require Government approval prior to use. When verification standards are used for the VL-VII sampling plan per MIL-STD-1916 paragraph 4.4, verification standards and frequency of use shall require Government approval prior to use.

(5) If the AAIE accepts a critical characteristic reject standard the Contractor shall notify the Government and act in accordance with paragraph (e) of Critical Characteristic Control. In addition, if the AAIE accepts a major and/or minor characteristic reject standard the Contractor shall act in accordance with paragraph 8.3 of ISO 10012 or paragraph 5.2.3 of ANSI/NCSL Z540.3.

(6) All AAIE shall be required to pass a Government-approved Acceptance (Prove-Out) Test. The Contractor shall conduct this test per the approved test plan and shall submit a test analysis report for approval. See applicable DD Form 1423. This test shall be performed at the Contractors facilities whose manufacturing system has had the AAIE fully integrated and calibrated as per paragraph (i) of this section. The Contractor shall allow Government personnel access to this facility and unobstructed monitoring of this test.

(7) The Contractor shall notify the Government prior to a modification and/or relocation of the Government-approved AAIE. The modified AAIE designs shall be submitted for approval. The modified and/or relocated AAIE shall require submission of the acceptance test plan (prove-out) and results for review and approval prior to use. The modified and/or relocated AAIE shall be in accordance with paragraphs (f)(1)-(f)(6).

(g) Measurement System Analysis (MSA). The Contractor is responsible to ensure all AIE is, at a minimum, stable, repeatable, and reproducible for all characteristics. Refer to ASTM E2782 and/or AIAG MSA for guidance. The Contractor shall provide objective evidence, including the MSA assessment plan, associated data, and analysis, which demonstrates the AIE is, at a minimum, stable, repeatable, and reproducible for the following characteristics (MSA CDRL): N/A

Approval of submitted MSA(s) must be granted before the corresponding AIE can be used or continue to be used for acceptance of

11 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

product. If at any time following approval of the AIE and MSA the AIE is disapproved, then the MSA shall be disapproved. After the resubmitted AIE is approved, the MSA shall be conducted on the approved AIE and resubmitted for approval.

(h) Robust AIE System. The Contractor shall ensure the AIE and its use is not negatively affected by any manufacturing/inspection environmental stimuli including, but not limited to production rate, noise, temperature, humidity, and vibration.

(i) AIE Calibration and Verification. The calibration system shall be in accordance with ISO 10012 or ANSI/NCSL Z540.3. All AIE shall be subjected to scheduled calibration intervals to ensure that the equipment will accept only conforming product and reject all non-conforming product for the duration of the approved calibration period. AIE shall be subjected to periodic verification to ensure that the equipment will continue to accept and reject product with the same consistency as it did at the time of its previous calibration.

(j) Non-Destructive Testing (NDT). Contractor shall submit detailed plans for qualifying and certifying NDT personnel and plans for qualification and ongoing use of NDT methods used for inspecting product. If re-qualification of NDT personnel and/or NDT methods is required, then the applicable plans shall be submitted.

(1) Personnel performing NDT examinations shall be qualified and certified in accordance with the standard practices prescribed by

NAS 410 (NAS Certification & Qualification of NDT Personnel), ANSI/ASNT-CP-189 (ASNT Standard for Qualification and Certification of NDT

Personnel), or SNT-TC-1A (Recommended Practice for Personnel Qualification and Certification in NDT), and additional procedures that may be identified by the Government. Acceptance of product using NDT shall be performed by personnel at a level of qualification consistent with that defined in the applicable standard.

(2) The NDT method(s) shall be applied in accordance with ASTM E 543 (Standard Specification for Agencies Performing Nondestructive

Testing) and the current nationally recognized standard practices appropriate to the NDT method(s) employed, such as ASTM E-1742

(Standard Practice for Radiographic Examination) and SAE-AMS-STD-2154 (Inspection, Ultrasonic, Wrought Metals, Process For). Each application technique shall identify the standard(s) utilized. Non-destructive testing includes, but is not limited to, the following types of testing: Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic Particle, and Liquid Penetrant.

(k) Contractor Alternate Inspection Method(s), Modifications and/or Relocation of AIE (Non-Automated) After Government Approval. If the

Contractor proposes an alternate inspection method and/or modifies the AIE design(s) affecting hardware, software, or procedures after

Government approval the intended change(s) shall be submitted to and approved by the Government prior to implementation. If an AIE is relocated and the relocation risks the integrity of the inspection system, notify the Government to determine information needed to assess impact to AIE. See DD Form 1423.

(l) Responsibility for AIE Package Submittal. The Contractor shall submit the AIE design documentation package within contractual timeframes per CDRL (See DD Form 1423). The Government will provide approval or disapproval within the timeframe specified in the CDRL.

Disapproval of the AIE package will require re-submittal and subsequent Government review in accordance with the CDRL requirements. The

AIE package and any required prove-outs must be approved prior to First Article (FA) (if required) or production start-up if FA is not required.

(m) Governments Right to Disapprove AIE. The Government reserves the right to revoke approval of any AIE that is not satisfying the required acceptance criteria at any time during the performance of this contract. See DD Form 1423.

(n) Navy Furnished Gages. When gages are listed in paragraph

(o)(9) Below, the Navy Special Interface Gage (NSIG) Requirement paragraphs (o)(1)-(o)(8) shall be satisfied.

(1) The NSIG(s) are provided for verification of selected interface dimensions and do not constitute sole acceptance criteria of production items or relieve the Contractor of meeting all drawing/specification requirements under the contract.

(2) The Contractor is responsible for contacting the Naval Surface Warfare Center (NSWC), Corona Division at least 45 days prior to

FAT (if required) or production, for the delivery of NSIG(s).

(3) NSIG(s) will be forwarded to the Contractor for joint use by the Government and the Contractor. Government furnished NSIG(s) shall not be used by the Contractor(s) or subcontractor(s) as in-process or working gage(s).

(4) For production items that fail to be accepted by the applicable NSIG(s), an alternate inspection method may be submitted for approval.

(5) The Contractor may substitute Contractor designed and built AIE for the NSIG(s) noted in paragraph (o)(9) below. However, the designs require Government (Navy) approval and the contractor AIE hardware requires Government (Navy) certification. AIE designs shall be submitted in accordance with CDRL (see DD Form 1423).

(6) The Government (Navy) shall not be responsible for discrepancies or delays in production items resulting through misuse, damage or excessive wear to the NSIG(s).

12 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(7) Calibration and repair of the NSIG(s) shall only be performed as authorized by the NSWC Corona Division. Repair is at no cost to the Contractor unless repair is required due to damage to the gages resulting from Contractor fault or negligence. Damaged, worn, or otherwise unserviceable NSIG(s) shall be brought to the immediate attention of the CAO and NSWC Corona Division. The Contractor shall not make any adjustments, alterations or add permanent markings to NSIG(s) hardware unless specified by the NSIG operating instructions or authorized by the NSWC Corona Division.

(8) Within 45 calendar days after final acceptance of all production items, the NSIG(s) shall be shipped to NSWC Corona Division, ATTN: Receiving Officer, Bldg. 575, Gage Laboratory, 1999 Fourth St., Norco, CA 92860-1915. The following shipping and marking specifications are applicable:

(i) Shipping, MIL-STD-2073, DOD Standard Practice for Military Packaging

(ii) Marking, MIL-STD-129, Marking for Shipment and Storage.

(9) The following NSIG(s) shall be provided and are mandatory for use except as noted by paragraph (o)(5) above.

(S) Definitions. This paragraph defines specific terms utilized throughout the rest of this section and in the accompanying Contract

Data Requirements List (CDRL) and Data Item Description (DID). This aids in clarifying the MSE requirements to Government and contractor personnel.

(1) Acceptance Inspection Equipment (AIE). All equipment (includes AAIE defined below), special and standard, including dimensional gages, measuring equipment, test fixtures, electronic and physical test equipment, and other test equipment used for examination and test of a product to determine conformance to the Technical Data Package (TDP) which may include drawings and specifications (e.g., Detail, Performance, Weapon specifications, and QAPs).

(2) Automated Acceptance Inspection Equipment (AAIE). AIE in which the inspection and acceptance determination of the product is performed, in whole or in part, in an automatic manner.

(3) Contractor Inspection Equipment. Government-approved equipment utilized by the Contractor to perform examination and tests to assure conformance to contract requirements.

(4) Commercial Inspection Equipment. Industry-developed inspection equipment of universal application, without limitations to a specific part or item, which is advertised or cataloged as available to the trade or to the public on an unrestricted basis at an established price. Examples follow:

(i) Standard Test Equipment. Multi usage equipment that is specific to a function rather than to an item. It includes such items as hardness testers, tensile strength testers, meters, weighing devices, standard gear testers, ohmmeters, voltmeters, and oscilloscopes.

(ii) Standard Measuring Equipment (SME). Multipurpose equipment and standards used for performing measurements. It includes such items as micrometers, rulers, tapes, height gages, and protractors, etc. Standards include visual inspection equipment such as scratch and dig standards, surface finish comparator, color standards (FED-STD-595), etc.

(5) Nondestructive Testing. The development and application of technical methods to examine materials or components in ways that do not impair future usefulness and serviceability in order to detect, locate, measure and evaluate flaws; to assess integrity, properties and composition; and to measure geometrical characteristics. NDT includes Radiography/Radioscopic, Ultrasonic, Eddy Current, Magnetic

Particle, and Liquid Penetrant.

(6) Measurement System Analysis (MSA). Per ASTM E2782 (Standard Guide for MSA), paragraph 3.1.7, MSA is any of a number of specialized methods useful for studying a measurement system and its properties.

(T) The Contractor may submit alternate inspection equipment technology, provided the vendor can demonstrate that the same characteristic can be measured and that the measurement is repeatable, reproducible. The resolution and accuracy of the results shall have the same or better fidelity when compared to the USG approved inspection methods. The approval method is laid out in the AIE process listed above.

*** END OF NARRATIVE E0001 ***

E0002 - FIRST ARTICLE TEST (CONTRACTOR TESTING)

(a) The first article shall consist of: the requirements of MIL-DTL-248D which shall be examined and tested in accordance with contract requirements, the item specifications, Quality Assurance Provisions (QAPS) and all drawings listed in the Technical Data

Package.

13 72

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(b) The first article shall be representative of items to be manufactured using the same processes and procedures and at the same facility as contract production. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used during regular production. All components, subassemblies, and assemblies in the first article sample shall have been produced by the Contractor (including subcontractors) using the technical data package provided by the Government.

(c) The first article shall be inspected and tested by the Contractor for all requirements of the drawing(s), the QAP(s), and specification(s) referenced thereon, except for:

(1) Inspections and tests contained in material specifications provided that the required inspection and tests have been performed previously and certificates of conformance are submitted with the First Article Test Report.

(2) Inspections and tests for Military Standard (MS) components and parts provided that inspection and tests have been performed previously and certifications for the components and parts are submitted with the First Article Test Report.

(3) Corrosion resistance tests over 10 days in length provided that a test specimen or sample representing the same process has successfully passed the same test within 30 days prior to processing the first article, and results of the tests are submitted with the

First Article Test Report.

(4) Life cycle tests over 10 days in length provided that the same or similar items manufactured using the same processes have successfully passed the same test within 1 year prior to processing the first article and results of the tests are submitted with the

First Article Test Report.

(5) Onetime qualification tests, which are defined as a onetime on the drawing(s), provided that the same or similar item manufactured using the same processes has successfully passed the tests, and results of the test are on file at the Contractors facility and certifications are submitted with the First Article Test Report.

(d) Those inspections which are of a destructive nature shall be performed upon additional sample parts selected from the same lot(s) or batch(s) from which the first article was selected.

(e) A First Article Test Report shall be compiled by the contractor documenting the results of all inspections and tests (including suppliers and Vendors inspection records and certifications, when applicable). The First Article Test Report shall include actual inspection and test results to include all measurements, recorded test data, and certifications (if applicable) keyed to each drawing, specification and QAP requirement and identified by each individual QAP characteristic, drawing/specification characteristic and unlisted characteristic. The Government Quality Assurance Representatives (QAR) findings shall be documented on DD Form 1222, Request for and Results of Tests, and attached to the Contractors test report. Two copies of the First Article Test Report and the DD Form 1222 will be submitted through the Administrative Contracting Officer to the Contracting Officer with an additional information copy furnished per CDRL A014.

(f) Notwithstanding the provisions for waiver of first article, an additional first article sample or portion thereof, may be ordered by…