Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

See summary of changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jul-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J18R5015

X 9B. DATED (SEE ITEM 11)

13-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Jul-2018

CODE

ARMY CONTRACTING COMMAND ROCK ISLAND

ACC-RI

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

W52P1J 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W52P1J18R5015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SOLICITATION AMENDMENT 0001

The purpose of this Solicitation Amendment 0001 is to :

1. Replace the original Appendix A Drawings with the Appendix A Revised Drawings 26Jul2018 added to

FBO.gov as explicit access.

2. Answer contractor questions:

Q1. "We are to extend the duct bank from the existing transformer pad to S29, compartment D. (per note 2 on drawing 2 of 5). Would like to know if a conduit has been stubbed out of S29 and if not, is there room under the switch for an additional 4" conduit/elbow.”

A1. 1- Regarding the existing cable duct underneath the existing S29. The existing condition on attached shows the empty conduit was stopped underneath the compartment C and the fused switch of compartment C is currently occupied for feeding the existing transformer T411 inside the electrical room of BLDG 250. The contractor have two options to solve that:

A- proceed with the existing plan shown on the Keynotes by extending the empty conduit to compartment D, provide proper size of fuse elements for the fuse switch of compartment D and connect the 15KV cable between the compartment D and primary of proposed transformer T518.

B- The other option re- use the existing empty conduit(stop underneath Compartment C) as its and connect the new transformer T518 to the compartment C but before that need to re wire the existing transformer T411 to compartment D.

Both options on above the contractor will need to disconnect the S29 first lift it up make all saw cut and place the new conduit and elbows and repair the concrete as required then but the S29 back again.

Q2. “There is a keyed note #12 on drawing 4 of 5, but the keyed notes on drawing 2 stop at 11.”

A2- Please decline note No.12 on drawing 4 of 5 because the last keynotes is number 11.

Q3. “Please qty of 100a breakers required in new switchboard. Note 6e on drawing 2 indicates 4, but the riser on sheet 5 indicates 5. "

A3. We will need four 100Amp breakers as spare and No. 5 shall be just space.

(End of Summary of Changes)