Amendment 01

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GARRISON CONTRACTING BRANCH

CCRC-IG, WENDY STREETER

BLDG 60

3055 RODMAN AVENUE

ROCK ISLAND IL 61299

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See summary of changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J-16-R-5003

X 9B. DATED (SEE ITEM 11)

23-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jun-2016

CODE

ARMY CONTRACTING COMMAND ROCK ISLAND

3055 RODMAN AVENUE

ROCK ISLAND IL 61299-8000

W52P1J 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W52P1J

FACILITY CODECODE

EMAIL:TEL:

W52P1J-16-R-5003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 1

The purpose of this amendment is to:

1) Provide answers to the following contractor questions:

Q1. Section 07530, 2.01, E specifies “R21 average over the roof. Minimum 3” material thickness”. R21 at the structurally sloped roof area is two layers of 1.9” polyisocyanurate or 3.8” insulation. If we install ¼” tapered 14’6” from the edge to where the structural slope begins it would require a 4” thickness on the structural slope but you would only have 1.75” at the drain. If the 3” minimum thickness at the drains takes precedence you would need 5.3” at the structural slope. Which takes precedence?

A1. There is no material value that necessarily takes precedence over another material value. All minimum values for materials (slope, R-value, thickness, fire rating, warranty, etc.) as noted in the Scope of Work and specifications are applicable. The Contractor shall provide, per the Scope of work, the minimum 3" thickness for ISO board and the 1/2" class A one hour rated roof boards to cover the entire roof and this coverage applies to roof drain areas also (See Scope of Work Section: 1.1.6, 1.1.7, 1.3.1, & 1.4.2.1). The Contractor is responsible for working with their prospective roofing manufacturer to provide a system that meets all the performance requirements.

Q2. On the base bid 3” minimum tapered at the drain is an average R50. Does the minimum thickness take precedence over the R21?

A2. The minimum ISO board thickness does not necessarily take precedence over the minimum average R-value.

The Contractor should work with their roofing provider to determine what other materials may be used in lieu of ISO board to build the applicable slope and provide the minimum average R-value. To reiterate, all minimum values for materials (slope, R-value, thickness, fire rating, warranty, etc.) as noted in the Scope of Work and specifications are applicable. The Contractor shall provide, per the Scope of work, the minimum 3" thickness for ISO board and the 1/2" class A one hour rated roof boards to cover the entire roof and this coverage applies to roof drain areas also(See Scope of Work Section: 1.1.6, 1.1.7, 1.3.1, & 1.4.2.1). The Contractor is responsible for working with their prospective roofing manufacturer to provide a system that meets all the performance requirements.

Q3. I cannot read the drawings clearly; what gauge and type of metal should the sheet metal flashings be fabricated in.

A3. Please see the following revised documents:

Attachment1ScopeOfWorkPR#2016-2293 Rev 20 June 2016 Appendix D. 07530-ELASTOMERIC ROOFING (EPDM) Rev 20 June 2016

2) All other terms and conditions remain unchanged.

(End of Summary of Changes)