AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
See summary of changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Jun-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W52P1J-16-R-5003
X 9B. DATED (SEE ITEM 11)
23-May-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Jun-2016
CODE
ARMY CONTRACTING COMMAND ROCK ISLAND
3055 RODMAN AVENUE
BLDG 60
ROCK ISLAND IL 61299-8000
W52P1J 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W52P1J-16-R-5003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT2
The purpose of this Amendment 0002 is to:
1. Answer contractor questions:
Q4. "The unit pricing with this contract requires the contractor to provide a unit price for the repair of structural concrete. Bldg 72 is a metal deck per as-builts please confirm."
A4. Please see the change to CLIN 0002 and the revised SOW dated 21 June 2016 in this Amendment 0002.
Q5. "Is there a structural analysis that leads the Gov't to believe that there is reason to believe the structural deck is compromised? If so, please provide."
A5. No, the Government did not perform a structural analysis.
2. CLIN 0002 has been revised from concrete roof deck to steel roof deck.
3. Incorporate revised Scope of Work (SOW) dated 21 June 2016.
4. All other terms and conditions remain unchanged.
CLIN 0002
The CLIN extended description has changed from:
Re-Roof Building 72 approximately 19,783 square feet in accordance with PR #2016-2293.The Government estimates that 500* square feet of structural concrete roof decking needs to be replaced, please include those replacement costs in your proposal. Please provide a unit price for decking:Concrete Roof Decking
$________/Square foot**You are advised that the unit prices set forth for the concrete roof decking will be utilized in the event additional replacement is required during performance of the contract.*Funds unused for concrete roof decking will be returned to the Government based upon the provided square footage price.
W52P1J-16-R-5003
To:
Re-Roof Building 72 approximately 19,783 square feet in accordance with PR #2016-2293.The Government estimates that 500* square feet of structural steel roof decking needs to be replaced, please include those replacement costs in your proposal. Please provide a unit price for decking:Steel Roof Decking $________/Square foot**You are advised that the unit prices set forth for the steel roof decking will be utilized in the event additional replacement is required during performance of the contract.*Funds unused for steel roof decking will be returned to the Government based upon the provided square footage price..
(End of Summary of Changes)