Attachment4PricingSheet.pdf
PDF 191 KB Posted
- Attached to
- Roof Replacement for Building 75
- Solicitation number
- W52P1J-16-R-WS01
About this file
Pricing Sheet attached
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Labor Equipment Subtotal
Description
01 00 General
Requirements
02 00 Existing Conditions
(Demo)
03 00 Concrete -
04 00 Masonry -
05 00 Metals -
06 00 Woods, Plastics, and
Composites
07 00 Thermal and
Moisture Protection
08 00 Openings -
09 00 Finishes -
10 00 Specialties -
11 00 Equipment -
12 00 Furnishings -
13 00 Special Construction -
14 00 Conveying
Equipment
21 00 Fire Supression -
22 00 Plumbing -
23 00 HVAC -
26 00 Electrical -
27 00
Communications
28 00 Electronic Safety and
Security
31 00 Earthwork -
32 00 Exterior
Improvements
33 00 Utilities -
34 00 Transportation -
35 00 Waterway and
Marine
41 00 Material Processing and Handling Equipment
44 00 Pollution
Control
Bonds -
Overhead -
Profit -
Note: Only fill out applicable sections that apply for this project Totals
Facilities Cost Estimate - Base Bid Project: 2016-2293 Re-Roof Building 75 Date:
Location: Rock Island Arsenal Rock Island, IL Estimator:
Section Direct Costs Total Cost
Material Labor Equipment Subtotal
Description
01 00 General
Requirements
02 00 Existing Conditions
(Demo)
03 00 Concrete -
04 00 Masonry -
05 00 Metals -
06 00 Woods, Plastics, and
Composites
07 00 Thermal and
Moisture Protection
08 00 Openings -
09 00 Finishes -
10 00 Specialties -
11 00 Equipment -
12 00 Furnishings -
13 00 Special Construction -
14 00 Conveying
Equipment
21 00 Fire Supression -
22 00 Plumbing -
23 00 HVAC -
26 00 Electrical -
27 00
Communications
28 00 Electronic Safety and
Security
31 00 Earthwork -
32 00 Exterior
Improvements
33 00 Utilities -
34 00 Transportation -
35 00 Waterway and
Marine
41 00 Material Processing and Handling Equipment
44 00 Pollution
Control
Bonds -
Overhead -
Profit -
Note: Only fill out applicable sections that apply for this project Totals
Facilities Cost Estimate - Option One Project: 2016-2293 Re-Roof Building 72 Date:
Location: Rock Island Arsenal Rock Island, IL Estimator:
Section Direct Costs Total Cost