This statement of work describes required additions and renovations to Building 1048, the ADAL Fire Station located at Will Rogers World Airport in Oklahoma. The project includes constructing a new bay on the north side of the building, installing a wet pipe fire suppression system throughout, renovating electrical and HVAC systems, converting offices and a training room to dormitory sleeping quarters and a workout room, and other incidental work. The work is to be performed under Solicitation Number W50S8T-20-B-0001a for the ADAL Fire Station project issued by the Department of the Army National Guard. The solicitation is for additions and alterations to be made to Building 1048, the fire station located at the Oklahoma Air National Guard Base.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OKLAHOMA AIR NATIONAL GUARD B-3 Submission ADAL FIRE CRASH AND RESCUE, BLDG 1048 15 October 2019
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Utility Outage Requests
Utility Connection Requests
Excavation Permits
Welding Permits
Burning Permits
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
The work includes the addition to and renovation of the ADAL Fire, Crash and Rescue Building 1048 and incidental related work.
The addition work includes a new bay to be constructed on the Nort side of the building, and a wet pipe fire suppression system throughout.
The renovation work includes major renovation of electrical and HVAC systems, conversion of existing offices into dorm room sleeping quarters, renovation of existing kitchen and dining area, conversion of training room to workout room, and other incidental work.
1.2.2 Location
The work is located at the Oklahoma Air National Guard Base at Will Rogers World Airport, approximately as indicated. The exact location will be shown by the Contracting Officer.
1.3 CONTRACT DRAWINGS
Five sets of full size contract drawings, maps, and specifications will be furnished to the Contractor without charge. Reference publications will not be furnished. Immediately check furnished drawings and notify the Government of any discrepancies.
1.4 WORK RESCHEDULING
Normal duty hours for work are from 6:30 a.m. to 5:00 p.m., Monday through Thursday. Requests for additional work requires written approval from the Contracting Officer 7 days in advance of the proposed work period.
SECTION 01 11 00 Page 1
OKLAHOMA AIR NATIONAL GUARD B-3 Submission ADAL FIRE CRASH AND RESCUE, BLDG 1048 15 October 2019
1.5 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
1.6 EXISTING WORK
In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.7 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.
Contact local utility locating service a minimum of 48 hours prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed.
Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.7.1 Notification Prior to Excavation
Notify the Contracting Officer at least 15 days prior to starting excavation work.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --