W50S8R-23-B-0001 00001.pdf
PDF 168 KB Posted
- Attached to
- B409 CYBER ALLIED SUPPORT Federal contract opportunity
- Solicitation number
- W50S8R-23-B-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_B409 CYBER Allied Support.pdf | ||
| W50S8R-23-B-0001 0003.pdf | ||
| Request for Information (RFI) document_10 Apr 23.pdf | ||
| Request for Information (RFI) document_06 Apr 23.pdf | ||
| W50S8R-23-B-0001 0002.pdf | ||
| W50S8R-23-B-0001 0002 (conformed).pdf | ||
| Q9 contractor attachment (for reference).pdf | ||
| Request for Information (RFI) document_27 Mar 23.pdf | ||
| Pre-Bid Conference-slides.pptx | PPTX presentation | |
| Pre-Bid Conference minutes_B409 Allied Support.pdf | ||
| Pre-Bid sign-in sheet.pdf | ||
| W50S8R-23-B-0001.pdf | ||
| Exhibit A_Sealed Bid Checklist Reminders.pdf | ||
| Attachment 03_Drawings.pdf | ||
| Attachment 05_B409 Exterior Drawing.pdf | ||
| Attachment 04_B409 Interior Drawing.pdf | ||
| Attachment 01_SOW B409 Allied Support.pdf | ||
| Exhibit B_Checklist for Bid Bonds.pdf | ||
| Attachment 02_Divisions 01-02-03.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S8R23B0001
PBXP 222030
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to: 1-update w age determination; 2-incorporate RFI questions & answ ers; 3-extend bid closing date.
***NOTE: RFI submission-by date w ill NOT change (is still 31 March 2023, 1:00PM EST)***
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Mar-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8R23B0001
X 9B. DATED (SEE ITEM 11)
20-Feb-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Mar-2023
CODE
USPFO OH 179 MISSION SUPPORT CONTRACTING
1947 HARRINGTON MEMORIAL RD
MANSFIELD OH 44903-8049
W50S8R 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION
The required response date/time has changed from 07-Apr-2023 01:00 PM to 14-Apr-2023 01:00 PM.
The following have been modified:
TABLE OF CONTENTS
SOLICTATION, OFFER, AND AWARD SF 1442
SECTION 00010 – BID SCHEDULE, NOTES
SECTION 00100 – INSTRUCTIONS TO BIDDERS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 – CONTRACT CLAUSES
SECTION 00800 – SPECIAL CONTRACT REQUIREMENTS
SECTION 01000 – GENERAL REQUIREMENTS
ATTACHMENT 01 – STATEMENT OF WORK_B409 CYBER ALLIED SUPPORT
ATTACHMENT 02 – DIVISIONS 01, 02, 03
ATTACHMENT 03 – DRAWINGS
ATTACHMENT 04 – B409 EXTERIOR DRAWING
ATTACHMENT 05 – B409 INTERIOR DRAWING
EXHIBIT A – SEALED BID CHECKLIST
EXHIBIT B – CHECKLIST FOR BID BONDS
SECTION 00010 NOTES
1. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: https://sam.gov.
2. Facsimile transmission of bid is NOT authorized. Electronic submission of bids will NOT be accepted.
Reference Section 100 for bid package submission instructions.
3. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: https://sam.gov (Contract Opportunities section). For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award
Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site.
4. A complete bid package MUST contain the following:
(a) Offer, Standard Form (SF) 1442 front and back signed
(b) Section 00010 Line Items- all items must be priced
(c) An Original Bid Bond and original Power of Attorney is required along with the bid on the due date. A copy of the bond and POA may be submitted with the bid, with the original signed copy with Seal to be submitted no later than 19 Apr 23, at 3:00PM (EST). The bid bond must be on a SF24 form (form version dated Aug 2016; ALL previous versions are not http://www.fbo.gov/ https://sam.gov/ https://www.sam.gov/portal/public/SAM/ usable/invalid). Rejection of a bid bond shall be in accordance with FAR 28.101-4
Noncompliance with bid guarantee requirements.
(d) Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at beta.sam.gov.
(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR
4.102. One copy of the SF1442 is required to have an original signature.
(f) All amendments to the solicitation must be acknowledged.
(g) Mark the front of the envelope with the following: “BID No. W50S8R-23-B-0001”, and the
Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.
5. Joint Venture Requirements
(a) Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the
Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the
System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint
Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business
Administration. A Joint Venture where-in one party is not a small business may be referred to the
Small Business Administration (IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the
Contracting Officer.
(b) A small business joint venture offeror must submit, with its offer, the representation required in paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications-
Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision
52.219-1, Small Business Program Representations, in accordance with 52.204-8(d) and 52.212-
3(b) for the following categories:
(A) Small business;
(B) Service-disabled veteran-owned small business;
(C) Women-owned small business (WOSB) under the WOSB Program;
(D) Economically disadvantaged women-owned small business under the WOSB Program; or
(E) Historically underutilized business zone small business
End of Section 00010
SECTION 00100 - INSTRUCTIONS TO BIDDERS
SECTION 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. Description of the Project: The 179th Airlift requires renovations to building 409, to support new cyber mission, located at Mansfield, OHANG base.
2. Instructions to Bidders:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) W50S8R-23-B-
0001 – B409 CYBER Allied Support, Project Number PBXP 222030, at the 179TH Airlift Wing, 1947
Harrington Memorial Rd., Mansfield, OH 44903.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. This solicitation is set-aside 100% for small businesses.
3. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:
3.1. A pre-bid conference will be conducted on 02 March 2023, at 10:00 AM (EST) for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at the 179th Airlift Wing, 1947 Harrington Memorial Rd., Mansfield, OH 44903. Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.
3.2. Due to security conditions, all offerors SHALL register to attend this conference and site visit. Email the following information for all attendees to Gordon Strom, at the following address:
gordon.strom.1@us.af.mil
◼ Visitor’s Name, Driver’s License Number, Company Name and Company Telephone Number
3.3. This information shall be provided in advance, at least 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you shall register to ensure adequate seating; failure to register shall result in denial of base access. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-bid conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
3.4. Visitors shall arrive no sooner than 30 minutes/no later than 15 minutes prior to start of meeting. Due to anticipated interest of prospective bidders, attendees will likely be redirected to parking outside of/adjacent to front gate, until government representatives are available to escort attendees to meeting location. All visitors
(except those who possess federal government common access cards/CAC’s) shall be escorted for the duration of the meeting and follow-on site visit. At no time shall non-CAC holders be authorized unescorted access/attendance to any part of base.
3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
3.6. A record of the conference shall be made and furnished to all prospective bidders via posting at https://sam.gov (within Contract Opportunities section). The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
4.1 Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact AE or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office. USE THE FOLLOWING FORMAT:
Subject Line: Reference No. SOLICITATION W50S8R-23-B-0001
Email: gordon.strom.1@us.af.mil
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________
From: ______________________________ Company Name: ________________________________
Address:_____________________________________________________________________________
Phone Number: _____________________________ Fax Number:______________________________
Email address: ________________________________________________________________________
Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
4.2 Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
4.3 All questions and requests for information (RFI) must be received NOT LATER THAN 31 March
2023 (1:00PM EST). OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT QUESTIONS
EARLY IN THIS PROCESS.
4.4 Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on SAM.gov at https://www.SAM.gov.
4.5 Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
4.6 For security reasons, all technical and engineering data related to this solicitation will be distributed
Using the Contract Opportunities (SAM.gov) system. Plans and specifications are locked on SAM.gov and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See complete instructions on SAM.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders must register with SAM.gov before accessing the system.
4.7 Amendments, if/when issued will be posted to https://www.SAM.gov for electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation.
Websites are occasionally inaccessible due to various reasons https://sam.gov/ mailto:gordon.strom.1@us.af.mil http://www.sam.gov/
5 BID REPOSITORY AND BID OPENING:
5.1 Method of bid package submission shall be through postal service, third-party carrier (e.g.
FedEx), or hand- carried. If method of submission for bid package is through use of postal service or third-party carrier, it is strongly suggested that you include confirmation of delivery (time/date stamp) to ensure your bid package can be confirmed as received by 179th base mail handling personnel no later than the solicitation closing date and time. Bidders who utilize postal service or third-party carrier are encouraged to contact Gordon Strom gordon.strom.1@us.af.mil ) to confirm package has been received.
If method of submission for bid package will be hand-carried, follow the instructions below (section
4.2). Late receipt of bids due to entry delays (section 4.2) or inability to provide proof of delivery (time and date stamp) may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.
5.2 Hand-carried bid packages. All prospective bidders who will be utilizing hand-carried method of bid packages shall do so adhering to the following instructions:
5.2.1 Proceed to front gate of 179th Airlift Wing, 1947 Harrington Memorial Rd, Mansfield, Ohio.
5.2.2 Provide 179th Security Forces front gate personnel with company name, and individual/office you need to provide package to (Gordon Strom/Contracting Office/419-520-6390). If he is not available, LT James Kliewer (419-520-6227) is authorized Contracting Office personnel to receive bid packages/confirm date and time of receipt. You will be directed to parking lot inside gate/next to front gate.
5.2.3 Contracting Office personnel will proceed to front gate, obtain your bid package, and require your representative’s signature, who they represent, date and time of package delivery.
5.3 The bid opening will occur at the time and date specified in Block 13 of the SF1442 the 179th
Airlift Wing, 1947 Harrington Memorial Rd, Bldg 164-Aircrew Briefing room, Mansfield Ohio 44903-
8049. All interested offerors and their major subcontractors are encouraged to attend the bid opening.
6 WAGE DETERMINATION:
Construction Wage Rates applicable to this project are: OH20230099, as shown in Section 00800.
7 BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS:
This IFB does NOT commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
8 CLAUSES:
Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
9 DISPOSITION OF UNSUCCESSFUL BIDS:
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids including the bid bond.
10 OFFERORS QUALIFICATIONS:
To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical mailto:gordon.m.strom.civ@mail.mil organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
11 List of Brand Name or Sole Source Justifications posted on SAM.gov: NONE
SECTION 00800 – SPECIAL CONTRACT REQUIREMENTS
"General Decision Number: OH20230099 03/03/2023
Superseded General Decision Number: OH20220099
State: Ohio
Construction Type: Building
County: Richland County in Ohio.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $16.20 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2023. |
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $12.15 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/06/2023
1 01/13/2023
2 03/03/2023
ASBE0008-010 03/01/2022
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 32.33 20.19
BROH0040-002 06/01/2021
BRICKLAYER.......................$ 31.93 22.54
BROH0040-006 06/01/2021
TILE FINISHER....................$ 27.76 20.76
TILE SETTER......................$ 31.93 22.54
CARP0200-003 05/01/2021
CARPENTER (Soft Floor Layer and Floor Laying - Hardwood
Floors Only).....................$ 28.08 19.68
ELEC0038-004 04/25/2022
ELECTRICIAN (HVAC/Temperature
Controls Installation Only)......$ 40.88 22.75
FOOTNOTES;
a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;
Labor Day; Thanksgiving Day; & Christmas Day
b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service
ELEC0683-004 05/30/2022
ELECTRICIAN (Low Voltage
Wiring Only).....................$ 36.50 23.15
ELEC0688-005 05/30/2022
ELECTRICIAN (Excludes Low
Voltage Wiring and
Installation of
HVAC/Temperature Controls).......$ 32.30 21.83
ELEV0037-003 01/01/2023
ELEVATOR MECHANIC................$ 52.64 37.335+a+b
PAID HOLIDAYS:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after
Thanksgiving, and Christmas Day.
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.
ENGI0018-041 05/01/2019
POWER EQUIPMENT OPERATOR
Bobcat/Skid Steer/Skid
Loader; Concrete Pump;
Crane.......................$ 37.02 15.20
Bulldozer...................$ 37.14 15.20
Oiler.......................$ 29.34 15.20
ENGI0066-048 06/01/2017
POWER EQUIPMENT OPERATOR
Grader/Blade................$ 32.42 19.66
Mechanic....................$ 32.92 19.66
IRON0172-005 06/01/2022
IRONWORKER, REINFORCING..........$ 33.27 21.20
IRON0550-011 05/01/2022
IRONWORKER (Ornamental and
Structural)......................$ 30.97 21.69
LABO0423-003 05/01/2021
LABORER
Mason Tender - Brick &
Cement/Concrete.............$ 29.04 11.80
LABO1216-003 05/01/2021
LABORER
Common or General...........$ 30.42 11.80
PAIN1275-001 05/01/2019
PAINTER (Spray)..................$ 25.26 14.20
* PLUM0189-005 06/01/2022
PIPEFITTER.......................$ 43.25 26.94
SFOH0669-009 04/01/2021
SPRINKLER FITTER (Fire
Sprinklers)......................$ 39.25 25.81
SHEE0024-028 06/01/2022
SHEET METAL WORKER (Excludes
HVAC Duct and Unit
Installation)....................$ 33.53 26.36
* SUOH2012-101 08/29/2014
ABATEMENT WORKER: ASBESTOS
(Removal from Ceilings, Floors, and Walls)...............$ 22.74 9.25
CARPENTER (Acoustical Ceiling
Installation Only)...............$ 24.17 8.61
CARPENTER (Excluding
Acoustical Ceiling
Installation, Floor Laying -
Hardwood Floors, and Soft
Floor Laying)....................$ 23.42 11.05
CEMENT MASON/CONCRETE FINISHER...$ 26.07 12.34
DRYWALL FINISHER/TAPER...........$ 20.44 4.75
DRYWALL HANGER AND METAL STUD
INSTALLER........................$ 21.15 3.75
GLAZIER..........................$ 22.60 11.02
LABORER: Landscape &
Irrigation.......................$ 13.74 ** 0.00
LABORER: Pipelayer..............$ 23.98 8.58
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 27.26 9.80
OPERATOR: Forklift..............$ 22.79 12.76
OPERATOR: Loader................$ 29.66 12.61
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 30.28 13.29
OPERATOR: Roller................$ 28.83 12.72
PAINTER (Brush and Roller).......$ 23.87 9.42
PLUMBER..........................$ 25.28 6.87
ROOFER...........................$ 25.24 11.38
SHEET METAL WORKER (HVAC Duct and HVAC Unit Installation
Only)............................$ 26.26 15.77
TRUCK DRIVER: Dump (All Types)...$ 24.32 11.73
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($16.20) or 13658
($12.15). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.