Attachment 03_Drawings.pdf

PDF 1 MB Posted

Attached to
B409 CYBER ALLIED SUPPORT Federal contract opportunity
Solicitation number
W50S8R-23-B-0001
Issued by
Department of the Army Ohio Army National Guard

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(4) 4" conduit going into building 409, room 103.

New Pull Box

Drawing 2, Building 409 Exterior

* Door may need removed/replaced with drywall if determined to be not needed by 179 CES

**Double doors may need installed to allow TSCIF electrical/UPS equipment into room 105

Room

Room

Room 108A

Drawing 3, Building 409 Layout

New ¾” fire retardant plywood

Existing ¾” fire retardant plywood and ground busbar

Drawing 4, backboard and grounding

To room

To room 108A

To room 108A

To TSCIF in room

To room

Cable trays will be 12" wide by 4" deep

Drawing 5, room 103 Cable Tray

~ 3' x 3' (~ 1m x 1m)

~ 3' x 3' (~ 1m x 1m)

~ 3' x 3' (~ 1m x 1m)

~ 3' x 3' (~ 1m x 1m)

29¼" X

23¾"

ISP

(1x30 amp power circuit)

ITN

(2x30 amp power circuit)

OSP

(1x30 amp power circuit)

Circuits (1x30 amp power circuit)

Reserved (1x30 amp power circuit)

Space reserved for future expansion

Space reserved for future expansion

Space reserved for future expansion

Space reserved for future expansion

Space reserved for future expansion

Space reserved for future expansion

Space reserved for future expansion

Space reserved for future expansion

Space reserved for future expansion

~ 3'

Drawing 6, Building 103 communications rack layout

1021322063N Callout We will no longer be using this room to route OSP cabling. No work will need to be done in here.

1021322063N Line

1 1

2 2 2

1021322063N

We were unable to remove all the cabling out of conduit 2 going from 108A to room 103. A new conduit will need to be installed from the new pull box to room 103. The previous plan was to re-use what is labeled as conduit 2 but we will not be able to do that now.

~24 ft ~12 ft~32 ft~32 ft

~32 ft

~32 ft ~32 ft

TSCIFComm room 1

Comm room 2

1021322063N Callout Will no longer need conduit pathway going to comm room 2.

1021322063N

Will need two conduit from comm room 103 to comm room 1 in TSCIF. They can enter the building where the previous TSCIF cabling entered.

B409 Allied Support Drawings
Working - PSA Drawing v1.vsdx
B409 Exterior
B409 alterations
103 plywood wall sheet 1
103 Conduit/Cable Tray Layout sheet 2
103 rack layout v2 sheet 3
B409 Allied Support_drawing 7 - room 102
B409 Allied Support_drawing 8 - room 108A
B409 Allied Support_drawing 9 - conduit of TSCIF
B409 OSP infrastructure

File details come from the government source that posted it. Updated .