Attachment 03_Drawings.pdf
PDF 1 MB Posted
- Attached to
- B409 CYBER ALLIED SUPPORT Federal contract opportunity
- Solicitation number
- W50S8R-23-B-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_B409 CYBER Allied Support.pdf | ||
| Request for Information (RFI) document_10 Apr 23.pdf | ||
| W50S8R-23-B-0001 0003.pdf | ||
| W50S8R-23-B-0001 0002 (conformed).pdf | ||
| Request for Information (RFI) document_06 Apr 23.pdf | ||
| W50S8R-23-B-0001 0002.pdf | ||
| Request for Information (RFI) document_27 Mar 23.pdf | ||
| W50S8R-23-B-0001 00001.pdf | ||
| Q9 contractor attachment (for reference).pdf | ||
| Pre-Bid Conference-slides.pptx | PPTX presentation | |
| Pre-Bid Conference minutes_B409 Allied Support.pdf | ||
| Pre-Bid sign-in sheet.pdf | ||
| W50S8R-23-B-0001.pdf | ||
| Exhibit A_Sealed Bid Checklist Reminders.pdf | ||
| Attachment 05_B409 Exterior Drawing.pdf | ||
| Attachment 04_B409 Interior Drawing.pdf | ||
| Attachment 01_SOW B409 Allied Support.pdf | ||
| Exhibit B_Checklist for Bid Bonds.pdf | ||
| Attachment 02_Divisions 01-02-03.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(4) 4" conduit going into building 409, room 103.
New Pull Box
Drawing 2, Building 409 Exterior
* Door may need removed/replaced with drywall if determined to be not needed by 179 CES
**Double doors may need installed to allow TSCIF electrical/UPS equipment into room 105
Room
Room
Room 108A
Drawing 3, Building 409 Layout
New ¾” fire retardant plywood
Existing ¾” fire retardant plywood and ground busbar
Drawing 4, backboard and grounding
To room
To room 108A
To room 108A
To TSCIF in room
To room
Cable trays will be 12" wide by 4" deep
Drawing 5, room 103 Cable Tray
~ 3' x 3' (~ 1m x 1m)
~ 3' x 3' (~ 1m x 1m)
~ 3' x 3' (~ 1m x 1m)
~ 3' x 3' (~ 1m x 1m)
29¼" X
23¾"
ISP
(1x30 amp power circuit)
ITN
(2x30 amp power circuit)
OSP
(1x30 amp power circuit)
Circuits (1x30 amp power circuit)
Reserved (1x30 amp power circuit)
Space reserved for future expansion
Space reserved for future expansion
Space reserved for future expansion
Space reserved for future expansion
Space reserved for future expansion
Space reserved for future expansion
Space reserved for future expansion
Space reserved for future expansion
Space reserved for future expansion
~ 3'
Drawing 6, Building 103 communications rack layout
1021322063N Callout We will no longer be using this room to route OSP cabling. No work will need to be done in here.
1021322063N Line
1 1
2 2 2
1021322063N
We were unable to remove all the cabling out of conduit 2 going from 108A to room 103. A new conduit will need to be installed from the new pull box to room 103. The previous plan was to re-use what is labeled as conduit 2 but we will not be able to do that now.
~24 ft ~12 ft~32 ft~32 ft
~32 ft
~32 ft ~32 ft
TSCIFComm room 1
Comm room 2
1021322063N Callout Will no longer need conduit pathway going to comm room 2.
1021322063N
Will need two conduit from comm room 103 to comm room 1 in TSCIF. They can enter the building where the previous TSCIF cabling entered.
| B409 Allied Support Drawings |
| Working - PSA Drawing v1.vsdx |
| B409 Exterior |
| B409 alterations |
| 103 plywood wall sheet 1 |
| 103 Conduit/Cable Tray Layout sheet 2 |
| 103 rack layout v2 sheet 3 |
| B409 Allied Support_drawing 7 - room 102 |
| B409 Allied Support_drawing 8 - room 108A |
| B409 Allied Support_drawing 9 - conduit of TSCIF |
| B409 OSP infrastructure |
File details come from the government source that posted it. Updated .