Q and A 132 HVAC.pdf

PDF 158 KB Posted

Attached to
Replace HVAC and Boiler at Building 132 Federal contract opportunity
Solicitation number
W50S8Q-21-B-0003
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC and Boiler at Building 132, newest first.
File Type Posted
Abstract of Offers OF1419.pdf PDF
Bid Opening Sign-in W50S8Q-21-B-0003.pdf PDF
Amendment_03_W50S8Q21B0003.pdf PDF
Q and A 132 HVAC 25 June 2021.pdf PDF
Amendment 02_W50S8Q21B00030002.pdf PDF
Amendment 01_W50S8Q21B00030001.pdf PDF
Amendment 01_W50S8Q21F00030001.pdf PDF
Updated Wage Determination OH20210072Mod5.pdf PDF
WAAR212110 Site Walk_Sign in.pdf PDF
Attachment 6.1 Drawing.pdf PDF
RFI Format.doc DOC document
W50S8Q21B003 Solicitation.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI ? # Question Date Sent Answer

Now that the official solicitation is out I would still like some clarification on what the basis of design boilers are and even what the specification/scope for the boiler itself is. Is all of this information going to be put out at the pre-bid? Is it just a like-for-like replacement or are you interested in additional vendors and/or newer technologies. 5/25/2021

Currently installed is a: Make: Lochinvar, Model: Knight, 121,000 BTU boiler. As stated in the SOW, para. 3.2.4, the government is looking for equivalent equipment that communicate properly with existing equipment.

Could you please tell me if this is a new requirement, or if there is a current or previous contractor who has performed similar services? If available, can you please send along the incumbent contract or task order number? 6/2/2021

This is a new construction effort for the replacement of an HVAC and boiler unit there is no incumbent information to provide.

3 Scope calls for a “compact unit”; What would be considered a “compact Unit” ? 6/2/2021 See Answer to RFI #5

The scope calls out for equipment to be able to be connected to a DDC controls system.

If the present controls are obsolete, do you want standalone controls for the new equipment?

6/2/2021

As stated in the SOW, para 3.2.7, the HVAC system and equipment is adequate and fully functional with the ability to be connected and operable with a DDC system. Any equipment installed must be compatible with Niagara 4 DDC software. Stand alone controls will be required to make the system functional as this project begins around the same time the current software becomes obsolete.

The scope calls out for a “compact unit” By “Compact unit” are they referring to a packaged heat pump where the duct will go up the outside of the building and tie into existing duct on the inside?

Does the present unit pull in 100% outside air or is it mixed with inside air? 6/2/2021

Yes, the intent is to have a "packaged heat pump unit" on the outside of the building that ties into the inside ducting.

Current unit pulls in 100% outside air.

The scope calls for “the ability to be connected to a DDC system” Will the new system be stand alone for the present time until a new controls system is installed?

6/2/2021

See Answer to RFI#4

The scope calls out for a “compact unit” By “Compact unit” are they referring to a packaged heat pump where the duct will go up the outside of the building and tie into existing duct on the inside?

Does the present unit pull in 100% outside air or is it mixed with inside air?

6/2/2021

See Answer to RFI #5

The scope calls for “the ability to be connected to a DDC system” Will the new system be stand alone for the present time until a new controls system is installed? 6/2/2021

See Answer to RFI #4 and 6

9 Is there a model number available for the existing boiler to be replaced? 6/2/2021 See Answer to RFI#1