W50S8221R00010003.pdf
PDF 147 KB Posted
- Attached to
- High Expansion Foam Install w/Pumphouse Federal contract opportunity
- Solicitation number
- W50S8221R0001
About this file
This solicitation requests proposals for a high expansion foam fire suppression system installation with a new pumphouse at two hangars for the Maryland Air National Guard. A firm fixed-price contract will be awarded to provide all labor, materials, equipment, permits and quality control. The contract duration is 365 days after notice to proceed. This opportunity is set aside 100% for women-owned small businesses with a North American Industry Classification System code of 236220 and size standard of $39.5 million. Proposals are due by the date specified on Contracting Opportunities at beta.sam.gov, where the solicitation and plans are posted. Amendments will also be posted there. At least 25% of the contract cost must be performed by the prime contractor's own employees, excluding materials, per FAR 52.219-14.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI W50S8221R0001 17 Jun 2021.pdf | ||
| W50S8221R00010002.pdf | ||
| RFI W50S8221R0001 16 Jun 2021.pdf | ||
| U-3 PWATER MPUtilities-Layout1.pdf | ||
| RFI W50S8221R0001 11 Jun 2021.pdf | ||
| Vendor sign in sheet.pdf | ||
| RFI W50S8221R0001.pdf | ||
| Pre-proposal slides.ppt | PPT presentation | |
| W50S82-21-R-0001-0001.pdf | ||
| WF 113 - Installation Access Application.pdf | ||
| Exhibit D_Letter of Commitment.docx | DOCX document | |
| EXHIBIT A.doc | DOC document | |
| RFI 1.docx | DOCX document | |
| EXHIBIT B.doc | DOC document | |
| W50S82-21-R-0001.pdf | ||
| EXHIBIT_C_Reference_Questionnaire_Package.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PJMS 152001
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to provide correction for solicitation proposal documents.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8221R0001
X 9B. DATED (SEE ITEM 11)
18-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jun-2021
CODE
USPFO MD 175 MSC
2701 EASTERN BLVD
MIDDLE RIVER MD 21220-2801
W50S82 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8221R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 16 - INSTRUCTIONS TO PROPOSERS
The following have been modified:
PROPOSAL PREPARATOIN INSTRUCT
A. PROPOSAL SUBMISSION (Section 00 21 16)
1. INTRODUCTION. The instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section 00 21 00, FAR Provision 52.215-1, and Instructions to Offerors – Competitive Acquisition.
Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award.
Prospective offerors shall submit the following volumes in two separate packages. The RFP shall provide the Government address and receipt date for proposal submitted.
2. PROPOSAL SUBMISSION REQUIREMENTS.
Volume 1, (Part 1) Technical Capability Proposal
Factor 1 – Experience and Capability (limit to 15 pages, excluding tabs, indexes and resumes.
Resumes limited to 2 pages.)
Factor 2 – Past Performance – limited to 3 projects within the past 5 years (limit to 3 pages per project or CPARS Print out or attached Past Performance Questionnaire)
Volume 2, Price Proposal
Forward Pricing Schedule, pro forma documents, in original and (1) hard copy, in accordance with instructions contained herein.
3. Proposal Files
Purpose: These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposed data. The proposal shall include all of the information requested in the specific instructions. Failure to include all information requested may adversely affect the evaluation.
A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
Offerors are cautioned to submit enough information to enable the evaluation committee to fully ascertain each offeror’ s capability to perform all of the requirements contemplated by this solicitation. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal should be complete and concise, but not overly elaborate. Excessive reliance on promotional brochures is discouraged.
W50S8221R0001
Written proposals shall be prepared on standard 8.5 x 11 inch paper (charts may be landscaped but must be on 8.5 x 11 inch paper) and shall be in a legible font size (10 min.). All pages of each proposal shall be appropriately numbered, and identified with the RFP number. For ease of reference, consecutive page numbering with tabs is required. Type size for graphics, charts, diagrams and tables shall be of an appropriate font and size for the application, and must be clearly readable without magnification assistance to the normal eye. Text lines shall be no less than single-space. To the maximum extent practicable, proposal submission shall be double sided. Where page limits exist, a page is defined as one single side of a page. Double sided pages count as 2 pages. Unless otherwise stated, tabs, indexes and dividers do not count in the page count.
Binding: Elaborate format and binding are neither necessary nor desirable. All binders will be capable of lying flat when opened. Three ring binders are preferred. The cover and spine of each binder will clearly identify the offeror’ s name, Project number, RFP number, RFP title and copy number, (e.g. copy 2 of 3). The original for each volume will be clearly identified on the cover and the spine. All binders will allow for easy removal and replacement of pages.
Indexing: Each binder will contain a “Table of Contents” for that volume. The “Table of Contents” will identify major areas, paragraphs and subparagraphs by number and title, as well as by page number and volume locations.
Tab indexing will be used to identify sections as appropriate.
Electronic Copy: Provide one (1) electronic copy of all of the Volume 1 and 2 proposal information. Electronic copies shall be submitted on CD/DVD saved in Microsoft Word format or Adobe Acrobat. (“Read Only” files are acceptable). All disks shall be virus checked prior to submission.
If revised proposals are requested, all proposal revisions shall be submitted on colored paper as page changes with each page identified by date and page number. Revised pages shall be printed on one side and punched with a 3-hole punch along the left margin. The number of revised copies to be submitted is the same as the initial proposal in accordance with FAR 15.306 (a). Requests for such information do not constitute discussions.
The offeror shall be held responsible for the validity of all information supplied in his/her proposal, including that provided by potential subcontractors. Should subsequent investigation disclose that the facts and conditions were not as stated, the proposal may be rejected.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .