RFI W50S8221R0001 11 Jun 2021.pdf
PDF 670 KB Posted
- Attached to
- High Expansion Foam Install w/Pumphouse Federal contract opportunity
- Solicitation number
- W50S8221R0001
About this file
This document contains questions and answers related to solicitation number W50S8221R0001 issued by the Maryland Army National Guard. The solicitation seeks a fixed-price contract to repair and replace an existing fire alarm system with a new high expansion foam system at Hangars 2050 and 2070, including construction of a new pumphouse. The contractor must provide all necessary labor, equipment, materials, licenses, permits, supervision and quality control to perform the work. The period of performance is 365 days from notice to proceed. This opportunity is set aside exclusively for women-owned small businesses. The North American Industry Classification code is 236220 with a size standard of $39.5 million. Attention is directed to the limitations on subcontracting clause. The solicitation and associated documents are available on the Contracting Opportunities website requiring registration and MPIN for access.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI W50S8221R0001 17 Jun 2021.pdf | ||
| W50S8221R00010003.pdf | ||
| W50S8221R00010002.pdf | ||
| U-3 PWATER MPUtilities-Layout1.pdf | ||
| RFI W50S8221R0001 16 Jun 2021.pdf | ||
| Vendor sign in sheet.pdf | ||
| RFI W50S8221R0001.pdf | ||
| Pre-proposal slides.ppt | PPT presentation | |
| W50S82-21-R-0001-0001.pdf | ||
| WF 113 - Installation Access Application.pdf | ||
| Exhibit D_Letter of Commitment.docx | DOCX document | |
| RFI 1.docx | DOCX document | |
| EXHIBIT B.doc | DOC document | |
| EXHIBIT A.doc | DOC document | |
| W50S82-21-R-0001.pdf | ||
| EXHIBIT_C_Reference_Questionnaire_Package.docx | DOCX document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS RELATED TO: SOLICITATION W50S82-21-R-0001
As of 11 Jun 2021
Q1. Volume 1: How many copies, if any? (we see that we need original and 1 copy of Volume 2 and 1 electronic copy of both volumes – but cannot locate instructions regarding Volume 1 quantities)
A1. Per the solicitation, Block 13, 1 original and 1 copy of the proposal is required.
Q2. Volume 1: Are Factor 1: Experience project references to be the same or different as the 3 projects presented in Factor 2: Past Performance?
A2. The projects provided should reference the experience or past performance required for the project.
Q3. Volume 2 Price Proposal: Clarify what is required as “pro-forma documents”.
A3. Documents that provide at a minimum, what is being asked.
Q4. Can we work 4 10 hour shifts p/week?
A4. The available work periods of the contract are Mon – Fri 7:00 AM – 5:00 PM. You may schedule your work within those time frames.
Q5. With all the utilities that are to be replaced/relocated we understand that the new is to be installed and ready for service before the existing is terminated. If we run into a problem and there is a slight disruption in water, would a fire watch be sufficient? Or would we need to provide cost for fire service?
A5. AT NO TIME SHOULD WATER SERVICE BE DOWN. IF THIS HAPPENS BECAUSE OF THE CONTRACTOR IT
WILL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE A SOLUTION FOR AT THEIR COST.
Q6. Would the Government consider extending the bid opening date to either July 1st or July 14th (preferably the 14th) this is due to the summer vacation and holiday schedules. With having to design a system, coordinate the design with other trades, write a technical capability proposal, get past performance questionnaire’s out to clients and back to the Government, 12 working days is not enough time to accomplish all that and have the proper time to do an evaluation of the design that is being proposed.
A6. The solicitation will not be extended at this time.
Q7. If we must use bar joist can we get a time extension on the POP of 90 days
A7. At this time, the POP will not be extended.
Q8. On drawing A-220 and spec section 05 21 00 bar joist are called out for use in the pump houses.
With the shortage of bar joist and the current demand putting lead times at 10 to 12 months, can we substitute WF of C shapes in lieu of bar joist? If so who would pay for that design?
A8. The existing plans are to be used. The cost of design changes that are vendor requested will be paid for by the vendor. All design changes require stamped drawings.
Q9. On FX 110 D there is a hatched out area for sprinkler demo in the secure ECM shop/storage. What ceiling is in that area? Can we get a diagram of the existing system? Can we get pictures of the existing piping?
A9. All available drawings have been provided and posted to SAM.gov.
Q10. Ceiling removal/replacement and cutting and patching is not addressed in the specifications
A10. RFI is not clear, resubmit so the Government can understand what is being asked.
Q11. In 01 32 01.0010 sec 2.1.2.2 other than primavera, is Microsoft Project an acceptable scheduling tool? If so can we use that program and not have to provide any additional training to the Government? This is the first spec I have seen in the last 8 years that has asked for P6 instead of MS Project.
A11. Per the specifications 2.1.2 - Scheduling software used by the contractor must be commercially available from the software vendor for purchase with vendor software support agreements available. The software routine used to create the required sdef file must be created and supported by the software manufacturer.
Q12. In 01 35 26 sections 1.5.1.1 & 1.5.1.2 where it talks about the QCM also being the SSHO, can that person also be the Superintendent? (all three roles would be filled by one person)
A12. THE SUPERINTENDENT CAN BE THE SSHO. THE QCM ONLY JOB IS QUALITY CONTROL
Q13. In the statement of special inspections, will the Government cover the cost for those inspections?
Or will the contractor need to carry those costs?
A13. The prime contractor will be required to provide those services.
Q14. In 01 50 00 3.3.10 does this mean to provide portable fire extinguishers?
A14. Yes, on the jobsite and in the trailer
Q15. In 01 50 00 3.6 do we need to provide a separate trailer for the Government?
A15. No.
Q16. Sections 21 13 13.0010 & 21 13 25.0010 with these systems being design build how do we accurately determine penetrations, ceiling cut and patch or removal and replacement? Can the Government provide quantities so that everyone is pricing the same amount of work?
A16. This is not a design build project. The sections you are referring to are of a common technique for the industry called delegated design. The quantities will vary based on the final inputs that cannot be quantified by the Government but by the vendor.
Q17. Both the fire suppression and fire alarm specifications appear to indicate the requirement for a full time 3rd party Fire Protection Engineer. Please confirm that the intent is for the general contractor to employ this individual for this project.
A17. The vendor is to provide a person that meets the qualifications listed under Key Personnel.
Q18. Please provide the hangar dimensions and/or the square footage of the hangars so that we can verify the number and size of foam generators required.
A18. Refer to drawings and specifications.
Q19. Please confirm that a teaming partner (subcontractor) can fulfill the experience and past requirements of the solicitation and does not have to be fulfilled by the prime company.
Prime/subcontractors will have their experience and past performance reviewed as a combined entity for the purposes of this solicitation.
A19. Subcontractor(s) past performance can be used only if the consent form is filled out and provided with the proposal package and the subcontractor(s) will be used during the construction.
Q20. With respect to the key personnel, can any of the positions (site superintendent, SSHO, & QCM) be combined and fulfilled by one person or can only one person fulfill each role?
A20. SUPERINTENDENT CAN BE THE SSHO. THE QCM POSITION IS TO BE FILLED BY
ONE PERSON AND HIS/HER ONLY JOB IS QUALITY CONTROL.
Q21. Proposal Inquiry: Fire Suppression Design Criteria Note #2 on sheet FX001 states that “The fire suppression system shall be designed and installed by a licensed/ certified company where employees are licensed/ certified to install fire protection equipment in the state of Maryland.” This note restricts competition on a DoD facility where licensure in the home state of which the company’s home office resides is sufficient to meet criteria to perform work on a DoD facility. Can this note be clarified to ensure that it is acceptable to allow the company’s licensure from its home state?
A21. All design/installation shall meet inspection requirements for the State of Maryland. Vendors can contact the Maryland State Fire Marshall for clarification - (410) 653-8980 | 1-800-525-3124 or msp.osfm@maryland.gov
As of 2 Jun 2021
Q1. In regards to Exhibit A-D, where in our response should these forms be placed? (i.e.
Exhibit A should be placed in Factor 1, Exhibit C should be placed in Factor 2.) Are these exhibits meant to comprise the entirety of these sections?
A1. All non-priced documents shall be provided in Volume 1, tabbed out and identified per solicitation reference Indexing under section 3. Proposal files.
Q2. Are there any formatting requirements for this response? (i.e. font type, font size, margin size, etc.)
A2. Refer to the same section for formatting
As of 18 May 2021
Q1. How do I access the files/documents for the Project?
A1. See the Contract Opportunities Learning Center available at https://beta.sam.gov/help/contract-opportunities. See also Section 00100 of the Solicitation. Additionally, to view and/or download Export Controlled Materials, a company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS). This certification establishes that a company is a U.S. or Canadian contractor eligible to receive unclassified technical data that is under the control of the U.S. Department of Defense (DoD) or the Canadian Department of National Defense (DND). Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted by telephone at: 1-(800) 352-3572; or email: jcpadmin@dla.mil.
Q2. I am trying to access the [export controlled] packages and have a number as assigned on DD Form 2345 but cannot get the packages to open. Our DD 2345 Number is ####### expiration ##/##/2015.
A2. The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact Contract Opportunities to have them add their JCP number to their Contract Opportunities account. The Contract Opportunities help desk (Federal Service Desk) reported to this office that companies need to make sure that they are registered and login as a Vendor to Contract Opportunities. When the Vendor click's to open an export controlled package/document, they should be asked for their MPIN. After entering the MPIN, the mailto:jcpadmin@dla.mil export controlled package/document should be viewable/downloadable by Vendors that have gone through the JCP process. If a Vendor still has problems, the Vendor should check to make sure that their SAM registration and MPIN are valid and up-to-date. If problems still persist, see the Contract Opportunities Learning Center at https://beta.sam.gov/help/contract-opportunities.
File details come from the government source that posted it. Updated .