W50S8221R00010002.pdf

PDF 186 KB Posted

Attached to
High Expansion Foam Install w/Pumphouse Federal contract opportunity
Solicitation number
W50S8221R0001
Issued by
Department of the Army Maryland Army National Guard

About this file

This amendment to a solicitation modifies the submission deadline and wage determination. The solicitation seeks proposals for a high expansion foam fire suppression system installation with a new pumphouse at two hangars for the Maryland Air National Guard. Offerors must propose a firm fixed price and will perform at least 25% of the work with their own employees. The North American Industry Classification Code is 236220. The project budget is between $1 million to $5 million. The submission deadline was extended to June 24, 2021. The wage determination was also updated to the current modification.

View the file

Other files for this federal contract opportunity

Other files attached to High Expansion Foam Install w/Pumphouse, newest first.
File Type Posted
RFI W50S8221R0001 17 Jun 2021.pdf PDF
W50S8221R00010003.pdf PDF
RFI W50S8221R0001 16 Jun 2021.pdf PDF
U-3 PWATER MPUtilities-Layout1.pdf PDF
RFI W50S8221R0001 11 Jun 2021.pdf PDF
Vendor sign in sheet.pdf PDF
RFI W50S8221R0001.pdf PDF
Pre-proposal slides.ppt PPT presentation
W50S82-21-R-0001-0001.pdf PDF
WF 113 - Installation Access Application.pdf PDF
EXHIBIT A.doc DOC document
Exhibit D_Letter of Commitment.docx DOCX document
RFI 1.docx DOCX document
EXHIBIT B.doc DOC document
W50S82-21-R-0001.pdf PDF
EXHIBIT_C_Reference_Questionnaire_Package.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PJMS 152001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to provide administrative changes to the solicitation. The solicitation closing date w ill be extended to 24 Jun 2021 and the Wage Determination has been updated to reflect the current modification #6.

No other changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 16

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jun-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8221R0001

X 9B. DATED (SEE ITEM 11)

18-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jun-2021

CODE

USPFO MD 175 MSC

2701 EASTERN BLVD

MIDDLE RIVER MD 21220-2801

W50S82 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8221R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 18-Jun-2021 02:00 PM to 24-Jun-2021 02:00 PM.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

INSTRUCTIONS TO OFFERORS

1. SCOPE

1.1. You are invited to submit a proposal in response to our Request for Proposal (RFP) W50S8221R0001 for Project No. PJMS 152001 at the Maryland Air National Guard. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.

1.2. This solicitation is set-aside 100% for Women Owned Small Business.

2. NOTICE OF PRE-PROPOSAL CONFERENCE

2.1. A pre-proposal conference will be conducted on 25 May 2020 at 9:00 AM EST for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at Building 2100, 175th Civil Engineering Squadron.

Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.

2.2. Due to security conditions, all offerors must register to attend this conference and site visit.

Email the WF 113 Base access form for all attendees to 175.wg.msc@us.af.mil.

2.3. This information must be provided in advance, not later than 5 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.

2.4. Visitors must pick up their passes at the Installation’s Main Entry Gate prior to arrival.

You will be required to present the following information upon arrival: (1) Vehicle Registration,

(2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such. Escorts will be provided after inspection.

2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

2.6. A record of the conference shall be made and furnished to all prospective offerors via posting to https://beta.sam.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.

3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS

3.1. Submit all questions via email to the contracting office at the address shown below. Do NOT contact the A-E or Engineering personnel directly. Doing so will only delay the response to your question.

Subject Line: Reference No. W50S8221R0001 Email: 175.wg.msc@us.af.mil

INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING

INFORMATION:

Date of Proposal Inquiry:

From: ______________________________

Company Name: ___________________________

Phone Number: ____________________________

Email address: _____________________________

Proposal Inquiry: Be specific as to part of solicitation you are questioning. Include paragraph number.

3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.

3.3. The Contracting Officer reserves the right to address questions received after the fifth business day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth business day prior to closing and will be posted not later than two business days prior to closing. The contracting officer reserves the right to address questions received after the fifth business day prior to closing. OFFERORS ARE STRONGLY

ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.

3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to https://beta.sam.gov.

3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 in section 19, Acknowledgement of Amendments, or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the website.

3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contracting Opportunities (https://beta.sam.gov) system. Contracting Opportunities is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Plans and specifications are locked on Contracting Opportunities and require Contractors to request explicit access from the Contracting Officer OR export controlled access through DLA. See the instructions on Contracting Opportunities regarding registration as interested bidders/offerors must register with Contracting Opportunities before accessing the system.

3.4.2.2. Interested offerors must be registered in the System for Award Management (SAM). To register go to: www.sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page.

4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS

4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted at https://beta.sam.gov.

4.2. Offerors are strongly cautioned to check this site frequently and to refresh their web page to ensure they have the lasted information.

5. HAND CARRIED PROPOSALS/INVITATIONS

5.1. A bid repository is provided for hand carried proposals and is located at: Building 4200, Maryland Air National Guard HQ, Room 205.

5.2. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.

5.3. Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined above in paragraph 2.1.2 for entry. Delays are probable at the entry point and should be accounted for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.

6. WAGE DETERMINATION

6.1. The Construction Wage Rate Requirements formerly known as Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are General Decision Number: MD20210030 06/04/2021for Baltimore County, MD.

In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of the solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c)(4) will apply.

6.2. Applicable wage rates can be found at https://sam.gov/wage-determination/MD20210030/6.

7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.

8. REMOVAL OF SECTIONS AT TIME OF AWARD

Sections 00 21 00, 00 21 16, 00 22 16, 00 45 00 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.

9. DISPOSITION OF UNSUCCESSFUL PROPOSALS

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals. The Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.

10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES

It has been determined that all reasonable amounts of utilities, where/if physically available, used in connection with this project will be furnished to contractor without cost. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-14, Availability and Use of Utility Services)

11. BID BONDS

An Original Bid bond is required with submission of the proposal. The bid bond is due on the date as stated on the SF1442 block 13. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.

12. EXCEPTIONS

If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00 10 00 through 01 00 00) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror’ s proposal unacceptable and ineligible for award.

13. CLAUSES

13.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

13.2. Clauses and provisions in this document may not appear in consecutive order.

14. BRAND NAME REQUIREMENTS

Vendor shall ensure fire suppression system must connect and operate with current installed Monaco Fire System.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE DETERMINATION

"General Decision Number: MD20210030 06/04/2021

Superseded General Decision Number: MD20200030

State: Maryland

Construction Type: Building

County: Baltimore County in Maryland.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 01/08/2021 2 01/15/2021 3 04/23/2021 4 05/07/2021 5 05/28/2021 6 06/04/2021

ASBE0024-007 04/01/2021

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 39.27 18.67+a

Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems

a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas

Day provided the employee works the regular work day before and after the paid holiday.

BRMD0001-011 05/02/2021

Rates Fringes

BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 34.00 12.59

CARP0197-003 09/01/2020

Rates Fringes

CARPENTER (Including Drywall Hanging, Drywall Finishing, Form Work, Metal Stud Installation and Scaffold Building)........................$ 29.25 13.79

CARP0219-002 06/08/2020

Rates Fringes

MILLWRIGHT.......................$ 33.06 16.18

CARP0441-002 05/01/2020

Rates Fringes

PILEDRIVERMAN....................$ 32.63 15.53

* ELEC0024-012 05/30/2021

Rates Fringes

ELECTRICIAN (Including low voltage wiring for and installation of alarms; HVAC controls)........................$ 41.00 5.25%+16.69

ELEC0024-013 05/31/2020

Rates Fringes

ELECTRICIAN (Communication and Sound Equipment).............$ 28.63 4.75%+14.12

PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Veterans Day, Thanksgiving Day, Day after Thanksgiving, Christmas Day

ENGI0037-026 04/01/2020

Rates Fringes

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 29.08 13.05+a OPERATOR: Bulldozer.............$ 31.03 13.05+a OPERATOR: Excavator.............$ 31.03 13.05+a OPERATOR: Forklift..............$ 31.03 13.05+a OPERATOR: Gradall...............$ 31.03 13.05+a OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 31.03 13.05+a OPERATOR: Roller excluding Asphalt..........................$ 25.45 13.05+a

a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and Christmas Day.

IRON0016-012 04/01/2016

Rates Fringes

GLAZIER..........................$ 28.48 19.45

IRONWORKER (Fence Erection-Chain Link/Cyclone).....$ 28.23 19.45

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 28.48 19.45

IRONWORKER, SHEETING.............$ 28.73 19.45

LABO0710-007 04/01/2019

Rates Fringes

LABORER: Mason Tender - Brick...$ 19.41 6.06 LABORER: Mason Tender - Cement/Concrete..................$ 19.41 6.06

PAIN0051-022 08/01/2020

Rates Fringes

PAINTER

Industrial..................$ 32.10 12.83 Spray and Paperhanger.......$ 25.05 11.17

PLAS0891-005 07/01/2018

Rates Fringes

PLASTERER........................$ 29.53 6.80

PLAS0891-008 08/01/2016

Rates Fringes

PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89

PLUM0486-012 12/16/2020

Rates Fringes

PIPEFITTER (Including HVAC Pipe and System Installation)....$ 41.92 21.67

ROOF0030-033 07/01/2019

Rates Fringes

ROOFER, Excludes Installation of Metal Roofs...................$ 26.44 12.24

SFMD0669-001 04/01/2021

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 36.95 24.12

SHEE0100-026 11/01/2020

Rates Fringes

SHEET METAL WORKER, Includes HVAC Duct Installation (Excludes Metal Roof Installation)....................$ 34.66 21.73

SUMD2010-078 04/30/2010

Rates Fringes

ABATEMENT WORKER: ASBESTOS

(Removal from Mechanical Systems).........................$ 12.60 3.91

CARPENTER (Acoustical Ceiling Installation Only)...............$ 16.00 2.60

CEMENT MASON/CONCRETE FINISHER...$ 19.52 5.96

ELEVATOR MECHANIC................$ 29.66 9.34

LABORER: Common or General......$ 11.85 2.40

LABORER: Grade Checker..........$ 16.00 2.90

LABORER: Landscape..............$ 10.00 0.00

LABORER: Mason Tender - Stone...$ 14.03 0.00

LABORER: Mortar Mixer...........$ 16.61 9.08

LABORER: Pipelayer..............$ 14.78 3.96

LABORER: Mason Tender (for Pointing, Caulking and Cleaning)........................$ 12.93 0.00

MASON - STONE....................$ 29.82 10.05

OPERATOR: Asphalt Roller........$ 21.35 5.38

OPERATOR: Backhoe...............$ 22.78 5.94

OPERATOR: Boom..................$ 21.44 8.29

OPERATOR: Crane.................$ 20.17 4.64

OPERATOR: Grader/Blade..........$ 16.75 5.79

OPERATOR: Loader................$ 20.01 6.38

PAINTER: Brush and Roller.......$ 19.28 5.04

PLUMBER..........................$ 27.88 10.97

POINTER, CAULKER, CLEANER,

Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.75 0.00

SHEET METAL WORKER (Metal Roofs Installation)..............$ 20.71 6.23

TILE FINISHER....................$ 17.32 0.00

TILE SETTER......................$ 21.38 4.65

TRUCK DRIVER: Dump Truck........$ 15.40 1.96

TRUCK DRIVER: Tractor Haul Truck............................$ 17.87 9.98

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)