Pre-proposal slides.ppt

PPT presentation 298 KB Posted

Attached to
High Expansion Foam Install w/Pumphouse Federal contract opportunity
Solicitation number
W50S8221R0001
Issued by
Department of the Army Maryland Army National Guard

About this file

This pre-proposal document outlines requirements for a firm fixed-price contract to install a new high expansion foam fire suppression system with pumphouse at Maryland Air National Guard Hangars 2050 and 2070. The solicitation seeks to award a single contract valued between $1-5 million to provide all labor, equipment, materials and supervision. The project is set aside exclusively for women-owned small businesses and requires at least 25% of the work to be completed by the prime contractor's own employees. Proposals are due no later than June 18, 2021 and must follow the specified two-volume format addressing price, technical capability, past performance and representations/certifications. The contract duration is 365 days from notice to proceed. All questions must be submitted in writing by the stated deadline and amendments will be posted to the designated website.

View the file

Other files for this federal contract opportunity

Other files attached to High Expansion Foam Install w/Pumphouse, newest first.
File Type Posted
RFI W50S8221R0001 17 Jun 2021.pdf PDF
W50S8221R00010003.pdf PDF
W50S8221R00010002.pdf PDF
U-3 PWATER MPUtilities-Layout1.pdf PDF
RFI W50S8221R0001 16 Jun 2021.pdf PDF
RFI W50S8221R0001 11 Jun 2021.pdf PDF
Vendor sign in sheet.pdf PDF
RFI W50S8221R0001.pdf PDF
W50S82-21-R-0001-0001.pdf PDF
WF 113 - Installation Access Application.pdf PDF
Exhibit D_Letter of Commitment.docx DOCX document
RFI 1.docx DOCX document
EXHIBIT B.doc DOC document
EXHIBIT A.doc DOC document
W50S82-21-R-0001.pdf PDF
EXHIBIT_C_Reference_Questionnaire_Package.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S82-21-R-0001 High Expansion Foam Installation with Pumphouse

PRE-PROPOSAL CONFERENCE

DATE: 25 May 2021

INTRODUCTION

Contracting Officer (KO) – SMSgt Michael Dombkiewicz
Government Team –
Maj DeJaun Saunders
Lt Kerry Guy
Mr. Blane Miller

SYNOPSIS

Magnitude-$1,000,000 TO $5,000,000.
A Firm-fixed Price Contract Will Be Awarded.
100% Women Ownded Small Business Set-aside
The Contract Will Be Awarded Using Lowest Price Technically Acceptable Procedures

SOLICITATION, PLANS

& SPECIFICATIONS

On The Web - https://www.sam.gov
Solicitation
Exhibits
Questions & Answers Document
Amendments
Check Regularly & Refresh Web Page
Plans & Specifications- must be registered and have password on SAM.gov

SOLICITATION, PLANS

& SPECIFICATIONS

Export Controlled Material
Company must be certified (via an approved DD Form 2345 by the Joint Certification Program (JCP) administered by the Defense Logistics Information Service (DLIS)
Questions about this program or DDForm 2345 should be addressed to:

U.S./Canada Joint Certification Office DLA Logistics Information Services Federal Center, 74 Washington Ave., North Battle Creek, MI USA 49037-3084

Phone: (800) 352-3572 Email: jcp-admin@dla.mil

DISCLAIMER

The following is a brief overview of the proposal requirements Offerors Are Strongly Cautioned To Carefully Read The Requirements Of The Solicitation And Comply Accordingly

Important Reminder The Government Intends To Award Without Discussion And There May Not Be A Chance For Discussions, Corrections, Or Revised Proposals

WHAT YOU MUST SUBMIT

Section 00 21 16 Of The RFP Details The Required Information And Format For The Proposal
2 Volumes Are Required
VOL 1 – Price/Cost
Pro forma documents
VOL 2 – Technical and Past Performance

Volume 1- Price/Cost

Offeror portion of SF1442
Contract Line Items (CLIN) – all CLINs must be filled out – DO NOT LEAVE BLANKS
Section 00 45 00 – Representations and Certifications (R&C)
Complete R&Cs in SAM on the web
Complete and Return DoD R&Cs in Section 00 45 00
Complete & Include Supplemental Information-Section 00 21 00

Volume 2 Technical Capability – Part 1

Part 2 – Technical Capability
Comprised of two (1) subfactors:
1. Experience & Capability
2. Past Performance

Volume 2 Past Performance – Part 2

NO PRICES/COST IN THIS VOLUME

Exhibit A- Part 1- Performance Relevancy Questionnaires – Use Exhibit Format!
Complete not more than 5 forms for Relevant Contracts Completed Or Substantially Completed (70%) In The Last Five Years
Exhibit A-Part 2 – Complete One (1)
Send Questionnaires For The Exhibit A Projects to references
Do This Early – Must Be to KO NLT Closing Date

Volume 2 – Part 2 Past Performance Continued If You Do Not Have Relevant Past Performance And Are Using Experience Of Key Personnel, Predecessor Companies Or Subcontractors To Obtain This Ensure You Clearly State This In The Proposal

To Be Considered Subcontractor Must Complete A Consent Form - Exhibit B

Past Performance References Exhibit C

Reference Questionnaires Are Also Due By This Time And Date
Send Reference Questionnaires Out As Soon As Possible
Return to KO E-mail – 175.wg.msc@us.af.mil SUBJECT: PP Questionnaire W50S8221R0001

Exhibits

Exhibit A = Relevancy Questionnaire
PART 1 (NTE 5) PART 2 (1)
Exhibit B = Subcontractor Consent Form- if applicable
Exhibit C = Past Performance Letter and Questionnaire (Send out to References)

Proposal Due Dates

Proposal Due: 18 Jun 2021 – 2:00 PM EST
Proposal Must Be Signed By Officer Of Your Company
No Facsimile Or Electronic Offers
Send or deliver to: (follow instructions in Section 00 21 00 for base access)

Proposal Evaluation

Process Is Detailed In RFP Section 00 22 16
Carefully Review Section 00 22 16 When Preparing Proposal
Comply With Section 00 21 00 And 00 21 16 Requirements
Failure To Furnish A Complete Proposal May Result In Elimination From Consideration

Proposal Evaluation

The award will be made based on the best overall (i.e. best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration give the to the three (3) evaluation factors: Technical, Past Performance and Price.
The firm that represents that represents the Best Value to the Government will be selected for an award IAW FAR 15.1 Source Selection Processes and Techniques

Important Reminders Submit a Complete Proposal In Accordance With Instructions – Use Formats Provided Award Without Discussions Is Intended, You May Not Have An Opportunity To Correct Or Revise Proposal 52.219-14 Limitations on Subcontracting Apply- Small Business must perform 25% of cost of contract, not including the cost of materials with it’s own employees

Important Reminders When Using A Subcontractor To Obtain/Enhance Relevancy Provide Subcontractor Consent Form, Exhibit B, Or The Information Will Not Be Considered

How Questions Will Be Handled

Questions Must Be Submitted in the format shown in Exhibit F Via Email To: 175.wg.msc@us.af.mil
Submit Questions NLT COB 5 Business days prior to close
Questions Received After May Be Held And Addressed After RFP Closing With Those Offerors Determined To Be In The Competitive Range If Discussions Are Deemed Necessary
Do Not Call Technical Personnel Or A&E- This Will Delay Getting An Answer

Answers To Questions All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The Web Site

https://www.sam.gov/
If Necessary Addendums, Issued By An Amendment, Will Also Be Posted
Check Web Site Regularly And Don’t Forget To Refresh Web Page

Websites www.sam.gov (to download RFP, plans and specs)

Questions