B764_RFI19_Concrete Pavement Detail.pdf
PDF 142 KB Posted
- Solicitation number
- W50S7W-23-B-0001
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1_OF1419A_Abstract-Construction_23-B-0001_WR ADAL.pdf | ||
| 1_OF1419_Abstract-Construction_23-B-0001_WR ADAL.pdf | ||
| ATQZ139764 ADAL Weapons Release Bldg 764 RFI Tracker_20230807.xlsx | XLSX spreadsheet | |
| 740_3_Ton_Crane_1989.pdf | ||
| 740_As-Built_1989-90.pdf | ||
| ATQZ139764 ADAL Weapons Release Bldg 764 RFI Tracker_INANG.xlsx | XLSX spreadsheet | |
| 1_IFB Amend_W50S7W-23-B-0001-0002_B764_WR ADAL.pdf | ||
| 1-Ton Crane_2.jpg | JPG image | |
| 1-Ton Crane_3.jpg | JPG image | |
| 3-Ton Crane_4.jpg | JPG image | |
| 3-Ton Crane_7.jpg | JPG image | |
| 3-Ton Crane_3.jpg | JPG image | |
| 3-Ton Crane_5.jpg | JPG image | |
| 1-Ton Crane_1.jpg | JPG image | |
| 3-Ton Crane_1.jpg | JPG image | |
| 3-Ton Crane_6.jpg | JPG image | |
| 3-Ton Crane_8.jpg | JPG image | |
| 1_IFB Amend_W50S7W-23-B-0001-0001_B764_WR ADAL.pdf | ||
| 3-Ton Crane_2.jpg | JPG image | |
| PreBid Conf Min_Sign In_B764_Weapons Release.pdf | ||
| 1_Sealed Bid Checklist for Bidders_23-B-0001_WR ADAL.pdf | ||
| 1_IFB (FINAL)_W50S7W-23-B-0001_B764_Weapons Release Add-Alter.pdf | ||
| Background Release Worksheet 2.2.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NTSB2 CONCRETE PAVEMENT
6" OF 4,000 PSI CONCRETE
4" AGGREGATE BASE COURSE
PREPARED SUBGRADENOTE: PROVIDE 1" Ø SMOOTH DOWEL, 18" LONG
AT 12" O.C. WHERE NEW CONCRETE PAVEMENT
ABUTS EXISTING CONCRETE PAVEMENT