1_Sealed Bid Checklist for Bidders_23-B-0001_WR ADAL.pdf
PDF 148 KB Posted
- Solicitation number
- W50S7W-23-B-0001
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1_OF1419_Abstract-Construction_23-B-0001_WR ADAL.pdf | ||
| 1_OF1419A_Abstract-Construction_23-B-0001_WR ADAL.pdf | ||
| B764_RFI19_Concrete Pavement Detail.pdf | ||
| 740_3_Ton_Crane_1989.pdf | ||
| 740_As-Built_1989-90.pdf | ||
| ATQZ139764 ADAL Weapons Release Bldg 764 RFI Tracker_20230807.xlsx | XLSX spreadsheet | |
| ATQZ139764 ADAL Weapons Release Bldg 764 RFI Tracker_INANG.xlsx | XLSX spreadsheet | |
| 1_IFB Amend_W50S7W-23-B-0001-0002_B764_WR ADAL.pdf | ||
| 1-Ton Crane_1.jpg | JPG image | |
| 3-Ton Crane_3.jpg | JPG image | |
| 3-Ton Crane_2.jpg | JPG image | |
| 3-Ton Crane_4.jpg | JPG image | |
| 1-Ton Crane_3.jpg | JPG image | |
| 3-Ton Crane_7.jpg | JPG image | |
| 1-Ton Crane_2.jpg | JPG image | |
| 3-Ton Crane_5.jpg | JPG image | |
| 3-Ton Crane_6.jpg | JPG image | |
| 3-Ton Crane_1.jpg | JPG image | |
| 1_IFB Amend_W50S7W-23-B-0001-0001_B764_WR ADAL.pdf | ||
| 3-Ton Crane_8.jpg | JPG image | |
| PreBid Conf Min_Sign In_B764_Weapons Release.pdf | ||
| 1_IFB (FINAL)_W50S7W-23-B-0001_B764_Weapons Release Add-Alter.pdf | ||
| Background Release Worksheet 2.2.pdf |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The following list should be used by bidders to avoid irregularities which have occurred in past bids.
1. Have amendments to the invitation been acknowledged on the< bid form in the spaces provided? If not, acknowledgment must be made by separate letter or telegram prior to opening of bids.
2. Have prices been inserted for all bid items of the Bidding Schedule?
3. Do prices inserted include subcontractors' and suppliers' quotations, indirect costs, and profit?
4. Does the total bid amount include the costs of obtaining performance and payment bonds?
5. Have all prices and computations been checked?
6. Is the bid submitted on the latest bid schedule?
7. Have changes been made to the Bidding Schedule if required by amendment?
8. Are decimal points in the bid prices in the proper places?
9. Have you checked for transposition of figures in prices inserted on the Bidding Schedule?
10. Is the bid form signed, and if so, is the bid form signed by a person legally authorized to bind the bidder? Is the bidder's address included?
11. If the bid is signed by an agent, is legal evidence of agent's authority to sign included with the bid?
12. Is the Bid Bond on STANDARD FORM 24 (rev. 1-90) or authorized form as directed in the BID GUARANTEE clause of this solicitation? If not, YOUR BID WILL BE CONSIDERED NONRESPONSIVE.
13. Is the Bid Bond completely and properly executed, dated not later than the bid opening date, signed by Principal and Surety, corporate certificates executed, and seals affixed, all as contained in "Instructions" on STANDARD FORM 24 BACK (REV 1-90)? Power of Attorney is also required to accompany the bonds. Is the penal sum marked in? If an individual surety (or sureties) is (are) guaranteeing the bid bond, have the requirements of the PLEDGES OF ASSETS clause of this solicitation been satisfied and are the supporting documents included with the bond?
14. Has the Plant and Equipment Schedule been completed and included?
15. When applicable, has the form entitled, "Work to be Performed with Contractor's Own Organization" been completed? Does the work or percentage listed meet the requirements of the invitation?
16. Have the appropriate boxes been checked in all paragraphs of the REPRESENTATIONS AND
CERTIFICATIONS?
Page 1 of 2Federal Contracting Database: Bidder's Checklist - Construction/Dredging - Cohen Seglia...
5/31/2016http://www.cohenseglias.com/federal-contracting-database/bidders-checklist-constructiond...
17. Has the certification contained in the provision REQUIREMENT FOR CERTIFICATE OF PROCUREMENT INTEGRITY been completed and signed? If not, and your bid is in excess of $100,000, your bid will be
NONRESPONSIVE.
18. Have all representations and certifications been submitted with the bid?
19. If required by the invitation, is literature, date, catalogs, etc., specified by the invitation included with the bid?
20. Have requirements of the LATE SUBMISSIONS, MODIFICATIONS AND WITHDRAWALS OF BIDS provision of this solicitation been met?
CAUTION: BIDS WHICH ARE QUALIFIED BY THE BIDDER MAY BE CONSIDERED NONRESPONSIVE.
(End of paragraph number 52.214-4018)
Page 2 of 2Federal Contracting Database: Bidder's Checklist - Construction/Dredging - Cohen Seglia...
5/31/2016http://www.cohenseglias.com/federal-contracting-database/bidders-checklist-constructiond...
File details come from the government source that posted it. Updated .