1_Sealed Bid Checklist for Bidders_23-B-0001_WR ADAL.pdf

PDF 148 KB Posted

Attached to
122FW - Fort Wayne, IN - Bldg 764 Addition/Alteration
Solicitation number
W50S7W-23-B-0001
Issued by

View the file

Other files

File Type Posted
1_OF1419_Abstract-Construction_23-B-0001_WR ADAL.pdf PDF
1_OF1419A_Abstract-Construction_23-B-0001_WR ADAL.pdf PDF
B764_RFI19_Concrete Pavement Detail.pdf PDF
740_3_Ton_Crane_1989.pdf PDF
740_As-Built_1989-90.pdf PDF
ATQZ139764 ADAL Weapons Release Bldg 764 RFI Tracker_20230807.xlsx XLSX spreadsheet
ATQZ139764 ADAL Weapons Release Bldg 764 RFI Tracker_INANG.xlsx XLSX spreadsheet
1_IFB Amend_W50S7W-23-B-0001-0002_B764_WR ADAL.pdf PDF
1-Ton Crane_1.jpg JPG image
3-Ton Crane_3.jpg JPG image
3-Ton Crane_2.jpg JPG image
3-Ton Crane_4.jpg JPG image
1-Ton Crane_3.jpg JPG image
3-Ton Crane_7.jpg JPG image
1-Ton Crane_2.jpg JPG image
3-Ton Crane_5.jpg JPG image
3-Ton Crane_6.jpg JPG image
3-Ton Crane_1.jpg JPG image
1_IFB Amend_W50S7W-23-B-0001-0001_B764_WR ADAL.pdf PDF
3-Ton Crane_8.jpg JPG image
PreBid Conf Min_Sign In_B764_Weapons Release.pdf PDF
1_IFB (FINAL)_W50S7W-23-B-0001_B764_Weapons Release Add-Alter.pdf PDF
Background Release Worksheet 2.2.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The following list should be used by bidders to avoid irregularities which have occurred in past bids.

1. Have amendments to the invitation been acknowledged on the< bid form in the spaces provided? If not, acknowledgment must be made by separate letter or telegram prior to opening of bids.

2. Have prices been inserted for all bid items of the Bidding Schedule?

3. Do prices inserted include subcontractors' and suppliers' quotations, indirect costs, and profit?

4. Does the total bid amount include the costs of obtaining performance and payment bonds?

5. Have all prices and computations been checked?

6. Is the bid submitted on the latest bid schedule?

7. Have changes been made to the Bidding Schedule if required by amendment?

8. Are decimal points in the bid prices in the proper places?

9. Have you checked for transposition of figures in prices inserted on the Bidding Schedule?

10. Is the bid form signed, and if so, is the bid form signed by a person legally authorized to bind the bidder? Is the bidder's address included?

11. If the bid is signed by an agent, is legal evidence of agent's authority to sign included with the bid?

12. Is the Bid Bond on STANDARD FORM 24 (rev. 1-90) or authorized form as directed in the BID GUARANTEE clause of this solicitation? If not, YOUR BID WILL BE CONSIDERED NONRESPONSIVE.

13. Is the Bid Bond completely and properly executed, dated not later than the bid opening date, signed by Principal and Surety, corporate certificates executed, and seals affixed, all as contained in "Instructions" on STANDARD FORM 24 BACK (REV 1-90)? Power of Attorney is also required to accompany the bonds. Is the penal sum marked in? If an individual surety (or sureties) is (are) guaranteeing the bid bond, have the requirements of the PLEDGES OF ASSETS clause of this solicitation been satisfied and are the supporting documents included with the bond?

14. Has the Plant and Equipment Schedule been completed and included?

15. When applicable, has the form entitled, "Work to be Performed with Contractor's Own Organization" been completed? Does the work or percentage listed meet the requirements of the invitation?

16. Have the appropriate boxes been checked in all paragraphs of the REPRESENTATIONS AND

CERTIFICATIONS?

Page 1 of 2Federal Contracting Database: Bidder's Checklist - Construction/Dredging - Cohen Seglia...

5/31/2016http://www.cohenseglias.com/federal-contracting-database/bidders-checklist-constructiond...

17. Has the certification contained in the provision REQUIREMENT FOR CERTIFICATE OF PROCUREMENT INTEGRITY been completed and signed? If not, and your bid is in excess of $100,000, your bid will be

NONRESPONSIVE.

18. Have all representations and certifications been submitted with the bid?

19. If required by the invitation, is literature, date, catalogs, etc., specified by the invitation included with the bid?

20. Have requirements of the LATE SUBMISSIONS, MODIFICATIONS AND WITHDRAWALS OF BIDS provision of this solicitation been met?

CAUTION: BIDS WHICH ARE QUALIFIED BY THE BIDDER MAY BE CONSIDERED NONRESPONSIVE.

(End of paragraph number 52.214-4018)

Page 2 of 2Federal Contracting Database: Bidder's Checklist - Construction/Dredging - Cohen Seglia...

5/31/2016http://www.cohenseglias.com/federal-contracting-database/bidders-checklist-constructiond...